Air-Ground Datalink Communications Implementation Status
Brussels, November 15th 2018
Air-Ground Datalink Communications
Heiko Teper - DP Realisation Manager
2
Ground – DLS Planned Implementation Planned Implementation status - December 2018
To have a clear picture of the DLS implementation status, a dedicated monitoring session has been
performed by the SDM in March 2018, with the aim of collecting updated and detailed information from
the involved stakeholders concerning the planned DLS Provision in European Airspace by
December 2018:
Airborne – DLS implementation Implementation Status and Future trends
3
Source: SDM Survey amongst EU/ECAC Headquartered Airspace Users (July 2018)
ATN B1 capability in Multi-frequency environment in aircraft domain
More than 40 AUs, headquartered in Europe/ECAC area have provided their feedbacks within the
SDM questionnaire. The results are related to more than 3.400 aircraft:
Feedbacks provided by ANSPs and Airspace Users on July 2018 allowed the SDM to obtain the
present and future deployment level of VDL Mode 2 in the airborne domain:
Implementing Projects Involving Military Stakeholders (1/4) Overview
4
2016 CEF Call IPs involving Military Stakeholders
ID Ref Title Implementing Partner
2016_089_AF6 ITAF ATC CONTROL SYSTEM MOVING TO i4D Italian MOD
2016_125_AF6_AIR Airbus A310 ATN VDL2 Compliance. (AIR) Spanish Airforce
2016_125_AF6_GND Airbus A310 ATN VDL2 Compliance. (GND) Spanish Airforce
2016_126_AF6_AIRFALCON 900 compliance with Air Ground ATN VDL2 Data Link
(AIR)Spanish Airforce
2016_126_AF6_GNDFALCON 900 compliance with Air Ground ATN VDL2 Data Link
(GND)Spanish Airforce
No Implementing Project has been submitted by Military Stakeholders in 2017 CEF Transport Call
The following Implementing Projects have been submitted by Military Stakeholders within 2016 CEF
Transport Call:
Implementing Projects Involving Military Stakeholders (2/4) 2016_089_AF6 - ITAF ATC CONTROL SYSTEM - MOVING TO i4D
5
ID Ref Title Implementing Partner
2016_089_AF6 ITAF ATC CONTROL SYSTEM - MOVING TO i4D Italian MOD
Project Description:
The project aims at fully support and manage data information exchange concerning the i4D concept at the
ground ATC control system level, in order to ensure the interoperability among Italian civil and military Area Air
Traffic Service Units.
Particular focus is referred to the Human Machine Interface (HMI) upgrade in the operational display subsystems,
that will be aligned with the new functionalities being implemented by ENAV in the Flight Data Processing FDP
system (FDP), and ready for implementing ATS Services based on ATN Baseline 1 (CPDLC message).
In order to ensure the interoperability among Italian civil and military Area Air Traffic Service Units, Area Military
Control Centres are co-located in civil ACCs. Each service provider is responsible for its equipment, and due to
interoperability reasons there is need to upgrade ITAF systems to display correctly surveillance and FDP information
on military Controller Working Positions.
Implementing Projects Involving Military Stakeholders (3/4) 2016_125_AF6 - Airbus A310 ATN VDL2 Compliance (AIR+GND)
6
ID Ref Title Implementing Partner
2016_125_AF6 Airbus A310 ATN VDL2 Compliance (AIR+GND) Spanish Airforce
Project Description:
The aim of this Project is to enable ESAF A310 fleet with required capabilities to operate within the European Air
Traffic Management Network, including ATN VDL-2 that will enable CPDLC (Control Pilot Data Link Communication)
and i4D.
More specifically, it will be used to enable ATN B1 and ATN B2 services. Trajectory data will be automatically
downlinked from the airborne System according to contract Terms. Then target times (Target Time Over (TTO)/ Target
Time for Arrival (TTA)) will be used as inputs to ATM (air Traffic Management) and ATFCM (Air Traffic Flow and
Capacity Management) constraints and for Arrival sequencing.
Furthermore, equipping will only be done when the technical specifications of the Technology are validated.
Implementing Projects Involving Military Stakeholders (3/4) 2016_126_AF6 - FALCON 900 compliance with Air Ground ATN VDL2 Data Link
(AIR+GND)
7
ID Ref Title Implementing Partner
2016_126_AF6FALCON 900 compliance with Air Ground ATN VDL2 Data Link
(AIR+GND)Spanish Airforce
Project Description:
The aim of this project is to enable SAF Falcon 900B aircraft with required capabilities to operate within the
European Air Traffic Management Network, including ATN VDL-2 that will enable CPDLC and i4D.
More specifically, it will be used to enable ATN B1 and ATNB2 services. Trajectory data shall be automatically
downlinked from the airborne system according to contract terms. Then target times (TTO/TTA) shall be used as
inputs to ATM and TFCM constraints and for arrival sequencing.
Involvement of Military Stakeholders in monitoring process
8
The SDM highlights the importance of civil/military collaboration in contribution to the monitoring
processes to:
Allow a synchronized deployment throughout Europe, maximizing benefits and
efficiency
Allow the coordination of the deployment with civil stakeholders
Find other partnership agreements to deploy
Guide Military Stakeholders on setting priorities when deploying the PCP
Support and anticipate potential risks of delay and find potential mitigation actions
Find incentives for deployment through the different INEA CEF Calls under SDM
coordination
Adequately track of the overall status of PCP deployment
Ensure homogeneous and harmonized reporting on the PCP among different
military authorities