5S SDLC05.08.11

download 5S SDLC05.08.11

of 16

Transcript of 5S SDLC05.08.11

  • 8/6/2019 5S SDLC05.08.11

    1/16

    1S & 2S

    Activities

    SAFE DEPOSIT LOCKER CABINET

  • 8/6/2019 5S SDLC05.08.11

    2/16

    Safefinalfitting

    line

    Emptytrolleyload

    ingline

    STEP 1 : ZONE FORMATION- Department is divided into small zones

    ZONE 3 SDL ASSY Bay 1 ZONE 19B SDL FF Bay 4

    ZONE 3B

    Checking work

    station

    ZONE 3AGrinding

    work

    station

    ZONE 3C

    Manual shelf filling

    ZONE 3D

    Sub-Assy station

    B-25

    ZONE 3ESPF line

    ZONE 3FSPF Box

    making station

    ZONE 3GManual Box

    making

    Engg.Cell

    Cabin

    FireDoor

    Cabin

    SDLC

    Cabin

    CODE DEPT. RESPONCIBLE

    Grinding Mr. Sushant P

    Checking Mr. Sushant P

    Shelf filling Mr. Santosh

    Shelf sub Assy. Mr. Santosh

    SPF line Mr. Sushantp

    SPF Box making Mr. Sushantp

    Manual Box making Mr. Prabhod

    ZONE 19HCover storage

    area

    ZONE 19IWorking area

    ZONE 19JLock storage

    Area

    ZONE 19KPacking AreaCODE DEPT. RESPONCIBLE

    Cover storage Mr. Rakesh

    FF work area

    Lock storage area

    Packing area Mr. Zaki

    Mr. Rakesh

    Mr. Zaki

    BAY 1

    B-24 B-23 B-22 B-21 B-20 B-19

    A-24 A-23 A-22 A-21 A-20 A-19A-24

    E-11

    E-10

    E-9

    E-8

  • 8/6/2019 5S SDLC05.08.11

    3/16

    STEP 2 : ZONE LEADER & TEAM FORMATIONZONE ZONE LEADER ZONE MEMBER AREA LOCATION

    ZONE 3A S. M. FADALE RAVINDRA NIKAM GRINDING STATION PILLAR B25 TO 24 BAY 1

    S. JOSEPHRAJ

    ZONE 3B B.R.SHEKDAR RAMU NAIR ASSY CHECKING

    STATION

    PILLAR B24 TO 22 BAY 1

    ASHOK GHADHI

    ZONE 3C D.B.MALI D.A.AMUNDKAR SHELF FILLINGSTATION

    PILLAR B24 TO 22 BAY 2

    SANDEEP KADAM

    DOMINIC D.

    HARISH SALVI

    SALIM M.R.

    SANDESH DALVI

    SAMEER GAWADE

    VILAS GAWADE

    SUNIL KADAM

    DAYARAM YADAV

    MARUTI PHOPALE

    VINOD KURADKAR

    AVINASH SHUKLA

    PRAKASH PANCHAL

  • 8/6/2019 5S SDLC05.08.11

    4/16

    STEP 2 : ZONE LEADER & TEAM FORMATION

    ZONE ZONE LEADER ZONE MEMBER AREA LOCATION

    ZONE 3H VIJAY PANCHAL RAHUL SHRISAT DOOR COVER STORAGEAREA

    PILLAR E11 TO 10BAY 4

    ASHOK KADAM

    JAGDISH P.

    ZONE 3I NICOLASD'SOUIZA

    SANTOSH G. FINAL FITTING WORKSTATION

    PILLAR E10 TO 9BAY 4

    NIKUL P.

    GHADI

    GHANEKAR

    R.M.PANCHAL

    S. KOKANE

    D. MISHRA

    SOMA PATEL

  • 8/6/2019 5S SDLC05.08.11

    5/16

    Tools for doing SEIRI (SORT)Tools for doing SEIRI (SORT)

    Red Tagging

    Worst Point Photography(WPP)

    FIXED POINT PHOTOGRAPHY (FPP)FIXED POINT PHOTOGRAPHY (FPP)

  • 8/6/2019 5S SDLC05.08.11

    6/16

    FIX POINT PHOTOGRAPHY

    The photograph of a Fixed Station taken from a Fixed Point

    Location in a Fixed Direction is FPP.

    Salient Features of FPP

    FPP is taken for a fixed station, from a fixed point in a fixed

    DirectionPhotograph should be taken by same person for every stage

    with same elevation

    1 FPP per week per zone has to be taken.

  • 8/6/2019 5S SDLC05.08.11

    7/16

    STEP 3 : Implementing 1S with FPP tool. ZONE: 19H

    Before After

    Rejected trolley RED

    TAGED

    Moved the rejected trolley to maintenance &Provided a movable railing so that the trolley

    remain in its correct place

  • 8/6/2019 5S SDLC05.08.11

    8/16

    STEP 3 : Implementing 1S with FPP tool. ZONE: 19 H

    Before After

    Old not in use door

    cover in mixed bin

    Mixed cover are separated &

    clear identification is given

    Not in use material is scrap as

    per standard format

  • 8/6/2019 5S SDLC05.08.11

    9/16

    STEP 3 : Implementing 1S with FPP tool. ZONE: 19 I

    Before After

    Excess door covers &

    unwanted hand tools

    Space is clear from

    unwanted material

    Door cover are

    store as per type

  • 8/6/2019 5S SDLC05.08.11

    10/16

    BEFORE AFTER

  • 8/6/2019 5S SDLC05.08.11

    11/16

    BEFOREAFTER

  • 8/6/2019 5S SDLC05.08.11

    12/16

    BEFORE AFTER

  • 8/6/2019 5S SDLC05.08.11

    13/16

    BEFORE AFTER

  • 8/6/2019 5S SDLC05.08.11

    14/16

  • 8/6/2019 5S SDLC05.08.11

    15/16

    BEFORE AFTER

  • 8/6/2019 5S SDLC05.08.11

    16/16

    Thank YouThank You