Southern Nuclear Operating Company
ND-13-0523, LAR-13-011
Enclosure 6
APP-OCS-GEH-222, "AP1000 Human Factors Engineering
Task Support Verification Plan," Revision 0 (Non-Proprietary)
Note: The following enclosure is a thirty-eight (38) page stand alone document.
![Page 2: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/2.jpg)
Attachment 5SVPSV0_001782
OWestinghouseWestinghouse Non-Proprietary Class 3
AP1000
Human Factors Engineering Task SupportVerification Plan
APP-OCS-GEH-222,Rev. 0
March 2013
APPROVALS
Function Name and Signature
Author Julie I. Reed*Fellow Engineer, Human Factors & Operations
Reviewer Daniel A. Zinzow*Senior Engineer, Human Factors & Operations
William N. Locke*Project Manager, Human Factors Engineering
Approver Craig D. Watson*Manager, Human Factors & Operations
*Electronically approved records are authenticated in the electronic document management system.
WESTINGHOUSE NON-PROPRIETARY CLASS 3
© 2013 Westinghouse Electric Company LLCAll Rights Reserved
![Page 3: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/3.jpg)
Attachment 5SVPSVO_001782
AP1000 Human Factors Engineering Task Support Verification Plan
LIST OF CONTRIBUTORS
Revision Name and TitleA Julie I. Reed
Principal Engineer, Human Factors & Operations
A Sarah J. BarczykManager, Technical Communications
B Brandon P. FloderEngineering Technician, Control Room Design
0 Jenna L. TygerTechnical Communications, Technical Editor
0 Steven P. KerchTechnical Adviser, Operator Interface Engineering
0 Zhonghai LiSenior Engineer, Human Factors & Operations
Template Version 2.3
APP-OCS-GEH-222, Rev. 0 i
![Page 4: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/4.jpg)
Attachment 5SVPSVO_001782
API000 Human Factors Engineering Task Support Verification Plan
REVISION HISTORY
RECORD OF CHANGES
Revision Author Description Completed
A Todd W. Van Meter Preliminary Issue 6/2008
B Todd W. Van Meter Revision was created to prepare the document with 4/2009proprietary markings for transmittal.
0 Julie I. Reed Incorporation ofAPP-GW-GEE-4051, Rev. 0. See EDMSNumerous updates to the References and Bibliographyin accordance with latest documents and revisions.
Minor editorial clarifications throughout thedocument.
Subsection 1.1.2, "Process Strategy":Added description of the mechanism to deal withdesign and procedure changes post-task supportverification, and added reference to APP-GW-GOY-002, "AP 1000 Configuration Management Plan" andWNA-PC-00005-WAPP, "AP1000 I&C ProjectsConfiguration Managemnt Plan".
Subsection 1.2.1, "Applicability": Replaced "completeset of' with "full range of activities in the" to make acorrection on the scope of OSA in terms of coveredEOPs.
Section 1.4, "List of Exceptions from WCAP-15860":
A new section is added.
Section 2.1, "Background": Clarified descriptions ofOSA-1 and OSA-2 scope and methodologies.
Section 2.2, "Verification Plan For Function-BasedTask Analysis": Deleted detailed information indescription about APP-OCS-J1A-030. Deleteddiscrepancy worksheet and added information on theHF Tracking System into which discrepancy will beentered. This change is implemented across thedocument in all other relevant places.
Subsection 2.3.1, "Prerequisite": Changed "programwide database (PWD)" to "AP1000 design" andincluded designinformation as an input to thedevelopment of OSA- 1.Subsection 2.4.1, "Prerequisite": Added reference toAPP-OCS-GLR-001, "AP 1000 Post-AccidentRisk-Important Human Actions Summary Report."
APP-OCS-GEH-222, Rev. 0 ii
![Page 5: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/5.jpg)
Attachment 5SVPSV0_001782
Human Factors Engineering Task Support Verification PlanAP1000
REVISION HISTORY (cont.)
RECORD OF CHANGES (cont.)
Revision I Author Description Completed
0 (cont.) Julie I. Reed Section 2.6, "Verification Plan for EmergencyOperations Facility and Technical Support Center TaskFunctions": Added reference to APP-OCS-JOA-001,"AP 1000 Human Factors Engineering Analysis toSupport Technical Support Center and EmergencyOperations Facility Design."
Section 3.1, "Verification Plan for Minimum InventoryEquipment": Clarified that the commiments to be metare those specified in the AP1000 DCD for minimuminventory equipment.
Subsection 4.2.1, "AP 1000 Implementation": Changedto reflect revision 0 of the OCS System Specificationdocument and to include a reference to APP-OCS-J1-024, "AP1000 Operation and Control CentersPresentation of Safety Functions Design Basis".
Subsection 4.4.2, "Verification Plan": Added theautomatic depressurization system operation controls tothe verification plan.
Section 4.5, "10 CFR 50.34(f)(2)(viii) - Post-AccidentSampling": Deleted statement about contingency plansand post-accident access areas.
Section 4.11, "10 CFR 50.34(f)(2)(xix) - Post-AccidentMonitoring Instrumentation": Deleted sentence "Thenormal control room display system is used for thedisplay of non-safety-related signals which are notrequired to be displayed by a qualified system".
Subsection 4.13.1, "AP 1000 Implementation": Clarifiedthat it is the MCR emergency habitability system thatfunctions to protect the operators and support the MCRequipment and HSI resources. The last paragraph wasmoved to be the first paragraph in this section.
Section 5. 1, "Resource Assignment": Changed 'OCSProduct Manager' to 'HF Manager' (in multiplesections). Changed definition of 'independent verifier'and included reference to NSNP 3.3.3, "DesignVerification by Independent Review or AlternateCalculations."
Section 5.2, "Personnel Requirements andTechiniques": Changed "HSI reources" to "item".
See EDMS
APP-OCS-GEH-222, Rev. 0 iiiAPP-OCS-GEH-222, Rev. 0 iii
![Page 6: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/6.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAPIO00
REVISION HISTORY (cont.)
RECORD OF CHANGES (cont.)
Revision Author Description Completed
0 (cont.) Julie I. Reed Section 5.3, "Documenting and Resolving Human See EDMSEngineering Discrepancies": Deleted informationdescribing the process for defining HEDs, creatingjustifications for discrepancies, prioritization of HEDs,and the process to resolve HEDs. Deleted "priority 1and priority 2." Changed the description of task supportverification completion from approval of the HEDresolution report (APP-OCS-GER-420) to the approvalof the design verification results (APP-OCS-GER-220).
Section 5.4, "Human Factors Discrepancy FormRequirements": Added reference to WNA-WI-00207-WAPP, "Human Factors Tracking System WorkInstruction." Updated the details and the example ofdiscrepancy worksheet in Section 5.4 and Appendix Ato the current Task Support Verification form in the HFTracking System.
Section 5.5, "Deliverables": Clarifications are made onthe process for discrepancy resolution.
DOCUMENT TRACEABILITY & COMPLIANCE
Created to Support the Following Document(s) Document Number Revision
AP1000 Human Factors Engineering Program Plan APP-OCS-GBH-001 I
OPEN ITEMS
Item Description Status
None.
APP-OCS-GEH-222, Rev. 0 ivAPP-OCS-GEH-222, Rev. 0 iv
![Page 7: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/7.jpg)
Affachment 5SVP SVO 001782
AP1000 Human Factors Engineering Task Support Verification Plan
TABLE OF CONTENTS
Section Title Page
LIST OF CONTRIBUTORS ....................................................................................... i
REVISION HISTORY ................................................................................................ ii
TABLE OF CONTENTS ............................................................................................. v
LIST OF TABLES ....................................................................................................... viii
LIST OF FIGURES ..................................................................................................... viii
ACRONYM S AND TRADEM ARKS ......................................................................... ix
GLOSSARY OF TERM S ............................................................................................ x
REFERENCES ............................................................................................................ xi
BIBLIOGRAPHY ........................................................................................................ xii
SECTION I INTRODUCTION ....................................................................................................... 1-1
1.1 OVERVIEW ................................................................................................................ 1-1
1.1.1 Purpose ........................................................................................................................ 1-1
1.1.2 Process Strategy ........................................................................................................... 1-1
1.2 SCOPE ......................................................................................................................... 1-2
1.2.1 Applicability ................................................................................................................ 1-2
1.2.2 Function-Based Task Analysis and Operational Sequence Analyses (OSAs) ............. 1-3
1.2.3 M inimum Inventory Equipment .................................................................................. 1-3
1.2.4 10 CFR 50.34(f) Requirements .................................................................................... 1-4
1.2.5 Limitation of Scope ..................................................................................................... 1-4
1.3 OBJECTIVE ................................................................................................................ 1-4
1.4 LIST OF EXCEPTIONS FROM W CAP-15860 ......................................................... 1-4
SECTION 2 VERIFICATION PROCESSES FOR FBTA AND OPERATIONAL
SEQUENCE ANALYSIS ............................................................................................ 2-1
2.1 BACKGROUND .......................................................................................................... 2-1
2.2 VERIFICATION PLAN FOR FUNCTION-BASED TASK ANALYSIS .................. 2-1
2.3 VERIFICATION PLAN FOR OSA- I ......................................................................... 2-2
2.3.1 Prerequisite .................................................................................................................. 2-2
2.3.2 Verification Plan .......................................................................................................... 2-2
2.4 VERIFICATION PLAN FOR OSA-2 - RISK-INIPORTANT TASKS AND
TASKS THAT HAVE HUMAN PERFORMANCE CONCERNS ............................ 2-3
2.4.1 Prerequisite .................................................................................................................. 2-3
2.4.2 Verification Plan .......................................................................................................... 2-3
2.5 VERIFICATION PLAN FOR M TIS ACTIVITIES .................................................... 2-3
2.6 VERIFICATION PLAN FOR EMERGENCY OPERATIONS FACILITY
AND TECHNICAL SUPPORT CENTER TASK FUNCTIONS ............................... 2-4
APP-OCS-GEH-222, Rev. 0 v
![Page 8: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/8.jpg)
Attachment 5SVP-SV0_001782
AP1000 Human Factors Engineering Task Support Verification Plan
TABLE OF CONTENTS (cont.)
Section Title Page
SECTION 3 VERIFICATION PROCESS FOR MINIMUM INVENTORY EQUIPMENT .......... 3-1
3.1 VERIFICATION PLAN FOR MINIMUM INVENTORY EQUIPMENT ................. 3-1
SECTION 4 VERIFICATION PROCESSES FOR 10 CFR 50.34 REQUIREMENTS .............. 4-1
4.1 BA C K G R O U N D ......................................................................................................... 4-14.2 10 CFR 50.34(f)(2)(iv) - SAFETY PARAMETER DISPLAY SYSTEM .................. 4-14.2.1 A P 1000 Im plem entation .............................................................................................. 4-14.2.2 V erification Plan ................................................................................................... 4-14.3 10 CFR 50.34(f)(2)(v) - SAFETY SYSTEM STATUS INDICATION ................ 4-I4.3.1 A P 1000 Im plem entation .............................................................................................. 4-24.3.2 V erification Plan .......................................................................................................... 4-24.4 10 CFR 50.34(f)(2)(vi) - REACTOR COOLANT SYSTEM HIGH POINT
V E N T S ........................................................................................................................ 4-24.4.1 A P 1000 Im plem entation .............................................................................................. 4-24.4.2 V erification Plan .......................................................................................................... 4-34.5 10 CFR 50.34(f)(2)(viii) - POST-ACCIDENT SAMPLING ...................................... 4-34.5.1 A P 1000 Im plem entation .............................................................................................. 4-34.5.2 V erification Plan .......................................................................................................... 4-34.6 10 CFR 50.34(f)(2)(ix) - HYDROGEN CONTROL .................................................. 4-44.6.1 A P1000 Im plem entation .............................................................................................. 4-44.6.2 V erification Plan .......................................................................................................... 4-44.7 10 CFR 50.34(f)(2)(xi) -VALVE POSITION INDICATION ................................... 4-54.7.1 A P 1000 Im plem entation .............................................................................................. 4-54.7.2 V erification Plan .......................................................................................................... 4-54.8 10 CFR 50.34(f)(2)(xii)- AUXILIARY FEEDWATER SYSTEM
INITIATION AND INDICATION .............................................................................. 4-54.8.1 A P 1000 Im plem entation .............................................................................................. 4-54.8.2 V erification Plan .......................................................................................................... 4-64.9 10 CFR 50.34(f)(2)(xvii) - SPECIFIC ACCIDENT MONITORING
INSTRUMENTATION ............................................................................................... 4-64.9.1 A P1000 Im plem entation .............................................................................................. 4-64.9.2 V erification Plan .......................................................................................................... 4-74.10 10 CFR 50.34(f)(2)(xviii) - INADEQUATE CORE COOLING
INSTRUMENTATION ............................................................................................... 4-74.10.1 A P 1000 Im plem entation .............................................................................................. 4-74.10.2 V erification Plan .......................................................................................................... 4-84.11 10 CFR 50.34(f)(2)(xix) - POST-ACCIDENT MONITORING
INSTRUMENTATION ............................................................................................... 4-84.11.1 A P 1000 Im plem entation .............................................................................................. 4-84.11.2 V erification Plan .......................................................................................................... 4-9
APP-OCS-GEH-222, Rev. 0 Ai
![Page 9: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/9.jpg)
Attachment 5SVPSVO_001782
AP1000 Human Factors Engineering Task Support Verification Plan
TABLE OF CONTENTS (cont.)
Section Title Page
4.12 10 CFR 50.34(f)(2)(xxvii) - IN-PLANT MONITORING .......................................... 4-94.12.1 A P1000 Im plem entation .............................................................................................. 4-94.12.2 V erification Plan .......................................................................................................... 4-94.13 10 CFR 50.34(f)(2)(xxviii) - CONTROL ROOM HABITABILITY ......................... 4-94.13.1 A P 1000 Im plem entation .............................................................................................. 4-94.13.2 V erification Plan .......................................................................................................... 4-10
SECTION 5 METHODOLOGY AND MEASURES ...................................................................... 5-1
5.1 RESOURCE A SSIGNM EN T ...................................................................................... 5-15.2 PERSONNEL REQUIREMENTS AND TECHNIQUES ........................................... 5-15.3 DOCUMENTING AND RESOLVING HUMAN ENGINEERING
D ISC RE PA N C IE S ....................................................................................................... 5-15.4 HUMAN FACTORS DISCREPANCY FORM REQUIREMENTS ........................... 5-15.5 D ELIV ERA B L ES ........................................................................................................ 5-3
APPENDIX A HF TASK SUPPORT VERIFICATION DISCREPANCY FORM ....................... A-I
APP-OCS-GEH-222, Rev. 0 vii
![Page 10: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/10.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAP1000
TABLE OF CONTENTS (cont.)
LIST OF TABLES
Table
None.
Title Page
LIST OF FIGURES
Figure
None.
Title Page
APP-OCS-GEH-222, Rev. 0 viiiAPP-OCS-GEH-222, Rev. 0 viii
![Page 11: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/11.jpg)
Attachment 5SVPSV0_001782
AP1000 Human Factors Engineering Task Support Verification Plan
ACRONYMS AND TRADEMARKS
Acronyms used in the document are defined in WNA-PS-00016-GEN, "Standard Acronyms andDefinitions" (Reference 1), or included below to ensure unambiguous understanding of their use withinthis document.
Acronyms Definition
HED Human Engineering DiscrepancyHF Human Factors
AP 1000 is a trademark or registered trademark of Westinghouse Electric Company LLC, its affiliatesand/or its subsidiaries in the United States of America and may be registered in other countries throughoutthe world. All rights reserved. Unauthorized use is strictly prohibited. Other names may be trademarks oftheir respective owners.
All other product and corporate names used in this document may be trademarks or registered trademarksof other companies, and are used only for explanation and to the owners' benefit, without intent toinfringe.
APP-OCS-GEH-222, Rev. 0 ix
![Page 12: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/12.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAPI000
GLOSSARY OF TERMS
Standard terms used in the document are defined in WNA-PS-00016-GEN, "Standard Acronyms andDefinitions" (Reference 1), or included below to ensure unambiguous understanding of their use withinthis document.
Term Definition
Independent Verifier
Task Support Verification
Any competent individual(s) or group(s) other than those who performedthe original design work, but who may be from the same organization orgroup
An evaluation to confirm that the human-system interface (HSI)resources are available to accommodate human capabilities andlimitations as identified in the project's task analyses.
APP-OCS-GEH-222, Rev. 0 xAPP-OCS-GEH-222, Rev. 0 X
![Page 13: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/13.jpg)
Attachment 5SVPSVO_001782
AP1000 Human Factors Engineering Task Support Verification Plan
REFERENCES
Following is a list of references used throughout this document.
1. APP-GW-J9Y-001, Rev 0 (WNA-PS-00016-GEN, Rev. 5), "Standard Acronyms and Definitions,"Westinghouse Electric Company LLC. (Proprietary)
2. APP-OCS-GBH-001, Rev. 1, "API000 Human Factors Engineering Program Plan," WestinghouseElectric Company LLC. (Proprietary)
3. APP-OCS-GEH-020, Rev. 2 (WCAP-15860), "Programmatic Level Description of the AP1000Human Factors Verification and Validation Plan," Westinghouse Electric Company LLC.
4. NUREG-071 1, Rev. 2, "Human Factors Engineering Program Review Model," U.S. NuclearRegulatory Commission.
5. APP-GW-GOY-002, Rev. 3, "AP1000 Configuration Management Plan," Westinghouse ElectricCompany LLC. (Proprietary)
6. WNA-PC-00005-WAPP, Rev 2, "AP 1000 I&C Projects Configuration Management Plan,"Westinghouse Electric Company LLC. (Proprietary)
7. 10 CFR 50.34, "Contents of Construction Permit and Operating License Applications; TechnicalInformation," U.S. Nuclear Regulatory Commission.
8. Regulatory Guide 1.47, Rev 1, "Bypassed and Inoperable Status Indication for Nuclear Power PlantSafety Systems," U.S. Nuclear Regulatory Commission, February 2010.
9. NSNP 3.3.3, Rev. 4, "Design Verification by Independent Review or Alternate Calculations,"Westinghouse Electric Company LLC, effective March 21, 2011.
APP-OCS-GEII-222, Rev. 0 xiAPP-OCS-GEH-222, Rev. 0 xi
![Page 14: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/14.jpg)
Attachment 5SVPSVO_001782
AP1000 Human Factors Engineering Task Support Verification Plan
BIBLIOGRAPHY
Following is a list of sources that were considered in preparing this document, or that provide additionalinformation.
1. APP-OCS-GEH-120, Rev. B, "AP1000 Human Factors Engineering Design Verification Plan,"Westinghouse Electric Company LLC. (Proprietary)
2. APP-OCS-GEH-320, Rev. 2, "AP1000 HFE Integrated System Validation Plan," WestinghouseElectric Company LLC. (Proprietary)
3. APP-OCS-GEH-420, Rev. B, "API000 Human Engineering Discrepancy Resolution Process,"Westinghouse Electric Company LLC. (Proprietary)
4. APP-OCS-GEH-520, Rev. B, "Plant Startup Human Factors Engineering Verification Plan,"Westinghouse Electric Company LLC. (Proprietary).
5. APP-OCS-JIR-100, Rev. 0, "Function-Based Task Analysis Methodology and Implementation forAPIOO0," Westinghouse Electric Company LLC. (Proprietary)
6. APP-OCS-J1R-1 10, Rev. 1, "Operational Sequence Analysis Methodology," Westinghouse ElectricCompany LLC. (Proprietary)
7. APP-OCS-J 1 R-2 10, Rev. 1, "AP 1000 Operational Sequence Analysis (OSA-2) ImplementationPlan," Westinghouse Electric Company LLC. (Proprietary)
8. APP-GW-GL-700, Rev. 19, "AP 1000 Design Control Document," Westinghouse ElectricCompany LLC.
9. APP-OCS-J1A-030, Rev. 0, "Function-Based Task Analysis Summary Report," WestinghouseElectric Company LLC. (Proprietary)
10. APP-OCS-J1R-120, Rev. 2, "APIOOO Operational Sequence Analysis (OSA-1) Summary Report,"Westinghouse Electric Company LLC. (Proprietary)
11. APP-GW-GL-01 1, Rev. 0, "AP1000 Identification of Critical Human Action and Risk ImportantTasks," Westinghouse Electric Company LLC.
12. APP-OCS-GLR-001, Rev. 0, "AP1000 Post-Accident Risk-Important Human Actions SummaryReport," Westinghouse Electric Company LLC. (Proprietary)
13. APP-OCS-J1R-220, Rev. 0, "AP1000 Operational Sequence Analysis (OSA-2) Summary Report,"Westinghouse Electric Company LLC.
APP-OCS-GEII-222, Rev. 0 xiiAPP-OCS-GEH-222, Rev. 0 xii
![Page 15: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/15.jpg)
Attachment 5SVP-SVO001782
Human Factors Engineering Task Support Verification PlanAP1000
14.
15.
16.
17.
18.
19.
BIBLIOGRAPHY (cont.)
APP-OCS-JOA-001, Rev. A, "AP 1000 Human Factors Engineering Analysis to SupportTechnical Support Center and Emergency Operations Facility Design," Westinghouse ElectricCompany LLC. (Proprietary)
APP-OCS-J7-001, Rev. 0, "AP1000 Operations and Control Centers System System SpecificationDocument," Westinghouse Electric Company LLC. (Proprietary)
APP-OCS-J1-024, Rev. 0, "AP1000 Operation and Control Centers Presentation of SafetyFunctions Design Basis". (Proprietary)
Federal Register, Volume 65, Number 211, October 31, 2000.
NUREG-0737, "Clarification of TMI Action Plan Requirements," November 1980.
Regulatory Guide 1.97, Rev. 4, "Criteria for Accident Monitoring Instrumentation for NuclearPower Plants," June 2006, U.S. Nuclear Regulatory Commission.
(Last Page of Front Matter)
)CS-GEH-222, Rev. 0 xiiiAPP-(
![Page 16: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/16.jpg)
Attachment 5SVPSVO_001782
AP1000 Human Factors Engineering Task Support Verification Plan
SECTION 1INTRODUCTION
1.1 OVERVIEW
1.1.1 Purpose
This document defines the Human Factors Engineering (HFE) task support verification plan for theAPI 000® plant. It is an integral part of the APP-OCS-GBH-001, "AP 1000 Human Factors EngineeringProgram Plan" (Reference 2).
This document is based on the information and guidance described in APP-OCS-GBH-001,"AP1000 Human Factors Engineering Program Plan" (Reference 2); APP-OCS-GEH-020(WCAP-15860), "Programmatic Level Description of the AP1000 Human Factors Verification andValidation Plan" (Reference 3); and NUREG-0711, "Human Factors Engineering Program ReviewModel" (Reference 4).
1.1.2 Process Strategy
The HFE task support verification plan is one of several verification and validation (V&V) activitiesperformed on human-system interface (HSI) resources and Operation and Control Centers (OCS), whereapplicable. Formal V&V activities are an integral part of the overall HFE design process. These activitiesand associated documents include the following as defined in the AP1000 HFE Program Plan(Reference 2):
* APP-OCS-GEH-120, "AP 1000 Human Factors Engineering Design Verification Plan"(Bibliog 1)
* APP-OCS-GER-120, "AP 1000 Human Factors Engineering Design Verification Report"[LATER]
" APP-OCS-GER-220, "API000 Human Factors Engineering Task Support Verification Report"
[LATER]
* APP-OCS-GEH-320, "AP1000 Human Factors Engineering Integrated System Validation Plan"
(Bibliog 2)
* APP-OCS-GER-320, "AP1000 Human Factors Engineering Integrated System ValidationReport" [LATER]
* APP-OCS-GEH-420, "API000 Human Engineering Discrepancy Resolution Process" (Bibliog 3)
* APP-OCS-GER-420, "AP 1000 Human Engineering Discrepancy Resolution Report" [LATER]
APP-OCS-GEII-222, Rev. 0 1-1APP-OCS-GEH-222, Rev. 0 1-1
![Page 17: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/17.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAP1000
* APP-OCS-GEH-520, "Plant Startup Human Factors Engineering Design Verification Plan"(Bibliog 4)
* APP-OCS-GER-520, "Plant Startup Human Factors Engineering Design Verification Report"]LATER]
These V&V activities are a final check of the adequacy of the HFE design of the HSI resources andOperation and Control Centers System (OCS) design.
]a~c
1.2 SCOPE
1.2.1 Applicability
Per APP-OCS-GEH-020, "Programmatic Level Description of the AP 1000 Human Factors Verificationand Validation Plan" (Reference 3), the HSI task support verification plan includes the methodology bywhich the HSI resources, and Operation and Control Centers are checked against the information andcontrol requirements identified in:
" Function-based task analyses (FBTA)
* Operational sequence task analyses for important and representative tasks
* Operational sequence task analyses performed for risk-important personnel tasks as defined bythe Probabilistic Risk Assessment (PRA)
APP-OCS-GEII-222, Rev. 0 1-2APP-OCS-GEH-222, Rev. 0 1-2
![Page 18: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/18.jpg)
Attachment 5SVPSV0_001782
API000 Human Factors Engineering Task Support Verification Plan
* Operational sequence task analyses performed for the full range of activities in the emergencyoperating procedures (EOPs)
* Required minimum inventory of alarms, displays, and controls
* Required federally mandated 10 CFR 50.34 (Reference 7) indications and control features
1.2.2 Function-Based Task Analysis and Operational Sequence Analyses (OSAs)
As part of the AP1000 HFE Program Plan (Reference 2), three separate task analyses are performed:
* APP-OCS-JIR-100, "Function-Based Task Analysis Methodology and Implementation forAP1000" (Bibliog 5)
* APP-OCS-JIR-1 10, "Operational Sequence Analysis Methodology" (Bibliog 6)
" APP-OCS-J1R-2 10, "AP 1000 Operational Sequence Analysis (OSA-2) Implementation Plan"(Bibliog 7)
Section 2, "Verification Processes for FBTA and Operational Sequence Analysis," contains theverification plans for each of these task analyses.
pac
1.2.3 Minimum Inventory Equipment
[
ac
Section 3, "Verification Process for Minimum Inventory Equipment," describes the verification plan forthe HSI resources associated with the minimum inventory equipment.
APP-OCS-GEH-222, Rev. 0 1-3
![Page 19: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/19.jpg)
Attachment 5SVPSV0_001782
AP1000 Human Factors Engineering Task Support Verification Plan
1.2.4 10 CFR 50.34(0) Requirements
The requirements and specifications in 10 CFR 50.34(f) are derived from the Three Mile Island (TMI)accident. The AP1000 Design Control Document (Bibliog 8), Section 1.9.3, evaluates each requirement indetail. Based on the "AP 1000 Response" for each requirement, specific sections of 10 CFR 50.34(f) areincluded as part of the AP1000 task support verification plan.
Specifically, only the sections in 10 CFR 50.34(f) involving the availability of HSI resources(i.e., displays, alarms, and controls) in the final plant design are applicable to the task support verificationassessment. For example, if the "AP1O0O Response" specifies a requirement as "not applicable" to theAP1000 design, then no verification plan for that requirement is included in this document. Also, the10 CFR 50.34(f) requirements which are not applicable to HSI resources are excluded from thisdocument; for example, 10 CFR 50.34(f)(1)(vi) states, "Perform a study to identify practicable systemmodifications that would reduce challenges and failure of relief valves, without compromising theperformance of the valves or other systems."
Section 4, "Verification Processes for 10 CFR 50.34(f) Requirements," identifies the applicablerequirements and describes the verification plans for these requirements.
1.2.5 Limitation of Scope
No critical human actions have been identified for the AP1000 plant. Therefore, the verification of criticalhuman actions is not required.
1.3 OBJECTIVE
The overall objective of Human Factors V&V is to ensure that the API000 design attains a high standardof human factors adequacy and thereby contributes to the safety, operability and maintainability of theplant.
The objective of the task support verification activities is to confirm the availability of the required OCSand HSI resources in the final AP1000 design, identify deviations, and formally document the results.
1.4 LIST OF EXCEPTIONS FROM WCAP-15860
The HFE task support verification complies with WCAP-15860, "Programmatic Level Description of theAP1000 Human Factors Verification and Validation Plan" (Reference 3). However, WCAP-15860 wasissued relatively early in the design stage of AP 1000, and therefore based on the current AP 1000 design,four adjustments were required. These are described below:
]a,c
APP-OCS-GEH-222, Rev. 0 1-4
![Page 20: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/20.jpg)
Attachment 5SVPSVO_001782.
Human Factors Engineering Task Support Verification PlanAP1000
AIO0
(Last Page of Section 1)
APP-OCS-GEH-222, Rev. 0 1-5
![Page 21: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/21.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAP1000
2.1
I
SECTION 2VERIFICATION PROCESSES FOR FBTA AND OPERATIONAL SEQUENCE
ANALYSIS
BACKGROUND
pac
VERIFICATION PLAN FOR FUNCTION-BASED TASK ANALYSIS2.2
[
]a" For each identified"Fail," a discrepancy is entered into the HF Tracking System (see Section 5.3, "Documenting andResolving Human Engineering Discrepancies" and Section 5.4, "Human Factors Discrepancy FormRequirements" for details).
APP-OCS-GEII-222, Rev. 0 2-1APP-OCS-GEH-222, Rev. 0 2-1
![Page 22: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/22.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAP1000
2.3 VERIFICATION PLAN FOR OSA-1
2.3.1 Prerequisite
[~
]ac
2.3.2 Verification Plan
]a.C For each HSI resource that is evaluated as "Fail," adiscrepancy is entered into the HF Tracking System (see Section 5.3, "Documenting and ResolvingHuman Engineering Discrepancies" and Section 5.4, "Human Factors Discrepancy Form Requirements"for details).
APP-OCS-GEH-222, Rev. 0 2-2APP-OCS-GEH-222, Rev. 0 2-2
![Page 23: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/23.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAPIO00
2.4 VERIFICATION PLAN FOR OSA-2 - RISK-IMPORTANT TASKS AND
TASKS THAT HAVE HUMAN PERFORMANCE CONCERNS
2.4.1 Prerequisite
As part of the task support verification activities, a qualified independent verifier will confirm that no newcritical human tasks, risk-important tasks, or tasks that have human performance concerns have beenidentified since the completion of OSA-2. This can be confirmed by checking APP-OCS-J 1R-210,"AP 1000 Operational Sequence Analysis (OSA-2) Implementation Plan" (Bibliog 7), Tables 2.1-1 and2.1-2, against the information provided in APP-GW-GL-0 11, "AP 1000 Identification of Critical HumanActions and Risk Important Tasks" (Bibliog 11) and APP-OCS-GLR-001, "AP 1000 Post-Accident Risk-Important Human Actions Summary Report" (Bibliog 12). [
]a,c
2.4.2 Verification Plan
II
I],c For each HSI resourcethat is evaluated as "Fail," a discrepancy is entered into the HF Tracking System (see Section 5.3,"Documenting and Resolving Human Engineering Discrepancies" and Section 5.4, "Human FactorsDiscrepancy Form Requirements" for details).
2.5 VERIFICATION PLAN FOR MTIS ACTIVITIES
I
]axc
APP-OCS-GEH-222, Rev. 0 2-3APP-OCS-GEH-222, Rev. 0 2-3
![Page 24: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/24.jpg)
Attachment 5SVPSV0_001782
Human Factors Engineering Task Support Verification PlanAP1000
I
I acFor each HSI resource that is evaluated as "Fail," a discrepancy is entered into the HIF Tracking System(see Section 5.3, "Documenting and Resolving Human Engineering Discrepancies" and Section 5.4,"Human Factors Discrepancy Form Requirements" for details).
2.6 VERIFICATION PLAN FOR EMERGENCY OPERATIONS FACILITY ANDTECHNICAL SUPPORT CENTER TASK FUNCTIONS
] For each HSI resource that is evaluated as
"Fail," a discrepancy is entered into the HF Tracking System (see Section 5.3, "Documenting andResolving Human Engineering Discrepancies" and Section 5.4, "Human Factors Discrepancy FormRequirements" for details).
(Last Page of Section 2)
APP-OCS-GEH-222, Rev. 0 2-4
![Page 25: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/25.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAP1000
SECTION 3VERIFICATION PROCESS FOR MINIMUM INVENTORY EQUIPMENT
3.1 VERIFICATION PLAN FOR MINIMUM INVENTORY EQUIPMENT
For each control, display, and alert identified in APP-GW-GL-700, "AP1000 Design Control Document"(Bibliog 8), Table 18.12.2-1, a qualified independent verifier will ensure the availability and HFEadequacy of the HSI resource.
1" For each HSI
Resource that is evaluated as "Fail," a discrepancy is entered into the HF Tracking System(see Section 5.3, "Documenting and Resolving Human Engineering Discrepancies" and Section 5.4,"Human Factors Discrepancy Form Requirements" for details).
(Last Page of Section 3)
APP-OCS-GEH-222, Rev. 0 3-1
![Page 26: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/26.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAP1000
SECTION 4VERIFICATION PROCESSES FOR 10 CFR 50.34 REQUIREMENTS
4.1 BACKGROUND
The applicability of 10 CFR 50.34(f), as implemented in the AP1000 design, is detailed in theAP1000 Design Control Document (DCD) (Bibliog 8), Section 1.9.3. Based on the "AP1000 Response"sections within the DCD and the guidance stated in APP-OCS-GEH-020, "Programmatic LevelDescription of the AP1000 Human Factors Verification and Validation Plan" (Reference 3), the followingsections of 10 CFR 50.34(f) are addressed in the task support verification process.
NoteThe "AP 1000 Implementation" sections below are not identical to the"AP1000 Response" sections in the AP 1000 Design Control Document. The"AP1000 Implementation" sections are structured to provide clarity to theverification process.
4.2 10 CFR 50.34(f)(2)(iv) - SAFETY PARAMETER DISPLAY SYSTEM
Provide a plant safety parameter display console that will display to operators a minimum set ofparameters defining the safety status of the plant, capable of displaying afull range of important plantparameters and data trends on demand, and capable of indication when process limits are beingapproached or exceeded
4.2.1 AP1000 Implementation
.a.c
4.2.2 Verification Plan
]a~c
4.3 10 CFR 50.34(f)(2)(v) - SAFETY SYSTEM STATUS INDICATION
Provide for automatic indication of the bypassed and [in]operable status of safety systems.
APP-OCS-GEH-222, Rev. 0 4-1
![Page 27: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/27.jpg)
Attachment 5SVPSV0_001782
Human Factors Engineering Task Support Verification PlanAP1000
4.3.1 AP1000 Implementation
[
] a,c
4.3.2 Verification Plan
II
]a For each item that "Fails," a discrepancy is entered into the HF Tracking
System (see Section 5.3, "Documenting and Resolving Human Engineering Discrepancies" andSection 5.4, "Human Factors Discrepancy Form Requirements" for details).
4.4 10 CFR 50.34(f)(2)(vi) - REACTOR COOLANT SYSTEM HIGH POINT VENTS
Provide the capability of high point venting of non-condensable gases from the reactor coolant system,and other systems that may be required to maintain adequate core cooling. Systems to achieve thiscapability shall be capable of being operated from the control room and their operation shall not lead toan unacceptable increase in the probability of loss-of-coolant accident or an unacceptable challenge tocontainment integrity.
4.4.1 AP1000 Implementation
]a,c
APP-OCS-GEH-222, Rev. 0 4-2
![Page 28: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/28.jpg)
Attachment 5SVPSV0_001782
Human Factors Engineering Task Support Verification PlanAPIOOO
AIO0
pac
4.4.2 Verification Plan
]a.c For eachHSI resource that "Fails," a discrepancy is entered into the HF Tracking System (see Section 5.3,"Documenting and Resolving Human Engineering Discrepancies" and Section 5.4, "Human FactorsDiscrepancy Form Requirements" for details).
4.5 10 CFR 50.34(f)(2)(viii) - POST-ACCIDENT SAMPLING
Provide a capability to promptly obtain and analyze samples from the reactor coolant system andcontainment that may contain TID-14844 source term radioactive materials without radiation exposuresto any individual exceeding 5 rem to the whole-body or 50 rem to the extremities. Materials to beanalyzed and quantified include certain radionuclides that are indicators of degree of core damage(e.g., noble gases, iodines and cesiums, and non-volatile isotopes) hydrogen in the containmentatmosphere, dissolved gases, chloride, and boron concentrations.
4.5.1 AP1000 Implementation
[
]ac
4.5.2 Verification Plan
ac
APP-OCS-GEH-222, Rev. 0 4-3APP-OCS-GEH-222, Rev. 0 4-3
![Page 29: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/29.jpg)
Attachment 5SVPSVO_001782
AP1000 Human Factors Engineering Task Support Verification Plan
For each HSI component that "Failed," a discrepancy is entered into the HF Tracking System (seeSection 5.3, "Documenting and Resolving Human Engineering Discrepancies" and Section 5.4, "HumanFactors Discrepancy Form Requirements" for details).
4.6 10 CFR 50.34(f)(2)(ix) - HYDROGEN CONTROL
Provide a system for hydrogen control that can safely accommodate hydrogen generated by theequivalent of a 100 percent fuel-clad metal-water reaction. Preliminary design information on thetentatively preferred system option of those being evaluated in paragraph (1) (xii) of this section (50.34) issufficient at the construction permit stage. The hydrogen control system and associated systems shallprovide, with reasonable assurance, that:
(A) Uniformly distributed hydrogen concentrations in the containment do not exceed 10 percent duringand following an accident that releases an equivalent amount of hydrogen as would be generatedfrom a 100 percent fuel-clad metal-water reaction, or that the post-accident atmosphere will notsupport hydrogen combustion.
(B) Combustible concentrations of hydrogen will not collect in areas where unintended combustion ordetonation could cause loss of containment integrity or loss of appropriate mitigating features.
(C) Equipment necessary for achieving and maintaining safe shutdown of the plant and maintainingcontainment integrity will perform its safety function during and after being exposed to theenvironmental conditions attendant with the release of hydrogen generated by the equivalent of a100 percent fuel-clad metal-water reaction including the environmental conditions created byactivation of the hydrogen control system.
(D) If the method chosen for hydrogen control is a post-accident inerting system, inadvertent actuation ofthe system can be safely accommodated during plant operation.
4.6.1 AP1000 Implementation
]ac
4.6.2 Verification Plan
]axc
APP-OCS-GEH-222, Rev. 0 4-4
![Page 30: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/30.jpg)
Attachment 5SVPSV0_001782
Human Factors Engineering Task Support Verification PlanAP1000
For each HSI resource that "Fails," a discrepancy is entered into the HF Tracking System(see Section 5.3, "Documenting and Resolving Human Engineering Discrepancies" and Section 5.4,"Human Factors Discrepancy Form Requirements" for details).
4.7 10 CFR 50.34(f)(2)(xi) - VALVE POSITION INDICATION
Provide direct indication of relief and safety valve position (open or closed) in the control room.
4.7.1 AP1000 Implementation
[
]a,c
4.7.2 Verification Plan
]a For each HSI resource that "Fails," a discrepancy is entered into
the HF Tracking System (see Section 5.3, "Documenting and Resolving Human EngineeringDiscrepancies" and Section 5.4, "Human Factors Discrepancy Form Requirements" for details).
4.8 10 CFR 50.34(f)(2)(xii) - AUXILIARY FEEDWATER SYSTEM INITIATIONAND INDICATION
Provide automatic and manual auxiliaryfeedwater system initiation, and provide auxiliary feedwatersystem flow indication in the control room.
4.8.1 AP1000 Implementation
[
pc
APP-OCS-GEH-222, Rev. 0 4-5APP-OCS-GEH-222, Rev. 0 4-5
![Page 31: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/31.jpg)
Attachment 5SVPSV0_001782
AP1000 Human Factors Engineering Task Support Verification Plan
4.8.2 Verification Plan
]a.C For each HSI resource that "Fails," a
discrepancy is entered into the HF Tracking System (see Section 5.3, "Documenting and ResolvingHuman Engineering Discrepancies" and Section 5.4, "Human Factors Discrepancy Form Requirements"for details).
4.9 10 CFR 50.34(f)(2)(xvii) - SPECIFIC ACCIDENT MONITORINGINSTRUMENTATION
"Provide instrumentation to measure, record and readout in the control room: (4) containment pressure,(B) containment water level, (C) containment hydrogen concentration, (D) containment radiationintensity (high level), and (E) noble gas effluents at all potential accident release points. Provide forcontinuous sampling of radioactive iodines and particulates in gaseous effluents from all potentialaccident release points, and for onsite capability to analyze and measure these samples."
4.9.1 AP1000 Implementation
AP1000 post-accident monitoring is described in Chapter 7 of the AP 1000 Design Control Document(Bibliog 8).
ac
APP-OCS-GEH-222, Rev. 0 4-6
![Page 32: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/32.jpg)
Attachment 5SVPSVO_001782
AP1000 Human Factors Engineering Task Support Verification Plan
Section 11.5.5 of the AP1000 DCD includes additional information on measurement of radioactiveeffluents and conformance with Regulatory Guide 1.97 (Bibliog 19).
The AP1000 primary sampling system is designed to provide post-accident sampling functions. Seesubsection 9.3.3.1 of the AP1000 DCD for additional information on the post-accident sampling system.
4.9.2 Verification Plan
],C For each HSI resource that "Fails," a discrepancy is
entered into the HF Tracking System (see Section 5.3, "Documenting and Resolving Human EngineeringDiscrepancies" and Section 5.4, "Human Factors Discrepancy Form Requirements" for details).
4.10 10 CFR 50.34(O(2)(xviii) - INADEQUATE CORE COOLINGINSTRUMENTATION
Provide instruments that provide in the control room an unambiguous indication of inadequate corecooling, such as primary coolant saturation meters in PWRs, and a suitable combination of signals fromindicators of coolant level in the reactor vessel and in-core thermocouples in PWRs and BWRs.
4.10.1 AP1000 Implementation
]a,c
APP-OCS-GEH-222, Rev. 0 4-7
![Page 33: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/33.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAPI000
4.10.2 Verification Plan
]a.c For each HSI resource that "Fails," a discrepancy is
entered into the HF Tracking System (see Section 5.3, "Documenting and Resolving Human EngineeringDiscrepancies" and Section 5.4, "Human Factors Discrepancy Form Requirements" for details).
4.11 10 CFR 50.34(f)(2)(xix) - POST-ACCIDENT MONITORINGINSTRUMENTATION
Provide instrumentation adequate for monitoring plant conditions following an accident that includescore damage.
4.11.1 AP1000 Implementation
The API000 post-accident monitoring system was developed by using Regulatory Guide 1.97 (Bibliog19) as a guidance document.
Caxi
Chapter 7 of the APl1000 DCD (Bibliog 8) has additional details pertaining to this requirement.
APP-OCS-GEH-222, Rev. 0 4-8
![Page 34: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/34.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAP1000
4.11.2 Verification Plan
[
asc
4.12 10 CFR 50.34(f)(2)(xxvii) - IN-PLANT MONITORING
Provide for monitoring of in-plant radiation and airborne radioactivity as appropriate for a broad rangeof routine and accident conditions.
4.12.1 AP1000 Implementation
Area radiation monitors (ARMs) are provided to supplement the personnel and area radiation surveyprovisions of the AP1000 health physics program described in Section 12.5 of the AP1000 DCD ( Bibliog8). In addition to the installed detectors, periodic plant environmental surveillance is established.
4.12.2 Verification Plan
]ac For each HSI resource that "Fails," a discrepancy is entered into the HF Tracking
System (see Section 5.3, "Documenting and Resolving Human Engineering Discrepancies" andSection 5.4, "Human Factors Discrepancy Form Requirements" for details).
4.13 10 CFR 50.34(f)(2)(xxviii) - CONTROL ROOM HABITABILITY
Evaluate potential pathways for radioactivity and radiation that may lead to control room habitabilityproblems under accident conditions resulting in a TID-14844 source term release, and make necessarydesign provisions to preclude such problems.
4.13.1 AP1000 Implementation
I ac
APP-OCS-GEH-222, Rev. 0 4-9
![Page 35: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/35.jpg)
Attachment 5SVPSVO_001782
APIOOOHuman Factors EnLyineering Task Sunnort Verification Plan
Ii
pac
4.13.2 Verification Plan
]a*c For each
compressed-air system component and associated sealed connections that is evaluated as "Fail," adiscrepancy is entered into the HF Tracking System (see Section 5.3, "Documenting and ResolvingHuman Engineering Discrepancies" and Section 5.4, "Human Factors Discrepancy Form Requirements"for details).
(Last Page of Section 4)
APP-OCS-GEH-222, Rev. 0 4-10
![Page 36: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/36.jpg)
Attachment 5SVPSVO_001782
AP1000 Human Factors Engineering Task Support Verification Plan
SECTION 5METHODOLOGY AND MEASURES
5.1 RESOURCE ASSIGNMENT
The HF Manager is responsible for identifying the HFE evaluation team. The HFE evaluation team willconsist of independent verifiers and the design engineering team. See NSNP 3.3.3, "Design Verificationby Independent Review or Alternate Calculations" (Reference 1), for additional guidance on personnelindependence and qualifications.
5.2 PERSONNEL REQUIREMENTS AND TECHNIQUES
To ensure an independent and unbiased review, the task support verification process is performed byindependent verifiers with input from other design team members. As necessary, the design engineers willprovide all design configuration and control documentation related to the item under evaluation to theindependent verifier.
]ax
The independent verifiers will produce the HFE Task Support Verification Summary Report. This willrecord the task support verification discrepancies and any recommendations and improvements (e.g.,lessons learned) to help in future design projects or task support verification activities.
5.3 DOCUMENTING AND RESOLVING HUMAN ENGINEERINGDISCREPANCIES
Discrepancies are identified as human engineering discrepancies (HEDs) and are required to be resolvedby the formal resolution process described in APP-OCS-GEH-420, "AP1000 Human EngineeringDiscrepancy Resolution Process" (Bibliog3).
The HFE task support verification activity is considered complete when HEDs are entered into thetracking database and the formal "AP1000 HFE Task Support Verification Report") is approved.
5.4 HUMAN FACTORS DISCREPANCY FORM REQUIREMENTS
An HF Task Support Verification Discrepancy Form is used to document discrepancies identified duringthe task support verification process. Appendix A, "HF Task Support Verification Discrepancy Form"provides an example screen shot of a form to ensure complete coverage and promote consistency indocumentation.
APP-OCS-GEII-222, Rev. 0 5-1APP-OCS-GEH-222, Rev. 0 5-1
![Page 37: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/37.jpg)
Attachment 5SVPSVO-001782
AP1000 Human Factors Engineering Task Support Verification Plan
I The HFE discrepancy form includes the following type of information:
[
]aC
APP-OCS-GEH-222, Rev. 0 5-2APP-OCS-GEH-222, Rev. 0 5-2
![Page 38: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/38.jpg)
Attachment 5SVPSVO_001782
Human Factors Engineering Task Support Verification PlanAPIOOO
axc
5.5 DELIVERABLES
Deliverables from the HFE task support verification plan are defined by the APP-OCS-GBH-001,"AP1000 Human Factors Engineering Program Plan" (Reference 2).
The results of the task support verification process are used to develop "lIFE Task Support VerificationSummary Report". [
]ac
APP-OCS-GEH-222, Rev. 0
(Last Page of Section 5)
5-3
![Page 39: APP-OCS-GEH-222, Rev. 0, 'AP1000 Human Factors …Section 3.1, "Verification Plan for Minimum Inventory Equipment": Clarified that the commiments to be met are those specified in the](https://reader033.fdocuments.us/reader033/viewer/2022052015/602dd5234cad8425110bf09a/html5/thumbnails/39.jpg)
Attachment 5SVPSV0_001782
Human Factors Engineering Task Support Verification PlanAPIO00
APPENDIX AHF TASK SUPPORT VERIFICATION DISCREPANCY FORM
a,c
Figure A-I. HF Task Support Verification Discrepancy Form in HF Tracking System
(Last Page of Appendix A)
APP-OCS-GEH-222, Rev. 0 A-1