Work Planning & Control OverviewDefining Required
Maintenance TasksExecuting Maintenance
TasksCapturing
MaintenanceHistory
Impro
Identify Ad-HocMaintenance Tasks
PlanningInputs: Planned
MaintenanceSchedules
Unscheduled WorkOrders (from PM,
PDM feedback) Outstanding Work
Orders Backlog (of
scheduled WorkOrders)
Production Demand(Ops Plan)
Outputs: Ops Plan 5 yr plan 1 yr plan 3 month plan Weekly plan
Opportunity Planning Overhaul Planning Workload smoothing Resource planning Etc.
TacticalMaintenance
Non-tacticalMaintenance
E
M
3Emergency
RepairEmergency
Maint. Procedure
2Operator RepairFirst Line Maint.
Procedure
4Plan &
Schedule JobsPlanning
Procedure
6Do PM
MaintenancePreventative
Maint. Procedure
7
Do PredictiveMaintenance
Predictive Maint.Procedure
11Do CorrectiveMaintenance
Corrective Maint.Procedure
8Repair by UHAR
UHAR RepairProcedure
9Repair by
ContractorContractor Repair
Procedure
10Overhaul Unit
(UHAR)Unit Overhaul.
Procedure
MOO
MO
Pr
P
K
U
Incident Log Observations
1Report FaultsFault Reporting
Procedure
5Operator Checks
Daily RoutineChecks
12Close-OutWork OrderClose-outProcedure
-
8/3/2019 ALUR WPC
2/61
enance
snt
t
ens
ening
e
g
S
-
8/3/2019 ALUR WPC
3/61
Any Person
1.1
If you see a fault,ID the equipmentno & report it the
Operator
Yes
No
Operator
1.2Is the faultrecorded?
MIMS
Operator
1.4
Log fault on MIMSIncident Log
MSO627:
Complete as far aspossible:
add production
work group name
Date
operation shift,
equipment
number
exact time offinding
detailed problem
description
maintenance typerequired
FLM Sup Name
where applicable
Operator
1.3Notify Fault
Reporter that faultis logged already.
Yes
No
Ops Sup
1.6Can it be
rectified byFirst LineMainte-
nance?
MIMS
Ops Sup
1.9Raise a Work Orderon MIMS (MSO627
action W)andassign to a work
group.
Ops Sup
1.7Notify Operator to
carry out therequired First Line
Maintenance
Yes
No
Ops Sup
1.8
Does itrequire
Emergency
Repair?
Operator
1.5Notify Sup Ops
Yes
No
Ops Sup
1.10Day Time?
Ops Sup
1.1Report to
Mai
Ops Sup
1.11Report to
Mai
Emergency if:
Serious
Safety Risk
Unit Trip
20%+ Derated
Will cause trip /
20%+ derationif not repairedwithin 48 hrs
1.0 Fault Reporting
-
8/3/2019 ALUR WPC
4/61
2.1FLM
3.1EM
4.5.1P & S
Sup Crt
ech Crt
-
8/3/2019 ALUR WPC
5/61
2.0 First Line Maintenance
1.7FR
Operator
2.2
Investigate job todetermine whattools and material
are required
O
Mus
Operator
2.6Collect Tools &
spares if required,then carry outmaintenance
Opera
Reco(fail
corrematerWO /retur
Yes
No
Operator
2.3Materialrequired?
Operator
2.1Record Incident No
in Operatorsworkbook
-
8/3/2019 ALUR WPC
6/61
MIMS
s Sup
2.4Issue Generalaterial requisitioning standard WO
per unitMSQ140 &
SO62Q action I
MIMS
DM Prod
2.5Authorise Materialrequisition usingstandard WO per
unitMSQ140 &
MSO62Q action I
Operator
2.8Return unusedparts to store
tor
2.7rd all findingsure, cause,ctive action,ial usage) onworkbook &to Ops Sup
MIMS
Ops Sup
2.9Close Incident Log
MSO627
13.1
13.2
-
8/3/2019 ALUR WPC
7/61
3.0 Emergency Maintenance
1.11
FRTech Cr Maint
3.1Do a FieldInspection
Location Surrounding
Area Equipment
Status Facility
Availability Other related
equipment Safety Factors
Yes
No
Sup Cr Maint
3.3Can UP Fixproblem?
Sup C
RespGro
Tech Cr Maint
3.14Record all fin
(failure, caucorrective ac
material usagWO / workboreturn to Ops
Sup Cr Maint
Sup Cr Maint
3.21
Sup Cr Maint
Fore
MateR
MS
Tech Cr Maint
3.2Notify / Report to
Sup Cr Maint
1.12FR
Tech CR M
3.18Stage & So
Spares /Resource
MIMS
Tech CR Maint
3.16Update Job Status -
Awaiting Spares
Tech Cr Maint
3.13Perform required
Maint. Job
Yes
No
Tech CR Maint
3.11Spares /
ResourcesAvailable?
Tech Cr Maint
3.12Collect Tools,Spares, etc as
required for Job
Tech CR Maint
3.17Notify Sup Ops &
Sup CR Maint
Tech CR Maint
3.20Close work permit
Tech / Sup CrMaint
3.8Raise ManualRequisition for
Material
Printer
Tech / Sup CrMaint
3.6Print Job Card
Tech CR Maint
3.7Obtain a work
permit
-
8/3/2019 ALUR WPC
8/61
Sup Cr Maint
3.19Notify Sup Prod
that job iscompleted
Yes
No
.Job
Completed?
job feedback onJob CardSign-off
3.22Deliver Complete
Card to Plann
-
8/3/2019 ALUR WPC
9/61
Sup Cr Maint
3.5Notify UHAR
MIMS
r Maint
3.4Changeonsible Workup to UHAR
8.2UHAR
dingsse,tion,e) onok &Sup
MIMS
an Cr Maint
3.9rial & Sparesequisition140 / MSQ
Action I
MIMS
Sup Cr Maint
3.10Approve
Requisition
aint
rce
s.
-
8/3/2019 ALUR WPC
10/61
d Jober
12.1CWO
-
8/3/2019 ALUR WPC
11/61
6.0 Preventive Maintenance
MIMS
Sup PM
6.3Raise RequisitionsGeneral Material
MSO140 &
MSO620 Action I
MIMS
DM Maint
6.4Approve
Requisitions forGeneral Material
Sup Ops
6.14Approve Job
Feedback
Tech PM
6.15Return Tools
Sup PM
6.1Receive Job Cards
Yes
No
Sup PM
6.2Job Cardrequire general
materila?
D
Foremen PM
6.7Allocate Job Cardsto PM Technicians
Tech PM
6.9Obtain Permit to
Work from Sup Ops
Tech PM
6.10Execute
Tech PM
6.12Record all findings
on job cardincluding correctiveactions required &
material usage.Return to Sup PM
Tech PM
6.8Collect Tools, GenMaterials, etc asrequired for Job
Sup Ops
6.13Close work
permit
-
8/3/2019 ALUR WPC
12/61
12.1CWO
Yes
No
M Maint
6.5RequisitionApproved?
Sup PM
6.6Distribute JobCards to applicable
Foremen
ork
Sup PM
6.16Evaluate and verifyjob feedback on
Job CardSign-off
Yes
No
Tech PM
6.11Any other faults
identified?1.1
-
8/3/2019 ALUR WPC
13/61
4.0 Maintenance Planning
4.1
Develop 5 yearPlan
4.2Develop Plan of the
Year
4.3Develop Plan of the
Quarter
4.4Develop Plan of t
Week Detail Planning
& Scheduling
of individual
Outages First Line
MaintenanceWork Orders
Monthly
Schedule &LoadBalancing
Work outsideOutages not urgent(required afterdays)
Preventative
Maintenance
UHAR
Contractor
Corrective
Yearly
Quarterly
Monthly
Weekly
Yearly PM &PdM Schedule
& LoadBalancing
Yearly
MaintenanceBudget
PlannedOutage
Scheduling
-
8/3/2019 ALUR WPC
14/61
he
4.5Develop Plan of the
Day
7
Daily
Work outsideOutages urgent (requiredin less than 7 days)
PreventativeMaintenance
UHAR
Corrective
-
8/3/2019 ALUR WPC
15/61
4.5 Planning & Scheduling
Plan the Jobsmake sure that all thematerial andresources (Spares,Support Equipment,People, Time requiredto complete a Job)are available,complete with thedetailed taskinstructions, BEFOREscheduling a job andissuing the jobcard.
This will result in moreeffective use of limitedand valuablemaintenance man-hours by reducingwasted maintenanceman-hours throughpreventing starting ajob and then have towait for material andother resources.
Pl
Plann
Uploin
Do resourcesmoothing
Job DescriptionCheck with
Weekly Plan
MIMS
Planner
4.5.3Extract list of workorders to be done
in next 7 days(from Morning
Meeting)
4.5.6Repair by UHAR
Planning
WOs from reported faults
WOs resulting from PMs and
PdMs
4.5.5Corrective
MaintenancePlanning
WOs from reported faults
WOs resulting from PMs and
PdMs
Additional PMs
required
MIMS
Planning Sup
4.5.12Approve Work
Orders
Planner
4.5.8ID additional task
(planningcompleted) to be
done during Force
Outage
Planner
4.5.10Complete Planning& Schedule tasks
for today
Yes
No
Planner
4.5.7Is a forced
outage requiredto do a job?
Daily
Planner
4.5.4From WOs raised,Identify additionalPM Tasks to be
done today
Morning Meeting
4.5.1Discuss IncidentLog to identifymaintenance
actions required
DM Maint / Ops Ops Sups
Ops Plan Sup Maint. Sups
Maint Plan Sup UHAR Plan Sup Eng Coordinator Planners
MIMS
Planner UP
4.5.2Raise a Work Orderon MIMS (MSO627action W)andassign to a work
group.
5.9OC
4.4.1
P&SWKL
12.5WCO
-
8/3/2019 ALUR WPC
16/61
Printer
anner
4.5.13
Print Job Cards
Planning Sup
4.5.14Distribute Job
Cards
MIMS
r
4.5.11ad scheduleto MIMS
Planner
4.5.9Negotiate outage
time & duration with
Ops Planner &Dispatcher.
d
4.5.15Outage Planning
Last week before outage
Follow-up on Specific Materialorders
Planner
4.5.5.1From WOs raised,Identify CM Tasksto be done from
next week onwardsYes
No
Planner
4.5.5.2Field Inspection
Required?
Yes
No
Foreman CM
4.5.5.4Material /services
Required?
Pl
Comp
R
4.5.1
Yes
No
Sup CM
4.5.5.5Approve
Quantities?
-
8/3/2019 ALUR WPC
17/61
Foreman CM
4.5.5.3Do Field inspection:ID Spares, SupportEquipment, People,
Time requiredComplete Job/Task
Instruction
MIMS
lanner
4.5.5.6
lete Material /Services
equisition
Yes
No
Planner
4.5.5.9All requiredMaterial &services
Available?
Planner
4.5.5.10Initiate
ProcurementProcess
MIMS
DM Maint.
4.5.5.7
Approve
Requisition
4.5.7
Yes
No
Planner
4.5.5.8RequisitionApproved?
-
8/3/2019 ALUR WPC
18/61
4.0 Planning & SchedulingPlanner (Ops &Maint)
4.1.1Obtain planninginputs
Current 5 yearplan
PlannedOutages perunit
OperationalPlan - 5 yearproductionplan(Dispatchers)
History(Forced &Maint.
Outages) Unit Capacities
MajorModifications /Upgrades
Other majorevents to beplanned for
Fuel Supply
Safety
Insurance
Environment
Planner (Ops &Maint)
4.1.2Prepare a draft5-year plan
Ops Planner
4.1.3Distribute draft Plan
UP Planning Team
4.1.4Yearly PlanningMeeting no 1
PJB Planning Team
4.1.7Yearly PlanningMeeting no 2:
Approve 5-yearPlan
UP Manager
DMs
Ops Planner
Maint. Planner
ROP PJB
UP Manager
DMs
Ops Planner
Maint. Planner
PJB Corporate
Planner Direktorat
Niaga
Draft Schedule
ResourceRequirements
Identify LongLead Items &Services
ROP PJB
UP Manager
DMs
PJB Budgeting,Financing &Corporate Planner
Direktorat Niaga
UP Manager
4.1.9Distribute Approved
Plan
UP Manager
4.1.6Distribute Plan
Planner (Ops &Maint)
4.1.8Update 5-year planas per minutes of
meeting
-
8/3/2019 ALUR WPC
19/61
-
8/3/2019 ALUR WPC
20/61
Planner (Ops &Maint)
4.1.5
Update 5-year planas per minutes of
meeting
Planner (Ops &Maint)
4.1.10Place Schedule
onto notice boardsin planning offices
Maint. Planner
4.1.11Place orders forlong lead items
(Specific Material)
Planner
4.2.1
Plot 52-weekCalender
Planner
4.2.2
Indicate PlannedOutages / Projects(from 5-year plan)
L
Planner
4.2.5Determi
Available Lhours / Work
skill level /
Planner
4.2.8Allocate EstimatedDuration /
Workgroup / skilllevel / week
Corrective
Maintenance(CM, UHAR,Contractor)
Planner
4.2.10Compile
Maintenance &Capital Budget
Planner
4.2.9Determine
Required Spares &Tools
Tea
Re
D S S S M
fo M
Pl O O
-
8/3/2019 ALUR WPC
21/61
-
8/3/2019 ALUR WPC
22/61
lanner
4.2.3
ist ALL ScheduledTasks
Planner
4.2.4Allocate Estimated
Duration /Workgroup / skill
level / week
nebour
group /week
Planner
4.2.6Identify Imbalances
Planner
4.2.7Address
Imbalances
Maint. Planner
4.2.14Place order for long
lead items(3 months plus)
ScheduledMaintenance
(PM &Planned
Outages)
4.2.11view Meeting
Planner
4.2.12Update Plan of the
Year
MIMS
Planner
4.2.13Update MIMS
M Maintenanceupervisors PM
upervisor PdMupervisors CM
aintenanceremenaintenancelannersps Supervisor
ps Planner
MIMS
Planner
4.3.20Upload to MIMS &
Create WOs
Parent, Sub,
Standing
UHAR
4.3.Prepare
sche
UHAR
4.3.16Plan all tasks (HR,
Spares, tools,Support Eq)
Planner
4.3.7Identify ALL
Specific Materialrequired.
Planner
4.3.11Prioritise tasks to
be carried outduring outage.
Outage Te
4.3.Meeti
Reviewscope / pSpecific
Planner
4.3.1Identify Outages tobe executed within
next Quarter
Planner
4.3.2Identify MajorProjects to be
executed withinext Quarter
First LineMaintenance
Planner
4.3.25Get FeedbackCurrent StandiWork Order fo
Closure
2 Monthsoutage /
MI
DM Maint.
4.3.Approv
Ord
Plann
A
To be complete
-
8/3/2019 ALUR WPC
23/61
-
8/3/2019 ALUR WPC
24/61
Planner
4.3.19Distribute scheduleto Ops Sup, Maint.Sups & Foreman &
UHAR
Outage Team
4.3.18Meeting 3
Approve OverhaulPlan & Schedule
Printer
Planner
4.3.24Print Job Cards
10
Planner
4.3.9Initiate Purchase
Procedure
17verhaulule
Planner
4.3.4
Prepare StandardScope of Work
Planner
4.3.5Identify additional
scope of work
(From PdM, PM,Incident Logs,UHAR)
am
12ng 2/ refineriority &
aterial
Planner
4.3.13Update scope ofwork & SpecificMaterial from
meeting
DM Maint. & UHAR
4.3.14Approve minutes &final scope of work& Specific Material
n
Planner
4.3.26Do Job Feedback
on CurrentStanding Work
Order
Planner
4.3.28Raise New
Standing WorkOrder
ngr
Planner
4.3.27Close CurrentStanding Work
Order
prior toProject
1 Month prior to
outage / Project
S
21Workrs
Planner
4.3.15Distribute Scope ofWork to Planner UP
& UHAR
Yes
No
er
4.3.8pecificaterialailable?
Planner
4.3.10Identify tasks wherematerial will not be
available forOutage / Project
MIMS
Planner
4.3.22Issue requisitionsSpecific Spares
MIMS
DM Maint.
4.3.23Approve
Requisitions
MIMS
Planner
4.3.6Create WOs where
necessary
Outage Team
4.3.3Meeting 1
Confirm Outages &Projects for nextQuarter
3 Months prior tooutage / Project
withinOne Weekafter Meeting 3
PlanThe pmakethe mresouSuppEquipTimecompare acompdetailinstruBEFscheand ijobca
Thismore
of limivaluamainthourswastemainthoursprevea jobhavematerresou
Plan
Extrorde
fro
ridays
Thursdays
Mon
daystoWednesdays
Mondays
12.5
WCO
-
8/3/2019 ALUR WPC
25/61
-
8/3/2019 ALUR WPC
26/61
the Jobsurpose is tosure that allaterial andrces (Spares,ortment, People,required tolete a Job)ailable,
lete with theed taskctions,REuling a jobsuing the
rd.
ill result in
effective useited andbleenance man-by reducingdenance man-
throughnting startingand thento wait forial and otherrces.
Weekly Review Team
4.4.14Weekly Review
Meeting Schedule Backlog
Planner
4.4.15Update & Finalise
SchedulesPrinter
Planner
4.4.17Print Job CardsPdM Job List
Planning Sup
4.4.18Distribute Job
MIMS
Planner
4.4.12Upload schedule
into MIMS
DM Maint
Planning Sup
Planners
CM Sups
PM Sups
PdM Sups
Ops Planning
Supervisor
Do resourcesmoothing
Job Description
MIMS
ner
4.4.1act list of workrs to be startedm next weekonwards
4.4.19Outage Planning
Follow-up on Specific Material
orders
4.4.5Repair by
Contractor Planning
WOs from reported faults
WOs resulting from PMs and
PdMs
4.4.4Repair by UHARPlanning
WOs from reported faults
WOs resulting from PMs and
PdMs
4.4.3Corrective
MaintenancePlanning
WOs from reported faults
WOs resulting from PMs and
PdMs
4.4.2
PreventativeMaintenancePlanning
Weekly list of standard PMs
Additional PMs required
MIMS
Planning Sup
4.4.16Approve Work
Orders
Yes
No
Planner
4.4.7Can it be
postponed tillnext planned
outage?
Planner
4.4.9ID additional tasks
(planningcompleted) to bedone during Maint.
Outage
Planner
4.4.10
Negotiate outagetime & duration withOps Planner &
Dispatcher.
Planner
4.4.11Complete Planning& Schedule tasks
for next week
Yes
No
Planner
4.4.6Is an outage
(maint./ planned)required to do
a job?
Planner
4.4.8Update task detail
& Mark WO for nextPlanned Outage
4.3.4
Printer
Planner
4.4.13Print Job Lists for
next week forreview meeting
Maint. Outage
Opportunity
-
8/3/2019 ALUR WPC
27/61
List
-
8/3/2019 ALUR WPC
28/61
Planner
4.4.2.1From MIMS,Identify StandardPM Tasks for next
week
Planner
4.4.2.3From WOs raised,Identify PM Tasksto be done during
next week
MIMS
Planner
4.4.2.2Run weekly
Planning process
4.4.64.4.1
-
8/3/2019 ALUR WPC
29/61
-
8/3/2019 ALUR WPC
30/61
Planner
4.4.3.1From WOs raised,Identify CM Tasksto be done from
next week onwardsYes
No
Planner
4.4.3.2Field Inspection
Required?
Foreman CM
4.4.3.3Do Field inspection:ID Spares, SupportEquipment, People,
Time requiredComplete Job/Task
Instructions
Yes
No
Foreman CM
4.4.3.4Material /services
Required?
MIMS
Planner
4.4.3.6
Complete Material /Services
Requisition
Yes
No
Planner
4.4.3.9All requiredMaterial &services
Available?
Plann
Pro
MIMS
DM Maint.
4.4.3.7
Approve
Requisition
4.4.1
Yes
No
Sup CM
4.4.3.5Approve
Quantities?
Yes
Planner
4.4.3.8RequisitioApproved
-
8/3/2019 ALUR WPC
31/61
-
8/3/2019 ALUR WPC
32/61
10tementss
4.4.6
No
Planner
4.4.4.1From WOs raised,
Identify UHARTasks to be donefrom next week
onwards
Yes
No
UHAR
4.4.4.3Field
InspectionRequired?
UHAR
4.4.4.4Do Field inspID Spares, SEquipment, P
Time requComplete Job
Instructio
Yes
No
UHAR
4.4.4.5Material /services
Required?
MIMS
PlannerUP / UHAR
4.4.4.7Complete General /
Specific Material
Requisition
Plan
MIMS
DM Maint. UP /Man. UHAR
4.4.4.8Approve
Requisition
Yes
No
UHAR
4.4.4.6Approve
Quantities?
Planner
4.4.4.2NotifyUHAR
4.4.1
-
8/3/2019 ALUR WPC
33/61
-
8/3/2019 ALUR WPC
34/61
No0l?
Planner
4.4.4.11Initiate
ProcurementProcess
UHAR
4.4.4.12Prepare & Submit
Quotation Scope, Schedule Time required
Cost
4.4.6
Yes
No
Planner
4.4.4.9RequisitionApproved?
P
I4.4.1
Planner
4.4.5.1From WOs raised,Identify ContractorTasks to be donefrom next week
onwards
Planner
4.4.5.2Compile
specification forwork to be done
-
8/3/2019 ALUR WPC
35/61
-
8/3/2019 ALUR WPC
36/61
r
.4.5.3procurementrocessl. service)
Planner &Procurement
4.4.5.4Review Offers from
Contractors4.4.6
-
8/3/2019 ALUR WPC
37/61
5.0 Operator Cheks for Maintenance
Ops & MaintPlanner
5.1Compile check listsfrom OEM Manuals,
As Built & MaintRequirements
Ops Planner
5.2File Check Lists &
copy 3-month stock
Operator
5.3Collect Check listfrom Ops Planner
Operator
5.4Perform check listinspections twice
per shift
Supervisor Ops
5.6Check & approve
Yes
No
Operator
5.5Problem
identified?
1.1
FR
Supervisor Ops
5.7Return Check List
to Ops Planner
Ops Planner
5.8Prepare monthly
report (plant /equipmentefficiency)
Ops Planner
5.10Archive Check Lists
Yes
No
Ops Planner
5.9Problemidentified
from trend?
1.13
FR
13.3
-
8/3/2019 ALUR WPC
38/61
7.0 Predictive Maintenance
Tech PDM
7.4Prepare Tools for
PDM
Tech PDM
7.6Obtain Permit to
Work from Sup Ops
Yes
No
Tech PDM
7.5Require Permit
to Work?
Tech PD
7.Execut
Sup PDM
7.9Evaluate DailyReports and
compile weeklyreport
Yes
No
Sup PDM
7.10ID Problemsthat require
furtherattention?
Sup PDM
7.11Inform Planner
Sup PDM
7.1Collects Weekly
Schedule from Planning
4
Sup PDM
7.2Plan and schedule
daily tasks
Sup PDM
7.3Issue daily task lists
to Technicians
Da
Daily DailyDaily
-
8/3/2019 ALUR WPC
39/61
7e work
Tech PDM
7.8Download, Analyse
& produce report
4P&S
End
Sup PDM
7.12File the analysis
report
ily Daily
-
8/3/2019 ALUR WPC
40/61
8.0 Repair Uhar
UHAR
8.16
UHAR
8.15
UHAR
UHA
ExReq
Purch
Yes
No
UHAR
8.9Require
additionalwork?
U
G
UHAR
8.8Sign-off Job Card
4
UHAR
8.1Receive Job Cardfrom UP Planner
UHAR
8.2Plan & schedule
work to be done
Yes
No
UHAR
8.7Work specified
on job cardcompleted?
Yes
No
UHAR
8.10Must work bedone before
return toservice?
Sen.Sup QA
8.11Notify UP Planner
that additional work
is required beforehanding back.
To be authorised by HO
UHAR to raise requisition for:
Consumables
General Material
Specific spares (to be
authorised by UP Planner
4
P&S
UHAR
8.4Obtain Permit to
Work
Yes
No
Planner
8.3Repair Workto be done
on-site?
3.5
EM
-
8/3/2019 ALUR WPC
41/61
an ac oOperations
ose erm oWork
8.17Hand Job Card
Planner
-
8/3/2019 ALUR WPC
42/61
Planner / DM MaintUP
8.18
12.1
8.5ecute Workuest materialase non-stock
UHAR
8.6Capture Job
Feedback
HAR
8.12et UP Planner to
Coordinatebetween Ops &UHAR for test
Yes
No
Sup Ops
8.13Test &Acceptwork?
Sup Ops
8.14Capture rework
reason on job card
-
8/3/2019 ALUR WPC
43/61
Acceptance Letter
to
CWO
-
8/3/2019 ALUR WPC
44/61
9.0 Repair Contractor
Requisition Process (inside 9.6)
Contractor
9.8Planner toCoordinate
between Ops &Contractor for test
YesNo
Sup Ops
9.9Test &Acceptwork?
UP QC Team
9.10Acceptance Letter
Contractor
9.12Hand back toOperations
Contractor
9.11Close Permit to
Work
Contr
C
Y
No
Contractor
9.4Work to be
done on site?4
Planner UP
9.6.5Notify Contractor
that SparesRequisition is
approved
Contractor
9.6.6Draw spares from
UP store
Yes
No
Sup Maint UHAR
9.6.7Spares
available?
Contractor
9.6.1Give Spares List to UPPlanner for requisition
MIMS
Planner UP
9.6.2
Raise Material
Requisition
Yes
No
DM Maint UP
9.6.3Approve
Requisition?
Planner UP
9.6.4Notify Contractor
that SparesRequisition is not
approved
Contractor
9.1Receive Purchase
Order
Contractor
9.2Plan & Schedule
work
Contractor
9.3Notify UP Plannerwhen you will start
-
8/3/2019 ALUR WPC
45/61
Contractor
9.5Obtain Permit to
Work
Contractor
9.6Execute Work
Request materialPurchase non-stock
actor
9.7apture Jobeedback
Contractor
9.13Hand Job Feedback to
Planner
12.1
CWO
es
Contractor
9.6.8Contractor to
purchase spares
9.6
-
8/3/2019 ALUR WPC
46/61
10.0 Overhaul
4
Sup OH Maint
10.1Received Job Card
from Planner
ELLIPSE
Planner
10.2Issue requisition
General Material,
Consumables
ELLIPSE
DM Maint
10.3Approve requisition
No
Planner
10.4
MaterialAvailable?
Supervisor Ops
10.6Shutdown Unit/
equipments
Supervisor Ops
10.7Handover to start
up Team
Tech OH Maint
10.8Obtain Permit to
Work
Tech OH Maint
10.9Prepares tools and
get spares
Sup OH Maint
10.20
Evaluate &Approved result of
work
No
Start-up Team
10.21Test
Acceptance
Tech OH Maint
10.22Close Permit to
Work with Start UpTeam
Tech OH Maint/Contractor
10.19
Capture Jobfeedback on Job
Cards
No
Planner
10.11Additional
work required
Sup OH Maint
10.12Identify & scope the
additional workrequired
No
DM Maint
10.13Get Approval
No
DM Maint
10.14Required inshutdown
Planner
10.15Issue approval note
ELLI
Planner
10.1Create
Yes
M
Planner
10.Creat
-
8/3/2019 ALUR WPC
47/61
10.25Compile Overhaul
report
-
8/3/2019 ALUR WPC
48/61
Planner
10.5
Follow PurchaseProcedure
Tech OH Maint/Contractor/ Eng
10.10Execute Work
Start-up Team
10.23Start up plant
up OH Maint
Planner
10.27
SE
O
Printer
Planner
10.17Print Job Card
IMS
18e WO
Start-up Team
10.24Hand back to OPS
Issue hand overcertificate
4.0
-
8/3/2019 ALUR WPC
49/61
10.26Return job card &report to Planner
Report to identify
improvementopportunities
12.1CWO
-
8/3/2019 ALUR WPC
50/61
11.0 Corrective Maintenance
Sup CR
11.1Collect Job Card
Tech Cr Maint
11.2Obtain Material /
spares / tools
Foreman
Tech CrMaint
Yes
No
Sup CR
11.16Require
additionalwork?
Y
Sup O
11.2TestAccework
4Yes
No
Sup CR
11.17Must work bedone before
return toservice?
Sup CR
11.18Notify UP Planner
that additional workis required before
handing back.
Sup CR
11.19Capture Additionalwork required on
Job Card
Yes
NoTech CrMaint
11.12AdditionalMaterial?
Tech CrMaint
Foreman
Postpone
MIMS
Tech CR Maint
11.4Update Job Status -
Awaiting Spares
Tech Cr
11Perform
Main
Yes
No
Tech CR Maint
11.3Spares /
ResourcesAvailable?
Tech
NotifSu
Tech Cr Maint
11.8Get Permit to Work
from SupervisorOps
Yes
No
Tech Cr Maint
11.7Permit to
Work?
MIMS
Foreman
11.13Material & SparesRequisition
MSQ140 / MSQAction I
Yes
No
Sup CR
11.14Approve
Quantitiesetc.?
Yes
No
DM Maint
11.15Approve
Requisition?
-
8/3/2019 ALUR WPC
51/61
11.2Hand baOperati
11.23Close Permit to
Work
11.22Return unused
material / spares
11.24Sign-off Job Card
-
8/3/2019 ALUR WPC
52/61
Sup CR
es
No
ps
0&pt?
Yes
No
Sup CR
11.11Work specified
on job cardcompleted?
Sup Ops
11.21Capture rework
reason on job card
Tech Cr Maint
11.10Record all findings
(failure, cause,corrective action,
material usage) onWO / workbook &return to Ops Sup
Tech CR Maint
11.6Stage & Source
Spares /Resources.
aint
.9requiredt. Job
CR Maint
11.5y Sup Ops &p CR Maint
-
8/3/2019 ALUR WPC
53/61
5ck toons
11.26Hand Job Card to
Planner
12.1CWO
-
8/3/2019 ALUR WPC
54/61
12.0 Close WO
Planner
12.1Receive completed
Job Cards
3.22
EM
6.16
PM
8.18
UHAR
9.13
Contr
10.27
Ovrh
11.26
CR
MIMS
Planner
12.2
Capture Job
Feedback on MIMS
Plann
Aany
Prob
MIMS
Planner
12.3
Close Work Orders
Standing
Sub
Main
-
8/3/2019 ALUR WPC
55/61
Yes
No
r
12.4re thereidentified
lems to befixed?
MIMS
Planner
12.5
Create new Work
Order Assign to
applicable work
group
4.4.1
P&S
4.5.3P&S
End
13.2
-
8/3/2019 ALUR WPC
56/61
13.0 Identify Maintenance Improvement O
Same as 17.specific for M
ImprovOpportu
Same as 17.1, just in moredetail for Maintenance
Improvement Opportunities
Planner
13.1Identify
DeterioratingReliabilities
Planner
13.2Identify
DeterioratingAvailabilities
Ops Planner
13.3Identify Low orDeterioratingEfficiencies
Planner
13.Raise MaiImprovem
as per
2.9
FLM
12.5
WCO
5.8
OC
-
8/3/2019 ALUR WPC
57/61
pportunities
, just moreaintenancementnities
4tenance
ent ECP17.2
17.3
-
8/3/2019 ALUR WPC
58/61
17.0 Engineering Change Manage
See 14.4 14.8forMaintenanceImprovementOpportunities
See 14.1 14.3forMaintenanceImprovement
Opportunities
See 13 for Maintenance ImprovementOpportunities
Originator
17.1Identify need for
change /modification
Originator
17.2Complete change
proposal form(ECP)
Originator
17.3Submit change
proposal to yourSupervisor
ChangeManag
Evalua
c(Week
Yes
No
Deputy ManagerEng
17.6Accept needto change?
Deputy Manager Eng
17.7Notify Originator
Deputy Manager Eng
17.8Archive ECP
Eng Team
17.9Finalise / design
the change /modification
package
Eng
17.16Supply Updated
Drawings
Eng
17.20Update PdMSchedules
Eng
17.21Update PMSchedules
Eng
17.22Update MIMS(Equipment)
Eng
17.17Ops Manual
Eng
17.19Maint Manual
Planner (Ops /Maint)
17.11Plan
Implementation
MIMS
Planner Maint
17.13Issue Work Order
Ops / UHAR /Contractor / CM
17.14ImplementChange /
Modification
Eng
17.15Update package to
As Built
Yes
No
EngTeam
17.12Require WO?
Eng
17.18SOP
Eng Team
17.10Indicate on ECP
what docs. &systems needs to
be updated
DeEn
Eng
17.23Update ProcessControl System
Eng
17.24Update Business
Process
Supervisor
17.4Evaluate proposed
change(Approve)
-
8/3/2019 ALUR WPC
59/61
ent
ment Team
17.5te proposed
hangely Meeting)
uty Manager
17.25Sign Off ECP
SafetyProcess
ImprovementAvailabilityReliabilityetc
Deputy Manager Eng
17.26Archive ECP
-
8/3/2019 ALUR WPC
60/61
14.0 Maintenance Optimisatio
Same as 17.9, just in more detail for Maintenance Improvement Opportunities
Same as 17.6, just in more detail for Maintenance Improvement
Opportunities
Engineer
14.1
Receive approvedMaint Improvement
ECPs
Engineer
14.2InvestigateProposals
RCFA FMEA
Estimate CostBenefit
Spare Parts Reliability
Availability Efficiency Safety Production
Environment Process Etc.
Engineer
14.4Prioritise Proposals
for Design
Engineer
14.5Design Solution
FDT Process
Stock Levels
Procedure Documentation Etc.
17.5ECM
Yes
No
Eng Coordinator
14.7Approve
designedsolution?
Planner
14.6Determine final
Costs and benefitof designed
solution
Yes
No
Eng Coordinator
14.3Go Ahead?
17.7ECM
En
I
Use sameprocess asSERP
I
-
8/3/2019 ALUR WPC
61/61
17.10ECM
ineer
14.8Prioritise
plementations
ImplementationSchedule