Apps for GOIN99 Data exchange Team collaboration Distributed Image Spread Sheet IPRC apps Disaster...

5
Apps for GOIN’99 Apps for GOIN’99 Data exchange Team collaboration Distributed Image Spread Sheet IPRC apps Disaster Telecture Live to JP, KR and TH(AIT) Apan manager will be invited to GOIN‘9 9.

Transcript of Apps for GOIN99 Data exchange Team collaboration Distributed Image Spread Sheet IPRC apps Disaster...

Page 1: Apps for GOIN99 Data exchange Team collaboration Distributed Image Spread Sheet IPRC apps Disaster Telecture Live to JP, KR and TH(AIT) Apan manager will.

Apps for GOIN’99Apps for GOIN’99

Data exchangeTeam collaborationDistributed Image Spread Sheet IPRC appsDisasterTelectureLive to JP, KR and TH(AIT)Apan manager will be invited to GOIN‘99.

Page 2: Apps for GOIN99 Data exchange Team collaboration Distributed Image Spread Sheet IPRC apps Disaster Telecture Live to JP, KR and TH(AIT) Apan manager will.

Conatact PersonsConatact Persons

Network providers– [email protected][email protected][email protected]

Project description– [email protected]

Site performance mesurements– [email protected]

Page 3: Apps for GOIN99 Data exchange Team collaboration Distributed Image Spread Sheet IPRC apps Disaster Telecture Live to JP, KR and TH(AIT) Apan manager will.

GOIN 99 networkGOIN 99 network

TW

SREN

AIT(TH)

KAIST(KR)

JapanAPAN/IMnet

TransPAC

STARTAP

CA*net2/CCRS

vBNS

NREN, ARC

DREN

EDC

GSFC

HIC(Hawaii)GOIN’99

Page 4: Apps for GOIN99 Data exchange Team collaboration Distributed Image Spread Sheet IPRC apps Disaster Telecture Live to JP, KR and TH(AIT) Apan manager will.

Mile StonesMile Stones

Apps definition - 2 Oct. 98Project description submitted - 9 Oct. 98APAN-NREN peering - 15 Oct. 98 Initial engineering config - 15 Nov. 98Baseline performance test - 15 Dec. 98

Page 5: Apps for GOIN99 Data exchange Team collaboration Distributed Image Spread Sheet IPRC apps Disaster Telecture Live to JP, KR and TH(AIT) Apan manager will.

Mile Stones(cont’d)Mile Stones(cont’d)

NSADA-IMnet 80Mbps - 31 Jan. 99Apps testing - 15 Feb. 99Readiness test - 1 Mar. 99CEOS Network SubWorkingGroup – 8-12 Mar. 99 @Osaka

GOIN 99 - 23-24 Mar. 99