  • Batemans Bay Bridge replacement Traffic and Transport Assessment NSW Roads and Maritime Services Reference: 256009

    Revision: 4

    23 October 2017

  • Proposal number 256009 File BBBCD-ENM-RPT-Traffic and Transport_FINAL.doc, 23 October 2017 Revision 4 2

    Document control record Document prepared by:

    Aurecon Australasia Pty Ltd ABN 54 005 139 873 Aurecon Centre Level 8, 850 Collins Street Docklands, Melbourne VIC 3008 PO Box 23061 Docklands VIC 8012 Australia T F E W

    +61 3 9975 3000 +61 3 9975 3444 melbourne@aurecongroup.com aurecongroup.com

    A person using Aurecon documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy

    version. b) Using the documents or data for any purpose not agreed to in writing by Aurecon.

    Document control

    Report title Traffic and Transport Assessment

    Document ID Proposal number 256009

    File path

    Client NSW Roads and Maritime Services

    Client contact Client reference

    Rev Date Revision details/status Author Reviewer Verifier (if required)

    Approver

    0 11 September 2017 Draft GA/AJ JB LC

    1 22 September 2017 Updated with RMS comments GA/AJ JB LC

    2 3 October 2017 Additional RMS Comments GA / AJ JB LC

    3 23 October 2017 Final GA / AJ JB LC

    Current revision 4

    Approval

    Name Gillian Austin Name Lucia Coletta

    Title Senior traffic planner Title Environmental Manager

  • Contents Glossary and acronyms ................................................................................................................................... 1

    Executive summary .......................................................................................................................................... 2 Overview ........................................................................................................................................................ 2 Strategic content ............................................................................................................................................ 2 Existing road network operation .................................................................................................................... 2 Do minimum option........................................................................................................................................ 3 Traffic benefits of the proposal ...................................................................................................................... 3 Maritime benefits ........................................................................................................................................... 3

    1 Introduction .................................................................................................................................................. 5 1.1 Proposal identification ............................................................................................................................ 5

    1.1.1 Proposal location and setting ...................................................................................................... 5 1.1.2 Key features of the proposal ....................................................................................................... 5 1.1.3 Proposal background .................................................................................................................. 6

    1.2 Purpose of the report ............................................................................................................................. 9 1.2.1 Secretary’s Environmental Assessment Requirements .............................................................. 9

    1.3 Structure of the report ............................................................................................................................ 9

    2 Study methodology ................................................................................................................................... 10 2.1 Relevant guidelines ............................................................................................................................. 10 2.2 Study area............................................................................................................................................ 10 2.3 Study approach .................................................................................................................................... 12

    3 Existing environment ................................................................................................................................ 14 3.1 Road network ....................................................................................................................................... 14 3.2 Road hierarchy and descriptions ......................................................................................................... 14

    3.2.1 Arterial roads ............................................................................................................................. 14 3.2.2 Local roads ................................................................................................................................ 15 3.2.3 Intersections .............................................................................................................................. 16

    3.3 Speed limits ......................................................................................................................................... 16 3.4 Heavy vehicle network ......................................................................................................................... 17 3.5 Traffic data ........................................................................................................................................... 21

    3.5.1 Current traffic volumes .............................................................................................................. 21 3.5.2 Traffic growth and trends ........................................................................................................... 21

    3.6 Crash data ........................................................................................................................................... 24 3.7 Transport mode share ......................................................................................................................... 25 3.8 Public transport .................................................................................................................................... 26

    3.8.1 Bus routes ................................................................................................................................. 26 3.9 Cycling and pedestrian network .......................................................................................................... 27 3.10 Clyde River maritime environment ...................................................................................................... 27

    3.10.1 General description ................................................................................................................... 27 3.10.2 Boat usage ................................................................................................................................ 30 3.10.3 Existing bridge lift span raises ................................................................................................... 30

    3.11 Existing land uses ................................................................................................................................ 31

    4 Existing road network performance ........................................................................................................ 33 4.1 Traffic data sources ............................................................................................................................. 33 4.2 Traffic volumes .................................................................................................................................... 33

  • 4.3 Existing road network performance ..................................................................................................... 34 4.3.1 Capacity of the existing bridge .................................................................................................. 34 4.3.2 Bridge delays and queuing ........................................................................................................ 35 4.3.3 Capacity of intersections ........................................................................................................... 35

    5 The proposal .............................................................................................................................................. 37 5.1 Changes in traffic movements ............................................................................................................. 37

    5.1.1 Clyde Street and Wharf Road changes ..................................................................................... 38 5.1.2 Traffic growth ............................................................................................................................. 38

    5.2 Future traffic movements ..................................................................................................................... 38 5.2.1 2021 volumes ......................................