75 D Ground Floor Proposed Plan

1
REV DESCRIPTION DR CH DATE LONDON LEEDS CARDIFF NEWCASTLE BRISTOL GLASGOW ABERYSTWYTH NEWTOWN BRADFORD MANCHESTER LOUGHBOROUGH d arnton 3 B CLIENT PROJECT DRAWING SCALE @ A0 DRAWN CHECKED CREATION DATE DARNTONB3 DRAWING NO. REVISION PROJECT NO -COMPANY- ZONE - LEVEL - TYPE - ROLE - NUMBER - - - - - - - - - - - DB3 A LOUGHBOROUGH Suite C, Loughborough Technology Centre, Epinal Way, Loughborough, Leicestershire LE11 3GE T: 01509 610510 www.darntonb3.com COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. T T TH H HI I IS S S D D DR R RA A AW W WI I IN N NG G G I I IS S S T T TO O O B B BE E E R R RE E EA A AD D D I I IN N N C C CO O ON N NJ J JU U UN N NC C CT T TI I IO O ON N N W W WI I IT T TH H H A A AL L LL L L O O OT T TH H HE E ER R R R R RE E EL L LE E EV V VA A AN N NT T T D D DR R RA A AW W WI I IN N NG G GS S S P P PR R RE E EP P PA A AR R RE E ED D D B B BY Y Y C C CO O ON N NS S SU U UL L LT T TA A AN N NT T TS S S A A AN N ND D D S S SU U UB B B- - -C C CO O ON N NT T TR R RA A AC C CT T TO O OR R RS S S. . . D D DO O O N N NO O OT T T S S SC C CA A AL L LE E E F F FR R RO O OM M M T T TH H HI I IS S S D D DR R RA A AW W WI I IN N NG G G. . . W W WO O OR R RK K K O O ON N NL L LY Y Y T T TO O O T T TH H HE E E P P PR R RI I IN N NT T TE E ED D D D D DI I IM M ME E EN N NS S SI I IO O ON N NS S S. . . T T TH H HI I IS S S D D DR R RA A AW W WI I IN N NG G G M M MU U US S ST T T N N NO O OT T T B B BE E E U U US S SE E ED D D F F FO O OR R R C C CO O ON N NS S ST T TR R RU U UC C CT T TI I IO O ON N N U U UN N NL L LE E ES S SS S S I I IS S SS S SU U UE E ED D D F F FO O OR R R CONSTRUCTION. CONSTRUCTION. CONSTRUCTION. CONSTRUCTION. R R RE E EP P PO O OR R RT T T A A AN N NY Y Y D D DI I IS S SC C CR R RE E EP P PA A AN N NC C CI I IE E ES S S T T TO O O T T TH H HE E E A A AR R RC C CH H HI I IT T TE E EC C CT T T O O OR R R R R RE E EP P PR R RE E ES S SE E EN N NT T TA A AT T TI I IV V VE E ES S S T T TH H HE E ER R RE E EO O OF F F. . . c c c c A R C H I T E C T U R E B1 B3 B3 B3 B3 ARCHITECTS ARCHITECTS ARCHITECTS ARCHITECTS W W WO O OR R RK K K T T TO O O A A A M M MA A AN N NA A AG G GE E EM M ME E EN N NT T T S S SY Y YS S ST T TE E EM M M W W WH H HI I IC C CH H H I I IS S S A A AP P PP P PR R RO O OV V VE E ED D D T T TO O O I I IS S SO O O- - -9 9 90 0 00 0 01 1 1 B B BY Y Y QMS QMS QMS QMS – – CERTIFICATE NUMBER QMS CERTIFICATE NUMBER QMS CERTIFICATE NUMBER QMS CERTIFICATE NUMBER QMS- - -GB GB GB GB18714 18714 18714 18714 DW GF 75 D 91470 03/05/2018 Fairfields School, Trinity Ave,NN2 6JN Northamptonshire County Council Ground Floor Proposed Plan Model Name/s :- I:\Projects\LBO\91470 Fairfields Primary School Construction Phase\DESIGN DATA\3 In Progress\91470 Fairfields mk23.pln CONSTRUCTION Re surface area 623 m 2 Extension Area 210 m 2 Classroom 20 A: 98 m2 Existing Office 19 A: 25 m2 Extension Area 57 m 2 R a d o n s u m p R a d o n s u m p R a d o n s u m p R a d o n s u m p R a d o n s u m p R a d o n s u m p R a d o n s u m p R a d o n s u m p R a d o n s u m p R a d o n s u m p W 1 3 S i l l 9 0 0 1,500 1,810 W 1 2 S i l l 9 0 0 1,500 1,810 W 1 1 S i l l 9 1 0 1,500 1,810 W 14 Sill 900 1 , 5 0 0 9 1 0 W 1 7 S i l l 9 0 0 1,500 910 W 1 5 S i l l 9 0 0 1,500 910 W 1 6 S i l l 9 0 0 1,500 910 W 19 Sill 900 1 , 5 0 0 9 1 0 W 18 Sill 900 1 , 5 0 0 9 1 0 ED04 2 , 4 0 0 2 , 9 3 5 W 2 1 S i l l 9 0 0 1,500 1,810 W 2 0 S i l l 9 0 0 1,500 1,810 W 2 2 S i l l 9 0 9 1,500 1,810 D18 FRFD30SC 2 , 1 0 0 1 , 5 0 0 D 2 0 2,100 1,035 W 0 7 S i l l 9 0 0 1,500 1,473 W 0 8 S i l l 9 0 0 1,500 1,473 E D 0 3 2,400 2,935 W09 Sill 900 1 , 5 0 0 1 , 4 7 3 W06 Sill 900 1 , 5 0 0 1 , 4 7 3 W10 Sill 900 1,500 1,500 D19 2 , 1 0 0 1 , 0 0 0 D 2 1 2,100 1,035 D 2 2 F R F D 3 0 S C 2,100 1,500 W04 Sill 665 1 , 4 3 5 1 , 4 7 3 W05 Sill 665 1 , 4 3 5 1 , 4 7 3 ED02 2 , 1 0 0 1 , 8 1 0 D 1 6 F R F D 3 0 S C 2,100 1,810 D 1 7 F R F D 3 0 S C 2,100 1,810 D03a FRFD30SC 2,100 1,035 D 2 3 2,400 1,850 D16a 2 , 1 0 0 9 2 5 W D W 1 in 15 1 in 40 1 in 21 1 in 21 1 in 40 1 i n 2 1 1 in 21 1 in 40 1 in 21 1 i n 21 1 in 2 1 in 21 D706 D707 3 , 0 0 0 665 1,810 1,115 1,473 1,115 1,473 458 665 2,935 1,340 1,473 1,914 1,473 1,565 1,903 1,473 1,409 1,115 910 1,178 2,935 1,178 910 1,115 1,790 910 2,690 910 2,690 910 1,276 1,340 1,810 6,290 1,810 5,666 1,810 1,238 595 910 778 890 1,810 1,238 1,810 1,238 1,810 1,311 8,250 2,189 11,595 4,900 20,079 9,571 11,176 2,283 10,222 2,025 8,601 11,038 11,857 987 1,500 987 818 1,000 612 3,326 4,131 2,247 2,725 2,426 240 1,035 590 1,019 1,500 264 2,018 1,035 101 2,280 2,566 1,147 1,810 1,147 1,903 1,473 1,409 3,002 1,850 300 7,500 1,850 7,500 1,765 2,055 89.15 89.091 89.22 88.255 89.45 88.345 88.268 88.262 88.313 88.58 88.74 88.84 88.23 88.408 88.292 88.317 88.659 88.838 88.255 88.255 88.255 88.522 88.486 88.422 88.430 88.431 88.42 89.30 88.425 88.530 88.454 88.485 88.430 88.472 88.530 88.428 88.246 88.188 88.235 88.414 88.400 88.939 88.458 88.386 88.371 88.194 88.394 88.530 88.336 88.425 88.659 88.422 88.431 88.522 88.472 88.425 88.363 88.336 88.274 88.356 88.287 88.268 88.284 88.349 88.396 88.219 88.181 88.206 88.23 88.400 88.450 88.380 E1 E1 E2 E2 E3 E3 E4 E4 E5 E5 E6 E6 E7 E7 S01 S01 S02 S02 S03 S03 S04 S04 S05 S05 S06 S06 S07 S07 S09 S09 S10 S10 S11 S11 S12 S12 S13 S13 D725-Classroom D725-Classroom Teaching wall wash up sink and storage Changing bed Ceiling hoist H track Extend office approximately 30m² Form secure lobby Remove ex. window and section of external walls to create thro' opening Allow for installation of Gabion baskets of suitable size and shape to retain existing ground and fence loads (gabion structure and foundations to be contractor design) Installation approximately 55m long New flooring and ceiling repaint for re use as new classroom Redecorate and fit new vinyl use as sensory room Decorate and fit new vinyl use as equipment storage area New Fence Existing canopy to be cut short and make good connection with new wall face of new entrance. Make good floor finish with matching spec to adjacent area to Client and School's approval R e m o v e d o o r s a n d s e c t i o n o f w a l l Remove doors and section of wall N e w w a l l a n d d o u b l e d o o r s w i t h s e c u r i t y a u t o m a t i c o p e n i n g d e v i c e . Remove section of external wall to create 2m wide opening and new lintol / beam to SEng's details Remove columns R e m o v e t o i l e t s a n d c u b i c a l p a r t i t i o n s a n d c a p o f f s e r v i c e s a n d d r a i n o u t l e t s f r o m W C ' s Allow for new treated timber railed hit and miss fencing 1500mm high with a pair of 900mm wide timber gates. Fence to be painted with exterior gloss paint on completion in five bright colours (as detailed in specification) Re enforcement to S.Eng's details Ex. brick pier 215mm thick block loadbearing wall Steel beam to S.Eng's details Steel beam to S.Eng's details R e m o v e e x . s t o r e w a l l a n d m a k e g o o d w a l l s a n d c e i l i n g . Projected section of brick pier removed to allow neat connection of new cavity wall. Extend ex. brick pier to S.Eng's details N e w s t e e l b e a m t o S E n g ' s d e t a i l s . N e w s t e e l b e a m t o S E n g ' s d e t a i l s . Existing upvc windows removed and opening blocked in blocks and wall made good in plaster + skim and decorations and including skirtings to match existing. E x . U P V C d o o r a n d s i d e s c r e e n r e m o v e d o p e n i n g b l o c k e d w i t h m a s o n r y E x i s t i n g u p v c w i n d o w s r e m o v e d a n d o p e n i n g b l o c k e d i n b l o c k s a n d w a l l m a d e g o o d i n p l a s t e r + s k i m a n d d e c o r a t i o n s . E x i s t i n g g l a z e d p a n e l d o o r & s i d e s c r e e n r e m o v e d a n d h a l f t h e o p e n i n g b l o c k e d a n d n e w s o l i d d o o r n e w f r a m e . E x i s t i n g u p v c w i n d o w r e m o v e d a n d o p e n i n g b l o c k e d i n b l o c k s a n d w a l l m a d e g o o d i n p l a s t e r + s k i m a n d d e c o r a t i o n s . Ex. fixed window removed and wall made good Childrens supplies cupboards 1000mm wide E x i s t i n g g l a z e d p a n e l d o o r a n d f r a m e r e m o v e d a n d o p e n i n g b l o c k e d a n d m a k e g o o d p l a s t e r w a l l a n d d e c o r . 140mm thick block loadbearing wall with plaster & skim finish 140mm thick block loadbearing wall with plaster & skim finish 140mm thick block 150mm thick block loadbearing wall Full height 250mm deep services cupboard Remove columns Remove existing see-saws. Make good floor finish with matching spec to adjacent area to Client and School's approval Remove shed and disposed of. Make good floor finish with matching spec to adjacent area to Client and School's approval Carefully remove existing sand box, 2 Nr swings, bucket and other equipment as agreed with the school and hand over to the school for relocating. Make good floor finish with matching spec to adjacent area to Client and School's approval Remove existing sensory garden and dispose. Redesign and installation of new sensory garden layout to be arranged and carried out by the school. Layout to be co-ordinated with Architect and Building Control requirements. Fire escape routes to be maintained. Remove timber climbing frame and dispose. Make good floor finish with matching spec to adjacent area to Client and School's approval Regard external levels to be no more than 1 in 21 Regard external levels as shown re use existing paving flags Regard external levels to be no more than 1 in 21 Radon sumps Reception counter window as schedule Painted Reception counter shelf D o o r t o b e b e e c h f i n i s h t o m a t c h e x i s t i n g . D o o r t o b e w h i t e g l o s s D o o r t o b e w h i t e g l o s s D o o r t o b e w h i t e g l o s s D o o r t o b e w h i t e g l o s s Grass battered bank Classroom to have head Classroom to have head Classroom to have head Classroom to have head boards and disused gas lines boards and disused gas lines boards and disused gas lines boards and disused gas lines removed and walls made removed and walls made removed and walls made removed and walls made good and re decorated good and re decorated good and re decorated good and re decorated Classroom to have head Classroom to have head Classroom to have head Classroom to have head boards and disused gas lines boards and disused gas lines boards and disused gas lines boards and disused gas lines removed and walls made removed and walls made removed and walls made removed and walls made good and re decorated good and re decorated good and re decorated good and re decorated Classroom to have head Classroom to have head Classroom to have head Classroom to have head boards and disused gas lines boards and disused gas lines boards and disused gas lines boards and disused gas lines removed and walls made removed and walls made removed and walls made removed and walls made good and re decorated good and re decorated good and re decorated good and re decorated Classroom to have head Classroom to have head Classroom to have head Classroom to have head boards and disused gas lines boards and disused gas lines boards and disused gas lines boards and disused gas lines removed and walls made removed and walls made removed and walls made removed and walls made good and re decorated good and re decorated good and re decorated good and re decorated Classroom to have head Classroom to have head Classroom to have head Classroom to have head boards and disused gas lines boards and disused gas lines boards and disused gas lines boards and disused gas lines removed and walls made removed and walls made removed and walls made removed and walls made good and re decorated good and re decorated good and re decorated good and re decorated Classroom to have head Classroom to have head Classroom to have head Classroom to have head boards and disused gas lines boards and disused gas lines boards and disused gas lines boards and disused gas lines removed and walls made removed and walls made removed and walls made removed and walls made good and re decorated good and re decorated good and re decorated good and re decorated Classroom to have head Classroom to have head Classroom to have head Classroom to have head boards and disused gas lines boards and disused gas lines boards and disused gas lines boards and disused gas lines removed and walls made removed and walls made removed and walls made removed and walls made good and re decorated good and re decorated good and re decorated good and re decorated 0 0 0 5 5 5 10 metres 10 metres 10 metres 10 metres T4 Horse Chestnut T4 Horse Chestnut T4 Horse Chestnut T4 Horse Chestnut Proposed removal Proposed removal Proposed removal Proposed removal T3 Sweet Chestnut - to T3 Sweet Chestnut - to T3 Sweet Chestnut - to T3 Sweet Chestnut - to be retained be retained be retained be retained T1 Propose removal T1 Propose removal T1 Propose removal T1 Propose removal T2 Propose removal T2 Propose removal T2 Propose removal T2 Propose removal All external retaining structures, raised beds and All external retaining structures, raised beds and All external retaining structures, raised beds and All external retaining structures, raised beds and greenhouse to be removed and area reduced in greenhouse to be removed and area reduced in greenhouse to be removed and area reduced in greenhouse to be removed and area reduced in height to form new hard play area to finished levels height to form new hard play area to finished levels height to form new hard play area to finished levels height to form new hard play area to finished levels noted (shown in red) making allowance for noted (shown in red) making allowance for noted (shown in red) making allowance for noted (shown in red) making allowance for necessary sub-base and finish as detailed in necessary sub-base and finish as detailed in necessary sub-base and finish as detailed in necessary sub-base and finish as detailed in specification specification specification specification Line of existing Line of existing Line of existing Line of existing retaining structure to retaining structure to retaining structure to retaining structure to be removed be removed be removed be removed Permeable tarmac hard play area with sub-base and geotextile membranes detailed in the SE specification All existing finishes to be broken up and removed from site sufficient to take new pereable tarmac finish and sub-base Actual line of existing Actual line of existing Actual line of existing Actual line of existing boundary fence boundary fence boundary fence boundary fence Line of existing Line of existing Line of existing Line of existing retaining structure to retaining structure to retaining structure to retaining structure to be removed be removed be removed be removed Level showed in red: Level showed in red: Level showed in red: Level showed in red: proposed proposed proposed proposed Level showed in black: Level showed in black: Level showed in black: Level showed in black: existing existing existing existing C/L of Glulam beam 2No. Glulam beams to SEng's details New steel beam to SEng's details & fire encase beam Ex. Conservatory Ex. Conservatory Ex. Conservatory Ex. Conservatory Ex. Conservatory Ex. Conservatory Ex. Conservatory Ex. Conservatory Ex. Classroom Ex. Classroom Ex. Classroom Ex. Classroom 2No. Glulam beams to SEng's details C/L of Glulam beam C/L of Glulam beam C/L of Glulam beam C/L of Steel beam Ex. Outside Play Area Ex. Outside Play Area Ex. Outside Play Area Ex. Outside Play Area Ex. RAMP DOWN D08A 1 in 20 gradient ramp 1 in 20 gradient ramp Landing Landing Extend foot path Classroom to have head Classroom to have head Classroom to have head Classroom to have head boards and disused gas lines boards and disused gas lines boards and disused gas lines boards and disused gas lines removed and walls made removed and walls made removed and walls made removed and walls made good and re decorated good and re decorated good and re decorated good and re decorated Permeable tarmac hard play area with sub-base and geotextile membranes detailed in the SE specification Permeable tarmac hard play area with sub-base and geotextile membranes detailed in the SE specification Approximate size of modular buildings. Exact size to be confirmed Hygiene room 22 A: 9 m2 Classroom 14 A: 48 m2 Sensory room 15 A: 54 m2 Storage 16 A: 22 m2 Toilet 23 A: 4 m2 Group room 24 A: 36 m2 Corridor 25 A: 29 m2 Storage 15a A: 6 m2 Extension Area 38 m 2 Corridor 17 A: 12 m2 Storage 21 A: 7 m2 Entrance/Lobby 18 A: 25 m2 Office 19 A: 31 m2 0. - Building Section S2 Office 1:125 Planning C 160427 Staff WC block added. CG GS D 03.05.18 Internal work areas removed. External ramp added. Extent of gabion wall and resurfacing amended to reflect AMS. GC GC

Transcript of 75 D Ground Floor Proposed Plan

REV DESCRIPTION DR CHDATE

LO

ND

ON

LE

ED

SC

AR

DIF

FN

EW

CA

ST

LE

BR

IST

OL

GLA

SG

OW

AB

ER

YS

TW

YT

HN

EW

TO

WN

BR

AD

FO

RD

MA

NC

HE

ST

ER

LO

UG

HB

OR

OU

GH

darnton 3BCLIENT

PROJECT

DRAWING

SCALE @ A0 DRAWN CHECKED

CREATION DATE

DARNTONB3 DRAWING NO.

REVISION

PROJECT NO -COMPANY- ZONE - LEVEL - TYPE - ROLE - NUMBER

-

-

-

-

-

-

- - -

- -

DB3 A

LOUGHBOROUGH

Suite C, Loughborough Technology Centre, Epinal Way,

Loughborough, Leicestershire LE11 3GET: 01509 610510 www.darntonb3.com

COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED. COPYRIGHT: ALL RIGHTS RESERVED.

TTTTHHHHIIIISSSS DDDDRRRRAAAAWWWWIIIINNNNGGGG IIIISSSS TTTTOOOO BBBBEEEE RRRREEEEAAAADDDD IIIINNNN CCCCOOOONNNNJJJJUUUUNNNNCCCCTTTTIIIIOOOONNNN WWWWIIIITTTTHHHH AAAALLLLLLLL OOOOTTTTHHHHEEEERRRR RRRREEEELLLLEEEEVVVVAAAANNNNTTTT DDDDRRRRAAAAWWWWIIIINNNNGGGGSSSS

PPPPRRRREEEEPPPPAAAARRRREEEEDDDD BBBBYYYY CCCCOOOONNNNSSSSUUUULLLLTTTTAAAANNNNTTTTSSSS AAAANNNNDDDD SSSSUUUUBBBB----CCCCOOOONNNNTTTTRRRRAAAACCCCTTTTOOOORRRRSSSS....

DDDDOOOO NNNNOOOOTTTT SSSSCCCCAAAALLLLEEEE FFFFRRRROOOOMMMM TTTTHHHHIIIISSSS DDDDRRRRAAAAWWWWIIIINNNNGGGG.... WWWWOOOORRRRKKKK OOOONNNNLLLLYYYY TTTTOOOO TTTTHHHHEEEE PPPPRRRRIIIINNNNTTTTEEEEDDDD DDDDIIIIMMMMEEEENNNNSSSSIIIIOOOONNNNSSSS....

TTTTHHHHIIIISSSS DDDDRRRRAAAAWWWWIIIINNNNGGGG MMMMUUUUSSSSTTTT NNNNOOOOTTTT BBBBEEEE UUUUSSSSEEEEDDDD FFFFOOOORRRR CCCCOOOONNNNSSSSTTTTRRRRUUUUCCCCTTTTIIIIOOOONNNN UUUUNNNNLLLLEEEESSSSSSSS IIIISSSSSSSSUUUUEEEEDDDD FFFFOOOORRRR

CONSTRUCTION.CONSTRUCTION.CONSTRUCTION.CONSTRUCTION.

RRRREEEEPPPPOOOORRRRTTTT AAAANNNNYYYY DDDDIIIISSSSCCCCRRRREEEEPPPPAAAANNNNCCCCIIIIEEEESSSS TTTTOOOO TTTTHHHHEEEE AAAARRRRCCCCHHHHIIIITTTTEEEECCCCTTTT OOOORRRR RRRREEEEPPPPRRRREEEESSSSEEEENNNNTTTTAAAATTTTIIIIVVVVEEEESSSS TTTTHHHHEEEERRRREEEEOOOOFFFF....

c c c c

A R C H I T E C T U R E

B1

B3 B3 B3 B3 ARCHITECTSARCHITECTSARCHITECTSARCHITECTS WWWWOOOORRRRKKKK TTTTOOOO AAAA MMMMAAAANNNNAAAAGGGGEEEEMMMMEEEENNNNTTTT SSSSYYYYSSSSTTTTEEEEMMMM WWWWHHHHIIIICCCCHHHH IIIISSSS AAAAPPPPPPPPRRRROOOOVVVVEEEEDDDD TTTTOOOO IIIISSSSOOOO----9999000000001111 BBBBYYYY

QMS QMS QMS QMS – – – – CERTIFICATE NUMBER QMSCERTIFICATE NUMBER QMSCERTIFICATE NUMBER QMSCERTIFICATE NUMBER QMS----GBGBGBGB18714187141871418714

DWGF 75 D91470

03/05/2018

Fairfields School, Trinity Ave,NN2 6JN

Northamptonshire County Council

Ground Floor Proposed Plan

Model Name/s :-I:\Projects\LBO\91470 Fairfields Primary School ConstructionPhase\DESIGN DATA\3 In Progress\91470 Fairfields mk23.pln

CONSTRUCTION

Re surface area 623 m2

Extension Area 210 m2

Classroom20

A: 98 m2

Existing Office19

A: 25 m2

Extension Area 57 m2

Radon

sump

Radon

sump

Radon

sump

Radon

sump

Radonsump

Radon

sump

Radon

sumpRadon

sump

Radon

sump

Radon

sump

W 13

Sill 900

1,5

00

1,8

10

W 12

Sill 900

1,5

00

1,8

10

W 11

Sill 910

1,5

00

1,8

10

W 1

4

Sill

900

1,500

910W 17

Sill 900

1,5

00

910

W 15

Sill 900

1,5

00

91

0

W 16

Sill 900

1,5

00

910

W 1

9

Sill

90

0

1,500

910

W 1

8

Sill

90

0

1,500

910

ED

04

2,400

2,935

W 21

Sill 900

1,5

00

1,8

10

W 20

Sill 900

1,5

00

1,8

10

W 22

Sill 909

1,5

00

1,8

10

D18

FR

FD

30S

C

2,100

1,500

D20

2,1

00

1,0

35

W07

Sill 900

1,5

00

1,4

73

W08

Sill 900

1,5

00

1,4

73

ED03

2,4

00

2,9

35

W09

Sill

900

1,500

1,473

W0

6

Sill

900

1,500

1,473

W10

Sill

90

0

1,500

1,500

D19

2,100

1,000

D21

2,1

00

1,0

35

D22

FRFD30SC

2,1

00

1,5

00

W04

Sill

66

5

1,435

1,473

W05

Sill

66

5

1,435

1,473

ED

02

2,100

1,810

D16

FRFD30SC

2,1

00

1,8

10

D17

FRFD30SC

2,1

00

1,8

10

D03a

FR

FD

30

SC

2,100

1,035

D23

2,4

00

1,8

50

D16

a

2,100

925

WD

W

1 in

15

1 in 40 1 in 21

1 in

21

1 in

401 in 21 1 in 21

1 in 40

1 in 21

1 in

21

1 in

2

1 in

21

D706

D707

3,000

665

1,8

10

1,1

15

1,4

73

1,1

15

1,4

73

458

665 2,935 1,340 1,473 1,914 1,473 1,565

1,9

03

1,4

73

1,4

09

1,1

15

910

1,1

78

2,9

35

1,1

78

910

1,1

15

1,790 910 2,690 910 2,690 910 1,276

1,340 1,810 6,290 1,810 5,666 1,810 1,238

595

910

778

890 1,810 1,238 1,810 1,238 1,810 1,311

8,2

50

2,189

11,595

4,9

00

20,079

9,5

71

11,176

2,2

83

10,222

2,0

25

8,6

01

11,038

11,857

98

71

,50

09

87

818

1,0

00

61

2

3,326 4,131

2,2

47

2,7

25

2,4

26

2401,035590

1,0

19

1,500264

2,0

18

1,035 101

2,280

2,5

66

1,147 1,810 1,147

1,9

03

1,4

73

1,4

09

3,002 1,850 300

7,5

00

1,8

50

7,5

00

1,7

65

2,0

55

89.15

89.091

89.22

88.255

89.45

88.345

88.268

88.262

88.313

88.58

88.74

88.84

88.2388.408

88.292

88.317

88.659

88.838

88.255

88.255

88.255

88.522

88.486

88.422 88.430

88.431

88.42

89.30

88.425

88.530

88.454

88.485

88.43088.472

88.530

88.428

88.246

88.188

88.235

88.414

88.400

88.939

88.458

88.386

88.371

88.194

88.394

88.530

88.336

88.425

88.659

88.422

88.431

88.522 88.472

88.425

88.363

88.336 88.274

88.356

88.287

88.268

88.284

88.349

88.396

88.219

88.181

88.206

88.23

88.400

88.450

88.380

E1 E1

E2 E2

E3

E3

E4 E4

E5

E5

E6

E6

E7

E7

S01

S01

S02 S02

S03S03

S04

S04

S05

S05

S06S06

S07

S07

S09

S09

S10

S10

S11

S11

S12 S12

S13 S13

D72

5-C

lassro

om

D725-Classroom

Teaching wall

wash up sink and storage

Changing bed

Ceiling hoist H track

Extend office approximately 30m²

Form secure lobby

Remove ex. window andsection of external walls tocreate thro' opening Allow for installation of Gabion

baskets of suitable size andshape to retain existing ground

and fence loads (gabionstructure and foundations to be

contractor design)Installation approximately 55m

long

New flooring and ceilingrepaint for re use as new

classroom

Redecorate andfit new vinyl useas sensoryroom

Decorate and fit new vinyl useas equipment storage area

New Fence

Existing canopy to be cut short

and make good connection withnew wall face of new entrance.Make good floor finish withmatching spec to adjacent areato Client and School's approval

Remove doors and section of wall

Remove doorsand section of

wall

New wall and double doorswith security automatic

opening device.

Remove section of external wallto create 2m wide opening andnew lintol / beam to SEng's details

Removecolumns

Remove toilets and cubical partitionsand cap off services and drain outlets

from WC's

Allow for new treated timberrailed hit and miss fencing

1500mm high with a pair of900mm wide timber gates.

Fence to be painted withexterior gloss paint on

completion in five bright colours(as detailed in specification)

Re enforcementto S.Eng's details

Ex. brick pier

215mm thick blockloadbearing wall Steel beam to

S.Eng's details

Steel beam toS.Eng's details

Remove ex. store wall and makegood walls and ceiling.

Projected section of brick pierremoved to allow neat connectionof new cavity wall.

Extend ex. brick pierto S.Eng's details

New steel beamto SEng's details.

New steel beamto SEng's details.

Existing upvc windows removedand opening blocked in blocks andwall made good in plaster + skimand decorations and includingskirtings to match existing.

Ex. UPVC door and sidescreen removed openingblocked with masonry

Existing upvc windows removedand opening blocked in blocks andwall made good in plaster + skimand decorations.

Existing glazed panel door & sidescreen removed and half the openingblocked and new solid door new frame.

Existing upvc window removedand opening blocked in blocks andwall made good in plaster + skimand decorations.

Ex. fixed window removedand wall made good

Childrens suppliescupboards1000mm wide

Existing glazed paneldoor and frame removedand opening blockedand make good plasterwall and decor.

140mm thick blockloadbearing wall withplaster & skim finish

140mm thick blockloadbearing wall withplaster & skim finish

140mm thick block

150mm thick blockloadbearing wall

Full height 250mm deepservices cupboard

Removecolumns

Remove existing see-saws.Make good floor finish with

matching spec to adjacent areato Client and School's approval

Remove shed and disposed of.

Make good floor finish withmatching spec to adjacent areato Client and School's approval

Carefully remove existing sandbox, 2 Nr swings, bucket andother equipment as agreed withthe school and hand over to the

school for relocating. Makegood floor finish with matchingspec to adjacent area to Clientand School's approval

Remove existing sensory garden anddispose. Redesign and installation of

new sensory garden layout to bearranged and carried out by the

school. Layout to be co-ordinatedwith Architect and Building Control

requirements. Fire escape routes tobe maintained.

Remove timber climbing frameand dispose. Make good floorfinish with matching spec toadjacent area to Client andSchool's approval

Regard external levels tobe no more than 1 in 21Regard external levels

as shown re use existingpaving flags

Regard external levels tobe no more than 1 in 21

Radon sumps

Receptioncounter windowas schedule

PaintedReception

counter shelf

Door to be beech finish to match existing.

Door to be white gloss

Door to be white gloss

Door to be white gloss

Door to be white gloss

Grass battered bank

Classroom to have headClassroom to have headClassroom to have headClassroom to have head

boards and disused gas linesboards and disused gas linesboards and disused gas linesboards and disused gas linesremoved and walls maderemoved and walls maderemoved and walls maderemoved and walls madegood and re decoratedgood and re decoratedgood and re decoratedgood and re decorated

Classroom to have headClassroom to have headClassroom to have headClassroom to have headboards and disused gas linesboards and disused gas linesboards and disused gas linesboards and disused gas lines

removed and walls maderemoved and walls maderemoved and walls maderemoved and walls madegood and re decoratedgood and re decoratedgood and re decoratedgood and re decorated

Classroom to have headClassroom to have headClassroom to have headClassroom to have headboards and disused gas linesboards and disused gas linesboards and disused gas linesboards and disused gas lines

removed and walls maderemoved and walls maderemoved and walls maderemoved and walls madegood and re decoratedgood and re decoratedgood and re decoratedgood and re decorated

Classroom to have headClassroom to have headClassroom to have headClassroom to have headboards and disused gas linesboards and disused gas linesboards and disused gas linesboards and disused gas lines

removed and walls maderemoved and walls maderemoved and walls maderemoved and walls made

good and re decoratedgood and re decoratedgood and re decoratedgood and re decorated

Classroom to have headClassroom to have headClassroom to have headClassroom to have headboards and disused gas linesboards and disused gas linesboards and disused gas linesboards and disused gas lines

removed and walls maderemoved and walls maderemoved and walls maderemoved and walls madegood and re decoratedgood and re decoratedgood and re decoratedgood and re decorated

Classroom to have headClassroom to have headClassroom to have headClassroom to have head

boards and disused gas linesboards and disused gas linesboards and disused gas linesboards and disused gas linesremoved and walls maderemoved and walls maderemoved and walls maderemoved and walls madegood and re decoratedgood and re decoratedgood and re decoratedgood and re decorated

Classroom to have headClassroom to have headClassroom to have headClassroom to have headboards and disused gas linesboards and disused gas linesboards and disused gas linesboards and disused gas lines

removed and walls maderemoved and walls maderemoved and walls maderemoved and walls madegood and re decoratedgood and re decoratedgood and re decoratedgood and re decorated

0000 5555 10 metres10 metres10 metres10 metres

T4 Horse ChestnutT4 Horse ChestnutT4 Horse ChestnutT4 Horse ChestnutProposed removalProposed removalProposed removalProposed removal

T3 Sweet Chestnut - toT3 Sweet Chestnut - toT3 Sweet Chestnut - toT3 Sweet Chestnut - to

be retainedbe retainedbe retainedbe retained

T1 Propose removalT1 Propose removalT1 Propose removalT1 Propose removalT2 Propose removalT2 Propose removalT2 Propose removalT2 Propose removal

All external retaining structures, raised beds andAll external retaining structures, raised beds andAll external retaining structures, raised beds andAll external retaining structures, raised beds andgreenhouse to be removed and area reduced ingreenhouse to be removed and area reduced ingreenhouse to be removed and area reduced ingreenhouse to be removed and area reduced inheight to form new hard play area to finished levelsheight to form new hard play area to finished levelsheight to form new hard play area to finished levelsheight to form new hard play area to finished levelsnoted (shown in red) making allowance fornoted (shown in red) making allowance fornoted (shown in red) making allowance fornoted (shown in red) making allowance fornecessary sub-base and finish as detailed innecessary sub-base and finish as detailed innecessary sub-base and finish as detailed innecessary sub-base and finish as detailed inspecificationspecificationspecificationspecification

Line of existingLine of existingLine of existingLine of existingretaining structure toretaining structure toretaining structure toretaining structure to

be removedbe removedbe removedbe removed

Permeable tarmac hard playarea with sub-base andgeotextile membranes

detailed in the SEspecification

All existing finishes to bebroken up and removed

from site sufficient to takenew pereable tarmac finish

and sub-base

Actual line of existingActual line of existingActual line of existingActual line of existingboundary fenceboundary fenceboundary fenceboundary fence

Line of existingLine of existingLine of existingLine of existingretaining structure toretaining structure toretaining structure toretaining structure to

be removedbe removedbe removedbe removed

Level showed in red:Level showed in red:Level showed in red:Level showed in red:

proposedproposedproposedproposed

Level showed in black:Level showed in black:Level showed in black:Level showed in black:

existingexistingexistingexisting

C/L of Glulam beam

2N

o.

Glu

lam

be

am

s t

o S

En

g's

de

tails

New steel beam to SEng's details

& fire encase beam

Ex. ConservatoryEx. ConservatoryEx. ConservatoryEx. Conservatory

Ex. ConservatoryEx. ConservatoryEx. ConservatoryEx. Conservatory

Ex. ClassroomEx. ClassroomEx. ClassroomEx. Classroom

2N

o.

Glu

lam

be

am

s to

SE

ng

's d

eta

ils

C/L of Glulam beam C/L of Glulam beam

C/L of Glulam beam

C/L of Steel beam

Ex. Outside Play AreaEx. Outside Play AreaEx. Outside Play AreaEx. Outside Play Area

Ex. RAMP DOWN

D08

A

1 in 2

0 g

radie

nt

ram

p1 in 2

0 g

radie

nt

ram

p

Landin

g

Landing

Exte

nd foot path

Classroom to have headClassroom to have headClassroom to have headClassroom to have headboards and disused gas linesboards and disused gas linesboards and disused gas linesboards and disused gas lines

removed and walls maderemoved and walls maderemoved and walls maderemoved and walls madegood and re decoratedgood and re decoratedgood and re decoratedgood and re decorated

Permeable tarmac hard play area with sub-base andgeotextile membranes detailed in the SE specificationPermeable tarmac hard play area with sub-base and

geotextile membranes detailed in the SE specification

Approximate sizeof modular

buildings. Exactsize to beconfirmed

Hygiene room22

A: 9 m2

Classroom14

A: 48 m2

Sensory room15

A: 54 m2

Storage16

A: 22 m2

Toilet23

A: 4 m2

Group room24

A: 36 m2

Corridor25

A: 29 m2

Storage15a

A: 6 m2

Extension Area 38 m2

PP

PP

PP

PP

PP

PP

PP

Corridor17

A: 12 m2

Storage21

A: 7 m2

Entrance/Lobby18

A: 25 m2

Office19

A: 31 m2

0.-

Building Section S2 Office

1:125

Planning

C 160427 Staff WC block added. CG GS

D 03.05.18 Internal work areas removed. External ramp added. Extent of gabion wall and resurfacing amended to reflect AMS. GC GC