Open Pit Mining

5
Open Pit Mining ORE / WASTE TRACKING SAMPLE TRACKING BLAST BLOCK MONITORING GRADE CONTROL SAMPLE TRACKING DMS PROCESS ASSET TRACKING SCREEN PANEL MANAGEMENT INBOUND LOGISTICS OUTBOUND LOGISTICS MINING OPERATION S EMERGENCY EVACUATION RTLS CAS SAFETY RFID enabled Solutions

description

RFID enabled Solutions. Open Pit Mining. 2. 1. 3. 6. 7. 8. 8. 9. 4. 10. 5. 13. 4. 14. Surveyor Drill Stake. Blast Block 302 Blast Holes. Blast Hole 300 mm OD. YOU CAN’T MANAGE WHAT YOU CAN’T MEASURE. Toe. Floor Over Dug. Gravel Stemming Material. Stemming Height. - PowerPoint PPT Presentation

Transcript of Open Pit Mining

Page 1: Open Pit Mining

Open PitMining

ORE / WAST

ETRACKING

SAMPLE TRACKING

BLAST BLOCK MONITORING

GRADE CONTROL

SAMPLE TRACKING

DMS

PROCESS

ASSET TRACKING

SCREEN PANEL MANAGEMENT

INBOUND LOGISTICS OUTB

OUND LOGISTICS

MINING OPERATIONS

EMERGEN

CY EVACUATION

RTLS

CAS

SAFETY

RFID enabled Solutions

Page 2: Open Pit Mining

• Sample Tracking

• Ore Waste Tracking

Page 3: Open Pit Mining

SURFACE MINING

APPLICATION

Exploration Samples 1

Drill Instructions 2

Grade Samples 3

On Line Samples 4

Laboratory Sample process 5

3D Block Mapping 6

Blast Movement Analysis 7

Hauling Ore / Waste 8

Pit To Plant 9

Plant Optimisation 10

Ore Management 11

Process Efficiency Monitoring 12

Mixing and Blending 13

Stockpile Management 14

12

4

4

5

36 7

8 8

9

10

14

13

Page 4: Open Pit Mining

Surveyor Drill Stake

YOU CAN’T MANAGE WHAT YOU CAN’T MEASURE

Blast Block302 Blast Holes

Blast Hole300 mm OD.

Page 5: Open Pit Mining

Blast Movement Analysis

YOU CAN’T MANAGE WHAT YOU CAN’T MEASURE

Gravel StemmingMaterial

Su

bd

rill

De

pth

Toe Floor Over Dug

Design Top Of Bench

Design Bench FloorCh

arg

e H

eig

ht

Ste

mm

ing

He

igh

t

Explosive Charge