A-101 - Homepage | California Air Resources Board · PDF fileECARS - Laboratory Data Support...

download A-101 - Homepage | California Air Resources Board · PDF fileECARS - Laboratory Data Support GC / GHS ECARS - Support Space MSCD MLD/ FETR Testing Equipment Mezzanine HDMezzanine NVEPB

If you can't read please download the document

Transcript of A-101 - Homepage | California Air Resources Board · PDF fileECARS - Laboratory Data Support...

  • Heavy-Duty Testing

    Light-Duty Testing

    Chemistry Labs

    Offices

    Shared Public Facilities

    Shared Employee Amenities

    Shared Support Facilities

    Shared Outdoor Facilities

    Color Legend

    HD PARKING(35 STALLS)

    VISITORPARKING

    (29 Spaces)

    EMPLOYEE PARKING(343 STALLS)

    OVERHANG

    PROPERTY LINE

    OVERHANG

    OVERHANG

    Employee Bike Lockers23 Bikes+ Future Bike Locker Area

    ThermalEnergyStorage

    TouchDown

    Slope

    50' - 0"

    LD PARKING(100 STALLS)

    Areaway

    Outdoor Terrace

    Utility CartGarage

    Mail FurnitureStorage

    FuelDrumsStorage

    HazardousMaterialsStorage

    +8'

    +12'

    +12'

    +18'

    +18'

    +0' +7'

    +20'

    +12'

    M

    GA

    TE

    GA

    TE

    ETB (In LDLab)

    Wellness

    Warehouse

    Shipping/ReceivingElectrical

    RoomElectrical

    Room

    MachineShop

    ElectronicsFabrication

    ECARS -ETB

    Cafe

    ECARS -ETB

    CAERB

    In-UseVehicle

    Programs

    EnforcementDivision

    LockerRoom

    ExerciseRoom

    M W

    LockerRoom

    EmployeeLunchRoom

    OISBuildingSupport

    Lactation /Quiet Rm

    Reception

    Auditorium

    Conf M

    W

    M

    Confe

    rence

    Sto

    rage

    Conf.XLPress Rm

    OverflowConference

    PrintAlcove

    Conf.L-Board

    Lounge

    BARCU

    Conf. XL

    VendingMachine

    Carbon &Aerosol

    Physics Lab

    GC/MSLaboratory

    ExtractionRoom

    Carbon &Ion Lab

    PM SampleReceiving /

    Storage

    AAMESMetals

    Laboratory

    DASCarriers

    SecurityControl

    SecurityEquipment

    InterviewRm

    Fuel Cell

    GuestOffice

    ASD

    CoolingTower

    AV

    Rm

    Sto

    rmw

    ate

    r M

    an

    ag

    em

    en

    t Z

    on

    e

    Coffee Bar

    GA

    TE

    GA

    TE

    GA

    TE

    V

    V

    V

    PHD Chassis

    Light-DutyTesting

    Lab

    HazardousMaterialsHolding

    ClerkOffice

    Trash andRecycling

    MaintenanceShopJanitor

    IDF

    IDF

    IDF

    MLDManualStorage

    BatteryRoomCylinder

    Storage

    Mail

    IT Storage

    EmergencyGenerator

    Flag poles

    FuelStation

    TruckWash

    Car Wash

    Fuel BusStation

    LiquidNitrogen

    Utility

    Conf M

    PedestrianGate

    PedestrianCrosswalk

    W

    Elect

    Elect

    OVERHANG

    MPOE

    SystemControl

    CAERB

    IDF

    Elect

    Visitor Bike Lockers14 Bikes

    ElevatorMachine

    V

    1

    2

    3

    4

    5

    6

    Thermal Energy Storage, 30'-0" high above grade, 10'-0" high below grade

    Installed Cooling Tower, 22'-0" high

    Fuel Cell Plant, 15'-0" high

    Truck Fueling and Vehicle Wash, 16'-0" high

    Liquid Nitrogen Tank, 10'-0" high

    LD Car Wash, 12'-0" high walls

    Main Entry

    Staff Entry

    PV Panel

    Legend Notes

    PV-SPV-S

    PV Panel on Structural Steel Canopy:For LD Parking and Roof top PV = 10' to top of Canopy above Roof

    20' to top of PV Panel above Roof

    For HD Parking PV = 16' to top of Canopy at HD Parking10' to top of Canopy at Visitor and LD Duty Parking

    *

    Seismic Joint

    Metal Fence(8'-0" height)

    Concrete Wall(8'-0" height)

    +/- 0' +18' Finish ElevationRelative to the LowestPoint of Site

    Sliding Gate w/AutomatedBarrier Arm

    V

    P Sliding Gate forSpecial Event

    Fire Barrier

    2016

    Key Plan

    Area 1Area 2Area 3

    Area 4

    C:\R

    evitLo

    cals

    \2015-0

    0144

    _S

    CC

    P_A

    RB

    _S

    I TE

    _H

    ED

    _m

    hironaka@

    hedev.c

    om

    .rvt

    1/6

    /201

    7 9

    :51:5

    8 P

    M

    2015-00144-000

    1ST FLOOR PLAN

    A-101

    Air Resources BoardSouthern CaliforniaConsolidation Project

    4001 Iowa Ave,Riverside, CA

    N

    SCALE: 1" = 40'-0"1 1ST FLOOR PLAN

    601 South Figueroa StreetSuite 500Los Angeles, California90017 USA

    (213) 542-4500

    WWW.HED.DESIGN

    Date Issued For11/30/2016 50% CONCEPT DRAWING

    01/06/2017 Task 2 Concept Drawing

  • ECARS -Laboratory

    DataSupport

    GC / GHS

    ECARS -SupportSpace

    MSCD

    MLD/ FETR

    TestingEquipmentMezzanine

    HDMezzanineNVEPB

    ECARS -DO

    FAMES

    PMGC/GHG

    Lab &HPLC Lab

    HydrogenLab

    Chair'sOffice

    MLD AMS

    Misc LabSupport

    AQPSD

    MW

    Below

    Reception

    Below

    Auditorium

    ECARS -OBDB

    RoofBelow

    HD PEMSMezzanine

    Open Below

    OpenBelow

    OpenBelow

    Rood Below

    Open Below

    RooftopEquipment

    RoofBelow

    RoofBelow

    Utility

    IDF

    IDF

    IDF

    IDF

    Cafe

    HDMezzanine

    MechanicalSpace

    HD FileStorage

    Cafe

    Seating

    MLD/ FETR

    MLDFETR/PEMS

    HD FileStorage

    Conf M

    Elect

    W

    M

    Open to below Open to belowOverhang Below

    Overhang Below

    Overhang Below

    Overhang Below

    RoofBelow

    IDF

    IDF

    Skylight above Skylight above

    Heavy-Duty Testing

    Light-Duty Testing

    Chemistry Labs

    Offices

    Shared Public Facilities

    Shared Employee Amenities

    Shared Support Facilities

    Shared Outdoor Facilities

    Color Legend

    1

    2

    3

    4

    5

    6

    Thermal Energy Storage, 30'-0" high above grade, 10'-0" high below grade

    Installed Cooling Tower, 22'-0" high

    Fuel Cell Plant, 15'-0" high

    Truck Fueling and Vehicle Wash, 16'-0" high

    Liquid Nitrogen Tank, 10'-0" high

    LD Car Wash, 12'-0" high walls

    Main Entry

    Staff Entry

    PV Panel

    Legend Notes

    PV-SPV-S

    PV Panel on Structural Steel Canopy:For LD Parking and Roof top PV = 10' to top of Canopy above Roof

    20' to top of PV Panel above Roof

    For HD Parking PV = 16' to top of Canopy at HD Parking10' to top of Canopy at Visitor and LD Duty Parking

    *

    Seismic Joint

    Metal Fence(8'-0" height)

    Concrete Wall(8'-0" height)

    +/- 0' +18' Finish ElevationRelative to the LowestPoint of Site

    Sliding Gate w/AutomatedBarrier Arm

    V

    P Sliding Gate forSpecial Event

    Fire Barrier

    2016

    Key Plan

    Area 1Area 2Area 3

    Area 4

    C:\R

    evitLo

    cals

    \2015-0

    0144

    _S

    CC

    P_A

    RB

    _S

    I TE

    _H

    ED

    _m

    hironaka@

    hedev.c

    om

    .rvt

    1/6

    /201

    7 9

    :52:0

    4 P

    M

    2015-00144-000

    2ND FLOOR PLAN

    A-102

    Air Resources BoardSouthern CaliforniaConsolidation Project

    4001 Iowa Ave,Riverside, CA

    SCALE: 1" = 40'-0"1 2ND FLOOR PLAN

    601 South Figueroa StreetSuite 500Los Angeles, California90017 USA

    (213) 542-4500

    WWW.HED.DESIGN

    N

    Date Issued For11/30/2016 50% CONCEPT DRAWING

    01/06/2017 Task 2 Concept Drawing