A G E N D A - Wheeler Ridge...2020/01/01  · a 50% capacity removal from each of Wonderful Citrus...

67
Wheeler Ridge-Maricopa Water Storage District A public agency providing irrigation water service to farms at the south end of the San Joaquin Valley Meeting Location: District Office 12109 Highway 166, 6.5 miles west of Mettler, CA 661-858-2281 Regular Board Meeting Wednesday, January 8, 2020 8:30 A.M. Please note the public portion of the meeting will begin at or after 9:00 A.M. Please note the closed session of the meeting will begin at 8:30 A.M. A G E N D A 8:30 1. Call to Order 2. Closed Session Conference with Legal Counsel Re: Existing Litigation (Govt. Code § 54956.9(a)): 1. Central Delta Water Agency #1 et al v. DWR, et al Re: Monterey Plus EIR/Reverse Validation (DWR) 2. Central Delta Water Agency #2 et al v. KCWA et al Re: KFE Transfer Reverse Validation KCWA) 3. Center for Food Safety v. California Department of Water Resources Re: Kern Water Bank Revised EIR 4. Golden Gate Salmon Association et al v. Ross (National Marine Fisheries Service) Re: California Water Fix Salmon Biological Opinion 5. Bay Institute et al v. Zinke (U.S. Fish and Wildlife Service) Re: California Water Fix Delta Smelt Biological Opinion 6. California Department of Water Resources v. All Persons Interested, etc. “Complaint for Validation” Re: SWP Contract Extension Amendment (Case 34-2018-00246183) 7. California Department of Water Resources v. All Persons Interested, etc. “Complaint for Validation: Re: WaterFix Bond Validation Action (JCCP 4942) 8. Buena Vista Water Storage District v. Kern Water Bank Authority, et al. Re: KWBA Kern River EIR (Case No. BCV-19-100122) Conference with Real Property Negotiator (Govt. Code § 54956.8) 9. District’s Designated Representative: Engineer-Manager 1) Property: Water Supplies a. Negotiation With: California Department of Water Resources, Kern County Water Agency and its Member Units, And State Water Contractors Conference with Legal Counsel Re: Potential Litigation (Govt. Code § 54956.9(d)(2) and/or (d)(4)): 10. One Potential Suit 9:00 Open Session Pledge of Allegiance 3. Attorney’s Report 4. Minutes * 1. Approval of Regular Board Meeting of December 11, 2019 5. Financial Reports * 1. Filing of Treasurer’s Report * 2. Approve Payment of Accounts Payable 2.1 Director Compensation and Expense * 3. Approval of Annual Investment Policy - *Resolution Required* 6. Controller’s Report 1. Delinquent Accounts Report for December 2019 2. Budget Expenditures Report for November 2019 Page 1 of 2

Transcript of A G E N D A - Wheeler Ridge...2020/01/01  · a 50% capacity removal from each of Wonderful Citrus...

Wheeler Ridge-Maricopa Water Storage DistrictA public agency providing irrigation water service to farms at the south end of the San Joaquin Valley

Meeting Location: District Office 12109 Highway 166, 6.5 miles west of Mettler, CA � 661-858-2281

Regular Board MeetingWednesday, January 8, 2020

8:30 A.M.Please note the public portion of the meeting will begin at or after 9:00 A.M.

Please note the closed session of the meeting will begin at 8:30 A.M.

A G E N D A8:30 1. Call to Order

2. Closed SessionConference with Legal Counsel Re: Existing Litigation (Govt. Code § 54956.9(a)):1. Central Delta Water Agency #1 et al v. DWR, et al Re: Monterey Plus EIR/Reverse Validation (DWR)2. Central Delta Water Agency #2 et al v. KCWA et al Re: KFE Transfer Reverse Validation KCWA)3. Center for Food Safety v. California Department of Water Resources Re: Kern Water Bank Revised EIR4. Golden Gate Salmon Association et al v. Ross (National Marine Fisheries Service) Re: California Water Fix

Salmon Biological Opinion5. Bay Institute et al v. Zinke (U.S. Fish and Wildlife Service) Re: California Water Fix Delta Smelt Biological

Opinion6. California Department of Water Resources v. All Persons Interested, etc. “Complaint for Validation” Re: SWP

Contract Extension Amendment (Case 34-2018-00246183)7. California Department of Water Resources v. All Persons Interested, etc. “Complaint for Validation: Re:

WaterFix Bond Validation Action (JCCP 4942)8. Buena Vista Water Storage District v. Kern Water Bank Authority, et al. Re: KWBA Kern River EIR (Case No.

BCV-19-100122)Conference with Real Property Negotiator (Govt. Code § 54956.8)9. District’s Designated Representative: Engineer-Manager

1) Property: Water Suppliesa. Negotiation With: California Department of Water Resources, Kern County Water Agency and

its Member Units, And State Water ContractorsConference with Legal Counsel Re: Potential Litigation (Govt. Code § 54956.9(d)(2) and/or (d)(4)):10. One Potential Suit

9:00 Open Session Pledge of Allegiance

3. Attorney’s Report

4. Minutes* 1. Approval of Regular Board Meeting of December 11, 2019

5. Financial Reports* 1. Filing of Treasurer’s Report * 2. Approve Payment of Accounts Payable

2.1 Director Compensation and Expense * 3. Approval of Annual Investment Policy - *Resolution Required*

6. Controller’s Report1. Delinquent Accounts Report for December 20192. Budget Expenditures Report for November 2019

Page 1 of 2

7. President’s Report1. Designate Assistant Secretary to Board

8. Engineer-Manager's Report1. Filing of the Monthly Report2. Water Supply - 2019 SWP Final Allocation of 75%

a. 2020 SWP Initial Allocation - 10%b. 2019 Water Supply/Demand Estimatec. General Authorization for Water Purchasesd. Other Purchases /Exchange

3. Water User Carryover Analysis and Banking Options* 4. Delta Conveyance Project* 5. Sites Reservoir* 6. Disposal of Surplus District Property/Equipment - *Resolution Required*

9. Reports1. Director’s Reports on Meetings Attended2. Kern County Water Agency3. Kern Water Bank4. Kern Groundwater Authority5. White Wolf Groundwater Sustainability Agency6. Kern River Watershed Coalition Authority7. Committee for Delta Reliability8. Cross Valley Canal

10. Unfinished and New Business1. Form 700's

11. Public Comments

12. Adjournment

*These items may require Board action and may be moved to earlier in the meeting to ensure the maximum number of Directors are present.

Posted pursuant to Government Code § 54954.2(a) at least 72 hours prior to said meeting.By: Danyel Ruth January 3, 2020

Per Govt. Code § 54953.2 and § 54961, requests for a disability-related modification or accommodation, including auxiliary aids or services, in order to attend or participate inthis meeting should be made to the Administrative Assistant (phone 661-527-6068) in advance of the meeting to ensure availability of the requested service or accommodation.

**Per Govt. Code § 54954.3(a), A member of the public may comment on any matter on the agenda, before or during the Board's consideration of the matter (and in the case ofa closed session matter immediately before the Board goes into closed session) upon being recognized by the President and subject to any time constraints the President mayimpose from time to time.

Page 2 of 2

Minutes of the Regular Board Meetingof the Board of Directors of the

Wheeler Ridge-Maricopa Water Storage DistrictConvened at 8:00 A.M., December 11, 2019

The regular meeting of the Board of Directors of the Wheeler Ridge-Maricopa Water Storage District was held atthe District Headquarters office, 12109 Highway 166 Bakersfield, CA 93313 on Wednesday December 11, 2019at the hour of 8:00 A.M. President Atkinson declared a quorum was present and called the meeting to order.

Directors Present. Atkinson, Blaine, Fry, Marin, Mettler, Reiter, Richardson.

Directors Absent. Valpredo & Division 9 Vacancy.

Others Present at 8:00 A.M. Engineer-Manager Sheridan Nicholas, District Consultant Bill Taube and Attorneyfor the District Steve Torigiani.

Others Present at 9:00 A.M. Angelica Martin with Tejon-Castac Water District, Danielle Duncan withWonderful, Trey Irwin with Tejon Ranch, Carlos Gonzalez with Terra Bella Greenhouse, Anona Dutton withEKI, Justin Golding with Wonderful, Aaron Eyraud with Maricopa Orchards, Water Resources Manager WendyJones, Staff Engineer Tom Suggs, Controller Jim Smith, Staff Accountant Kelly Mielke, Contract AdministratorEric McDaris and Administrative Assistant Danyel Ruth.

8:00 A.M. Closed Session. The Board convened in Closed Session to consider the following matters:

Conference with Legal Counsel Re: Existing Litigation (Govt. Code § 54956.9(a)):1. Central Delta Water Agency #1 et al v. DWR, et al Re: Monterey Plus EIR/Reverse Validation (DWR)2. Central Delta Water Agency #2 et al v. KCWA et al Re: KFE Transfer Reverse Validation KCWA)3. Center for Food Safety v. California Department of Water Resources Re: Kern Water Bank Revised EIR4. Golden Gate Salmon Association et al v. Ross (National Marine Fisheries Service) Re: California Water Fix Salmon

Biological Opinion5. Bay Institute et al v. Zinke (U.S. Fish and Wildlife Service) Re: California Water Fix Delta Smelt Biological Opinion6. California Department of Water Resources v. All Persons Interested, etc. “Complaint for Validation” Re: SWP Contract

Extension Amendment (Case 34-2018-00246183)7. California Department of Water Resources v. All Persons Interested, etc. “Complaint for Validation: Re: WaterFix Bond

Validation Action (JCCP 4942)8. Buena Vista Water Storage District v. Kern Water Bank Authority, et al. Re: KWBA Kern River EIR (Case No. BCV-19-

100122)Conference with Real Property Negotiator (Govt. Code § 54956.8):

9. District’s Designated Representative: Engineer-Manager1) Property: State Water Project Supplies

a. Negotiation With: California Department of Water Resources, Kern County WaterAgency and its Member Units, And State Water Contractors

10. District’s Designated Representative: Engineer-Manager1) Property: Water Supplies

a. Negotiation With: Patterson Irrigation DistrictConference with Legal Counsel Re: Potential Litigation (Govt. Code § 54956.9(d)(2) and/or (d)(4)):11. One Potential Suit

9:00 A.M. Open Session. The Board convened in open session with President Atkinson leading the Pledge ofAllegiance. Mr. Torigiani stated their was one reportable action was taken in closed session, giving the Engineer-Manager direction on Agenda Item 2.10.

Attorney’s Report. Mr. Torigiani reviewed the November 27, 2019 letter from Young and Wooldridge to theBoard detailing Young and Wooldridge’s new fee schedule beginning in 2020.

Page 1 of 6

Appointment of Division 9 Director. Mr. Nicholas reported that only one Letter of Interest had been receivedfrom Allen Lyda of Tejon Ranch. Upon motion from Director Reiter, seconded by Director Mettler andunanimously carried with no abstentions the Board approved Resolution No. 2019-17 in the matter of:

APPOINTMENT TO FILL VACANCY IN THE OFFICE OF DIRECTOR OF DIVISION 9

Minutes. Mr. Nicholas noted a few minor typographical errors in the minutes that had been distributed whichwould be corrected. Upon motion from Director Marin, seconded by Director Blaine and unanimously carriedwith no abstentions, The Minutes of the Regular Board Meeting of Directors... Convened November 13, 2019 ascorrected were approved and filed.

Filing of the Treasurer’s Report. Treasurer Mettler presented and reviewed the Treasurer’s Report for the monthof November 2019. Upon motion from Director Mettler, seconded by Director Blaine and unanimously carriedwith no abstentions, the Treasurer’s Report for the month of November 2019 was approved and filed.

Approve Payment of Accounts Payable. Treasurer Mettler presented and reviewed the Accounts Payable -November 2019, and the Reimbursements and Transfers - November 2019. Upon motion from Director Mettler,seconded by Director Fry and unanimously carried with no abstentions, the Accounts Payable - November 2019was approved and filed.

Delinquent Accounts Report for November 2019. Mr. Smith reported that there were no delinquent accounts andthe District had received all installment payments.

Budget Expenditures Report for October 2019. Ms. Mielke reviewed the Budget Expenditures Report forOctober 2019.

President’s Report. Nothing to report.

Engineer-Manager’s Report. Mr. Nicholas stated the District had delivered 164,140 acre-feet through November,which is significantly less than the normal 180,000 to 185,000 acre-feet the District typically delivers annually.He also noted the rest of the E-M Report was included in the board packet for review.

2020 SWP Initial Allocation - 10%. Water Resources Manager Wendy Jones noted the initial SWP Allocation of10%.

2019 Water Supply/Demand Estimate. Mrs. Jones reviewed the 2019 Water Supply/Demand Estimate with theBoard and stated that the SWC had started discussions for a 2020 Dry Year Transfer.

2020 Water Supply/Demand Estimate. Mrs. Jones reviewed the 2020 Water Supply/Demand Estimate with theBoard, which includes three possible scenarios based upon three possible SWP allocations, 10%, 25% and 40%.

Approval of Form of Second Priority Sub-Account Program Agreement. Mrs. Jones reviewed her November 6,2019 memorandum to the Board entitled Second Priority Sub-Account Program Agreement. Mrs. Jones thenreviewed the minor changes made to the Agreement as a result of distributing it to the Board for review after the November Board meeting.

Upon motion from Director Marin, seconded by Director Mettler and unanimously carried with no abstentions theBoard authorized Staff to implement use of the Second Priority Sub-Account Program Agreement for allparticipating Water Users, including securing an Agreement from all previous and current participants.

Further Review of KWB Capacity Redistribution - February 2019. Mrs. Jones reviewed her December 11, 2019memorandum to the Board entitled November Board Meeting Agenda Item 8.3.b Further Administrative Review

Page 2 of 6

of Kern Water Bank Capacity Redistribution - February 2019. Included with the memorandum were threepossible options for handling the re-distribution. Those options were:

Option #1) Only KWB Canal Adjustments. No adjustments to capacity re-distribution regarding the ITissue for emails not received.

Option #2) No Change. Current adjustment and unrevised Staff determination as presented by email tothe four participants on September 10, 2019. This variance column reference is comparing whathad been banked with KWB Canal adjustments (Option #1 Total AF).

Option #3) Director Reiter’s suggestion for 50% reduction to the accounts (as stated in Option #2 / Staff determination) for those not receiving the initial emails. Modification to capacity distribution fora 50% capacity removal from each of Wonderful Citrus and Tejon Ranch Co. and re-distributethat capacity, pro-rata using CAW, to Sun Pacific Farming and Maricopa Orchards.

Mrs. Jones stated that District Staff recommends the Board support Staff’s previous review, analysis,determination and adjustments, without revision (herein Option #2), as Staff has determined this approach to bereasonable and the most fair and equitable to all parties, including the District and its Water Users overall.

Upon motion from Director Reiter (who specifically noted the abovementioned Option # 3 is not what heproposed at the regular November Board meeting), seconded by Director Blaine and unanimously carried with noabstentions the Board approved Option #3 and directed District Staff to modify KWB accounts and water ledgersas necessary to reflect the Option #3 redistribution.

Consider Approval of District’s Management Plan of KGA GSP. Mr. Nicholas reviewed his December 10, 2019memorandum to the Board entitled Consider Approval of District’s Management Area Plan (MAP) of KGA GSP,and public comments the District and KGA have received. Anona Dutton (EKI) presented a PowerPointPresentation reviewing the modifications to the District’s MAP, and answered questions from the Board andpublic. Upon motion from Director Reiter, seconded by Director Blaine and unanimously carried with noabstentions the Board approved Resolution No. 2019-18 in the matter of:

RESOLUTION APPROVING MANAGEMENT AREA PLAN FOR WHEELER RIDGE-MARICOPAWATER STORAGE DISTRICT MANAGEMENT AREA

Designate District Representative and Alternate to KGA Board of Directors. Mr. Nicholas reviewed hisDecember 9, 2019 memorandum to the Board entitled Designate District Representative and Alternate to KGABoard of Directors and recommended the Board designate a District Representative as well as an Alternate to theKGA Board of Directors.

Upon motion from Director Mettler, seconded by Director Fry and unanimously carried with no abstentions theBoard designated Director Blaine as the new District Representative and Director Richardson as the Alternate tothe KGA Board of Directors.

Consider Approval of Revised District/Landowner Non-District Lands Management Agreement. Mr. Nicholasreviewed his December 10, 2019 memorandum to the Board entitled Consider Approval of RevisedDistrict/Landowner Non-District Lands Management Agreement. Upon motion from Director Reiter, seconded byDirector Blaine and unanimously carried with no abstention the Board authorized the Engineer-Manager toexecute the First Amended and Restated Sustainable Groundwater Management Act Management Agreementwith Wheeler Ridge-Maricopa Water Storage District, subject to final approval of the Engineer-Manager andDistrict Counsel.

Delta Conveyance Project. Mr. Nicholas gave an update to the Board and stated that the DCP proposed projectwas on the agenda for tomorrow’s Member Unit Managers’ meeting.

Release of New Biological Opinions. Mr. Nicholas reviewed his December 10, 2019 memorandum to the Boardentitled Release of Draft EIR for Operation of SWP, plus the additional attached handouts.

Page 3 of 6

Consideration of Berrenda Mesa Project. Mrs. Jones reviewed her December 11, 2019 memorandum to theBoard entitled Berrenda Mesa Banking Project - First Amendment to Joint Water Banking Project Agreementwith the Board.

Upon motion from Director Reiter, seconded by Director Blaine and unanimously carried with no abstentions, theBoard authorized the Engineer-Manager to execute the First Amendment to the Joint Water Banking ProjectAgreement on the Berrenda Mesa Project, subject to final approval as to form by the Engineer-Manager andCounsel. Commendation for Dennis Mullins. Mr. Kunde reviewed the commendation he prepared for Director Mullins,and reflected on his time at the District. Upon motion from Director Mettler, seconded by Director Marin andunanimously carried with no abstention the Board approved Resolution No. 2019-19 in the matter of:

COMMENDATION AND EXPRESSION OF APPRECIATION TO DENNIS MULLINS

Designate District Representatives to Fill Various Vacancies. Mr. Nicholas thanked Mr. Taube for his nearly 10years of service to the District as a consultant. Mr. Nicholas then reviewed his December 9, 2019 memorandum tothe Board entitled Designate District Representatives to Fill Various Vacancies, particularly noting that Mr.Nicholas would be the District’s representative to serve on the Kern Water Bank Authority Board of Directors.

Sites First Amendment to the 2019 Reservoir Project Agreement. Mr. Kunde reviewed his December 9, 2019memorandum to the Board entitled First amendment to the “2019 Reservoir Project Agreement” and brieflydiscussed the document. He also noted that there would be a meeting to be scheduled next month with the variousDistrict participants. Upon motion from Director Reiter, seconded by Director Fry and unanimously carried withno abstentions, the Board authorized the Board President to execute the First Amendment to the Sites Agreement.

Director’s Meeting Attended. Nothing to report.

Kern County Water Agency. Mr. Nicholas noted the KCWA approved the previously mentioned Berrenda MesaAmendment.

Kern Water Bank. Mr. Taube reported he was meeting with the KCWA to discuss issues related to Basin 9. Healso stated that the KWB had adopted a 2020 Budget which is similar to its 2019 budget.

Kern Groundwater Authority. Mr. Nicholas stated everything has been previously covered during Agenda Item8.4.

White Wolf Groundwater Sustainability Agency. Nothing to report.

Kern River Watershed Coalition Authority. Michael Blaine reported that their was a new Treasurer for theCoalition, Dennis Johnston. Ms. Mielke also stated that they were currently looking at financial service agencies.

Committee for Delta Reliability. No meeting or handouts.

Cross Valley Canal. Nothing to report.

Consultant’s Report. Mr. Taube reported that after December he would no longer be consulting for the District,and that he would be stepping down from a number of positions, including representing the District on theKWBA Board of Directors. He stated he would continue work on the Basin 9 issue. He further noted that GeneLundquist was voted in as the new WAKC President.

Unfinished and New Business. Administrative Assistant Danyel Ruth reported that the Christmas Party would beheld on December 21st and asked for a head count of those who would be attending.

Page 4 of 6

Public Comments. None.

Adjournment. With no further business the meeting was adjourned at 11:17 a.m.

Respectfully submitted:

[Seal] ______________________________Jose Marin, Secretary of the Board

Page 5 of 6

List of Abbreviations:

ACWA Association of California Water AgenciesADM SSC Administrative Service Charge, for basic administrative costs, non-project in nature, benefitting both SWSA and groundwater service areaAECA Agricultural Energy Consumers AssociationAgency Kern County Water AgencyAWMP Agricultural Water Management PlanBDCP Bay Delta Conservation PlanBDS Bond Debt ServiceCAW Contract Amount of Water totaling 200,818 acre-feet between the District & Water UsersCEQA California Environmental Quality ActCFWC California Farm Water CoalitionCOBRA Consolidated Omnibus Budget Reconciliation ActCVC Cross Valley CanalCVP Central Valley Project (operated by the U.S. Bureau of Reclamation)CWF California WaterFix delta conveyance program (previously DHCCP)DFW California Department of Fish and WildlifeDHCCP Delta Habitat Conservation and Conveyance Program - the conveyance element of the BDCP - renamed the CaliforniaDistrict Wheeler Ridge-Maricopa Water Storage DistrictDOG California Division of Oil & GasDWR California Department of Water ResourcesDYTP Dry Year Transfer ProgramEIR Environmental Impact ReportFAA Final Accounting AdjustmentFO Fixed Obligation water rateFWS U.S. Fish and Wildlife ServiceGEN SSC General Service charge, for recovery of Bond Debt for general purposes in the DistrictGSA Groundwater Sustainability AgencyGSP Groundwater Sustainability PlanILRP Irrigated Lands Regulatory ProgramIRWMP Integrated Regional Water Management PlanJPIA Joint Powers Insurance AuthorityKCWA Kern County Water Agency or AgencyKFMC Kern Fan Monitoring CommitteeKGA Kern Groundwater AuthorityKRGSA Kern River Groundwater Sustainability AgencyKRWCA Kern River Watershed Coalition AuthorityKWB Kern Water BankKWBA Kern Water Bank AuthorityMOU Memorandum of UnderstandingMWD Metropolitan Water DistrictNoD North of the DeltaNonC Non-Contract ChargesOMR Operations, Maintenance and Repair, not to be confused with OMR of Old Middle RiversOMR Old and Middle Rivers in the Sacramento-San Joaquin DeltaOSHA Occupational Safety and Health AdministrationPEF Pastoria Energy FacilityPoE Probability of ExceedancePROJ SSC Project Service Charge, for project costs related to, but not specific to a particular systemRWQCB Regional Water Quality Control BoardSGMA Sustainable Groundwater Management ActSLR San Luis ReservoirSoD South of the DeltaSSC Special Service Charge, consists of ADM SSC, GEN SSC and PRO SSCSSJVWQC Southern San Joaquin Valley Water Quality CoalitionSVWRA South Valley Water Resources AuthoritySWC State Water ContractorsSWP State Water Project (operated by DWR)SWRCB State Water Resources Control BoardSWSA Surface Water Service Area or contracted acreagesWAC Water Availability Charge, consists of BDS, OMR & FOWater User A landowner holding a Water Service Contract with the DistrictWD Water DistrictWRMWSD Wheeler Ridge-Maricopa Water Storage DistrictWS5 Westside 5 Water Districts - Belridge, Berrenda Mesa, Dudley Ridge, Lost Hills & Wheeler RidgeWSC Water Service ContractWSD Water Storage DistrictWUC Water Use Charge, consists of State Pumping/Variable and District Pumping/VariableWWGSA White Wolf Groundwater Sustainability Agency

Page 6 of 6

5.1

01/08/2020 Brd PktFUNDS ON DEPOSIT: GENERAL FUND

BALANCE AS OF: 11/30/2019 47,738,599.50 PLUS CASH RECEIVED (SEE BELOW) FOR: Dec-19 2,446,053.83 LESS CASH EXPENDED DURING MONTH FOR: Dec-19 (1,645,445.59) (nov pr ap, cdr, mnl, fees - dec pr burdens, ee net, taxes, inv)

FUNDS ON DEPOSIT AT END OF MONTH: 48,539,207.74

THE ABOVE FUNDS ARE ON DEPOSIT AS FOLLOWS: WELLS FARGO BANK NA - CASH BALANCE 383,625.44 KCT-POOLED INVESTMENTS-CASH BALANCE 48,153,719.05 LAIF-POOLED INVESTMENTS-CASH BALANCE 1,863.25

48,539,207.74

INTEREST APPORTIONMENT PERCENTAGE (ANNUALIZED)QUARTER ENDING SEP 30, 2019 --------- 2.029%QUARTER ENDING JUN 30, 2019 --------- 2.030%QUARTER ENDING MAR 31, 2019 --------- 2.122%QUARTER ENDING DEC 31,2018 --------- 1.916% ALL FUNDS ARE PLACED IN ACCORDANCE WITH THE DISTRICT'S INVESTMENTPOLICY AND GUIDELINES. SUFFICIENT CASH FLOW EXISTS TO MEET BUDGETEDOBLIGATIONS FOR THE NEXT SIX MONTHS.

CASH RECEIVED (KERN COUNTY TREASURER/WELLS FARGO) DURING MONTH AS FOLLOWS:

Invoice 2019-80-89, 90-91, 94, 96, 98, 100-102 14170 1,640,187.89WSC - ca hampire corporation 14172 45.84Cobra Medical, Vision, Dental Ins Premium - dunn, mullins 14179 1,185.82WSC - kern county water agency 19900 30,424.39Invoice CDR 2019-lhwd, bmwd, bwsd, drwd, rrbwsd, cwd, kdwd 23307 472,168.00Special Service Charges Administrative-kc auditor/controller 43043 261,272.19Special Service Charges General-kc auditor/controller 43044 18,854.69Tower Lease, Rebate for Pump Replacement-american, lincus 46200 21,117.81JPIA Finco Expense Reimburse - ACWA JPIA 60202 797.20

$$ Receipts Summary 13150 2,446,053.83 OPERATING RESERVE FUND BALANCE: 15,480,231.00

WHEELER RIDGE - MARICOPA WATER STORAGE DISTRICTTREASURER'S REPORT FOR THE MONTH OF DECEMBER 2019

Page 1 of 12

5.1

1/8/2020 Board Packet

Audited 2019 AdjustedINTERNALLY CONSTRAINED RESERVES 12/31/2018 Adjustments 12/31/2019

OPERATING RESERVE FUND 15,480,231 15,480,231

EQUIPMENT REPLACEMENT RESERVE FUND 2,342,804 (180,526) (4) 2,100,700(61,578) (5)

GROUND WATER REPLENISHMENT RESERVE FUND 9,301,008 9,301,008

CONTINGENCY RESERVE FUND 6,494,963 154,223 (1) 6,410,395(41,703) (2)

(197,088) (3)

WATER BANKING CAPITAL RESERVE FUND 2,562,813 2,562,813

KWBA EQUIPMENT REPLACEMENT RESERVE FUND 216,476 216,476

1998 PREPAID O&M RESERVE 0 0

TOTAL RESERVE FUNDS INTERNALLY CONSTRAINED 36,398,295 (326,672) 36,071,623

THIS AMOUNT IS SHOWN AS AN UNCONSTRAINED RESERVE. 33,036,949 326,672 33,363,621THIS IS MISLEADING AS THE BOARD HAS NOT DESIGNATED SUCH A RESERVE, AND IT IS NOT A CASH ASSET (COMPARE THE$69.4 MILLION OF TOTAL RESERVES TO THE $42.7 MILLION OFCASH EQUIVALENTS ON PAGE 9 OF THE 2018 AUDIT.

UNRESTRICTED NET ASSETS 69,435,244 0 69,435,244

(1) Refund of Sites Reservoir Funding for Phase 1(2) California Water Fix - Legal Expenses(3) Committee for Delta Reliability - Membership Assessment 2019(4) Peterbilt Dump Truck - purchased in 2019 and budgeted as a Capital Expenditure in 2020

Approved and authorized by the Board of Directors on 2/13/2019(5) Ford F-450 Utility Truck - purchased in 2019 and budgeted as a Capital Expenditure in 2020

Approved and authorized by the Board of Directors on 4/10/2019

AUDITED RESERVE FUND BALANCES AS OF DECEMBER 31, 2018 PLUS ESTIMATED ADJUSTMENTSWHEELER RIDGE - MARICOPA WATER STORAGE DISTRICT

WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICTACCOUNTS PAYABLE

DECEMBER 2019

5.2ID NAME DATE INVOICE # AMOUNT DESCRIPTION 5,000+

B120 JOHN BOOKOUT 12/31/2019 12312019 25.00 MONITOR WATER - DEC. 2019B125 ROBERT CLAFFY 12/31/2019 12312019-1 50.00 OPERATOR CERT - 4TH QTR 2019B125 ROBERT CLAFFY 12/31/2019 12312019-2 25.00 DEC. WATER TREATMENTB128 ROSALYNN CASTILLO 1/6/2020 01062020 405.34 REIMBURSEMENT - 2 BC CLASSESB135 NEIL DURHAM 12/31/2019 12312019 50.00 WATER TREATMENT 4TH QTR 2019B175 DOUGLAS HARE 12/31/2019 12312019 174.00 TRANSPORTATIONB176 STEVEN LEWIS 12/31/2019 12312019 17.40 TRANSPORTATIONB209 ROBERT KUNDE 12/20/2019 12202019 1,063.02 MILEAGE/MEALS/LODGINGB211 ADRIAN MARTINEZ 12/31/2019 12312019 365.40 TRANSPORTATIONB214 KELLY MIELKE 12/31/2019 12312019 330.60 TRANSPORTATIONB222 ANGIE MONTES 12/11/2019 12112019 75.00 FOOD - BOARD MEETINGB225 MICHAEL PILATTI 12/31/2019 12312019-1 25.00 SAFETY MEETING - DEC. 2019B225 MICHAEL PILATTI 12/31/2019 12312019-2 50.00 SAFETY DIRECTOR - 4TH QTR 2019B288 THOMAS SUGGS 12/3/2019 12032019 14.90 MEALS - FALL ACWA CONFERENCEB291 WILLIAM TAUBE 12/31/2019 12312019 4,591.84 DECEMBER 2019 CONSULTINGB291 WILLIAM TAUBE 11/30/2019 11302019 4,194.89 NOVEMBER 2019 CONSULTING 8,786.73 B298 JAYSON TURNER 12/31/2019 12312019 50.00 OPERATOR CERT. 4TH QTR 2019

C0930 661 COMMUNICATIONS 12/17/2019 1469 417.19 CIRCUIT BRD - DISPATCH RADIOC0930 661 COMMUNICATIONS 12/17/2019 1468 2,888.80 RADIOS #384/385/386C1010 HYDRAULIC CONTROLS, INC. CORP. A 12/9/2019 02236242 149.29 ADAPTERS/HOSE END #384C1010 HYDRAULIC CONTROLS, INC. CORP. A 12/16/2019 02238532 248.53 HOSE/FITTING/ADAPTER #376C1050 ACWA/JPIA 12/31/2019 12312019 27,233.97 WORKERS COMPENSATION - 4TH QTR 27,233.97 C1111 AMERICAN TRAFFIC SAFETY SERVICES 6/3/2019 INV-13581-R0K5K5 81.00 MEMBERSHIP RENEWALC1116 APEX INDUSTRIAL SUPPLY INC. 12/10/2019 3097 427.07 GASKETS/WIRE WHEELSC1116 APEX INDUSTRIAL SUPPLY INC. 12/11/2019 3105 268.55 TRUCK ROPE/ROD GUARDS #369/377C1130 APPLIED TECHNOLOGY GROUP, INC 12/9/2019 INV0000018668 3,156.57 TRANSCEIVER/RETROFIT KITC1192 AVADINE 1/1/2020 106810 1,000.00 LATIS MAINTENANCE/SUPPORTC1210 B.S.& E. CO., INC. 1/4/2020 01042020 257.82 ROTOMIXX RENTAL - 14G LATERALC1247 BAKERSFIELD ICE 12/31/2019 3641 178.70 RENTAL/ICEC1277 B & R SUPPLY, INC. 12/18/2019 1900940381 31.72 PULLER JAW #381C1341 BESPECTACLED EYE CARE 12/18/2019 16238 300.00 SAFETY GLASSES - KELLEYC1390 JIM BURKE FORD 12/17/2019 1362707 64.86 WIPER SWITCH #126C1390 JIM BURKE FORD 12/6/2019 1361133 91.11 DOOR HANDLE #119C1407 BUTTE COUNTY TREASURER 12/10/2019 255 331,663.36 BUTTE TABLE A 2ND PAYMENT 331,663.36 C1431 CAL LOWBED SERVICE 12/3/2019 20157420 375.00 MOVE EXCAVATOR TO 850 #790C1431 CAL LOWBED SERVICE 12/20/2019 20157624 312.50 MOVE EXCAVATOR FROM 850 TO COPUSC1451 CALIFORNIA INDUSTRIAL RUBBER 12/13/2019 B-016317 482.63 100' - BLACK RUBBER BELTC1453 CALIFORNIA TRUCK ACCESSORIES 11/27/2019 55517 199.46 3" NERF BAR #384C1453 CALIFORNIA TRUCK ACCESSORIES 11/3/2019 55528 730.69 BUMPER BRACKET #384C1530 COASTLINE EQUIPMENT 12/18/2019 650142 600.67 SKID PLATE/WASHERSC1599 COVERALL NORTH AMERICA, INC. 12/1/2019 1545146330 659.00 WEEKLY CLEANING SERVICEC1689 E.M. THARP INC. 12/5/2019 B923692 84.03 NUT COVERS #385/386C1689 E.M. THARP INC. 12/5/2019 B923708 158.22 HUB CAPS/BLOWER KIT #385/386C1689 E.M. THARP INC. 12/11/2019 B924330 14.25 RED FLAG MARKERSC1692 EKI ENVIRONMENT & WATER, INC. 12/23/2019 B70103.01-18 12,429.28 CONSULTING/SGMA 12,429.28 C1695 ELECTRIC MOTOR WORKS INC 11/20/2019 103115 4,749.58 LABOR/PARTS - MOTORC1695 ELECTRIC MOTOR WORKS INC 11/29/2019 103166 6,112.10 LABOR/PARTS - WRM 8 UNIT 4 10,861.68 C1755 FASTENAL 11/27/2019 CABA230182 207.76 VENDING SUPPLIESC1755 FASTENAL 12/10/2019 CABA230278 1,178.96 NUTS & BOLTSC1755 FASTENAL 12/20/2019 CABA230329 197.26 42 - BOLTSC1775 FERGUSON ENTERPRISES, INC. 12/3/2019 1504448 5,621.78 COUPLERS - 5P LATERAL 5,621.78 C1815 FLYERS ENERGY, LLC 12/15/2019 CFS-2141489 44.27 FUELC1960 GRAINGER 12/27/2019 9395604524 91.01 BATTERY DISCONNECT SWITCHC1960 GRAINGER 12/18/2019 9389438293 30.06 LABEL CARTRIDGEC1960 GRAINGER 12/18/2019 9389648404 28.30 LABEL CARTRIDGEC1960 GRAINGER 12/17/2019 9387442826 187.99 50' CABLE/SOLAR PANELC1969 GRAPEVINE MSP 12/15/2019 21041 3,201.50 IT SERVICE/BACKUP/SECURITYC1980 GRAYBAR ELECTRIC CO, INC 12/4/2019 9313521764 238.99 VARIOUS CONNECTORSC1990 CUSTOM TRUCK ONE SOURCE LLC 12/30/2019 215634.02 1,165.76 INSPECTION - 366AC1992 GREG'S PETROLEUM SERVICE, INC. 12/12/2019 198387 2,418.65 RED DIESEL FUELC2075 HOWARD SUPPLY CO 12/12/2019 50903974 252.67 RATCHET STRAPSC2106 IGS SOLAR 12/11/2019 193450003411701 21,194.55 SOLAR SUPPLY CHARGEC2106 IGS SOLAR 10/15/2019 192880003298421 28,436.84 SOLAR SUPPLY CHARGE 49,631.39 C2114 INSTRUMENT CONTROL SERVICES 12/16/2019 WRW10219RMR 941.52 LEVEL TRANSMITTERC2150 JERRY & KEITH'S INC 12/18/2019 052971 2,130.28 BED VIBRATOR #385C2150 JERRY & KEITH'S INC 12/18/2019 052970 2,007.69 BED VIBRATOR #386C2168 JORGENSEN & CO 12/26/2019 5851820 218.70 02 SENSOR/INSTALL&CALIBRATIONC2213 KEN'S OPTICAL 12/9/2019 02536 249.00 SAFETY GLASSES - LOVELESSC2268 KERN GROUNDWATER AUTHORITY 12/23/2019 2019-134 8,674.10 ANNUAL COST SHARES 8,674.10 C2310 KERN WATER BANK AUTHORITY 12/20/2019 RCHG 2019-10E 23,189.50 OCT. 2019 RECHARGE FROM EASTC2310 KERN WATER BANK AUTHORITY 12/20/2019 RCHG 2019-10W 22,230.00 OCT. 2019 RECHARGE FROM WEST 45,419.50

Page 3 of 12

WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICTACCOUNTS PAYABLE

DECEMBER 2019

ID NAME DATE INVOICE # AMOUNT DESCRIPTION 5,000+C2320 KISCO SALES - BAKERSFIELD 12/17/2019 121908 127.74 CALIBRATION JUGS/CLAMPSC2330 KNIGHTS PUMPING SERVICE 12/6/2019 31809 85.79 PORTABLE TOILET/SERVICEC2338 KRONICK MOSKOVITZ TIEDEMANN & 12/20/2019 296311 540.00 SITES RESERVOIR WORKC2371 LAWSON PRODUCTS 12/16/2019 9307248121 371.11 VARIOUS DILL BITS/FITTINGSC2425 WM K. LYONS AGENCY, INC 12/26/2019 114847 124.66 BOND - LYDAC2443 MAILFINANCE 12/16/2019 N8057767 472.20 POSTAGE METER LEASEC2552 NAPA AUTO PARTS-GENUINE PARTS 12/18/2019 593907 25.61 STARTING FLUIDC2552 NAPA AUTO PARTS-GENUINE PARTS 12/11/2019 593523 49.31 RED PAINTC2552 NAPA AUTO PARTS-GENUINE PARTS 12/26/2019 594267 8.78 RAIN-X CLEANERC2655 ONE STOP AUTO CARE CENTER 12/13/2019 324097 62.35 SMOG #369C2690 P G & E #1 12/31/2019 12312019 117,406.73 DECEMBER POWERC2691 P G & E #2 12/31/2019 12312019 90,480.74 DECEMBER POWERC2692 P G & E #3 12/31/2019 12312019 2,966.83 DECEMBER POWERC2693 P G & E #4 12/31/2019 12312019 875.01 DECEMBER POWERC2694 P G & E #5 12/31/2019 12312019 1,881.24 DECEMBER POWER 213,610.55 C2800 PRAXAIR 12/22/2019 93836843 849.13 DEMURRAGEC2808 PRICE DISPOSAL INC 12/11/2019 562279 419.40 40 YD ROLLOFFC2812 PROVOST & PRITCHARD 12/6/2019 76350 418.27 WS5 WATER SUPPLYC2840 QUINN COMPANY 12/4/2019 PC080444328 988.29 1 WHEEL #686BC2840 QUINN COMPANY 12/12/2019 WO080070775 4,658.52 REPAIR BACKHOE #686B 5,646.81 C2980 SAFELITE AUTOGLASS 12/4/2019 01518-156871 228.12 WINDSHIELD #373C2982 SANCHEZ, IRENE M.D. 12/9/2019 3136-45876 100.00 PHYSICAL/DRUG SCREENC3020 SAN JOAQUIN SAFETY SHOES 12/10/2019 I100-1209688 129.90 BOOTS - CONTRERASC3020 SAN JOAQUIN SAFETY SHOES 12/13/2019 I100-1210162 129.89 BOOTS - PARKERC3082 SPARKLE UNIFORM & LINEN SERVIC 12/12/2019 0771022 551.05 UNIFORMSC3082 SPARKLE UNIFORM & LINEN SERVIC 12/26/2019 0772798 551.05 UNIFORMSC3082 SPARKLE UNIFORM & LINEN SERVIC 12/19/2019 0771919 551.05 UNIFORMSC3082 SPARKLE UNIFORM & LINEN SERVIC 1/2/2020 0773689 598.75 UNIFORMSC3100 SMART & FINAL 12/18/2019 015440 51.34 SUPPLIESC3100 SMART & FINAL 12/11/2019 042026 73.91 SUPPLIESC3100 SMART & FINAL 12/11/2019 036685 13.72 SUPPLIESC3100 SMART & FINAL 12/24/2019 049143 56.25 SUPPLIESC3105 SMITH'S BAKERIES 12/11/2019 263181 53.76 BOARD MEETINGC3120 SNIDERS 12/16/2019 S69809 89.89 6 MASTER LOCKSC3120 SNIDERS 12/9/2019 S69291 87.10 6 MASTER LOCKSC3200 STINSON'S 12/19/2019 904769-0 731.56 SUPPLIESC3250 TARGET SPECIALTY PRODUCTS, INC 12/18/2019 PI1077493 2,698.79 30 GAL. ROUNDUP HERBICIDEC3264 TESCO CONTROLS, INC 12/16/2019 0069107-IN 115,000.00 SCADA SYSTEM UPGRADEC3264 TESCO CONTROLS, INC 12/16/2019 0069109-IN 33,450.00 PLC AND SCADA ADDITIONS 148,450.00 C3286 TODD GROUNDWATER 12/8/2019 46302 791.20 PROFESSIONAL SERVICESC3417 UNWIRED BROADBAND, INC. 12/26/2019 INV00767044 899.99 WIRELESS SERVICEC3430 VALLEY DECAL, INC 12/13/2019 19D7919 173.20 DECALS - STOCK/#385/#386C3470 VULCAN MATERIALS 12/18/2019 72442597 349.05 21.71 TONS ROCK - 850C3470 VULCAN MATERIALS 12/20/2019 72445715 389.94 20.17 TONS ROCK - 8GDC3470 VULCAN MATERIALS 11/30/2019 72427594 448.04 23.26 TONS ROCK - 5P42C3470 VULCAN MATERIALS 12/13/2019 72437833 797.74 41.29 TONS ROCK - 5P5 LATERALC3470 VULCAN MATERIALS 11/30/2019 72427595 395.58 20.47 TONS ROCK - 5P42C3588 WESTERN EXTERMINATOR COMPANY 11/30/2019 7647233 165.00 PEST CONTROLC3670 YOUNG WOOLDRIDGE 12/31/2019 12312019 6,034.49 LEGAL SERVICES 6,034.49 C3700 ZEP SALES AND SERVICE 12/17/2019 9004786075 246.45 LUBE/DISINFECTANT WIPES

SUBTOTAL 919,659.00

8,282.68 MANUAL CHECKS ATTACHED402.49 WELLS FARGO ANALYSIS FEES460.35 VOIDS

VOUCHER TOTAL 928,804.52

Page 4 of 12

WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICTMANUAL CHECKS DECEMBER 2019

5.2ID NAME DATE INVOICE # AMOUNT DESCRIPTION 5,000+

B304 MATTHEW WHITBEY 12/16/2019 12162019 158.75 BOOTS - M. WHITBEYC1187 AT&T 11/19/209 3725721505 607.31 WRM/HQ PHONESC1187 AT&T 12/8/2019 12082019 172.09 FIRE ALARM LINESC1187 AT&T 12/8/2019 12082019-1 296.87 ANALOG LINESC1187 AT&T 12/19/2019 9431002502 607.31 WRM/HQ PHONESC1765 FAST UNDERCAR 10/23/2019 08EI7707 472.26 3 BATTERIES/NITRILE GLOVESC1765 FAST UNDERCAR 10/30/2019 08EJ1903 274.76 BRAKE PADSC2412 LOWE'S BUSINESS ACCOUNT 12/2/2019 12022019 280.75 SUPPLIESC2582 NEOPOST 12/13/2019 12132019 174.74 POSTAGEC3170 SOUTHERN CALIFORNIA GAS COM11/20/2019 11202019 115.66 NATURAL GASC3710 SOUTHERN CALIFORNIA GAS COM12/20/2019 12202019 364.20 NATURAL GASC3283 TIAA COMMERCIAL FINANCE, INC 12/11/2019 6779500 646.78 LEASE OF 2 KYOCERA COPIERSC3461 VERIZON WIRELESS 12/9/2019 9843830313 287.24 IPAD DATAC3461 VERIZON WIRELESS 12/9/2019 9843830312 188.99 CELL PHONEC3548 WELLS FARGO - JONES 12/3/2019 12032019 1,178.25 LODGING-WORKSHOP IN SACRAMENTOC3549 WELLS FARGO - LOVELESS 12/3/2019 12032019 701.26 2 RADIOS - DUMP TRUCKSC3552 WELLS FARGO - OFFICE 12/3/2019 12032019 300.46 SUBSCRIPTIONSC3555 WELLS FARGO - SUGGS 12/3/2019 12032019 747.03 POWER SUPPLY/BOOK CASEC3558 WELLS FARGO - OFFICE #2 12/3/2019 12032019 368.44 SUPPLIES/BDAY COOKIESC3562 WELLS FARGO - SMITH 12/3/2019 12032019 339.53 LODGING/MEAL-AWCA FALL CONFERENCE

TOTAL 8,282.68

Page 5 of 12

5.2

NAME INVOICE NUMBER DESCRIPTION AMOUNT

TRANSFERS AUTHORIZED BY WRMWSD BOARD

DECEMBER 11, 2019 BOARD MEETING DECEMBER VOUCHER 92,629.92

VOUCHER TOTAL REQUESTED 92,629.92

EXPENDITURES AUTHORIZED BY COMMITTEE AND PAID BY WRMWSD MANUAL CHECK

Center for CA Water Resources 241 Murphy/Hamilton - July to Oct 2019 28,866.80Cramer Fish Sciences SIN004290 Predation - Oct 2019 597.50Cramer Fish Sciences SIN004300 Science Program - Oct 2019 3,290.00Cramer Fish Sciences SIN004302 Silversides Predation - Oct 2019 4,678.00Cramer Fish Sciences SIN004366 Predation - Nov 2019 1,527.50Cramer Fish Sciences SIN004367 SAFE - Nov 2019 411.25Cramer Fish Sciences SIN004373 Science Program - Nov 2019 2,121.00Cramer Fish Sciences SIN004375 Silversides Predation - Nov 2019 2,260.00Nossaman 501804 ESA/Water Quality Counseling - Oct 2019 40,260.21Nossaman 501805 Reconsultation - Oct 2019 2,722.50West Coast Advisors 12600 Consulting - Dec 2019 5,000.00West Coast Advisors 12595 Expenses - Oct 2019 895.16

TOTAL PAID 92,629.92

INVOICES AWAITING COMMITTEE APPROVAL INVOICES APPROVED BY WRMWSD BOARD @ JANUARY 8, 2020 BOARD MEETING (VOUCHER)

Center for CA Water Resources 242 Hamilton - Oct to Nov 2019 33,696.25Cramer Fish Sciences SIN004448 Predation - Dec 2019 2,657.50Cramer Fish Sciences SIN004456 Silversides Predation - Dec 2019 3,773.75Cramer Fish Sciences SIN004457 Science Program - Dec 2019 2,996.25Nossaman 503621 Reconsultation - Nov 2019 594.00Nossaman 503683 ESA/Water Quality Counseling - Nov 2019 39,673.26West Coast Advisors 12630 Consulting - Jan 2020 5,000.00West Coast Advisors 12620 Expenses - Nov 2019 655.58

VOUCHER TOTAL REQUEST 89,046.59

WHEELER RIDGE-MARICOPA WSDFISCAL AGENT FOR COMMITTEE FOR DELTA RELIABILITY

CUSTODIAL FUNDS-REPORT OF EXPENDITURES AND TRANSFERSDECEMBER 2019 FOR THE JANUARY 8, 2020 BOARD MEETING

Page 6 of 12

5.2

Check Date Payee Amount DescriptionBALANCE AS OF 11/30/2019 7,000.00

REPLENISH 0.00

7,000.00

Total Checks Issued 0.00

Ending Balance 7,000.00Balance Limit 7,000.00

Replenish Amount 0.00

Wheeler Ridge-Maricopa Water Storage DistrictRevolving Account Check Listing

December 2019

WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICT 5.2.1BOARD OF DIRECTORS/MANAGEMENT BENEFITS BREAKDOWNDecember 2019 FOR THE January 8, 2020 BOARD MEETING

ACWA BLUE CROSS OF CA HARTFORDNAME MED VISION LIFE/AD &D CLAIMS ADM DISABILITY TOTAL

ATKINSON 1,752.48 17.21 9.73 *** 16.50 0.00 ***BLAINE 2,262.51 17.21 3.93 *** 16.50 0.00 ***

FRY 2,262.51 17.21 3.13 *** 16.50 0.00 ***MARIN 2,262.51 17.21 3.93 *** 16.50 0.00 ***

METTLER 1,752.48 17.21 3.93 *** 16.50 0.00 ***REITER 859.93 17.21 3.13 *** 16.50 0.00 ***

RICHARDSON 2,262.51 17.21 2.13 *** 16.50 0.00 ***VALPREDO 2,262.51 17.21 3.13 *** 16.50 0.00 ***

JONES 1,752.48 17.21 59.83 *** 16.50 65.30 ***KUNDE 1,736.91 17.21 59.83 *** 16.50 64.68 ***

LOVELESS 2,262.51 17.21 22.33 *** 16.50 65.30 ***NICHOLAS 2,262.51 17.21 22.33 *** 16.50 65.30 ***

SMITH J 2,262.51 17.21 59.83 *** 16.50 65.30 ***SUGGS 2,262.51 17.21 59.83 *** 16.50 65.30 ***

28,216.87 240.94 317.02 740.00 231.00 391.18

TOTAL BENEFITS 30,137.01

*** INDIVIDUAL CLAIM AMOUNTS ARE CONFIDENTIAL PER THE HEALTH INSURANCE PORTABILITY ACCOUNTABILITY ACT (HIPAA)

DENTAL-HEALTHEDGE

Page 8 of 12

5.2.1WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICTBOARD OF DIRECTORS/MANAGEMENT COMPENSATION & EXPENSE BREAKDOWNDECEMBER 2019 for the JANUARY 08, 2020 BOARD

NAME DATE TOTAL PAYEE MEMO

Atkinson 12/11/2019 129.00 Atkinson Regular Board Meeting/mileage - wedBlaine 12/11/2019 128.00 Blaine Regular Board Meeting/mileage - wedBlaine 12/16/2019 125.00 Blaine KGA Executive Meeting - monBlaine 12/18/2219 125.00 Blaine KGA Regular Board Meeting - wedBlaine 12/30/2019 125.00 Blaine KGA Executive Meeting - monFry 12/11/2019 125.00 Fry Regular Board Meeting/mileage - wedMarin 12/11/2019 125.00 Marin Regular Board Meeting/mileage - wedMettler 12/11/2019 128.00 Mettler Regular Board Meeting/mileage - wedReiter 12/11/2019 139.00 Reiter Regular Board Meeting/mileage - wedReiter 11/12/2019 125.00 Reiter KCWA Meeting - tueReiter 11/19/2019 125.00 Reiter KCWA Call - tueReiter 12/4/2019 125.00 Reiter ACWA Conference - wedReiter 12/5/2019 125.00 Reiter ACWA Conference, for WRM w/Valley Water San Luis WD - thuRichardson 12/11/2019 128.00 Richardson Regular Board Meeting/mileage - wedValpredo

DIRECTORS 1,777.00

Page 9 of 12

5.2.1WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICTBOARD OF DIRECTORS/MANAGEMENT COMPENSATION & EXPENSE BREAKDOWNDECEMBER 2019 for the JANUARY 08, 2020 BOARD

NAME DATE TOTAL PAYEE MEMO

Jones 11/5/2019 13.90 Jones West side 5 Meeting @ KWB - mealsJones 11/17/2019 - 11/20/2019 50.55 Jones State Water Workshop, Inspection, Fresno Meeting - mealsJones 11/17/2019 - 11/19/2019 760.32 Jones State Water Workshop, Inspection, Fresno Meeting - lodgingJones 11/17/2019 - 11/19/2019 87.00 Jones State Water Workshop, Inspection, Fresno Meeting - parkingJones 12/5/2019 64.01 Jones 2019 ACWA Fall Conference - mealsLovelessNicholas 12/9/2019 108.96 Verizon Communication - cellNicholas 10/30/2019 & 11/20/2019 39.08 Wells Fargo Lunch with the Engineer - Manager - mealsNicholas 10/30/2019 - 11/20/2019 20.34 Wells Fargo Lunch with the Engineer - Manager - mealSmithSuggs

MANAGEMENT 1,144.16

Kunde 11/12/2019 - 01/02/2020 626.40 Kunde Delta, Sites, SWC, KCWA - mileageKunde 11/18/2019 - 12/21/2019 72.00 Kunde Delta, Sites, SWC, KCWA - parkingKunde 11/13/2019 - 12/19/2019 63.78 Kunde Delta, Sites, SWC, KCWA - mealsKunde 11/13/2019 - 12/15/2019 300.84 Kunde Delta, Sites, SWC, KCWA - lodging

RETIRED ANNUITANT 1,063.02

Board

TOTAL EXPENSE 3,984.18

*** note: retired annuitant costs are expense reimbursements not compensation

Page 10 of 12

5.2.1WHEELER RIDGE - MARICOPA WSD

PAYROLL FUNDDECEMBER 2019

JANUARY 08, 2020 BOARD MEETINGEMPLOYEES DIRECTORS RETIREES COBRA SUPPLEMENTAL TOTALS

SALARIES 84,021.03 1,284.35 85,305.38Pay Period Ended: (NOV 30, 2019/EE)-(NOV 30,2019/DIR)

SALARIES 80,917.37 80,917.37Pay Period Ended: (DEC 14, 2019)

SALARIES 84,539.15 84,539.15Pay Period Ended: (DEC 28, 2019)

PAYROLL PEOPLE 79,564.29 215.18 79,779.47Federal, SSI, Medicare Taxes

PAYROLL PEOPLE 14,601.76 39.39 14,641.15State Tax / SDI / SUI

PERS (EMPLOYEE PORTION) 25,547.26 25,547.26RETIREMENT

PERS (EMPLOYER PORTION) 42,165.68 42,165.68RETIREMENT

PERS (UAL,GASB 68 reports, fees) 0.00 0.00RETIREMENT - classic & pepra

NATIONWIDE DEFERRED COMPENSATION 930.00 930.00Deferred Compensation #1 Deductions

LINCOLN LIFE 5,553.00 5,553.00Deferred Compensation #2 Deductions

WRM WSD EMPLOYEES' FUND 387.00 387.00Employees' Fund Deductions

ACWA-HEALTH BENEFITS 81,613.09 18,107.56 29,546.15 912.26 130,179.06Medical/Vision Insurance Premium (+cobra)

ACWA-LIFE/AD&D 1,392.85 52.24 69.22 1,514.31Life/supplemental Insurance Premium

HEALTH EDGE ADMINISTRATORS INC 709.50 132.00 462.00 49.50 1,353.00Dental Insurance Administrative Fees (+cobra)

HEALTH EDGE ADMINISTRATORS INC 4,709.78 3,352.74 883.58 212.37 9,158.47Dental Insurance Claims

THE HARTFORD GROUP 2,873.31 2,873.31Long Term Disability Insurance

CA STATE DISBURSEMENT - FRANCHISE TAX BOARD 476.90 476.90IWO (income withholding orders x 2 jm)

PAYROLL PEOPLE 521.64 92.83 614.47P/R Processing Fees

TOTAL PAYROLL FUND: 510,523.61 23,276.29 30,891.73 1,174.13 69.22 565,934.98

5.2.1WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICT

REIMBURSEMENTS AND TRANSFERSJANUARY 08, 2020 BOARD MEETING

DECEMBER 2019

GENERAL/REVOLVING ACCOUNT:

FUND #

60710 WRM-WSD WELLS FARGO BANK GENERAL ACCOUNT #4121027197TRANSFER TO PROVIDE FUNDS FOR: DECEMBER 2019 ACCOUNTS PAYABLE 1 $ 928,804.52

60710 WRM-WSD WELLS FARGO BANK GENERAL ACCOUNT #4121027197

TRANSFER TO PROVIDE FUNDS FOR: 1.1 $

60710 WRM-WSD WELLS FARGO BANK GENERAL ACCOUNT #4121027197TRANSFER TO PROVIDE FUNDS FOR: DECEMBER 2019 ACCOUNTS PAYABLE 928,804.52 $

60710 WRM-WSD WELLS FARGO BANK GENERAL ACCOUNT #4121027197TRANSFER TO PROVIDE FUNDS FOR: Committee for Delta Reliability 2 $ 89,046.59

60710 WRM-WSD WELLS FARGO BANK REVOLVING ACCOUNT #4121027205TRANSFER TO REIMBURSE FUNDS FOR: DECEMBER 2019 REVOLVING 3 $

TOTAL GENERAL/REVOLVING ACCOUNT: $ 1,017,851.11

PAYROLL ACCOUNT:

FUND #

60710 WRM-WSD WELLS FARGO BANK PAYROLL ACCOUNT #4121027221TRANSFER TO PROVIDE FUNDS FOR PPE: JANUARY 11, 2020 4 228,000.00

60710 WRM-WSD WELLS FARGO BANK PAYROLL ACCOUNT #4121027221TRANSFER TO PROVIDE FUNDS FOR PPE: JANUARY 25, 2020 5 98,000.00

60710 WRM-WSD WELLS FARGO BANK PAYROLL ACCOUNT #4121027221

TRANSFER TO PROVIDE FUNDS FOR PPE: FEBRUARY 08, 2020 6 228,000.00

TOTAL PAYROLL ACCOUNT: $ 554,000.00 554,000.00

TOTAL REIMBURSEMENTS AND TRANSFERS: $ 1,571,851.11

Page 12 of 12

Agenda Item 5.3

WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICT

STATEMENT OF INVESTMENT POLICY

January 1, 2020

In accordance with the provisions of Section 53646 of the Government Code of the State of California, this investment policy for the Treasurer of the Wheeler Ridge-Maricopa Water Storage District is hereby established. OBJECTIVE: The objectives of the District’s investment policy are as follows, in order of priority.

1. Safeguard the principal of the funds under its control by maintaining an appropriate risk level.

2. Meet the liquidity needs of the District. 3. Achieve an optimum rate of return (defined as income plus realized and unrealized capital

gains and losses) on available assets (not required for current operating needs), commensurate with an appropriate level of risk.

SCOPE: Except for funds held in Wheeler Ridge-Maricopa Water Storage District’s working bank accounts used for the daily operations, it is intended that this policy cover investment funds and activities of the District. DELEGATION OF AUTHORITY: Section 53600, et seq. of the California Government Code provides legal authorization and reporting requirements for the investment of funds of local agencies when applicable. All investments of the Wheeler Ridge-Maricopa Water Storage District shall conform to the requirements of these laws. In accordance with Section 53607 the authority to invest or reinvest the funds of the District is delegated to the Treasurer of Wheeler Ridge-Maricopa Water Storage District for a one-year period. Each year, at its January Board Meeting and the Board delegates its authority to invest funds to the District’s Treasurer, who shall thereafter assume full responsibility for those transactions until the delegation of authority is revoked or expires. PRUDENCE: All participants in the investment process shall recognize that the investment portfolio is subject to the prudent investment standard as set forth by California Government Code and to public review and evaluation and shall seek to act responsibly as fiduciaries of the public trust. The prudent investor standard states that when investing, reinvesting, purchasing, acquiring, exchanging, selling, or managing public funds, a trustee shall act with care, skill prudence, and diligence under the circumstance then prevailing, including but not limited to, the general economic conditions and the anticipated needs of the District, that a prudent person acting in a like capacity and familiarity with those matters would use in the conduct of funds of a like character and with like, aims, to safeguard the principal and maintain the liquidity needs of the District. ETHICS AND CONFLICTS OF INTEREST:

Agenda Item 5.3

Officers and employees involved in the investment process shall refrain from personal business activities that could conflict with proper execution of the investment program, or which could impair their ability to make impartial decisions. PERMISSIBLE INVESTMENTS: The District Treasurer may invest from among the following authorized investments.

1. State of California Investment Pool – Local Agency Investment Fund – Not to Exceed

$40,000,000.00.

2. State of California Bonds – Not to exceed 15% of the District’s reserve funds. 3. U.S. Government Agency securities including Treasury Obligations, Notes, participation’s

or obligations issued by an agency of the Federal Government or U.S. government sponsored enterprises with a maximum maturity date of 5 years.

4. Bankers Acceptances drawn on and accepted by the 15 largest banks in the United States or by any of the world’s 100 largest banks. A rating among the top three ratings by Standard and Poor’s or Moody’s will be required. The maximum investment in Bankers Acceptances shall not exceed 40% of District’s reserve funds with no more than 30% of the District’s reserve funds invested in any one commercial bank with a maximum maturity date of 270 days.

5. Certificates of Deposit from commercial banks and savings and loan associations.

a. Investments up to $250,000 in any single institution are exempt from further collateral requirements because of FDIC or FSLIC insurance provisions.

b. Except as provided in (a) above, all investments must have collateral at 110% of the

principal amount by government securities or 150% of the principal amount by first mortgages.

c. No more than 5% of the District’s reserve funds shall be in negotiable certificates of deposit in any one institution. No more than 15% of the District’s reserve funds shall be in collateralized Certificates of Deposit in any one institution, and in no case shall the total amount of all certificates of deposit exceed 30% of the investment portfolio.

6. Repurchase agreements not to exceed 25% of the District’s reserve funds. Collateral must

be 102% of the invested amount adjusted quarterly with a maximum maturity date of 1 year.

A. AUTHORIZED DEPOSITORY. District funds not invested directly may be maintained in the

Kern County Treasurer on behalf of the District.

B. MATURITIES. The maturities of investments shall generally be within the following guidelines:

Agenda Item 5.3

1. At least 1/3 of all investments shall have maturities of three months or less.

2. No more than 1/3 of all investments shall have maturities exceeding one year. 3. No more than 5% of all investments shall have maturities exceeding three years.

C. LOCATION OF FUNDS. Subject to the guidelines provided in this Statement of Investment Policy, all funds shall be held secure under the “Prudent Investor Rule” in one or any of the following institutions:

1. California State Treasury. 2. Kern County Treasury. 3. Banks and Savings and Loans. 4. Brokerage Companies which are New York Stock Exchange member firms.

Government Agency securities, including Treasury Bills and Notes shall be in a safekeeping account established with one of the institutions described above. Cash management accounts may be used for certificates of deposit and other investments; however the linking of credit cards and the use of margins is strictly prohibited.

BEFORE THE BOARD OF DIRECTORS OF THEWHEELER RIDGE-MARICOPA WATER STORAGE DISTRICT

RESOLUTION NO. 2020-XXIN THE MATTER OF:

ADOPTING AN ANNUAL INVESTMENT POLICYFOR THE

WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICT

WHEREAS, the Wheeler Ridge-Maricopa Water Storage District occasionally has reserve funds on handwhich are in excess of the District's immediate financial requirements;

WHEREAS, it is the established policy of this District that such reserve funds shall be held in the District'svarious cash accounts in the Kern County Treasury where they participate pro rata in the County's investmentprogram except as herein below stated;

WHEREAS, occasionally when interest rates in general are rising and conditions are such that the averageearning rate of the Kern County Treasury's portfolio is less than the rates available in the market place, theDistrict's policy provides for the transfer and specific investment of appropriate portions of such funds byDistrict staff, in order to maximize interest earnings; and

WHEREAS, the District Treasurer, in accordance with Section 53646(a) of the Government Code, hasrendered an annual statement of investment policy.

NOW THEREFORE BE IT RESOLVED, by this Board that the Treasurer's Annual “Statement ofInvestment Policy” dated January 1, 2020 and attached hereto, is hereby approved and adopted.

ALL THE FOREGOING being on motion of Director , seconded by Director , and authorized by thefollowing vote:

AYES: NOES: None. ABSENT: None. ABSTAINING: None.

I HEREBY CERTIFY that the foregoing is the resolution of said District as duly passed and adopted bysaid Board of Directors on the 8th day of January 2020.

WITNESS my hand and seal of said Board of Directors this day of January 2020.

_______________________________________(Seal) Secretary of the Board of Directors

AGENDA ITEM 6.2 (page 1)

UNDER/(OVER)BUDGET TO % OF

ANNUAL ANTICIPATED TO ACTUAL SPENT ACTUAL ANTICIPATEDBUDGET CLASS BUDGET DATE TO DATE DIFFERENCE TO DATE

I PAYROLL SALARIES 3,187,666 2,942,461 2,867,179 75,282 97.44%PAYROLL TAX 246,461 227,502 225,865 1,637 99.28%PAYROLL PERS 392,952 362,725 329,977 32,747 90.97%PAYROLL HEALTH 1,106,596 1,014,380 963,550 (a) 50,829 94.99%TOTAL PAYROLL & BENEFITS 4,933,675 4,547,068 4,386,572 160,496 96.47%

FUEL & OIL 261,000 258,446 250,687 7,759 97.00%MATERIALS & SUPPLIES 799,315 732,705 672,671 60,034 91.81%SMALL TOOLS & INSTRUMENTS 41,155 37,725 15,844 21,881 42.00%WELL MAINT. STANDBY POWER 0 0 0 0.00%COMMUNICATIONS 56,750 52,021 31,260 20,761 60.09%DIRECTORS FEES & EXPENSES 42,000 38,500 26,628 11,872 69.16%DIRECTORS HEALTH 240,000 220,000 213,584 (a) 6,416 97.08%INSURANCE & BONDS 209,000 191,583 146,757 (1) 44,826 76.60%RETIREES-OPEB 355,000 325,417 318,272 (a) 7,145 97.80%MEMBERSHIPS 135,175 123,910 90,948 32,962 73.40%MISC SERVICES & SUPPLIES 69,050 67,018 67,018 0 100.00%OFFICE SERVICES & SUPPLIES 44,205 40,521 31,313 9,209 77.27%COMPUTER SUPPLIES 45,400 41,617 36,028 5,589 86.57%MAINT. & REPAIR BY OTHERS 302,970 277,723 139,126 138,596 50.10%PROFESSIONAL & SPECIALIZED-LEGAL 90,000 82,500 64,169 18,331 77.78%PROFESSIONAL & SPECIALIZED-ACCT: AUDIT 45,000 45,000 47,750 (2) (2,750) 106.11% WELLS FARGO FEES 4,000 3,667 3,224 443 87.93%PROFESSIONAL & SPECIALIZED-OTHER 225,620 206,818 169,315 37,503 81.87%SGMA - KERN GW AUTHORITY 350,000 320,833 306,666 14,168 95.58%SGMA - WHITE WOLF GSA 120,000 110,000 81,379 28,621 73.98%LEGAL NOTICES & PUBLICATIONS 14,820 13,585 5,472 8,113 40.28%

* RENTED EQUIPMENT 46,795 42,895 46,898 (4,003) 109.33%SPECIAL DEPARTMENT EXPENSE 12,000 12,000 19,616 (3) (7,616) 163.47%TRANSP & TRAVEL EXPENSE 46,370 42,506 30,988 11,518 72.90%UTILITIES 85,000 77,917 73,567 4,350 94.42%JUDGEMENTS & CLAIMS EXPENSE 6,600 6,050 0 6,050 0.00%CURRENTLY FUNDED ASSETS 1,190,000 578,244 578,244 0 100.00%RESERVE FUNDED ASSETS 635,000 227,774 227,774 0 100.00% SUBTOTAL 10,405,900 8,724,044 8,081,769 642,274 92.64%

II KCWA F.O. 28,160,929 28,160,929 28,160,929 0 100.00%KCWA VARIABLE 7,205,381 7,205,381 7,205,381 0 100.00%

DISTRICT POWER-PUMPS 10,283,629 10,283,629 10,283,629 0 100.00% SUBTOTAL 45,821,488 45,821,488 45,821,488 0 100.00%

TOTAL 56,227,388 54,545,532 53,903,257 642,274 98.82%

(a) Health Insurance combined 1,701,596 1,559,796 1,495,406 64,390 95.87%

(1) Received a $38,151 refund from the ACWA/JPIA RPA Stabilization Fund(2) Additional fees for GASB implementation and OPEB valuation(3) Three retirement parties

WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICTBUDGET EXPENDITURES REPORTPERIOD ENDING NOVEMBER 2019

(UNAUDITED)

C:\Users\druth\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\DCCVCSZ2\2019 Budget Status Board

AGENDA ITEM 6.2 (page 2)

CAPITAL EXPENDITURES BUDGET - PERIOD ENDING SEPTEMBER 2019# of ITEMS

BGT COST TOTAL CURRENT RESERVE (net of CURRENT RESERVE % PURCH ofQTY DESCRIPTION PER ITEM BUDGET FUNDED FUNDED trade) FUNDED FUNDED OF BGT. BUDGET

ADMINISTRATION:1 SITES RESERVOIR 25,000 25,000 25,000 0%

SUBTOTAL 25,000 - 25,000 - - -

ENGINEERING:1 850 SYSTEM - POWER COST REDUCTION FACILITIES 500,000 500,000 500,000 3 RECTIFIERS 3,500 10,500 10,500 9,198 9,198 88% 3 of 30 SACRIFICIAL ANODES - - 0 REFERENCE CELLS - -

SUBTOTAL 510,500 10,500 500,000 9,198 9,198 -

OPERATIONS AND MAINTENANCE:2 FULL SIZE 1/2 TON STANDARD CAB PICKUP 25,000 50,000 50,000 36,240 36,240 72% 2 of 21 FULL SIZE 1/2 TON CREW CAB PICKUP 28,000 28,000 28,000 22,990 22,990 82% 1 of 11 FULL SIZE 1/2 TON CREW CAB 4x4 PICKUP 35,000 35,000 35,000 28,292 28,292 81% 1 of 11 FULL SIZE 3/4 TON STANDARD CAB 4x4 PICKUP 35,000 35,000 35,000 23,713 23,713 68% 1 of 11 FULL SIZE 3/4 TON EXT. CAB PICKUP w/ Scelzi SB98 Utility Bed 45,000 45,000 45,000 28,795 28,795 64% 1 of 12 FULL SIZE 1 TON EXT. CAB PICKUP w/ Scelzi SB98 Utility Bed 55,000 110,000 110,000 67,525 67,525 61% 2 of 21 SUPER 10 DUMP TRUCK 200,000 200,000 200,000 5,000 5,000 3% Deposit Only1 ROLL-OFF TRAILER WITH BIN 15,000 15,000 15,000 0%1 4" DIESEL PUMP 45,000 45,000 45,000 0%1 REPAVE DISTRICT PARKING LOT 145,000 145,000 145,000 0%1 REPLACE WELDING SHOP DOORS 18,500 18,500 18,500 0% SEE NOTE 11 COAT ROOF - MAINT BLDG, WAREHOUSE, WELD SHOP 17,000 17,000 17,000 17,515 17,515 103% 1 of 11 PAINT - MAINT BLDG, WAREHOUSE, WELD SHOP 58,000 58,000 58,000 0% SEE NOTE 11 (LOT) HIGH EFFICIENCY ELECTRIC MOTOR REPLACEMENT 100,000 100,000 100,000 0% SEE NOTE 11 WRM 9A TRAVELING WATER SCREEN (a) 110,000 110,000 110,000 0%1 ELECTRONIC DOCUMENT STORAGE HARDWARE 33,000 33,000 33,000 0%1 ELECTRONIC DOCUMENT STORAGE PROJECT 75,000 75,000 75,000 0% SEE NOTE 2

($225,000 over 3 years)1 SCADA UPGRADE - TESCO 170,000 170,000 170,000 0%

SUBTOTAL 1,289,500 1,179,500 110,000 230,070 230,070 -

TOTAL CAPITAL EXPENDITURES 1,825,000 1,190,000 635,000 239,268 239,268 -

NOTES:(1) These line items will not be purchased in 2019, and

instead are reflected in the 2020 Capital Expenditures Budget(2) This project will not be started in 2019, and instead

is budgeted in Administrative costs for 2020

BUDGET ACTUAL

C:\Users\druth\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\DCCVCSZ2\2019 Capital Budget

À W H E E L E R R I D G E - M A R I C O P A W A T E R S T O R A G E D I S T R I C T �

Agenda Item 7.1

MEMORANDUM

TO: Board of Directors

FROM: Sheridan Nicholas

DATE: January 7, 2020

SUBJECT: Designate Assistant Secretary to Board

Director Mullins, at the time of his passing, was Assistant Secretary to the Board. Now that allDistrict Divisions are represented, it would be appropriate for the Board to appoint a newAssistant Board Secretary.

Along with that, I would recommend that the Board also appoint the Engineer-Manager as anadditional Assistant Secretary to the Board. There have been circumstances when it has beendifficult for the District to obtain Board signatures, and this would help alleviate this issue inthose instances. This is not without precedent as Jim Smith also serves as an Assistant Treasurerto the Board.

S:\Management\Shared_AA\Board Mailing JAN 2020\PREP DOCS (DO NOT SAVE TO THISFOLDER)\WRM_Memo_2020_Designate_District_Assistant_Secretary.wpd

WHEELER RIDGE – MARICOPA WATER STORAGE DISTRICT 12109 Highway 166, Bakersfield, CA 93313-9630, 661-858-2281

MEMORANDUM TO: BOARD OF DIRECTORS FROM: SHERIDAN NICHOLAS DATE: JANUARY 8, 2020 SUBJECT: ENGINEER-MANAGER’S MONTHLY REPORT FOR DECEMBER 2019 During the month of December, the District delivered 5,266 acre-feet of water consisting of the four water types described below. This compares to projected deliveries of 2,600 acre-feet estimated in September 2018. Of the total quantity delivered, 305 acre-feet were delivered for industrial use, and the remaining were delivered for agricultural use. The total quantities of water delivered during the month as well as the year-to-date water supply by source and type of water delivery are summarized in the following tabulation:

(a) 2019 updated allocation of 147,816 acre-feet (75%) (b) At 1/1/19, an estimated 23,153 acre-feet of 2018 Carryover was available (7,306 acre-feet District, 15,847 acre-feet Water User) (c) District estimates 2,306 acre-feet of 2019 Article 21 Supplemental 2 water was delivered in-District, exact figures pending KCWA and DWR validation. (d) As per WRM / Pastoria and WRM / Granite / TCCWD Agreements

Source of Supply Jan-Nov Dec YTD2019 SWP Entitlement (a) 125,511 4,923 130,434

2018 Carryover (b) 7,712 0 7,7122019 Article 21 - Supp 2 Supply (c) 2,306 0 2,306Santa Clarita VWA 2,670 0 2,670Kern River & Lower River Water 13,005 0 13,005Kern Water Bank/Pastoria (d) 2,289 300 2,588TCCWD/Granite (d) 5 4 9Western Hills (WS5) 1,394 0 1,394User Input-District Wells 328 0 328User Input-Private 5,255 39 5,294Friant Recirc Supply 468 0 468Landowner Transfers 3,200 0 3,200

Total 164,140 5,266 169,406

Type of DeliveryIrrigation 161,829 4,961 166,789Industrial Contract 2,294 304 2,598Other Industrial 19 1 20

Total 164,140 5,266 169,406

Quantities (Acre- Feet)

MEETINGS ATTENDED DURING DECEMBER

Engineer-Manager Sheridan Nicholas attended the following meetings.

December 03 ACWA Agricultural Committee December 03 ACWA Water Management Committee December 04 ACWA December 05 San Luis Water District @ ACWA December 05 SCVWA @ ACWA December 06 GSA Managers Meeting - Bill Lyons December 06 KGA Managers Meeting December 12 Member Unit Managers Meeting December 16 California Farm Water Coalition Meeting December 18 KGA Board Meeting December 18 South Valley Water Resource Authority Weekly Member unit and Westside 5 calls Retired Annuitant Rob Kunde attended the following meetings. December 02 Sites Reservoir - Value Planning Work Group - staff planning call December 05 Member Unit Managers - Delta Conveyance Project Contract Amendment Conference Call December 09 Sites Reservoir - Budget and Finance Work Group Conference Call December 12 Kern River Watershed Coalition Authority - Treasurer Transition Meeting December 12 Kern River Watershed Coalition Authority - Shinault Baker Meeting regarding fiscal services transition December 12 Delta Conveyance Project - Policy Briefing December 16 Sites Reservoir - Value Planning Team December 16 KCWA State Water Contractors Team Conference Call December 18 State Water Contractors - Committee Meetings - Sacramento December 19 State Water Contractors - Board of Directors - Sacramento December 19 Sites Reservoir - Reservoir Project Committee – Sacramento December 20 Sites Reservoir - Value Planning Staff Conference Call

Consultant Bill Taube attended the following meetings. December 03 ACWA Ag Committee December 04 SGMA Toolbox Session December 05 Region 6&7 Board meeting December 11 WRM Board December 18 SVWRA Board

WATER RESOURCES MANAGER REPORT (W. JONES)

2019 State Water Project Allocation. The final 2019 State Water Project allocation is 75% as announced by the Department of Water Resources on June 19, 2019. 2020 State Water Project Allocation. The California Department of Water Resources announced the initial 2020 State Water Project allocation of 10% on December 2, 2019. Per DWR’s Notice Number 19-12 dated December 2, 2019, this initial allocation is made consistent with the long-term water supply contracts and public policy. DWR’s approval considered several factors including existing storage in SWP conservation reservoirs, SWP operational constraints such as the conditions of the Biological Opinions for Delta Smelt and Salmonids, and the Longfin Smelt Incidental Take Permit, and the 2020 contractor demands. DWR may revise the initial and subsequent allocations if warranted by the year’s developing hydrologic and water supply conditions. The 10% allocation is consistent with the 90% probability of exceedance study with moderate Old and Middle River (OMR) restrictions in DWR’s December 1, 2019 “Allocation Analysis for 2020” (Analysis). The Analysis includes different ranges of impacts from the Delta Smelt and Salmon Biological Opinions as well as the Longfin Incidental Take Permit (the Analysis uses existing Delta Smelt Biological Opinion standards). Key points of the Analysis include: 1. Under median conditions (50% probability of exceedance = median conditions) the allocation

range would be 13% - 46%. Under a 46% allocation, there is little to no capacity to transfer non-Project water across the Delta (due to OMR restrictions) and no Article 21 would be available.

2. Without the Biological Opinions, the 50% POE forecast would be for a 75% allocation and over 880,000 acre-feet of Article 21 water would be available.

3. Water supply reductions under median conditions from the Biological Opinions could range from 945,000 acre-feet to 1.414 MAF acre-feet depending on how restrictive the fishery agencies are with OMR flows.

4. Under no allocation scenarios will San Luis Reservoir near dead storage during 2020.

The December 2019 DWR Analysis results for 2020 are as follows (values in acre-feet). Source/Hydrology Critical Dry Blw Nrml Abv Nrml

SWP Allocation 13% 25% 46%

46%

OMR Restriction [a] M

Moderate Moderate Moderate Moderate Prob. of Exceedance [b] 9

90% 75% 50% 25% District Supply 25,621

49,272

90,660

90,660 [a] Average Old and Middle River reverse flow restrictions (cfs) from December 2019 to June

2020. Least OMR Restrictions would add approximately 4% to the Allocation. [b] Example: a 90% Probability of Exceedance means there is a 9 in 10 chance conditions will

be wetter than assumed, and 1 in 10 chance conditions will be conditions will be drier than assumed.

Water Conditions. The “Northern Sierra 8-Station Precipitation Tabulation” index of rain and snow water content for the Sacramento, Feather, Yuba and American River Basins in December was 9.8 inches of the monthly average of 9.2 inches. Accumulation for the season is as follows:

Current Amount – October 1, 2019 – September 30, 2020 12.8” Average (historic) to Date 18.7”

Average (historic) for the entire Water Year (Oct. 1 through Sep. 30) 51.80” Percent of Average to Date through Oct. 31, 2019 3.5% Percent of Average to Date through Nov. 30, 2019 31.6% Percent of Average to Date through Dec. 31, 2019 68.5%

Note that precipitation is not runoff, and runoff is not Delta export pumping for the District. Under normal conditions, an average precipitation year equates to a 65% to 75% SWP allocation depending on timing and proportions of snow and rain. The December 31, 2019 “San Joaquin 5-Station Precipitation Tabulation” index was 6.7 inches, which is 75% of historical average. note because significant San Joaquin River flows allow for greater pumping at the Delta by lowering reverse flows on the Old and Middle Rivers. Carryover and Spill Conditions. The District continually reviews current San Luis Reservoir (SLR) storage levels (Dec. 31st – 63% capacity, 93% of average) to determine optimum carryover amounts. End of month San Luis Reservoir conditions were as follows:

Description Million Acre-feet (MAF)

SLR Capacity SWP Share 1.062 CVP Share 0.966 SWP + CVP subtotal 2.028 Actual December 31, 2011 storage 1.928 Actual December 31, 2012 storage 1.098 Actual December 31, 2013 storage 0.604 Actual December 31, 2014 storage 0.820 Actual December 31, 2015 storage 0.436 Actual December 31, 2016 storage 1.259 Actual December 31, 2017 storage 1.638 Actual December 31, 2018 storage 1.503 Actual December 31, 2019 storage SWP Share 0.888 CVP Share 0.398 SWP + CVP subtotal 1.286

At the District’s regular Board Meeting held August 14, 2019, it was announced that WRM will be adhering to its standard Carryover Policy of 5% of the Contract Amount of Water (“CAW”) for 2019 carryover into 2020. Water User carryover of Landowner Transfer, SWP entitlement, and other Board authorized water supplies available to Water User, would be permitted with an upper limit of 5% of CAW for each Water User. All water held by Water Users at December 31, 2019, in excess of 5% of their CAW will be subject to loss without notice and the District shall not be responsible for losses or damages from the loss of Carryover water. Meetings. The Water Resources Manager attended various meetings during the month.

ACCOUNTING ACTIVITIES (J. SMITH) Controller’s Report: 2019 Water Allocations, Deliveries and Billings. The November Water Reports were mailed December 3. The second revised SWP allocation is 75% of the Contract Amount of Water or 147,816 acre-feet. Supplemental 1 Water is 10% or 22,903 acre-feet. Other allocations were:

• User Carryover (2018) 11,826.39 acre-feet • User Input 5,293.22 acre-feet • Returns -10,162.00 acre-feet • Purchases 10,162.00 acre-feet • Sup6 $205 wtr 2,025.00 acre-feet • Article 21 2,308.16 acre-feet • Deliveries (Jan-Dec) 166,803.88 acre-feet

The Controller’s activities included:

• Updated water allocations in Latis for 2019 and 2020. Dispatch will be going live with Latis on January 1, 2020.

• Reconciled and completed 2019 Water Reporting • Auditor’s performed “walk throughs” in preparation for 2019 audit • Finalized necessary continuing education for CPA license renewal

The Staff Accountant’s activities included:

• Training to set up and calculate Final Accounting • Posted month end transactions to water accounting, ran all month end reports, sent

out reports to water users • Provided answers and reports to water users and staff re: water billing • Provided training to Accountant for Short Run Delivery Charges and Bank

Reconciliations • Reviewed month end journal entries, prior to Accountant making entries into our

accounting software • Completed the Budget and Capital Expenditure Reports • Attended the WRMWSD Board Meeting • Prepared bank reconciliations • Reviewed accounts payable coding prior to posting by Account Clerk • Recapped YTD work order expenses and compiled backup invoices • Prepared financial reports and Accounts Payable checks for Committee for Delta

Reliability, Kern River Watershed Coalition Authority, and South Valley Water Resource Authority

• Attended the SVWRA Board Meeting • Attended a KRWCA meeting to coordinate accounting duties with new treasurer

and CPA firm • Communicated with auditors to complete South Valley Water Resource Authority

audits for 2015 to 2018 • Communicated with auditors to complete Kern River Watershed Coalition

Authority audits for 2015 to 2018

• Prepared Industrial Water invoicing • Prepared the Statement of Annual Charges for Pastoria Energy Facility • Responded to requests for Industrial Water purchases • Followed up on past due miscellaneous Accounts Receivable • Collected Employee Committee snack money weekly. Prepared EC monthly

financial statement and bank deposit. • Attended Employee Committee meeting • Continued planning Employee Committee Christmas Party • Made VISA card payments at Wells Fargo in town

The Contract Administrator’s activities included: Contract/ Water Allocation Work - Contract work for 20E3, 74, 49, 127, 5A & 20E5

o Received Board member signatures and prepared for Recorders Office. - Contract work for 2.01A

o Re-sent Assumption Agreement as first one was never received (60 days). - Continually monitored the 2019-2020 carryover estimates and emailed/phoned

Users with carryover and use projections. o Maintained constant contact with those Users who had significant at risk

supplies. Landowner Assistance - Assisted 1 landowner regarding contract add exclude questions.

o Reviewed proposed add/exclude and submitted to Engineering Department for further review.

- Assisted multiple landowners regarding District KWB Second Priority Banking program

o Sent newly developed KWB Second Priority Agreement as well as acknowledgement email and introductory information

- Assisted multiple Water Users with information regarding water ledger—2019 allocation, YTD use, acre feet remaining, etc.

- Assisted multiple landowners regarding water transfers and return in preparation for year end.

- Other Tasks - Reviewed the monthly Accounts Payable and distributed Board and Consultant

payables. - Completed weekly water schedule updates, reconciling variances with Dispatch &

Controller. - Managed and reconciled petty cash fund. Managed EC stamp cash fund. - Prepared December monthly report for Board Meeting packet. - Updated forms for 2020 (Water Transfer, Water Return, etc). - Assisted and trained the Eng. Technician on the creation of maps for Water Users. - Submitted notice to County Elections Office regarding appointment of new

Division 9 Director.

The Accountant’s activities included: • Assisted employees with Worker’s Compensation questions/filing as needed • Reviewed CalPERS correspondence. • Prepared Treasurer’s Report. • Prepared Payroll journal entries. • Reconcile miscellaneous and employee accounts receivables. • Provided notary services for staff, customers and District. • Continued employee-benefit summary tracking by employee. • Prepared and filed governmental compliance reports as required • Maintained Salary/CalPERS/Tax/Health worksheet for the budget expenditure report • Assisted employees with travel expense reports • Assisted employees with CalPERS policies. • Maintained District’s accounts payable “SafePay” • Reviewed Wells Fargo Client Analysis Statements for validity of charges • Assisted employees with disability claims as needed • Ongoing payroll training as needed to Account Clerk II • Ongoing training with Staff Accountant, primarily journal entry preparation and

posting.

The Account Clerk II’s activities included: • AP: code, obtain approvals and post all invoices to the District’s account program • Prepared payroll and related burden payments • Prepared Directors payroll • Added interest to account program • Daily desktop deposits of cash receipts • Deposits for KRWCA • Cash receipt summary report for December • Manual checks report for December • Audit walkthrough • Filed and made new vendor folders for accounts payable • Covered front desk during Board Meeting • Set up and clean up for Board Meeting

ENGINEERING ACTIVITIES (T. SUGGS)

December 2019 WRM 9A Traveling Water Screen: Considerable time was spent revising a package of plans and specifications for this project in response to a number of minor comments and requests for additional details that were received from the State Water Project Analysis Office (SWPAO) following their last review. It is expected that revisions will be submitted in early January. Premium Efficiency Motors Project: About five man-days were required to prepare a specification for furnishing 40 new premium efficiency electric motors. The intention is to publish a bid solicitation in early January with a due date of late January. SGMA: On December 9th, three cooperative stream gages, all located on the Wind Wolves Preserve, were visited and found to be partially buried by silt. Other gages located on Tecuya Creek and Salt Creek were inaccessible due to mud. When conditions dry out, another visit will be scheduled to dig out gages and restore the dataloggers. User Input Program: District wells were off during the month of December, but Landowner wells produced approximately 39 acre-feet for Water User accounts. All District-owned wells were checked for static water levels, requiring about one man-day of effort. Direct Landowner Services: The following engineering assistance was provided to landowners or members of the general public:

• Two different Water Users were provided with custom maps showing their owned lands. Underground Facilities and Turnouts: The following field activities and/or research was conducted related to underground facilities:

• Engineering Department staff responded to 121 underground services alerts (USAs) during December.

• A total of 3.0 miles of District pipelines were marked during the month. • Assistance was provided to the O&M Department with locating various electrical conduits

and underground piping at the PD-1 Pumping Plant, as the O&M Department was engaged in replacing three large, nonoperational butterfly valves.

• Support was provided to the O&M Department with locating an isolation valve on the 8G-D Lateral following a pipe break.

• The Engineering Assistant worked with a Water User to evaluate the feasibility of increasing the size of a turnout in the 5P Service Area, but because that system is allocated for flow rates at peak times, it was recommended that there was little benefit to upsizing.

• Field notes and photos were taken during the repair of an oil pipeline which was located close to the 5G-A Lateral.

• Field notes and photos were taken during the repair of a separate oil pipeline that was located in parallel to the 7G-C Lateral.

• Several field meetings were held with an oil company contractor in preparation for the planned laying of two new small (3-inch and 3.5-inch diameter) low pressure gas pipelines together with a new oil and water pipeline in the 8G Service Area. Available District plan and profile drawings were also provided to the contractor. Eventually, field inspections were made and as-built notes were collected where the pipelines crossed above the District’s 8G-2 and 8G-3 Laterals.

• As-built notes were collected during the installation of new electrical conduits at the WRM-3 and WRM-4 pumping plants.

Maps, Records, and Easements: Engineering Department staff accomplished the following related to maps and records:

• The District’s databases of water levels, groundwater quality, and wells construction were updated with many field notes and laboratory results collected or received during the last year.

Hydrology and Hydraulics: The following took place related to hydrology:

• Daily and weekly data were collected on evaporation, wind, temperature, and rainfall at District weather stations.

• The new automated weather station located at the PA-2 Pumping Plant was found to be working well and logging data properly.

• The Cooperative weather station located at the District Headquarters, which is maintained by the National Weather Service, stopped reporting on October 19th.

Surface Water or Groundwater Quality: As part of an ongoing program, Aqueduct raw water samples were collected at the untreated water spigot located at the District’s maintenance shop building once per week for e. coli analysis. Results through December 2019 are posted on the District’s website. Corrosion Protection: The following work took place in support of cathodic protection:

• Potentials were measured at seven cathodic protection rectifier stations and minor adjustments were made to rectifier voltage as needed.

Annual Maintenance Inspections: The HP tank at the 15GP-2 Pumping Plant was inspected as part of annual maintenance. The interior coating, which was applied in 2013, was found to be in excellent condition and the cathodic protection systems were found to be intact. Energy: Work focusing on energy consumption and electrical accounts included the following:

• Forty-two PG&E bills were received and processed for payment in the December A/P. Due to the holidays, nine bills were not received as of this writing.

• On December 16th, the Staff Engineer was interviewed by a representative of the California Public Utilities Commission (CPUC) concerning the District’s Booster Pump Replacement Program and specifically concerning the factors that led to the decision to replace pumps, including the influence of available PG&E rebates.

• Total savings associated with the District’s solar projects over the preceding 12 months was found to be $48,268.

Meetings: Engineering Department staff attended the following meetings during the month:

December 3 KCWA Operations Conference Call December 3 ACWA Groundwater Committee December 3 ACWA Energy Committee December 10 KCWA Operations Conference Call December 17 KCWA Operations Conference Call

($100,000)($80,000)($60,000)($40,000)($20,000)

$0$20,000$40,000$60,000

8/1/

2018

9/1/

2018

10/1

/201

8

11/1

/201

8

12/1

/201

8

1/1/

2019

2/1/

2019

3/1/

2019

4/1/

2019

5/1/

2019

6/1/

2019

7/1/

2019

8/1/

2019

9/1/

2019

10/1

/201

9

11/1

/201

9

12/1

/201

9

WRMWSD NET SOLAR PROJECT COSTS (OR SAVINGS)ASSOCIATED WITH SPILL BASIN AND TRIANGLE PARCEL

PG&E Credits IGS Solar Charges Net of Charges and Credits

Parameter December 2019 Since 10/1/2019 Days Occurred in December

Maximum Temperature 74⁰ 92⁰ 23rd

Minimum Temperature 32⁰ 32⁰ 2nd, 17th, 30th

No. Days at or over 100° F 0 0 0

No. Days at or under 32° F 0 0 0

Precipitation 2.13 2.13 2nd, 4th, 10th, 23rd, 24th, 27th

Evaporation 3.286 12.149 ----

Maximum Wind Gust (c) (c) NA

Wind Run 2,400.0 5,079 ----

2018 2019

Shasta 4,552,000 2,270,141 3,329,922

Oroville 3,538,000 1,032,330 2,079,445

San Luis (Total) 2,028,000 1,509,517 1,286,842

San Luis (State Share) 1,062,000 (a) 867,981 888,398

Folsom 977,000 310,502 511,115

Isabella 361,250 (b) 66,574 168,329

Millerton 520,000 298,183 272,781

TOTALS 11,976,250 5,487,247 7,648,434

(b) US Army Corps Of Engineers restricted pool = 361,250AF; normal authorized capacity = 568,000AF(a) Included in the San Luis (Total); not included in the TOTALS for CAPACITY and STORAGE.

(c) Wind speed gage inoperable. NR Not reported as of this publication

CLIMATALOGICAL DATA FOR GREENLEE'S PASTURE

Reservoir Capacity Storage at End of December

STORAGE IN MAJOR RESERVOIRS(Acre-Feet)

OPERATIONS AND MAINTENANCE ACTIVITIES (G. LOVELESS)

Safety Training Tailgate safety meeting on Dumped Material on District Property. Field/System Maintenance.

• December 1 – 7, Completed 15G-P1 and 15G-P2 Annual Maintenance. • Replaced isolation valve tube and stack at turnout 7G-10. • Received delivery of two new Peterbilt dump trucks. • Replaced the swing check valves on unit #5 at 4P-P2 and unit #6 at WRM-4. • Replaced swing check valves on unit #3 at 5P-P2 and unit #5 at 5P-P3. • Replaced swing check valves on units #2 and #3 at 15G-P1

Pipeline Repair

• December 9 – Completed repair of previously reported leak on 5P-D lateral. • December 18, 1030 hours – Leak reported on 8G-D lateral. Repair was completed and service

restored December 21, 0500 hours. • December 27, 0730 hours - Leak reported on 14G-A lateral at turnout 14G31. Repair is scheduled

to be completed next month. Power Outage

• December 16, 0530 hours – Power outage WRM-9. PG&E was notified, service resumed 2100 hours.

• December 17, 0930 hours – Power outage WRM-9, WRM-9A, and 850 canal system. PG&E was notified, service resumed December 18.

• December 21, 1900 hours - Power outage WRM-9 and WRM-9A. PG&E was notified, service resumed December 22, 0400 hours.

Other Interruptions in Service

• December 11, 0800 hours - SCADA communication failure resulting in system shut-down at 8P-P2. Service resumed 0930 hours.

• December 25, 1840 hours- SCADA communication failure resulting in system shut down at WRM-8. Service resumed December 26, 0830 hours.

Pump and Electrical • SCADA system upgrade commenced. Tesco field technicians downloaded new programs in the

Programmable Logic Controllers (PLC) at all pumping plants. • Conduit was run from MC buildings to HP tanks for pressure transducers installation at WRM-3

and WRM-4. • Scheduled power disconnect at WRM-4 for buss bar inspection. Bolts holding buss bar were

torqued to specifications and checked for broken insulators. Roof was patched near bussing chimney due to water found leaking in cabinet during inspection.

• Shock relays on water screens were adjusted to operate within desired parameters. New unit was installed at PC-1.

• Replaced a polyphaser (spark arrester) for SD 9 radio at WRM-8. • Power outage caused the PLC to lock up at PA-1. PLC memory was dumped, and new program

was downloaded into PLC. • PA-1 travelling water screen solenoid valve was repaired.

• 15GP-1, unit #3, 150 HP motor was replaced after burnt leads were found in the weather head.

Equipment Maintenance. 6 Regular vehicle services

• Unit #129 had the windshield wiper control arm replaced. • Unit #686B was delivered to Quinn Caterpillar for repair to broken wheel hub.

Current gasoline bulk purchase prices for the District are $2.848 per gallon for gasoline and $2.867per gallon for diesel.

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

ACR

E-FE

ET

WATER DELIVERIES SUMMARYThrough December 2019

ESTIMATE ACTUAL

5,266 ac-ft.in December;169,407 ac-ft.year to date

*Based on 75% SWP Allocation & Total Deliveries of 182,000 ac-ft.

Wheeler Ridge-Maricopa Water Storage District(Includes water from the State Water Project, banking projects, District wells, and User input.)

Monthly Deliveries in Acre-Feet

Month 20062007

20082009

20102011

20122013

20142015

20162017

*2018

2019

January 1,962 5,258 1,615 1,265 894 1,613 6,108 2,213 3,367 2,210 1,223 2,425 1,785 3,055February 7,588 7,269 6,933 2,952 3,440 5,333 8,128 6,387 6,380 4,666 3,077 1,454 7,704 1,667March 9,315 12,557 12,392 10,151 8,440 7,938 10,696 10,695 9,627 10,157 10,218 8,184 3,174 5,494April 10,572 15,665 17,770 17,717 12,966 13,935 10,521 16,999 13,994 17,102 13,133 14,731 13,500 14,824May 20,700 25,488 24,384 24,151 20,664 21,545 23,320 25,754 23,317 20,936 21,496 25,759 21,858 16,441June 26,542 29,940 27,348 26,379 29,411 27,534 29,261 29,894 25,128 24,540 29,390 32,629 28,802 27,146July 29,107 28,394 29,661 30,156 32,124 29,719 28,259 28,599 23,476 21,401 29,546 33,290 28,233 30,633August 25,078 21,817 22,680 22,153 23,873 24,461 25,027 24,554 17,490 18,220 26,948 26,639 26,029 27,793September 16,897 13,924 16,050 17,453 18,335 17,923 16,678 17,090 15,244 14,908 15,452 17,376 17,705 18,343October 9,033 9,385 10,797 11,953 8,156 12,343 13,075 13,440 13,394 10,715 11,135 14,974 13,896 12,444November 5,438 5,609 6,093 5,669 5,872 4,699 4,895 6,485 5,412 4,862 4,957 5,351 5,867 6,300December 4,788 7,424 3,245 2,739 2,515 6,315 3,354 6,615 4,231 3,055 2,520 4,449 4,626 5,266

Accumulated Monthly Deliveries in Acre-Feet

Month 20062007

20082009

20102011

20122013

20142015

20162017

20182019

January 1,962 5,258 1,615 1,265 894 1,613 6,108 2,213 3,367 2,210 1,223 2,534 1,785 3,055February 9,550 12,527 8,548 4,217 4,334 6,946 14,236 8,600 9,747 6,876 4,300 3,879 9,489 4,722March 18,865 25,084 20,940 14,368 12,774 14,884 24,932 19,295 19,373 18,191 14,518 12,063 12,663 10,216April 29,437 40,749 38,710 32,085 25,740 28,819 35,453 36,294 33,367 35,293 27,651 26,794 26,163 25,040May 50,137 66,237 63,094 56,236 46,404 50,364 58,773 62,048 56,684 55,071 49,147 52,553 48,021 41,481June 76,679 96,177 90,442 82,615 75,815 63,014 88,034 91,942 81,812 79,611 78,537 85,182 76,823 68,627July 105,786 124,571 120,103 112,771 107,939 107,617 116,293 120,541 105,288 101,012 108,082 118,472 105,056 99,260August 130,864 146,388 142,783 134,924 131,812 132,078 141,320 145,096 122,778 119,232 135,030 145,111 131,085 127,053September 147,761 160,312 158,833 152,377 150,147 150,001 157,998 162,186 138,022 134,140 150,482 162,487 148,790 145,396October 156,794 169,697 169,630 164,330 158,303 162,344 171,073 175,626 151,416 144,855 161,617 177,461 162,686 157,840November 162,232 175,306 175,723 169,999 164,175 167,043 175,968 182,111 156,828 149,717 166,574 182,812 168,553 164,140

December 167,020 182,730 178,968 172,738 166,690 173,358 179,322 188,726 161,059 152,772 169,094 187,261 173,179 169,406SWP Allocation% 100% 60% 35% 40% 50% 80% 65% 35% 5% 20% 60% 85% 35% 75%SWP Allocation (AF) 197,088 118,253 68,981 78,835 98,544 157,670 128,107 68,981 9,854 39,418 118,253 167,525 68,981 147,816

California Snow Water Content, December 31, 2019, Percent of April 1 Average

Statewide Percent of April 1: 33% Statewide Percent of Average for Date: 94%

Dec Jan Feb Mar Apr May Jun Jul

0

5 0

1 0 0

1 5 0

2 0 0

2 5 0

Average1 9 7 6 - 1 9 7 7

1982-1983 (max)

2014-2015 (min)

2 0 1 6 - 2 0 1 7

2 0 1 7 - 2 0 1 8

2 0 1 8 - 2 0 1 9

2 9

Percent of Average for this Date: 81%North

0

5 0

1 0 0

1 5 0

2 0 0

2 5 0

Average1 9 7 6 - 1 9 7 7

1982-1983 (max)

2014-2015 (min)

2 0 1 6 - 2 0 1 7

2 0 1 7 - 2 0 1 8

2 0 1 8 - 2 0 1 9

34

Percent of Average for this Date: 94%Central

0

5 0

1 0 0

1 5 0

2 0 0

2 5 0

Average

1 9 7 6 - 1 9 7 7

1982-1983 (max)

2014-2015 (min)

2 0 1 6 - 2 0 1 7

2 0 1 7 - 2 0 1 8

2 0 1 8 - 2 0 1 9

35

Percent of Average for this Date: 109%South

Northern Sierra Precipitation: 8-Station Index, December 31, 2019

To

tal

Wa

ter

Ye

ar

Pre

cip

ita

tio

n

Oct 1 Nov 1 Dec 1 Jan 1 Feb 1 Mar 1 Apr 1 May 1 Jun 1 Jul 1 Aug 1 Sep 1 Oct 1Water Year (October 1 - September 30)

0

5

1 0

1 5

2 0

2 5

3 0

3 5

4 0

4 5

5 0

5 5

6 0

6 5

7 0

7 5

8 0

8 5

9 0

9 5

1 0 0C

um

ula

tiv

e D

ail

y/M

on

thly

Pre

cip

ita

tio

n (

inc

he

s)

51.8Average (1966-2015)

19.01976-1977(2nd driest & driest thru Aug)

88.51982-1983 (2nd wettest)

82.41 9 9 7 - 1 9 9 8

37.22014-2015 Daily Precip

94.72016-2017 Daily Precip (wettest)

41.02017-2018 Daily Precip

70.72018-2019 Daily Precip

Current: 12.9

Percent of Average for this Date: 69%Mount Shasta CityShasta DamMineral

QuincyBrush Creek

Sierraville RSBlue Canyon

Pacific House

contains hidden rows

as of Jan. 01, 2020 based on Dec. 2, 2019 10% SWP allocation

Values in acre-feet 12/02/2019 DWR 25% SWP 40% SWPALLOCATION ALLOCATION ALLOCATION

Capacity Supply Shortage Supply Shortage Supply Shortageor (Excess) or (Excess) or (Excess)

Sacramento Valley Water Year Index (40-30-30)Probability of Exceedance (a) 90% POESWP Allocation (a) 10% Alloc 25% Alloc 40% AllocAssumptionsEstimated Demand -- WRMWSD in-District deliveries (b) 182,000 182,000 182,000 -- less demands over the CAW 0 0 0– less Pastoria Energy Facility demands from KWB -3,500 -3,500 -3,500

Total Estimated Demand 178,500 178,500 178,500Surface SuppliesSWP Table A Entitlement 197,088 19,709 158,791 49,272 129,228 78,835 99,665SWP Supply 19,709 9.8% 49,272 24.5% 78,835 39.3%Western Hills Water District 8,000 0 158,291 54 128,674 378 98,787

158,291 128,674 98,787Supplemental 1 Supplies - DistrictDistrict Carryover from 2019 0 0 158,291 0 128,674 0 98,787Butte County 3,200 86 158,205 216 128,458 345 98,442San Luis Water District (WS5) 2,700 2,700 155,505 2,700 125,758 2,700 95,742Kern Water Bank - actual 0 0 155,505 0 125,758 0 95,742Kern Water Bank - estimated through end of year 25,000 25,000 130,505 25,000 100,758 25,000 70,742Pioneer Project - actual 0 0 130,505 0 100,758 0 70,742Pioneer Project - estimated through end of year 5,000 5,000 125,505 5,000 95,758 5,000 65,742District & BRID Wells - actual 0 0 125,505 0 95,083 0 64,662District & BRID Wells - estimated through EOY 10,000 10,000 115,505 10,000 85,083 10,000 54,662

Supplemental 1 Water Available 45,900DISTRICT ALLOCATION 62,995 31.4% 93,417 46.5% 123,838 61.7%

0.89 AF/Alloc Ac 1.31 AF/Alloc Ac 1.74 AF/Alloc Ac

Supplemental 2 Supplies ( these discussions have not begun )Dry Year Transfer Program-figures to include estimated carriage loss 0 0 115,505 0 85,083 0 54,662Yuba C4 0 0 115,505 0 85,083 0 54,662Browns Valley ID 0 0 115,505 0 85,083 0 54,662

Supplemental Supplies - Water UserWater User - Carryover from 2019 8,286 8,286 107,219 8,286 76,797 8,286 46,376User Input - actual 0 0 107,219 0 76,797 0 46,376User Input - estimated through EOY 20,000 20,000 87,219 15,000 61,797 10,000 36,376Landowner Transfer 0 0 87,219 0 61,797 0 36,376

Available Supply 287,274 91,282 116,704 142,126Estimated Demand 178,500 178,500 178,500Shortage (Excess) 87,218 61,796 36,374

(a) Per 12/02/2019 SWP 10% allocation(b) Based upon estimated Deliveries based on 30% SWP Allocation. Lyndal Water not yet calculated.

Estimates for Banking Project recovery and District Well productions follow 2017 Rationing policy. WATER IN STORAGE @ 9/30/19

LOCATION AFKern WB 196,600KCWA 54,656North Kern 0SemiTropic 7,500TOTAL 255,359

PRELIMINARYSUBJECT TO REVISION

Below Normal

Item 8.2.a.WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICT

2020 WATER SUPPLY/DEMAND ESTIMATE

1/6/2020 W.Jones

1/6/2020 Series of December Storms Provides Good Start to Sierra Snowpack

https://water.ca.gov/News/News-Releases/2020/January-2020-Snow-Survey 1/1

Series of December Storms Provides Good Start to SierraSnowpackPublished: Jan 02, 2020

SACRAMENTO, Calif. -- The Department of Water Resources (DWR) today conducted the first manual snow survey of2020 at Phillips Station. The manual survey recorded 33.5 inches of snow depth and a snow water equivalent (SWE) of11 inches, which is 97 percent of average for this location. The SWE measures the amount of water contained in thesnowpack, which provides a more accurate forecast of spring runo�.

“While the series of cold weather storms in November and December has provided a good start to the 2020 snowpack,precipitation in Northern California is still below average for this time of year,” said DWR Director Karla Nemeth. “Wemust remember how variable California’s climate is and what a profound impact climate change has on our snowpack.”

More telling than a survey at a single location are DWR’s electronic readings from 130 stations scattered throughout theState. Measurements indicate that statewide, the snowpack’s SWE is 9.3 inches, or 90 percent of the January 2 average.

“It’s still too early to predict what the remainder of the year will bring in terms of snowpack,” said Sean de Guzman,chief of DWR’s Snow Surveys and Water Supply Forecasting Section. “Climate change is altering the balance of rain andsnow in California. That is why it is important to maintain our measurements of the snowpack to document the changein addition to having critical information to forecast spring runo�.”

California traditionally receives about 75 percent of its annual precipitation during December, January and February,with the bulk of this precipitation coming from atmospheric rivers. Similar to last year, California experienced a drystart to this water year followed by cold, wet December storms that brought the state up to 74 percent of averageannual precipitation for this time of year. Climate change is expected to lead to continued warming and fewer but moreintense storms impacting the snowpack of the Sierra Nevada. These changes continue to impact the distribution ofsnow across elevations, its pattern of accumulation, and rate of melt.

DWR conducts five media-oriented snow surveys at Phillips Station each winter in January, February, March, April and,if necessary, May. On average, the snowpack supplies about 30 percent of California’s water needs as it melts in thespring and early summer.

Video of January 2 Phillips Station snow survey. 

Digital photos January 2 Phillips survey

###

 

Contact:

Chris Orrock, Information Officer, Public Affairs, Department of Water Resources

916-480-5414 | [email protected]

SkiptoMainContent

contains hidden rows

as of Dec. 31, 2019 based on June 19, 2019 75% SWP allocation

Values in acre-feet 06/19/19 DWRALLOCATION

Capacity Supply Shortage

Sacramento Valley Water Year Index (40-30-30)Probability of Exceedance (a) 90% POESWP Allocation (a) 75% AllocAssumptionsEstimated Demand -- WRMWSD in-District deliveries (b) 182,000 -- less demands over the CAW 0 – less Pastoria Energy Facility demands from KWB -2,588Total Estimated Demand 179,412Surface SuppliesSWP Table A Entitlement 197,088 147,816 31,596

Article 21 In-District deliveries **(estimate)** 2,306 2,306 29,290KR and Lower River Water estimate (d) 13,005 13,005 16,285SWP Supply 163,127 81.2%Western Hills Water District 1,429 1,429 14,856

Supplemental 1 Supplies - DistrictBrowns Valley ID 0 0 14,856Butte County 3,508 3,508 11,347San Luis Water District (WS5) 674 674 10,673Santa Clarita VWA Table A Supply (WS5) 2,670 2,670 8,003Estimated 2018 District Carryover In-District Deliveries 1,164 1,164 6,839District & BRID Wells - actual (c) 328 328 6,510

6,510Supplemental 1 Water Available 8,345DISTRICT ALLOCATION 172,902 86.1%

2.40 AF/ACSupplemental 2 SuppliesSan Luis Water District (WS5) 2,023 2,023 4,487

4,487Supplemental 2 Water Available 2,023

Supplemental Supplies - Water User *Estimated 2018 Water UserCarryover In-District Deliveries 6,548 6,548 -2,061User Input - actual 5,293 5,293 -7,354User Input - (modified) estimate through EOY 0 0 -7,354Landowner Transfer 700 700 -8,054

0 -8,054

Available Supply 236,738 187,466Estimated Demand 179,412Shortage (Excess) (8,054)

(a) Per 6/19/19 SWP 75% allocation(b) Based upon estimated Deliveries for a 75% SWP Allocation. Lyndal Water not yet calculated, nor included.(c) This quantity not included on 2019 Melded Cost of SWP and Supp Water(d) Estimated supplies delivered May-Sept

* Water User's Kern Water Bank Second Priority accounts estimated total 2017 to date:2017 1,568 8 PARTICIPANTS

2018 (125) 1 2017 PARTICIPANT RECOVERED 2017 BANKED SUPPLY2018 1,000 1 2017 PARTICIPANT SUPPLEMENTED THEIR ACCOUNT2019 4,364 3 NEW PARTICIPANTS AND 1 2017 PARTICIPANT RECHARGED PORTIONS OF 2018 CARRYOVER2019 7,420 4 NEW PARTICIPANTS RECHARGED PORTIONS OF SUPPLEMENTAL ACQUISTIIONS2019 6,604 2 PRIOR PARTICIPANTS RECHARGED 2019 'AT RISK' EXCESS SUPPLIES

20,831 AF - ESTIMATED TOTAL 2017 TO DATE

Item 8.2.b.WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICT

2019 WATER SUPPLY/DEMAND ESTIMATE

Wetor (Excess)

LOCATION AFKern WB 196,600KCWA 54,656North Kern 0SemiTropic 7,500TOTAL 258,756

SUBJECT TO REVISION

WATER IN STORAGE @ 9/30/19

PRELIMINARY

1/6/2020 - W. Jones

◖◖◖◖ W H E E L E R R I D G E - M A R I C O P A W A T E R S T O R A G E D I S T R I C T ◗◗◗◗ Agenda Item 8.2.c

MEMORANDUM

TO: Board of Directors

FROM: Wendy Jones

DATE: January 8, 2020

SUBJECT: Authority to Execute Water Agreements for 2020

Historically, the Board has authorized the Engineer-Manager to purchase any water supplies up

to a specific amount per acre-foot. Beginning in water year 2014, the Board authorized the

purchase of supplies up to $900 per acre-foot based upon Water User demand (subscription basis

only). Since the 2016 water year, the Board has authorized purchases up to $350 per acre-foot

for all Water Users and, in the 2017 water year, the Board authorized $200 per acre-foot for

groundwater recharge supplies during wet conditions when such supplies may become available.

With an initial SWP allocation of 10% and a review of the estimated supplies shown in our

initial 2020 Water Supply/Demand Estimate (8.2.a), it is possible to foresee a low allocation

equating low supplies, which will render high water costs.

For information purposes only, an analysis of average cost estimates for available 2020 supplies

as shown in the initial Water Supply/Demand Estimate provides the following:

Supplement to 2020 Water Purchase Authorization

AF $/AF Estimated Cost

SWP 10% Entitlement 19,709 1,170$ 23,050,903$

Kern WB 25,000 250$ 6,250,000$ valued replacement cost rate

Pioneer 5,000 270$ 1,350,000$ valued replacement cost rate

District Wells 10,000 195$ 1,950,000$ energy cost + maintenance

59,709 546$ 32,600,903$

Estimates for Banking Project recovery and District Well productions follow 2017 Rationing policy.

Recommendation: Based upon the above historical information and what we know at this

writing, it is recommended that the Board extend the Engineer-Manager’s authorization to

execute any water agreements in 2020 (subject to Engineer-Manager and Counsel approval) and

purchase water supplies that fall in accordance with the characterized criteria, specifically the

following:

purchase any water supplies available at a cost not to exceed $350 per acre-foot,

purchase any water supplies available at a cost not to exceed $900 per acre-foot subject to

Water User subscription requests, and

purchase any recharge water supplies available at a cost not to exceed $200 per acre-foot.

Water supplies that cost more per acre-foot than the amounts categorized herein would require

separate Board approval and authorization. u:\documents\wendy's docs\1 wrm\board prep\2020 01 board prep\8.2.c 2020 water purchase authorization.docx

À W H E E L E R R I D G E-M A R I C O P A W A T E R S T O R A G E D I S T R I C T �

Agenda Item 8.4

MEMORANDUM

TO: Board of Directors

FROM: Robert Kunde

DATE: January 7, 2020

SUBJECT: Delta Conveyance Project

On January 7, 2020, the Department of Water Resources announced Public Negotiation #10 will be heldon January 22 to discuss the State Water Project Contract Amendment for Delta Conveyance. DWR haspublished its 6th Offer (attached).

Staff will provide verbal comments at the January 8 Board meeting. It is likely this Offer will also bediscussed at the 1:30 pm January 9 Delta Conveyance at the Kern County Water Agency.

Attachment

Page 1 of 1

DCP Negotiation #082 California Department of Water Resources

Preface to Sixth Offer December 20, 2019

Page 1 of 1

California Department of Water Resources

Preface to its Sixth Offer in

the Contract Negotiations Concerning Water Supply Contract Cost and Benefit Allocation of Delta Conveyance Facilities of the State Water Project

At the public negotiation held on November 13, 2019 the Department’s negotiator committed to take the AIP to the Director for approval, but requested a straw poll be conducted of the level of support from the 29 PWAs. Completion of that straw poll indicated less support than initially anticipated with only 16 of 29 PWAs committing to recommending a position of support to their boards of directors.

It is the Department’s position that this level of support is unlikely to result in a contract amendment that can be implemented uniformly across all the contracts. It is also the Department’s understanding that the PWAs do not feel there is likely to be an increase in the level of support should further negotiations be held on the existing “Opt-In” approach. In light of this information, the Department submits this counter-proposal to the “Opt-In” approach as its sixth offer.

The Department currently has the statutory and contractual authority to proceed with planning, construction and operation of a Delta conveyance facility. Recognizing that there are PWAs that do not wish to pay for or benefit from a Delta conveyance facility, DWR has structured within its sixth offer an “Opt-Out” provision that will credit any PWA exercising this option for any costs associated with planning, constructing or operating a Delta conveyance facility. Commensurate with such a credit would be express waivers of any water supply benefits from a Delta conveyance facility. This counter-offer addresses the concerns expressed by Kern County Water Agency by providing the ability to “Opt-Out” for either 100% of a PWA’s municipal and industrial allocation or 100% of its agricultural allocation.

PWAs not exercising an “Opt-Out” will benefit from a Delta conveyance facility pursuant to the existing State Water Project Water Supply Contracts, and shoulder the associated costs based upon the existing billing provisions.

The Department proposes that further contract negotiations begin on January 22, 2020 in order to discuss its sixth offer, thereby giving the PWAs significant time over the next several weeks to discuss within their caucus.

It is the Department’s continued belief that a Delta conveyance facility is in the best interests of the state, the PWAs, and the Delta.

DCP Negotiation #083 California Department of Water Resources

Sixth Offer December 20, 2019

Page 1 of 8

AGREEMENT IN PRINCIPLE CONCERNING

WATER SUPPLY CONTRACT COST AND BENEFIT ALLOCATION OF DELTA CONVEYANCE FACILITIES

OF THE STATE WATER PROJECT

DECEMBER 20, 2019

DCP Negotiation #083 California Department of Water Resources

Sixth Offer December 20, 2019

Page 2 of 8

This Agreement in Principle is by and between the undersigned State Water Project Public Water Agencies1 and the State of California by and through the Department of Water Resources for the purpose of providing a mechanism for amending the State Water Project Water Supply Contracts that will address cost and benefit allocation of Delta Conveyance Facilities of the State Water Project with an assumed State Water Project capacity of 6,000 cubic feet per second. Outline of Agreement in Principle

I. Definitions II. Objective 1 - Availability of an option to avoid, or partially avoid, costs and

benefits of Delta Conveyance Facilities of the State Water Project III. Objective 2 - Availability of an option to assume, or partially assume, costs

and benefits of Delta Conveyance Facilities of the State Water Project IV. Objective 3 - Pursuit of State Water Project Delta Conveyance Facilities under

the State Water Project Water Supply Contracts V. Objective 4 - Delta Conveyance Facility billing credits and surcharges VI. Objective 5 - Delta Conveyance Facility benefits allocation VII. Objective 6 - Affect upon other Water Supply Contract provisions VIII. Intent to seek approval of option to avoid or assume costs and benefits of Delta Conveyance

Facilities of the State Water Project IX. Environmental Review Process X. Authorized Representative Signatures

1 The State Water Project Contractor Public Water Agencies includes Alameda County Flood Control and Water Conservation District (Zone 7), Alameda County Water District, Antelope Valley-East Kern Water Agency, Castaic Lake Water Agency, City of Yuba City, Coachella Valley Water District, County of Butte, County of Kings, Crestline-Lake Arrowhead Water Agency, Desert Water Agency, Dudley Ridge Water District, Empire West Side Irrigation District, Kern County Water Agency, Littlerock Creek Irrigation District, The Metropolitan Water District of Southern California, Mojave Water Agency, Napa County Flood Control and Water Conservation District, Oak Flat Water District, Palmdale Water District, Plumas County Flood Control and Water Conservation District, San Bernardino Valley Municipal Water District, San Gabriel Valley Municipal Water District, San Gorgonio Pass Water Agency, San Luis Obispo County Flood Control and Water Conservation District, Santa Barbara County Flood Control and Water Conservation District, Santa Clara Valley Water District, Solano County Water Agency, Tulare Lake Basin Water Storage District, and Ventura County Flood Control District.

DCP Negotiation #083 California Department of Water Resources

Sixth Offer December 20, 2019

Page 3 of 8

I. Definitions a. Clifton Court Forebay shall mean the existing State Water Project diversion at Clifton

Court Forebay facility through its intake located on Old River in the southern Delta and the associated Skinner Fish Facility.

b. Delta shall mean the Sacramento-San Joaquin Delta as defined in Section 12220 of the California Water Code on the date of approval of the Bond Act by the votes of the State of California.

c. Delta Conveyance Facility (DCF) shall mean those facilities of the State Water Project consisting of a water diversion intake structure, or structures, located on the Sacramento River and connected by facilities to Banks Pumping Plant in the southern Delta with a single tunnel that will serve the water supply purposes of the State Water Project.

d. State Water Project (SWP) shall mean the State Water Resources Development System as described in California Water Code section 12931.

e. State Water Project Contractor Public Water Agencies (PWAs) shall include the 29 entities holding State Water Project Water Supply Contracts with the Department of Water Resources.

II. Objective 1 - Availability of an option to avoid, or partially avoid, costs and

benefits of the DCF a. This AIP makes available to each PWA an option to avoid, or partially avoid, costs and

benefits of the DCF through a contract amendment that establishes a Statement of Charges credit in exchange for expressly waiving rights to water diverted at or conveyed through the DCF, as described in Section VI of this AIP.

b. PWAs indicating an intent to avoid, or partially avoid, costs and benefits of the DCF shall be described in Section VIII of this AIP.

c. An option to avoid, or partially avoid, costs and benefits of the DCF are limited such that a PWA must avoid at a minimum 100% of its Municipal and Industrial Table A or 100% of its Agricultural Table A.

III. Objective 2 - Availability of an option to assume, or partially assume, costs

and benefits of the DCF a. This AIP makes available to each PWA an option to assume, or partially assume,

additional costs and benefits of the DCF through a contract amendment that establishes a Statement of Charges surcharge in exchange for enumerated additional rights to water diverted at or conveyed through the DCF, as described in Section VI of this AIP.

b. PWAs indicating an intent to assume, or partially assume, costs and benefits of the DCF shall be described in Section VIII of this AIP.

IV. Objective 3 - Pursuit of State Water Project Delta Conveyance Facilities under

the State Water Project Water Supply Contracts a. The DCF shall be constructed and operated as an integrated component of the State

Water Project, and DWR will continue to operate the State Water Project at its sole discretion.

DCP Negotiation #083 California Department of Water Resources

Sixth Offer December 20, 2019

Page 4 of 8

b. The DCF is an authorized component of the State Water Project pursuant to California Water Code sections 11100 et seq. and 12930 et seq.

c. Effective Date: A contact amendment pursuant to this AIP shall have an effective date no sooner than the billing transition date set forth in State Water Project Water Supply Contract Amendment known as The Contract Extension Amendment.

d. Administration of DCF: DWR will account for Project Water diverted at and conveyed through the DCF and DWR will determine whether or not that Project Water would not have been available at Clifton Court Forebay.

V. Objective 4 - Delta Conveyance Facility billing credits and surcharges

a. Statement of Charges i. DCF costs shall be billed to and collected from each PWA through the annual

Statement of Charges on a separately stated line item comprised of the following components: DCF Capital Charge; DCF Minimum Operations, Maintenance, Power and Replacement Charge; and DCF Variable Operations, Maintenance, Power and Replacement Charge.

ii. These charges shall be subject to redetermination. b. Upon completion of this AIP, DWR will propose contract amendments establishing the

following: i. A credit for the costs associated with construction and operation of the DCF for

PWAs that indicated an intent to avoid, or partially avoid, costs and benefits of the DCF as recorded in Section VIII of this AIP.

ii. A surcharge for the costs associated with construction and operation of the DCF for the PWAs that indicated an intent to assume, or partially assume, costs and benefits of the DCF as recorded in Section VIII of this AIP.

c. Upon completion of this AIP, DWR shall determine the specific proportions of participation in the DCF based upon Section VIII of this AIP. These proportions will be reflected in the draft contract amendments prepared by DWR for PWAs indicating an intent to avoid or assume costs and benefits of the DCF.

d. DWR will not propose contract amendments and will not execute said amendments that will in the judgment of the State impair the financial feasibility of project facilities.

VI. Objective 5 - Delta Conveyance Facility benefits allocation

a. PWAs that execute a contract amendment to avoid, or partially avoid, costs and benefits of the DCF will agree, within that amendment, to the following:

i. A credit to its Statement of Charges as set forth in Section V of this AIP. ii. Forego and waive any contractual rights to or delivery of Project Water diverted

at and conveyed through the DCF. Provided that DWR determines that such water would not have been available for diversion at Clifton Court Forebay. This AIP will not modify the amounts within Table A but will memorialize this limited Table A reduction by amending the PWA’s Table A with a footnote recognizing this new constraint upon its rights and deliveries.

iii. Forego and waive any contractual rights to or delivery of Article 21 Interruptible Water prior to the point(s) in time each year DWR determines that the SWP

DCP Negotiation #083 California Department of Water Resources

Sixth Offer December 20, 2019

Page 5 of 8

share of San Luis Reservoir storage will be displaced and after displacement of an amount of water in San Luis Reservoir equal to the amount of Project Water diverted at or conveyed through the DCF. Provided that when supply of Article 21 Interruptible Water is greater than demand for Article 21 Interruptible Water this constraint shall not prohibit DWR from offering and a PWA from taking delivery of said water. [See Illustration 1.]

iv. Forego and waive any contractual rights to use of the DCF, unless a subsequent contract with DWR is entered that provides for payment of capital, fixed and variable costs associated with such use.

b. PWAs that execute a contract amendment to assume, or partially assume, costs and benefits of the DCF will agree, within that amendment, to the following:

i. A surcharge to its Statement of Charges as set forth in Section V of this AIP. ii. A right of first refusal for the delivery of Table A amounts diverted at and

conveyed through the DCF foregone by PWAs avoiding the benefits of the DCF. Provided that this right of first refusal is limited by the proportion assumed of all foregone benefits as set forth in a contract amendment. This AIP will not modify the amounts within Table A but will memorialize this limited Table A addition by amending the PWA’s Table A with a footnote recognizing this new addition of rights.

iii. A right of first refusal for the delivery of Article 21 Interruptible Water foregone by PWAs avoiding the benefits of the DCF. Provided that this right of first refusal is limited by the proportion assumed of all foregone benefits as set forth in a contract amendment.

VII. Objective 6 - Affect upon other Water Supply Contract provisions

a. Unless specifically stated in this AIP and incorporated into a subsequent contract amendment, there are no changes to the existing State Water Project Water Supply Contracts.

b. Transfers and exchanges are not intended to be modified under this AIP, and shall be subject to the provisions of the then existing State Water Project Water Supply Contracts.

VIII. Intent to seek approval of option to avoid or assume costs and benefits of Delta Conveyance

Facilities of the State Water Project Within the parameters set forth in Section II of this AIP, the following table indicates the intent of each PWA to seek either (1) a contract amendment to avoid costs and benefits of the DCF, or (2) a contract amendment to assume costs and benefits of the DCF, or (3) to maintain the current contracted Table A proportion of the DCF.

DCP Negotiation #083 California Department of Water Resources

Sixth Offer December 20, 2019

Page 6 of 8

State Water Project Contractor Public Water Agency

Exercising

Option to

Avoid

Exercising

Option to

Assume

Maintaining

Existing

Alameda County Flood Control and Water Conservation District Zone 7 N N Y

Alameda County Water District N N Y

Antelope Valley-East Kern Water Agency N N Y City of Yuba City N N Y Coachella Valley Water District N N Y County of Butte N N Y

County of Kings- Government Center N N Y Crestline-Lake Arrowhead Water Agency N N Y Desert Water Agency N N Y

Dudley Ridge Water District N N Y

Empire West Side Irrigation District N N Y

Kern County Water Agency N N Y

Littlerock Creek Irrigation District N N Y

Metropolitan Water District of Southern California N N Y Mojave Water Agency N N Y Napa County Flood Control and Water Conservation District N N Y

Oak Flat Water District N N Y

Palmdale Water District N N Y

Plumas County Flood Control and Water Conservation District N N Y

San Bernardino Valley Municipal Water District N N Y

San Gabriel Valley Municipal Water District N N Y

San Gorgonio Pass Water Agency N N Y

San Luis Obispo County Flood Control and Water Conservation District N N Y

Santa Barbara County Flood Control and Water Conservation District N N Y

Santa Clara Valley Water District N N Y

Santa Clarita Valley Water Agency N N Y

Solano County Water Agency N N Y

Tulare Lake Basin Water Storage District N N Y

Ventura County Watershed Protection District N N Y

DCP Negotiation #083 California Department of Water Resources

Sixth Offer December 20, 2019

Page 7 of 8

IX. Environmental Review Process a. DWR and the PWAs agree that this AIP is intended to be used during the environmental

review process for the CEQA, to define the proposed project description for the purposes of CEQA, and to permit the next steps of the SWP water supply contract amendment process, including scoping and the preparation of the EIR. The AIP principles are not final contract language and do not represent a contractual commitment by either DWR or the PWAs to approve any proposed project or to sign contract amendments. By concurring with the AIP, DWR and the PWAs express their intent to move forward with the CEQA process with DWR as lead agency and the PWAs as responsible agencies, and ultimately develop a proposed project consisting of contractual amendments consistent with the AIP principles and prepare the EIR for consideration by DWR and the PWAs.

b. At the end of the CEQA process and in compliance with CEQA, DWR and the PWAs will each individually evaluate the EIR and Contract Amendment, exercise their independent judgment, and determine whether or not to certify the EIR, approve the proposed project and sign the contract amendment or to approve an alternative project. Consequently, even though DWR and the PWAs have agreed to the AIP for the purposes described in the preceding paragraphs, DWR and each PWA retain their full discretion under CEQA to consider and adopt mitigation measures and alternatives, including the alternative of not going forward with the proposed project.

X. Authorized Representative Signatures California Department of Water Resources ___________________ Alameda County Flood Control and Water Conservation District Zone 7 ___________________ Alameda County Water District ___________________ Antelope Valley-East Kern Water Agency ___________________ City of Yuba City ___________________ Coachella Valley Water District ___________________ County of Butte ___________________ County of Kings- Government Center ___________________ Crestline-Lake Arrowhead Water Agency ___________________ Desert Water Agency ___________________ Dudley Ridge Water District ___________________

DCP Negotiation #083 California Department of Water Resources

Sixth Offer December 20, 2019

Page 8 of 8

Empire West Side Irrigation District ___________________ Kern County Water Agency ___________________ Littlerock Creek Irrigation District ___________________ Metropolitan Water District of Southern California ___________________ Mojave Water Agency ___________________ Napa County Flood Control and Water Conservation District ___________________ Oak Flat Water District ___________________ Palmdale Water District ___________________ Plumas County Flood Control and Water Conservation District ___________________ San Bernardino Valley Municipal Water District ___________________ San Gabriel Valley Municipal Water District ___________________ San Gorgonio Pass Water Agency ___________________ San Luis Obispo County Flood Control and Water Conservation District ___________________ Santa Barbara County Flood Control and Water Conservation District ___________________ Santa Clara Valley Water District ___________________ Santa Clarita Valley Water Agency ___________________ Solano County Water Agency ___________________ Tulare Lake Basin Water Storage District ___________________ Ventura County Watershed Protection District ___________________

Illustration of Project Water storage not diverted through the DCFIllustration of Project Water storage

Point at which the volume of water diverted through the DCF is displaced from San Luis Reservoir

Time

Point at which DWR determinesArticle 21 will be available

SWP San Luis Reservoir Storage

Foregone Article 21 Interruptible Water

A B

Volume

ILLUSTRATION A

À W H E E L E R R I D G E-M A R I C O P A W A T E R S T O R A G E D I S T R I C T �

Agenda Item 8.5

MEMORANDUM

TO: Board of Directors

FROM: Robert Kunde

DATE: January 7, 2020

SUBJECT: Sites Reservoir Project - January 7, 2020 Update Meeting with Water Users

On January 7, 2020, a meeting was held with District Water Users funding the Sites Reservoir Project. The memorandum to Water Users is attached.

Water User funding of Sites Reservoir Phase 2A was to cover the period from April to December 2019. At its December 19, 2019 meeting, the Sites Reservoir Committee approved an extension in the currentPhase 2A which is now scheduled to end on August 31, 2020. Funding decisions for the next Phase 2Bby participants are due by July 9, 2020.

With the extension of Phase 2A, the District budget for administrative costs (primarily my time andtravel expenses) will need to increase. In January 2019, the Board set the 2019 Sites administrativebudget at $16 per acre-foot of participation to be collected from participating Water Users. This budgetand resulting fee on participating Water Users was sufficient to cover expenses through January 2020. Per today’s meeting and consultation with Water Users, a 2020 Sites administrative budget of anadditional $8 per acre-foot in 2020 is needed to cover District administrative expenses through August2020. Water Users were supportive of this proposal.

Recommendation. It is recommended the Board authorize, subject to formal approval by participatingWater Users:(a) a budget rate for 2020 District administrative expenses for Sites Reservoir of $8.00 per acre-foot

of Sites participation,(b) billing to Water Users for same, and(c) the President or Engineer-Manager to execute, upon approval of Counsel as to form, a letter

agreement or Amendment to the District/Water User Agreement for Phase 2A (2019) reflectingthis 2020 charge.

Attachment(filename S:\Management\Shared_AA\Board Mailing JAN 2020\PREP DOCS (DO NOT SAVE TO THIS FOLDER)\8.5Sites_B_D_01.07.2020.wpd)

Page 1 of 4

À W H E E L E R R I D G E-M A R I C O P A W A T E R S T O R A G E D I S T R I C T �

MEMORANDUM

TO: District Water Users Supporting Phase 2A of the Sites Reservoir Project

FROM: Robert Kunde

DATE: January 7, 2020

SUBJECT: Sites Reservoir Project - January 7, 2020 Update Meeting with Water Users

Status. Your participation in funding of Sites Reservoir Phase 2A was to cover the period from April toDecember 2019. At its December 2019 meeting, the Sites Reservoir Committee approved an extensionin the current Phase 2A which is now scheduled to end on August 31, 2020. Funding decisions forPhase 2B by participants are due by July 9, 2020.

Updated information on the Project and needed input from you are described below.

District/Water User Agreement for Phase 2A (2019). Among other things, this Agreement:1. Authorizes “Sites costs” of $60/AF of participation plus “WRM administrative costs” (capped by

Board of Directors at $16/AF of participation.)2. Has no specific termination date. Contemplates a future amendment or separate agreement for

funding Phase 2B and subsequent phases.3. Authorizes funding for Phase 2A originally scheduled for April 1 to December 31, 2019 subject

to revision by the Sites Authority.4. Provides priority access to Water User for Sites Project water supply benefits if ultimately

constructed with additional Water User funding.

On December 11, 2019, the District executed a Phase 2A Sites/District Contract Amendment to extendPhase 2A through March 31, 2020. The Sites Authority decided on December 19, 2019 to extend Phase2A through August 31, 2020. There will be no additional “Sites Costs” for the extension. Water Usersare asked for direction on the “WRM administrative costs” which may be incurred during the extension.

Progress to Date. Selected events and activities during Phase 2A to date are listed.5. Phase 2A Participation settled on 192,812 AF of participation from local agencies. The state

share for environmental water (WSIP, or Proposition 1) varies from 16,000 to 35,000 AFdepending on the ultimate Project cost.

6. Adoption of Storage Policy intended as Exhibit to Phase 2B funding agreement.7. Decided to proceed without Bureau of Reclamation investment (but continued cooperation on

water operations) because Washington DC congressional approval (or not) of federal fundingwill not occur before key Sites Project decisions are required.

8. Negotiations with California Department of Fish and Wildlife regarding possible CaliforniaEndangered Species Act Permit. The likely range of average annual yield reduced from 500,000AF/year per the Water Storage Investment Program (WSIP) application (Proposition 1 funding)to 200,000 to 225,000 AF/year under likely state permit conditions.

Page 2 of 4

9. The August 2019 Affordability Analysis based on reduced yield and various Reservoir sizesshowed the Sites Project was not affordable for agriculture (including Sacramento Valley 25%participation).

10. The Sites Value Planning process was initiated to explore lower cost Project alternatives and is inprogress. So far, alternate Reservoir Projects (down to a 1.3MAF reservoir) would range from$3.4 to $4.0 billion in 2018 capital cost dollars and excluding a risk management allowance andfinancing costs. This compares to the current Alternate D proposal for a 1.8MAF reservoir at acapital cost $5.2 billion.

Phase 2A Goal. The goal of Phase 2A was to narrow the range of uncertainty in Sites’ cost and yield. Updated information is provided in the 45 page “Joint Authority/Reservoir Committee Workshop -November 15th” presentation on January 7, 2020, and available electronically upon request. Phase 2A/2B Timeline. The updated Sites timeline (subject to revision) is as follows:

May 1, 2020 Sites provides the latest information on the Reservoir and funding plans for Phase2B to Participants.

July 9, 2020 Deadline for Sites Participants to notify Sites Authority regarding level ofparticipation and funding for Phase 2B.

July 16, 2020 Sites Reservoir Committee and Project Authority decide on how to continueprogress on the Project in Phase 2B.

July 31, 2020 Sites Authority issues Phase 2B invoices (perhaps $50/AF initially and $50/AF in2021).

Aug 31, 2020 Phase 2B invoice payments dueSept 1, 2020 Start of Phase 2BDec 31, 2021 End of Phase 2B

Phase 2B Funding Input. Sites has requested the following information from Participants on Phase 2Bfunding by early January. Therefore, your feedback is requested so the District can respond.11. A staggered cash call of no more than $100/AF of participation has been proposed to fund Phase

2B work through December 31, 2021. Can your agency fund a cash call up to $100 per acre foot?12. Do you require financing at $100/AF, or a combination of financing and a cash call?13. What level of cash call could you support?

Phase 2A Sites Funding. During the extension of Phase 2A through August 2020, no additionalpayments to the Sites Project will be required from Participants. Sufficient funds exist from your priorsupport of $60 per acre-foot of participation combined with re-prioritizing the Sites work andProposition 1 reimbursements from the California Water Commission.

Phase 2A WRM Administrative - Representation. I represent you in Sites matters as follows:14. at the monthly Sites Reservoir Project Committee meetings in Sacramento and Maxwell,15. as the Co-Chair of the Reservoir Operations Work Group which provides direction to and review

of Sites water supply options and analyses,16. as the Chair of the Value Planning Work Group which is evaluating options to reduce the Sites

capital costs,17. as a member of the Budget and Finance Work Group which evaluates monthly financial reports,

expenditures, budgets, and work plan development,18. as a member of the Coordination Work Group which coordinates activities among the various

Page 3 of 4

Work Groups and sets the monthly Committee meeting agendas,19. as an occasional participant in the Environmental and Permitting Work Group which reviews and

provides direction to staff on said work, and20. as the Chair of the Sites State Water Contractor Group which addresses Sites issues related to the

State Water Project, and is not a part of the Sites Reservoir Committee per se.

I was asked to consider running for the position of Vice Chair of the Reservoir Project Committee in2020. I declined due to the additional time requirement affecting my retirement and uncertainty if youwould fund the additional cost in 2020.

Phase 2A WRM Administrative - Cost. You provided $48,800 ($16 per acre-foot) for the “WRMAdministrative costs” i.e. primarily my time and travel expenses from April through December 2019. An estimated $45,000 of expense was incurred leaving a balance of about $4,000. Average monthlyexpenses were about $4,900, so your funding will cover January 2020 expenses.

Are you willing to provide additional funding for my activity on your behalf from February to August2020 through the end of Phase 2A i.e. 5 months at $3,000 per month + 2 months at $4,900 per month =$24,700 = $8.00 per acre-foot of participation? The estimated cost in 2020 ($3000 per month inFebruary to June) will be lower then in 2019 ($4900 per month) because I will have to reduce my part-time hours to meet pension legal requirements.

Page 4 of 4

Agenda Item 8.6

BEFORE THE BOARD OF DIRECTORS OF THE WHEELER RIDGE-MARICOPA WATER STORAGE DISTRICT

IN THE MATTER OF: RESOLUTION NO. 2020-XX

AUTHORIZING SALE OF EXCESS MATERIALS

WHEREAS, the Wheeler Ridge-Maricopa Water Storage District owns various excess computer/electronic equipment (Excess Equipment); and WHEREAS, California Water Code section 43507 provides as follows: “The Board may determine by resolution entered upon its minutes that any property, real or personal, held by the District is not necessary for the uses and purposes thereof and may sell the same for an adequate consideration. Title may be conveyed or transferred to the purchaser by the president and secretary pursuant to the resolution;” and WHEREAS, the Excess Equipment is not necessary for the uses and purposes of the District, now or in the foreseeable future, and there are certain potential liabilities and responsibilities associated with continuing to own the same exceeding its value to the District; and WHEREAS, it is in the best interest the District to sell the Excess Equipment. NOW, THEREFORE, BE IT RESOLVED, by the Board of Directors as follows:

1. The foregoing recitals are true and correct.

2. The District staff are authorized and directed to do all things necessary and appropriate to sell the Excess Equipment for adequate consideration consistent with the requirements of applicable law, including issue notice inviting bids and making evaluation and award of bids.

ALL THE FOREGOING, being on motion of Director ________________, and seconded by Director , was hereby authorized by the following vote, to wit: AYES: NOES: ABSTAIN: ABSENT: I HEREBY CERTIFY that the foregoing is a true copy of the resolution of the Board of Directors of Wheeler Ridge-Maricopa Water Storage District as duly passed and adopted by said Board of Directors on the 8th day of January 2020. WITNESS my hand and official seal of said Board of Directors this 8th day of January 2020.

______________________________________ (SEAL) Secretary of the Board of Directors

Mr. Robert Fen ton, Jr.

<trnngr.ess nf tq.e Nnit.eh j;fates 1lnta11lfington, ilQt 20515

December 16, 2019

Regional Administrator, Region IX Federal Emergency Management Agency 1111 Broadway, Suite 200 Oakland, California 94607

Dear Mr. Fenton:

Thank you for your response, dated August 15, 2019, to our letter regarding the California Department of Water Resources' (DWR) appeal of the Federal Emergency Management Agency's (FEMA) initial partial denial of reimbursement for repairs of the spillways at Oroville Dam that has been submitted by the Governor's Office of Emergency Services.

It is our understanding the FEMA appeal review process may be concluding, and a decision could be made early next year on reimbursing the State of California for repair work to the Oroville Dam spillways. We are also aware that your staff requested additional information from DWR regarding this appeal and that State officials provided detailed responses to FEMA last month. We hope the State's responses fully address any remaining concerns or questions regarding the eligibility of the actions the DWR took to repair both the gated spillway and emergency spillway for Federal reimbursement under the Robert T. Stafford Disaster Relief and Emergency Assistance Act.

In light of these developments, we want to reiterate our view that the State of California should be provided reimbursement for costs of storm-related damage to the Oroville Dam spillways at the full 75% cost share allowed under the Stafford Act. To that end, we would like to highlight a few key issues State officials have raised with us in their appeal that support Federal reimbursement:

• The gated spillway chute is a single continuous structure, not a distinct upper section and lower section, and repairs made to this entire structure were required by the Federal Energy Regulatory Commission, the California Division of Safety of Dams, and multiple reports from the Independent Board of Consultants following the 2017 storm event;

• Damage to the gated and emergency spillways was the direct result of the 2017 storm event, not pre-disaster deferred maintenance of these structures;

• The emergency spillway is an improved and maintained structure with a discharge channel, access road, and drain system on the hillside below the overflow weir, and therefore the State can seek reimbursement for repair work to this structure under the Stafford Act;

PRINTED ON RECYCLED PAPER

Agenda Item 9.2

• Repairs to the emergency spillway, such as the use of engineered fill materials on the hillside to replace eroded bedrock, were necessary and required to restore the facility to pre-disaster operational status to protect human life and property; and,

• The reconstruction of the gated and emergency spillways significantly reduced the potential for similar future disaster damages to the facility, as -supported by DWR's benefit-cost analysis.

We hope that as you review the appeal, the responses provided to FEMA Region IX staff provide additional clarity on the actions the DWR took to repair the spillways at Oroville Dam,· as well as the reasons why, making these actions eligible for Federal reimbursement under the Stafford Act. Accordingly, we respectfully request that you keep our offices informed as you carefully and thoroughly review the appeal and the additional new information provided to FEMA as you prepare to make a decision on this important issue.

Please do not hesitate to contact us if you need any additional informati0n, or if we can be of assistance to you during your review of the eligibility appeal for the repair work conducted on the· Orovilie Dam spillways.

KEVIN McCARTHY House Republican Leader

liiit:ER(i(flt(z ~ Member of Congress

cc: The Honorable Peter T. Gaynor Acting Administrator

Sincerely,

United States Senator

Federal Emergency Management Agency

1/7/2020 coalitionforasustainabledelta.cmail20.com/t/ViewEmail/d/F88F5B716EB90B922540EF23F30FEDED/69A5840BAF091CE7C68C6A341B5…

coalitionforasustainabledelta.cmail20.com/t/ViewEmail/d/F88F5B716EB90B922540EF23F30FEDED/69A5840BAF091CE7C68C6A341B5D209E 1/2

NEWSOM ADMINISTRATION’S WATERRESILIENCE PORTFOLIO

A step in the right direction but fails to protectrural farming communities

The Newsom Administration’s highly anticipated Water ResiliencePortfolio presents an impressive suite of actions that will certainlyadvance California water management. The Natural ResourcesAgency, CalEPA, and California Department of Food & Agriculture’splan offers new opportunities to improve the Sacramento-San JoaquinDelta ecosystem through enhanced monitoring and incorporation ofadaptive management based on the best available science, enhanceconveyance and storage, and address the impacts of climate change.

“The Coalition for a Sustainable Delta remains concerned, however,that the portfolio fails to address the growing impacts of water scarcityon rural farming communities throughout the Central Valley ofCalifornia. While the portfolio recognizes land fallowing resulting fromimplementation of the Sustainable Groundwater Management Act andincreasingly limited surface water supplies, it stops short of providingreal solutions to address the impacts to residents, farms and smallbusinesses that depend on reliable water supplies,” said Bill Phillimore,Coalition for a Sustainable Delta President. “The state needs to providemore concrete solutions to a problem that will have far reachingimpacts on millions who live and work in these regions.”

CONTACT: Maddie Munson(916) 291-4878

For more visit sustainabledelta.com or follow us on Twiiter@DeltaWatch

Web Version | Update preferences | Unsubscribe Like Tweet Forward

About the Coalition

The Coalition for aSustainable Delta is anot-for-profit organizationcomprised of water userswho depend on the Deltafor conveyance of a largeportion of their watersupplies and individualswho utilize the Delta foraesthetic and recreationalenjoyment. Coalitionefforts are dedicated tocreating a healthy Deltaecosystem by workingtowards a comprehensivesolution to the manyfactors or “stressors”affecting the estuary.

Edit your subscription | UnsubscribeCoalition for a Sustainable Delta

915 L Street, #C-438,Sacramento, CA 95814