Bernard Barani European Commission Deputy Head of Unit, Network Technologies European Support to 5G...
Transcript of Bernard Barani European Commission Deputy Head of Unit, Network Technologies European Support to 5G...
Bernard BaraniEuropean Commission
Deputy Head of Unit, Network Technologies
European Support to 5G
WWRF 5G WorkshopEUCNC Conference, Paris
29 June 2015
EC Framing Initiative: 5G PPP
Industry ( Association members)Adva Optical NetworkingAlcatel-LucentAstrium SatellitesAtosDeutsche TelekomDOCOMO Communications Laboratories Europe GmbHEricssonHuawei Technologies Düsseldorf GmbHIBM HaifaIntel mobiles NEC Europe Ltd., NEC Laboratories EuropeNokia Orange LabsPortugal TelecomSamsung ElectronicsSESTelecom ItaliaTelefónica I+DTelenor ASATelespazioThales Alenia SpaceTurk Telekomünikasyon A.Ş.
Research (Association members)• CEA-LETI• Centre Tecnologic de
Telecomunicacions de Catalunya (CTTC)
• Consorzio Nazionale Interuniversitario per le Telecomunicazioni (CNIT)
• Fundacion IMDEA Networks• Instituto de Telecomunicacoes• TNO• Uni Lisbon• University of Bologna – DEI
SMEs (Association members)• Integrasys SA• INTERINNOV• M.B.I. S.R.L.• Nextworks s.r.l.• Quobis• Sequans Communications
5G-PPP.eu
VISION: 5G Key Business Drivers
• 5G targets a unified and programmable infrastructure
• 5G will support multi tenancy models• 5G will be designed to be a sustainable and
scalable technology• 5G will create an ecosystem for technical and
business innovation• 5G infrastructures will involve vertical markets
New business models will be created thanks to open interfaces (APIs for resources, connectivity and services enablers).
4
• 5G wireless will support a heterogeneous set of integrated air interfaces– from evolutions of current access schemes– to brand new technologies
• Seamless handover between heterogeneous access technologies• Simultaneous radio access technologies to increase reliability and availability• Deployment of ultra-dense networks with numerous small cells requires new
interference mitigation, backhauling and installation techniques• 5G networks will encompass cellular, satellite and optical solutions• 5G will be driven by software and will heavily rely on emerging technologies
– Software Defined Networking (SDN)– Network Functions Virtualization (NFV)– Mobile Edge Computing (MEC)– Fog Computing (FC)
to achieve required performance, scalability and agility• Easier and optimised network management by means of exploitation of Data
Analytics and Big Data techniques– to monitor users Quality of Experience– while guaranteeing privacy
5G Key Tech components
5
5G-XhaulOptical/Wless integrated back/fronthaul & SDN control
Flex5Gware hardware/software platforms, low energy
CHARISMAWireless end to end security and cloud control (phy)
5G-NORMA 5G Mobile Net architecture, API for OTT innovation
COGNET Scalable & Cognitive Net Management Platform XHAUL
integrated backhaul fronthaul, multi service and multitenancy
COHERENT
Unified programmable control framework for mobnet resources
SELFNET Autonomic network management framework
METIS II Overall RAN Design and resource control SESAME Cloud enabled small cell
management.
FANTASTIC 5G
Multi Service unifier air interface below 6GHz SPEED-5G
densification, balanced traffic allocation over heterogeneous wireless technologies,
mmMAGIC RAT-mmWave SUPERFLUIDITY
Converged cloud-based architecture, virtualization of radio and network processing tasks
ICT 14 Projects R&I
6
SONATA Service patterns and description techniques for composed services, customised SDK
5G EXcollaboration between operators,with a unification via NFV/SDN compatible multi-domain orchestration.
VIRTUWINDSDN & NFV ecosystem, applied to industrial networks
Others:- EURO 5G, Coordination
- 5G ENSURE, RIA, to come, (security)
- Other relevant projects which may want to join!
ICT 14 Projects Innovation
5G Joint Declarations signed with:• South Korea• JapanMirrored by MoU at 5G I-A level with• 5G Forum• 5G MFTo come• ChinaOther• MoU US 4G america; FCC discussions
International Cooperation
Moving Forward
• Collaboration across projects
• Preparing for International milestones
• Beyond R&D
• Next Work programme.
• Implementation of the 5G PPP Program notion "Special Interest Working Groups" (SIWG)– By opposition to a loose set of independent projects
– Access to collaboration agreement
• Joint understanding towards progress on PPP KPI's
• Efficient addressing of cross issues and issues of common interest
• Support to preparation of next Phases and Gaps id;
• Research views on important policy / non R&D milestones (std, spectrum..)
• Support to 5G PPP overall evaluation
5G PPP Projects Collaboration
Current Association Working Groups and Joint Activities structure: WG 5G Vision and Societal Challenges
•Facilitator: Jean-Sebastian Bedo
WG 5G Pre-standards•Facilitator: Henrik Abramowicz
WG SME support•Facilitator: Jacques Magen
WG 5G Spectrum •Facilitator: Terje Tjelta
Joint Activity: Community building and Public RelationsFacilitator: Jacques Magen
Joint Activity: 5G International cooperation•Facilitator: Werner Mohr
Joint Activity: 5G-PPP KPI monitoring and management•Facilitator: Ingrid van der Voorde
OTHER Working Groups proposed: Architectures, SDN/NFV/Net Mgt
Working Groups
Standardisation
IMT-2020 specifications
Evaluation
5D#23Feb 16
5D#26Feb 17
5D#27Jun 17
Requirements
Evaluation criteria
Initial submissions of proposals
5D#28Oct 17
5D#32Jun 19
5D#31Oct 18
5D#34Feb 20
5D#36Oct 20
RAN#70Dec 15
channel modeling
RAN#69Sep 15
RAN#72Jun 16
RAN#86Jun 20
RAN SI: scope & requirements
HSPA/LTE evolution
IMT
2020
RAN WG SI: evaluation of solutions RAN WG WI: specification of solutions
Fina
l 3GP
P su
bmiss
ion
Initi
al 3
GPP
subm
issio
n
IMT 2020
requirements
RAN#71 Mar 16
Rel-13 freeze
RAN Workshop
3GP
P re
quire
men
ts
SA system work
RAN-SA Workshop
SA1 SMARTER SI SA1 SMARTER WI
Typical Timeline (3G PPP)
Spectrum – WRC issues
EC Council decision + ECP's: Sept 2015- Spectrum below 6 GHz- Spectrum ranges above 6 GHz for future IMT systems
Additional ranges to current EU harmonised spectrumSpectrum needs / targets ?Global mobile allocations Synergy through shared use of access and backhaul spectrum
(mobile and fixed service co-allocation) Streamline work towards WRC-19
MS Positions under developments, e.g. OFCOM consultation Report
5G To serve Heterogeneous Verticals
• Workshop on 18 June 2015• Follow up events at EUCNC• White Papers end of September• Preparation of next WP• Possible event MWC 2016• Identification of key requirements
Verticals
WP 2016-17, 5G PPP Support lines(NB: subject to final agreement with Member States)
- 150 M€ for 5G R&I and Innovation projects- More focus on proof of concepts, experiments- Close links to standards/spectrum expected- Other actions
- EU-Japan joint call, radio acces and vitualisation- EU-Korea joint call, interop framework- EU-TW targeted opening, access testbeds- Companion socio economic study
- Submission November 2016; EU-J, EU-K Jan. 2016
Funded actions
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
R12 R13 R14
R14 (start SI)
R15
R15
R16
R16?
4G in 3GPP
5G in 3GPP
5G PPP j1
WRC’15 WRC’19
VisionITU Requirements / Method Proposals
5G PPP j2 5G PPP j35G PPP Set-upEC5G PPP
ONF, Open Daylight, OPNFV, Open Stack…SDN/NFV
EC FP7 Pre-5G METIS, 5GNOW…ECFP7j1: Specificationj2: Developmentj3: Experimentation
Winter Olympics in South Korea
FIFA World Cup in RussiaSummer Olympics in Japan
5G Deployment and CommercializationTrialsRadio ExperimentsMobile
Networks
Wkp
IMT-2020 Specifications
Evaluation
Note: Other Regions events under elaboration
5G (EU) Timeline
Key framing milestones
• 5G PPP is the umbrella for European 5G leadership
• "Research in motion", good basis to move forward
• Next challenges: successfully contributing to the main international milestones.
• 5G industrial association is a key asset realise that.
Conclusion