Ag & Au Open Pit Mining Project don balo
DON BALO is a mining PROJECT on an EARLY EXPLORATION STAGE where SILVER and GOLD (among other minerals) have been hosted inside a LIMESTONE ore deposit which has been dated back to the CRETACEOUS period. The PROJECT is looking to achieve it’s PRODUCTION STAGE and SUSTAINED DEVELOPMENT through a JOINT VENTURE (between OWNER – INVESTOR/FINANCIAL INSTITUTION – CONTRACTOR), reaching an agreement for a SUCCESSFUL BUSINESS RELATIONSHIP.
?
?
?
DON BALO PROJECT GOALS
ESTIMATED Au AVERAGE GRADE
2 gr/TON
RECOVERY > 65%
5,000 TPD CRUSHING &
GRINDING PLANT
PRODUCTION COSTS
< $800 USD/Oz Au
BIO-LEACHING LEACHING FLOTATION
COMMODITY PRICE
$ 1,450 USD/Oz Au
200 Oz/day Au
$135K USD/day ($40M USD/YEAR)
-TAXES - INVESTMENT
+ SUB PRODUCTS
Don Balo Mining Concession AREA: 4766.4053 Ha
Issued from November 19, 2010 and valid through
November 18, 2060
100 % owned by Armando González Rovira
A Local Community Agreement has been settled to
perform all necessary exploration works including
drilling and rock extraction from the zone for further
analysis.
Environmental Impact Manifest (MIA) for this specific
activities has also been achieved at the corresponding
Natural Resources Preservation Entity (SEMARNAT)
The Mexican Geological Service (SGM), Mining
Development Trust (FIFOMI), and the General Mining
Coordination have granted a 100K USD credit for 1st
stage drilling program inside DON BALO Mining
Concession Project. Drilling program will begin shortly.
Some of these magmatic flows can be found through the area of interest, where clearly we can observe how the limestone has been broken and a different material is in between the limestone layers.
Geomorphology
Stratigraphy
Regional Geology
Soils
This Project has found it’s feasibility according to the existing
infrastructure, location, environmental regulations, labor force
availability, commodities price, sub-products potential.
PROBABLE and ESTIMATED reserves:
GOLD: 12 M oz.
SILVER: 340 M oz.
Over an area of 550 hectare out of the 4776.4053 hectare of Don
Balo and estimation is made up to a depth of 9.80 meters.
Assays and tests have showned that gold can be found in:
A very fine free form
Sulfides
Oxides
Processing the refractory gold will require a combination of heap-
leaching, bio-leaching and flotation to achieve recoveries around
65%
PHASE I 6 MONTHS INVESTMENT/FUNDING COMPLETE REMAINING EXPLORATION WORKS PHASE II 8-10 MONTHS PERMITTING AND DEALS PILOT PLANT DESIGN & OPERATION PHASE III 10-12 MONTHS WORKING CAPITAL, ENGINEERING, CONCRETE/STEEL STRUCTURES MINING PLANT: CRUSHING, GRINDING, CONCENTRATE, BENEFICIATION MINING CAMP FACILITIES, LABORATORY EQUIPMENT/VEHICLES PHASE IV INITIAL BLAST PRODUCTION
DON BALO PROJECT PHASES
SOCIAL BENEFITS
GREEN TECHNOLOGY
ENVIRONMENTAL REMEDIATION REGIONAL/STATE ECONOMY
DON BALO
Negotiate LONG TERM ACCESS and DEALS with
Local Community and 2 particulars
Explosives Permit
Environmental Impact Manifest
ETJ permit regarding minining operation in the area,
which is directly linked to Environmental Impact
Manifest
Don Balo Project is a great business opportunity within
the mining sector.
It is a chance to develop a greener, cleaner and
modern option in mining applying the most advanced
techniques and technology available as well as for the
energy consumption requirements. WE CAN make it
environmentally friendly and a true ROLE MODEL for the
XXIst Century Mining Industry.
Ag & Au Open Pit Mining Project
Grupo Minero ARGORO S.A. de C.V.
Moliere 340-B / 101
Polanco, Miguel Hidalgo
C.P. 11550
México, D.F.
Phone/Fax: +52 (55) 52818756
www.argoro.com
Don balo