Access Road. · 2020. 11. 22. · 77,230 5,000 8,500 50,125 37,700 12,175 100,000 48,502 2,000...

1
200 2,700 200 48,502 200 4,723 6,674 25,651 6,674 7,575 1,569 5,231 2,369 77,230 5,000 8,500 50,125 37,700 12,175 100,000 48,502 2,000 2,923 200 38,800 200 7,175 200 100,000 100,000 100,000 5,342 200 31,400 7,400 200 1,591 5,584 200 200 1,025 150 3,025 200 200 2,225 150 2,000 200 200 2,225 150 2,000 200 200 4,200 200 4,600 4,600 12,000 ramp up ramp up walk way Under ground water tank pv pv pv pv pv pv pv pv pv pv pv passage passage Entry Porch terrazzo polish f/f Bascket Ball Pitch Playing Field. Ic Ic Ic Ic Ic Ic Ic Ic Ic Mh Mh Septic Tank Landscaped garden. Fire horse reel cemt.screed f/f cemt.screed f/f cemt.screed f/f Soak pit Access Road. ramp up Court Yard N Fire Exit Fire Exit Fire Assembly point Fire Exit 2. All figured dimensions to be taken in preference to scaled dimensions ARCHITECTURAL Drawing Title. 1:100 DO NOT SCALE FROM THE DRAWING USE FIGURED DIMENSION ONLY 2. All figured dimensions to be taken in preference to scaled dimensions LEGEND Working Drawings 3. All walls below 200mm to be reinforced with hoopiron at alternative courses REV. CONSULTANTS BY REV. DESCRIPTION Evans Job Title Checked by: 1. All work to be carried in accordance with the council regulations Date Nov. 2020 5. Pv indicate permanent ventilations. 8. All sanitary work to be in accordance with MOH rules and regulations. BY 9. 500g Polythene sheeting, anti- termite treatment to be provided underground floor concrete slab. Gbm Drawing No. Rev. No. Client 01 DATE. Arch. Evans Asiyo 6.All drainage passing under the building and drive area to be of pvc pie and encased in concrete. REVISIONS [Site plan ]. Scale Proposed Gubadleey Secondary School in Mogadishu, Somalia. NOTES 7. All inspection chambers in drive areas to be heavy duty covers. 11. All reinforced concrete work is to be in accordance with structural Engineer's specifications. CADD FILE 10. Check all dimension on site. L[-01-] Apt/ADRA/03 DATE. NOTES 4. Provide damp proof course (DPC) under all walls. Design by: NOTES ADRA DEVELOPMENT & RELIEF AGENCY, SOMALIA. Fire Exit Parking Parking Wc. Sentry box Ic Assembly ground Under ground water tank Septic. tank Mh Mh Soak pit Ic Ic Ic Ic Ic Ic Ic Ic gt Ic

Transcript of Access Road. · 2020. 11. 22. · 77,230 5,000 8,500 50,125 37,700 12,175 100,000 48,502 2,000...

  • 200

    2,70

    020

    0

    48,502 200 4,723 6,674 25,651 6,674 7,575

    1,56

    95,

    231

    2,36

    977

    ,230

    5,00

    08,

    500

    50,125 37,700 12,175

    100,

    000

    48,502 2,000 2,923 200 38,800 200 7,175 200

    100,

    000

    100,000

    100,000

    5,342 200 31,400 7,400200 1,591

    5,584 200

    200

    1,02

    515

    03,

    025

    200

    200 2,225150

    2,000 200

    200 2,225150

    2,000 200

    200

    4,20

    020

    04,

    600

    4,60

    0

    12,0

    00

    ram

    p up

    ram

    p up

    walk way

    Under groundwater tank

    pv

    pv

    pv

    pv pv

    pvpv

    pv pv

    pv

    pv

    passage passage

    EntryPorch

    terrazzo polish f/f

    Bascket Ball Pitch

    Playing Field.

    IcIc

    IcIcIcIc

    Ic Ic Ic

    Mh

    Mh

    SepticTank

    Landscaped garden.

    Fire horse reel

    cemt.screed f/f

    cemt.screed f/fcemt.screed f/f

    Soak pit

    Access Road.

    ram

    p up

    Court Yard

    N

    Fire Exit

    Fire Exit

    Fire Assembly point

    Fire Exit

    2. All figured dimensions to be taken in preference to scaled dimensions

    ARCHITECTURAL Drawing Title.

    1:100

    DO NOT SCALE FROM THE DRAWING USE FIGURED DIMENSION ONLY

    2. All figured dimensions to be taken in preference to scaled dimensions

    LEGEND

    Working Drawings

    3. All walls below 200mm to be reinforced with hoopiron at alternative courses

    REV.CONSULTANTS

    BYREV. DESCRIPTION

    Evans

    Job Title

    Checked by:

    1. All work to be carried in accordancewith the council regulations

    Date

    Nov. 2020

    5. Pv indicate permanent ventilations.

    8. All sanitary work to be in accordance withMOH rules and regulations.

    BY

    9. 500g Polythene sheeting, anti- termite treatment to be provided underground floor concrete slab.

    Gbm

    Drawing No. Rev. No.

    Client01

    DATE.

    Arch. Evans Asiyo6.All drainage passing under the buildingand drive area to be of pvc pieand encased in concrete.

    REVISIONS

    [Site plan ].

    Scale

    Proposed Gubadleey Secondary Schoolin Mogadishu, Somalia.

    NOTES

    7. All inspection chambers in drive areasto be heavy duty covers.

    11. All reinforced concrete work is to be in accordance with structural Engineer's specifications.

    CADD FILE

    10. Check all dimension on site. L[-01-] Apt/ADRA/03

    DATE.

    NOTES

    4. Provide damp proof course (DPC) under all walls.

    Design by:

    NOTES

    ADRA DEVELOPMENT & RELIEF AGENCY, SOMALIA.

    Fire Exit

    ParkingParking

    Wc.

    Sentry box

    Ic

    Assembly ground

    Under groundwater tank

    Septic. tank

    MhMh Soak pitIc

    Ic Ic Ic Ic Ic Ic

    Ic

    gt

    Ic