All Phase Intro PPT

24
Tampa / Orlando / Miami

Transcript of All Phase Intro PPT

Page 1: All Phase Intro PPT

Tampa / Orlando / Miami

Page 2: All Phase Intro PPT

CONTACT INFORMATION

Tampa Office:

1906 North Armenia Ave

Suite 214

Tampa FL 33607

Phone: 813-443-5081

Fax: 813-254-0000

E-Mail: [email protected]

Web: www.apcdflorida.com

Miami Office:

Phone: 305-981-6344

E-Mail: [email protected]

Orlando Office:

Phone: 407-440-8993

E-Mail: [email protected]

Florida License # CGC 151 6380

Surety Bonded

LEED Certified

Page 3: All Phase Intro PPT

CLIENT LIST

Built OutAR Savage & Sons • AMC Theater • AnyTime Fitness

AVAYA (St. Petersburg, Maitland, Brandon, Altamonte & Miami)

• BloodGood • Big Lots • Beverly Corporation • Boardwalk Apts.

Clearwater Mattress • COSYS • Danka • Hughes Supply • Hewlett Packard

Integrity Staffing • Jigsaw Printers • Lin Rogers Electric • Preserve Apts. ∙ Regions Bank

RaceTrac Petroleum • RedBamboo Spa • Shape Express • Sturgis

Tech USA • Travel Max • Trugreen Chemlawn • UniFirst Inc. • XPEDX Paper

Financial Accredited Home Lending • Allied Capital Mortgage • AmSouth Banks

Bank of America (Largo & Charlotte) • Florida Capital Bank • Fidelity National Title

Hancock Financial • Lending Hand Mortgage • Landmark Bank

Overstreet Financial Planners • Realty Executives • Sun Trust Banks • Regions Banks

Government / SchoolsMacDill AFB • Manhattan Hairstyling Academy • Troy University ∙ Brain Balance

Law FirmsBlackwell & Blackwell • Fowler White • Haas Dutton • We The People

Property ManagementCapital Properties • CB Richard Ellis • CIMLINK Real Estate Services •

Colonial Properties • Decade Properties • GVA Advantis

Hillsborough Community Center • Tampa Convention Center • Trammel Crown (pre-merger)

RenovationBay Lake Corporation • BridgePort Office Building • Grand Plaza Office Center

Historic Cuban Club • Memorial Center • Providence Square

Republic Square Center

RestaurantsFiascos Dinner Theater • It’s Just Lunch • Let’s Eat • Panda Express

Page 4: All Phase Intro PPT

COMPANY OVERVIEW

• 20+ Years Servicing Florida Businesses

• Innovative Turn-Key Industrial & Commercial

Construction Services

• Competitive Pricing, Seamless Execution,

On-Time Completion

• Multi-Sector Experience

• Projects Ranging In Value From

$10,000 To Over $5,000,000

• Full Range of Services From Concept

To Completion

• Dedication To Total Client Satisfaction

Regardless Of Project Scope, Size Or

Value

• Surety Bonded

• LEED Certified

Page 5: All Phase Intro PPT

AFFILIATIONS & MEMBERSHIPS

Page 6: All Phase Intro PPT

COMPANY COMMITMENT

• Practical & Common Sense Approach In

Planning, Executing and Completing Your

Project

• Timely & Effective Communications To

Cut Down On Change Orders, Keep You

Informed & Limit Problems Or Hassles

• Complete Your Project At Cost, On Time

And To The Highest Quality Standards

• Superior Customer Service That Earns

Your Trust And Forms A Long-Term

Relationship

Page 7: All Phase Intro PPT

SERVICES OVERVIEW

• Wide Range of Services Covering All

Phases Of Construction Including:

- General Contractor Services

- Construction Management Services

- Design – Build Services

- Project Support Services

• General Contracting & Construction

Management Company

• Superb Project Support Services

Team

Page 8: All Phase Intro PPT

GENERAL CONTRACTOR SERVICES

TYPE OF SERVICE

• Most Familiar Form Of Construction Services

• We Select & Contract With Sub-Contractors

For Various “Scopes-Of-Work”

• Services Range From

Undergrounds To Final

Walk - Through

THE ALL PHASE ADVANTAGE

• Non-Traditional Approach

- Competitive Bidding

- Value Engineering

- Negotiated Fee

- Time & Material Contracts

• Superb & Consistent Service

- Constant Communication On

Project Status

- Adherence To A Well-Conceived &

Deeply Detailed Construction Site

Page 9: All Phase Intro PPT

CONSTRUCTION MANAGEMENT SERVICES

TYPE OF SERVICE

• Coordinate Efforts Of The Owner,

Architect, Engineers, Contractors & Vendors

• Services Include Estimating, Budgeting,

Scheduling, Planning, Bidding &

Managing

• From Concept To

Completion

THE ALL PHASE ADVANTAGE

• Extensive Experience In All Phases Of

Construction

• Commitment To Superb Customer

Service Addressing Every Detail

Though Completion & To Your

Complete Satisfaction

• Long-Standing Relationships With

Sub-Contractors & Vendors Who Will

Perform To Our High Standards

Page 10: All Phase Intro PPT

DESIGN – BUILD SERVICES

TYPE OF SERVICE

• Every Phase Of The Construction Project

• Success Depends On Precise Collaboration

Between Architect & Builder

• Offers Greatest Potential

To Realize Time &

Cost Savings THE ALL PHASE ADVANTAGE

All Phase Construction & Development Has The

Experience, Knowledge And Talent To Maximize

The Inherent Benefits Of Choosing The Design –

Build Services Option:

- Reducing Project Cycle Time

- Eliminating Redundancies

- Reducing Owner’s Risk

- Minimizing Change Orders

- Identifying Money Making Scenarios

- Reducing Design / Management Costs

Page 11: All Phase Intro PPT

PROJECT SUPPORT SERVICES

Supervisory Personnel & Administrative Support With The Experience & Knowledge

To Build Top-Notch Project Teams And Get Your Project Completed On Time, At Cost

And To Your Complete Satisfaction:

Financial Management

Project Planning

Project Estimating

Pre-Construction Services

Job Site Specific Field Offices

State-Of-The Art & Industry Proven Software

We Take Pride In Responding Intelligently, Flexibly & Promptly To Changing Project

Requirements & Expectations With A Focus On Building Profitable & Long-Standing

Business Relationships.

Page 12: All Phase Intro PPT

TESTIMONIAL

I am writing this letter to attest to compliment All Phase Construction for the work performed on a difficult construction

project at MacDill AFB, Florida. From 25 November until 15 December, 2007, All Phase Construction completed repairs

to the BAK12 aircraft arresting system on MacDill’s runway. This system is comprised of a steel cable that extends across

the runway, which is suspended above a series of twenty-five resilient pads. Each of the 2’ x 4’ pads is secured by six

stainless steel studs anchored into the underlying concrete. Because the existing studs were not originally installed to

specifications, All Phase Construction was hired to drill out the existing studs. Because these repairs were to be completed

on an active runway, All Phase Construction completed this work on our active runway at night during hours when flight

traffic is minimal.

From the start of the project, All Phase Construction encountered extreme difficulty in drilling out the old bolts since they

were not plumb. All Phase Construction suggested several technical adjustments which permitted the work to be

accomplished on time and within budget. The final product was outstanding.

In addition to their great enthusiasm, All Phase Construction demonstrated dedication by delivering an excellent product

and customer satisfaction. This was accomplished by furnishing excellent sub-contractors and persevering under difficult

circumstances. I could not be more pleased with the results on this highly important job, nor would I hesitate to use All

Phase Construction for future jobs.

Palmer G. Arnold • Project Manager

Chugach Management Services • MacDill Air Force Base • Tampa, Florida

Page 13: All Phase Intro PPT

TESTIMONIAL

I have been working with All Phase Construction now

for several months on the entire build out of my health

club facility. From day one this build out has been

riddled with change orders and revisions due to my

issues on my end so it has been nothing ordinary or

simple. All Phase has been just absolutely incredible

to work with. From top to bottom, from the owners to

the Super it has truly been an effortless experience.

They have been able to stay consistent throughout and

have made up for lost time occurring from my revisions

and changes that I’ve made. I honestly wonder what

this whole process would have been like with another

company. I have already informed them that without a

doubt they have locked in my business for future

Anytime Fitness facilities in which we will being

purchasing almost immediately. Please feel free to

contact me anytime.

Dave La Gree

Owner

Anytime Fitness

Clearwater – Safety

Harbor, Florida

Page 14: All Phase Intro PPT

TESTIMONIAL

Gerard DiRuggiero

General Manager

UniFirst Corporation

Tampa, Florida

UniFirst Corporation has contracted a

job with All Phase Construction

Company approximately four months

ago. They have been very professional

in all aspects of our needs. All Phase

Construction is extremely

knowledgeable in their line of business.

We are completely satisfied with our

relationship with All Phase Construction

over the past few months and do not

hesitate to recommend them to any

company looking for quality and reliable

work.

Page 15: All Phase Intro PPT

TESTIMONIAL

A. Chris Ciavarella

MBA RPA

CB Richard Ellis

Tampa, Florida

All Phase Construction / David Robey have

completed several projects, which totaled in

excess of 1.6MM for me while I was on the

Avaya and CimLink accounts. His projects

were completed on time, within budget and

with very little disruption to the tenant. He

provides high quality work at a fair price.

It was a pleasure to work with him and I look

forward to future opportunities which may

present themselves.

Page 16: All Phase Intro PPT

TESTIMONIAL

A. Robert E. Valdez, SR.

CEO President

Manhattan Hairstyling

Academy

Tampa, Florida

I wish to express the fact that All Phase

Construction / David Robey has been a

pleasure to work with on several

projects ranging from $600,000.00 to

$1,600,000.00. All of which were

finished on time, on schedule and on

budget. Because of these results we

will be continuing to work with All Phase

Construction in the future.

Page 17: All Phase Intro PPT

St. Johns County Transit Facility

LOCATION:State of Florida Department of Military Affairs

Starke, FL

PROJECT SCOPE:A 6 acre project consisting of 3 ground-up

separate buildings including an office building,

mechanics shop, bus wash building and fueling

station. Project also consisted of widening the

main highway to allow access to the property.

PROJECT VALUE:$1,742,987.00

SERVICES PROVIDED:General Contracting & Construction Management

COMPLETION DATE:2010

Page 18: All Phase Intro PPT

Chemical, Biological, Radiological, Nuclear, Explosive Enhanced Response

Force-Package (CERF-P)

LOCATION:

State of Florida Department of Military Affairs

Starke, FL

PROJECT SCOPE:

A design-build ground-up emergency response

containment facility

PROJECT VALUE:

$402,636.00

SERVICES PROVIDED:

Design Build, Construction Management

COMPLETION DATE:

2010

Page 19: All Phase Intro PPT

REGIONS BANK

LOCATION

Throughout Florida

PROJECT SCOPE

Interior, Exterior & Ground – Up

PROJECT VALUE

$50,000 to $1,000,000

SERVICES PROVIDED

General Contracting

COMPLETION DATE

2005 to Present

Page 20: All Phase Intro PPT

BRIDGEPORT OFFICE BUILDING

LOCATION

5201 W. Kennedy Boulevard

Tampa, Florida

PROJECT SCOPE

Nine Story Interior Renovation

PROJECT VALUE

$342,988

SERVICES PROVIDED

General Contracting

COMPLETION DATE

2007

Page 21: All Phase Intro PPT

ANYTIME FITNESS

LOCATION

2522 – B McMullen Booth Road

Clearwater, Florida

PROJECT SCOPE

Major Interior & Exterior Build – Out

PROJECT VALUE

$291,323

SERVICES PROVIDED

General Contracting & Construction

Management

COMPLETION DATE

2007

Page 22: All Phase Intro PPT

MANHATTAN HAIRSTYLING ACADEMY

LOCATION

6401 W. Waters Avenue

Tampa, Florida

PROJECT SCOPE

Rebuild 90% of Interior & Exterior Building

Back

PROJECT VALUE

$7783,644.

SERVICES PROVIDED

General Contracting & Construction

Management

COMPLETION DATE

2008

Page 23: All Phase Intro PPT

BANK OF AMERICA

LOCATION

Throughout Florida

PROJECT SCOPE

Interior, Exterior & Ground – Up

PROJECT VALUE

$50,000 to $1,000,000

SERVICES PROVIDED

General Contracting

COMPLETION DATE

2005 to Present

Page 24: All Phase Intro PPT

REDBAMBOO MEDI – SPA

LOCATION

2522 – B McMullen Booth Road

Clearwater, Florida

PROJECT SCOPE

Major Interior & Exterior Build – Out

PROJECT VALUE

$117,000

SERVICES PROVIDED

General Contracting

COMPLETION DATE

2008