ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

17
April 2003 ASAS TN 28-30 April 2003 Workshop 1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der Kraan ADS Programme Manager EUROCONTROL

description

ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”. Pieter van der Kraan ADS Programme Manager EUROCONTROL. Package I Architecture Activities. Airborne Surveillance Application Users. ADS-B. A-SDPD ADS-B Aircraft *. A-SDPD ADS-B Aircraft *. - PowerPoint PPT Presentation

Transcript of ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

Page 1: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 1

ADS ProgrammeASAS TN Workshop (28-30 Apr ‘03)

“Package I Architecture and CBA Activities”

Pieter van der KraanADS Programme Manager

EUROCONTROL

Page 2: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 2

Package I Architecture Activities

Page 3: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 3

End-to-End ADS-B/TIS-B Architecture

Flight PlanCorrelation

Manager

ADS-B/TIS-B Architecture Boundary

ADS-B

ADS-B TIS-B

GroundADS-B/TIS-B

G-SDPD

Airborne Surveillance Application Users

Ground SurveillanceApplication Users

unequippedAircraft **

RadarsASDE

Multi-Lat.

** or equipment in failure

A-SDPD

ADS-BAircraft *

A-SDPD

ADS-BAircraft *

* or vehicle

Page 4: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 4

ADS-B & TIS-B Architecture DefinitionMajor Objectives

Establish a common view of ADS-B & TIS-B functions Facilitate cross-communication between the various

corresponding European projects Provide a means towards Interoperability

Support the Validation activities Establish a logical and traceable bridge from requirements

(OSED, SPR, INTEROP) to infrastructure component specifications

Support the Validation Infrastructure Development (AVT) Support the CBA activities

Page 5: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 5

OSEDs, SPR, INTEROP

Functional Architecture (FA): identification of:• functions and sub-functions (functional requirements)• high level data flows• rules for data exchange

Physical Architecture (PA): mapping of the FA requirement onto components to support infrast. dev. • Includes performance requirements/specifications• Detailed interfaces (protocol, ASTERIX, etc)

Infrastructure Component Development (AVT)

Top-Down Flow of RequirementsFrom ED78A to Validation platform

Tra

ceab

ilit

y

In

tero

per

abil

ity

elem

ents

Page 6: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 6

Ground Functional and PhysicalArchitecture Definition

ADS-B & TIS-B Functional Architecture: Intermediate ground FA (Functional Architecture) document

focused on TIS-B is available Work is on-going for the next version including ground

ADS-B aspects (May 2003) At a later stage, airborne aspect resulting from the study on

the airborne functional architecture will be included ADS-B & TIS-B Ground Physical Architecture (allocation

of requirements to physical components) has started

Page 7: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 7

Link#1

Link#2

ADS-B

ADS-B GroundData Acquisition

Ground Surveillance Data

Processing & Distribution

TIS-B Data Processing &Distribution

TargetReportsRadar (SSR/PSR)

ASDEMulti-Lat

Flight Plan Correlated Data

Tracks

Flight PlanCorrelation

Manager

Tracks

Link#1

Link#2

TIS-B

Tracks

Ground SurveillanceApplication Users

Ground ADS-B/TIS-B Architecture

Page 8: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 8

“Airborne Surveillance Functional Architecture” Study

“ASFA” Study constitutes a major ADS Programme airborne related activity centred around the Airborne SDPD function

Project teams comprise key airframers and avionics industry Project delivers :

Position Paper on ACAS-ASAS/ADS-B Relationship Functional, performance and interface requirements for an Airborne

SDPD prototype Including development recommendations derived from an analysis of existing Ground

SDPD systems

Airborne Surveillance Functional Architecture Definition Workshops facilitated exceptional platform for extensive

discussions between major industry parties

Page 9: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 9

“ASFA” Project Teams

NLR led Consortium NLR (Project Manager) Rockwell-Collins (Technical Manager) BAe Systems Boeing

THALES Avionics led Consortium THALES Avionics (Project Manager) ACSS CENA Airbus

Page 10: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 10

“Surveillance Processing Layer”

“Application Layer”(Source + End System)

ADC

IRS FMS

etc

GPS

Airb

orne S

urveillan

ceC

ontrol F

un

ction

Application Pre-processing

“End Systems”e.g. CDTI, FMS, Tools

Link#1

Link#2

ADS-B

Link#1

Link#2

ADS-B(TIS-B)

“Data Link Layer”

ADS-B out ADS-B in

Air

bor

ne

Su

rvei

llan

ceC

ontr

ol F

un

ctio

n

AircraftArchitecture

Data ConcentrationData Routing

Data CollectionData Processingand Distribution

ACAS

Airborne ADS-B/TIS-B Architecture

Page 11: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 11

PROVECWP

FPPS

Radar

VDL-4 GS

ADS-B reports

tracks

plots

Flight plan

Flight plan

A320-CDTI

ADSP

ARTASv6b1SDPDUAT GS

NUP

1090 GS

ADS-MEDUP

TIS-B

Server

tracks

TIS-B msg

AST062

ADS-B

Server

ADS-B Link

Simulator

AirSpace

Traffic

Generator

A/G

Link Model

ADS-B reports AST021

ATC Tools

State

vectors

ADS-B reports

ADS-B reports

TIS-B masg

Flight

correl..

ADS-B reports

ADS-B reports

CrossLink ADS-B reports

MCS

MASS

ARTAS2

Scope of Ground ADS-B & TIS-B Physical Architecture

Architecture Definition and AVT

Page 12: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 12

Package I CBA Activities

Page 13: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 13

Package I Cost Benefit Analysis Package I CBA Study is on-going :

Review Group including NATS, IATA, LH, SAS, IAOPA, Rockwell-Collins; Airbus; CARE-ASAS

Focuses on a sub-set of applications (ground and air) with significant potential for operational benefits

The current CBA document shows : High benefits (up to 2Bn€) from :

SSR radar replacement Enhanced Visual Approaches Enhanced Sequencing and Merging;

Also, strong indications that other Package I applications will generate a very positive return on investment :

Crossing and Passing en-route; extension of S&M to the approach phase

Page 14: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 14

Airborne Infrastructure Equipage Options and Scenarios

Package I Equipage Options: Option 1: “ADS-B out” Option 2a: “ADS-B in” ATSAW Option 2b: “ADS-B in” ATSAW & Spacing w/o automation Option 3: “ADS-B in” ATSAW & Spacing with automation

Option 3 upgradable to Package II at relatively low cost

Package I Equipage Scenarios : For Air Transport & Helicopters (off-shore) :

Scenario #1 applying equipage option 2a Scenario #2 applying equipage option 2b Scenario #3 applying equipage option 3

For General Aviation & Military applying equipage option 1

Page 15: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 15

Initial Cost Benefit Results(ECAC-wide)

Application Benefits Airbornecosts

scenario 1

Airbornecosts

scenario 2

Airbornecosts

scenario 3

Groundcosts

Radar replacement benefits(ADS-B-ACC & ADS-B-TMA)

148 M€

Final approach spacingbenefits (cf ATSA-SVA) (*)

1772 M€

Sequencing and merging(ASPA-S&M) (*)

428 M€

ASPA-C&P 893 M€ADS-B APT 10 M€ATSA-SURF (**) 400 M€ATSA-AIRB (***)ASPA-ITP 70 M€

Package 1 total benefit(100% equipage)

3721 M€ 1537 M€ 3047 M€ 5753 M€ 237 M€

Package II: Cluster controlbenefits total (100% equip)

962 M€

TOTAL BENEFITS 4683 M€

Equipage Option/Scenario 3 upgradable at low cost to support Package II

Page 16: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 16

Package II CBA Considerations

Application Examples: Airborne separation applications (Cluster Control alone

would account for ~1B€) Airborne self-separation applications in low-density airspace

(initial high level estimates of ~1.5B€; not investigated further)

Upgradability of Airborne Architecture options, from Package I to Package II requirements is a key issue under consideration

Page 17: ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities”

April 2003 ASAS TN 28-30 April 2003 Workshop 17

Conclusions ADS/B and TIS-B Architecture Definition :

Establishing a logical and traceable bridge from Requirements to Infrastructure Component Specifications

Providing a means towards Interoperability Ground Functional and Physical Architecture Definition “Airborne Surveillance Functional Architecture” Study

CBA Activities : The work is on-going for review by the Review Group Package I shows potential for a positive CBA Evolution to Package II