AIR QUALITY MANAGEMENT EFFORTS INKARACHI INKARACHI NATIONAL WORKSHOP ON THE IMPROVEMENT OF URBAN AIR...

27
AIR QUALITY MANAGEMENT EFFORTS AIR QUALITY MANAGEMENT EFFORTS IN IN KARACHI KARACHI NATIONAL WORKSHOP ON THE NATIONAL WORKSHOP ON THE IMPROVEMENT OF URBAN AIR QUALITY IMPROVEMENT OF URBAN AIR QUALITY OF PAKISTAN OF PAKISTAN (December 13 - 15, 2004) (December 13 - 15, 2004) Lahore, Pakistan Lahore, Pakistan MALIK ZAHEER-UL-ISLAM MALIK ZAHEER-UL-ISLAM

Transcript of AIR QUALITY MANAGEMENT EFFORTS INKARACHI INKARACHI NATIONAL WORKSHOP ON THE IMPROVEMENT OF URBAN AIR...

AIR QUALITY MANAGEMENT EFFORTSAIR QUALITY MANAGEMENT EFFORTS

IN IN

KARACHI KARACHI

AIR QUALITY MANAGEMENT EFFORTSAIR QUALITY MANAGEMENT EFFORTS

IN IN

KARACHI KARACHI

NATIONAL WORKSHOP ON THE NATIONAL WORKSHOP ON THE IMPROVEMENT OF URBAN AIR QUALITY IMPROVEMENT OF URBAN AIR QUALITY

OF PAKISTAN OF PAKISTAN

NATIONAL WORKSHOP ON THE NATIONAL WORKSHOP ON THE IMPROVEMENT OF URBAN AIR QUALITY IMPROVEMENT OF URBAN AIR QUALITY

OF PAKISTAN OF PAKISTAN

(December 13 - 15, 2004)(December 13 - 15, 2004)Lahore, Pakistan Lahore, Pakistan

(December 13 - 15, 2004)(December 13 - 15, 2004)Lahore, Pakistan Lahore, Pakistan

MALIK ZAHEER-UL-ISLAMMALIK ZAHEER-UL-ISLAM

KARACHI MASS TRANSIT

KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL

AREA (DISTRICT) 3,520 Sq.Km

URBAN AREA 1,800 Sq.Km

POPULATION (ESTIMATED) 14 Million

POPULATION GROWTH RATE 4%

CITY PROFILECITY PROFILE

1947 1957

1987 2004Growth TrendGrowth Trend

KATCHI ABADIES 550 (55% OFPOPULATION)

ROAD NETWORK 7400 KM

REGISTERED VEHICLES 1.3 MILLION

COMPOSITION

PRIVATE CARS 45 %

MOTOR CYCLES 38 %

MCRS 3 %

TAXIS 3.2%

BUS / MINI-BUSES 1.6%

TRUCKS 1.6%

OTHERS (D-VANS, PICKUPS ETC.) 7.6%

AVERAGE VEHICLE INCREASE / DAY 203

CITY PROFILE- CITY PROFILE- ContdContd

• ANNUAL VEHICLE GROWTH 13%

• SOLID WASTE GENERATION 8000 TONS/DAY

• INDUSTRIAL AREASAREA (ACRES) NO. OF PLOTS

SITE (1947) 4460 1956KORANGI (1961) 3500 2700NORTH KARACHI (1983) 1029 280

TYPE OF INDUSTRIES : ENGINEERING, TEXTILES, CONSUMER GOODS, AUTO PARTS, LEATHER PRODUCTS,PHARMACEUTICAL PRODUCTS,BASIC CHEMICALS, PAINTS, LPG PLANTS ETC.

CITY PROFILE- CITY PROFILE- ContdContd

AIR POLLUTION LEVEL

BASED ON VARIOUS SURVEYS / STUDIES AIR POLLUTION LEVELS IN THE CITY HAVE EITHER CROSSED SAFE LIMITS OR HAVE REACHED THE THRESHOLD VALUES.

AUTHORITY: CITY DISTRICT GOVERNMENT KARACHI

TOWNS 18

UNION COUNCILS 178

CANTONMENT BOARDS 6

ADMINISTRATIVE SET-UPADMINISTRATIVE SET-UP

CITY AT A GLANCECITY AT A GLANCE

MAJOR ENVIRONMENTAL ISSUESMAJOR ENVIRONMENTAL ISSUES URBAN CHAOS

CONGESTION, LACK OF INFRASTRUCTURE, LACK OF PLANNING AND COORDINATION

DEGRADED ROAD ENVIRONMENTPOOR CONDITION OF VEHICLES PLYING POOR CONDITION OF ROADSBAD ROAD USER BEHAVIOUR

INDUSTRIAL POLLUTIONNEGATION OF ENVIRONMENTAL STANDARDS

POLLUTION FROM POWER PLANTS / GENERATORSOPERATION OF POWER PLANTS / GENERATORS WITH FURNACE OIL / DIESEL

SOLID WASTE MANAGEMENTIMPROPER DISPOSAL OF INDUSTRIAL / DOMESTIC / HOSPITAL AFFLUENT AND WASTE

TRANSPORT SITUATIONTRANSPORT SITUATION

Karachi: 40 persons competing for one bus seat

Mumbai: 12 persons competing for one bus seat

Hong Kong: 8 persons competing for one bus seat

KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL

Karachi Travel DemandKarachi Travel Demand

(Mechanised Trips-2004)(Mechanised Trips-2004) Trip Generation /day Over 13.6 million Public Transport (B/MB/C/CC) 52% Private / Para-transit 48%

FUEL CONSUMED (2001- 02)

GASOLINE 729 Tons/ day DIESEL 1780 Tons/ day

AIR POLLUTION DUE TO DIESEL DRIVEN VEHICLES (CONSERVATIVE ESTIMATES)

Tons/ day

CO2 4770.40HYDROCARBONS 4.63SULPHUR DIOXIDE 33.82NITROGEN OXIDES 19.58CARBON MONOXIDE 77.43PARTICULATE MATTER 4.27

FUEL CONSUMPTION & FUEL CONSUMPTION & IMPACT ON ENVIRONMENT IMPACT ON ENVIRONMENT

Assessment of Air Quality in Assessment of Air Quality in Karachi- 2002 by SUPARCO Karachi- 2002 by SUPARCO Concentration of TSP & PM 10 in ug/m3 at

different sites of Karachi and around cement plants

SITES TSP

(µg/m3)

PM 10

(µg/m3)

Civic Centre 367 227

Garden Rd. 371.9 243

Elender Rd. 342.2 213.2

West Wharf 367.8 261.4

Korangi Gas T. 411.6 377.2

K. Creak 252.9 203.3

Gizri 267.8 252.9

SITE 357 267.8

Assessment of Air Quality in Assessment of Air Quality in Karachi- 2002 by SUPARCO Karachi- 2002 by SUPARCO

((Contd.)Contd.) Rashid Minhas Rd. 227.8 138.8

G. Jauhar 239.4 197

N. Kar. (Javedan Cement Factory) 496 317.5

Nooriabad (Dada Bhoy Cement Factor) 406.7 317.5

Near Essa Cement Plant) 545.6 406.7

Pakland Cement Factory 388.5 289

USEPA PERMISSIBLE LIMIT

(24h) FOR TSP IS 260 µg/m3

USEPA PERMISSIBLE LIMIT

(24h) FOR PM 10 IS 150 µg/m3

IMPROVEMENT PROGRAMMES IMPROVEMENT PROGRAMMES

UPDATING OF KARACHI MASTER PLAN

REVAMPING OF PUBLIC TRANSPORT SYSTEM

INDUCTION OF EURO-II AND CNG ENVIRONMENTAL FRIENDLY BUSES

CONVERSION OF AUTO RICKSHAWS TO CNG

LOW COST TRAFFIC MANAGEMENT SCHEMES:

BUS LANES, BUS STOPS, INTERSECTIONS IMPROVEMENT, URBAN TRAFFIC CONTROL,

SMV FACILITIES - FOOTPATHS ETC.

CREATION OF VEHICULAR FREE ZONE- PEDESTRIAN MALLS IN DOWN TOWN

CAPITAL INTENSIVE TRANSPORT IMPROVEMENT PROGRAMMES:

CONSTRUCTION OF ROAD INFRASTRUCTURE PROJECTS INCLUDING FLYOVERS / UNDER PASSES ETC.

- NORTHERN BY PASS- LYARI EXPRESSWAY

MOTOR VEHICLE TESTING AND DRIVERS’ TRAINING PROGRAMMES THROUGH PUBLIC PRIVATE PARTNERSHIP BASES

DEMAND MANAGEMENT

REVITALIZATION OF KCR

IMPLEMENTATION OF RAIL BASED MASS TRANSIT PROJECT ON PRIORITY-I CORRIDOR

REVAMPING OF PUBLIC TRANSPORTREVAMPING OF PUBLIC TRANSPORT (PUBLIC / PRIVATE PARTNERSHIP APPROACH)(PUBLIC / PRIVATE PARTNERSHIP APPROACH)

KPTS

Routes in Operation = 10

Buses / Coaches = 230

UTS (CDGK + GOS)

Routes in Operation = 10

Existing Bus Fleet = 200

Buses to be inducted = 300(by Dec 2004)

KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL

KARACHI CIRCULAR RAILWAY (KCR)KARACHI CIRCULAR RAILWAY (KCR)

(1964 – 2004)(1964 – 2004)

KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL

KARACHI MASS KARACHI MASS TRANSIT PROGRAMMETRANSIT PROGRAMME

KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL

1

1

2

2

3

3

4

4

5

5

6

6

COMPONENTS OF PRIORITY COMPONENTS OF PRIORITY ACTION PLANACTION PLAN

Corridor- I

Stage-I

Tower to Sohrab Goth -15.2 k.m

Stage-II

Extension upto New Sabzi Mandi-8 k.m

Corridor-II

Cantt. Station to Orangi Town – 13.4 k.m

KCR

Revitalization and Up-gradation-58 k.m

Total: 86.6 k.m

(Serve 60% + commuters)

KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL

STUDY IN HAND STUDY IN HAND

THE CDGK IS UNDER TAKING A STUDY ON ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF THE OPERATION OF VEHICULAR TRAFFIC WITH THE FOLLOWING OBJECTIVES:

TO CREATE THE BASELINE DATA TO DETERMINE AND ESTIMATE THE EXTENT OF POLLUTION AND THE DAMAGES DONE TO THE HEALTH AND LIVING ENVIRONMENT

IDENTIFICATION OF REMEDIAL MEASURES AND THE MOST APPROPRIATE COURSE OF ACTION FOR ABATEMENT OF ENVIRONMENTAL POLLUTION IN THE TRANSPORT SECTOR

BROADER TASKS WILL INCLUDE:

ASSESSMENT OF THE PROBLEM DUE TO DIFFERENT FUELS IN USE

IDENTIFICATION OF THE ROLE OF CULTURAL PRACTICES OPERATING IN THE TRANSPORT SECTOR AND THEIR CONTRIBUTION TO THE SOCIO-ECONOMIC AND ENVIRONMENTAL PROBLEMS OF THE CITY

ESTIMATION OF THE COST OF ENVIRONMENT POLLUTION RESULTING FROM PRESENT DILEMMA IN THE TRANSPORT SECTOR

STUDY IN HAND- Contd STUDY IN HAND- Contd

THANK YOU