26 May 2010 Hans Postema - CERN
Status and plan for the development and construction
of CO2 Cooling System for Pixel Upgrade
1
![Page 2: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/2.jpg)
Why CO2?
• Radiation hard• Not electrically conductive, non corrosive• Not flammable, not toxic• Has excellent thermodynamic properties for micro-
channels. • Low dT/dP• Low mass • Low liquid/vapour density ratio• Low viscosity• High latent heat• High heat transfer coefficient• Environmental friendly
Hans Postema - CERN26 May 2010 2
![Page 3: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/3.jpg)
Pressure advantage
• Intuitively, higher pressures seem a disadvantage but:
• Gas flow at higher pressures needs smaller pipe diameters
• Pressure drops due to flow become less significant, allowing smaller pipes
• Small pipes can easily support the required pressures
Hans Postema - CERN26 May 2010 3
![Page 4: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/4.jpg)
Selection
• Many activities in different places
• Good overview requires several hours
• Global overviews risk to be repeating themselves through the year
• This presentation is a selection of some important achievements over the last few months
Hans Postema - CERN26 May 2010 4
![Page 5: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/5.jpg)
FPIX tube (February)
Hans Postema - CERN26 May 2010 5
![Page 6: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/6.jpg)
FPIX in fridge
Hans Postema - CERN26 May 2010 6
![Page 7: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/7.jpg)
Layout of the test section
Length of the tube: 1mInner diameter: 1.4mmWall thickness: 100µm
13 temperature sensors glued on the tubeCopper blocks for power supply
![Page 8: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/8.jpg)
Improved insulation
• Environment influences obviously the readings of the sensors
• Better insulation of the tube needed
• Freezer must be at the same temperature as the cooling fluid
Kapton tapeTube Armaflex
![Page 9: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/9.jpg)
Improvements
Better results through insulating the tube and keeping the temperatureinside the freezer at the temperature of the liquid
![Page 10: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/10.jpg)
Temperature drop vs. tube length at 0°C
Sensor 1 and 13 are before or after the heated test section
![Page 11: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/11.jpg)
Temperature drop vs. tube length at -15°C
Sensor 1 and 13 are before or after the heated test section
![Page 12: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/12.jpg)
Comparison to correlations
Temp. Thome Friedel Test 1 Test 2
Temperature drop9°C
0.34 °C 0.27 °C 0.05 °C 0.18 °C
Pressure drop 0.35 bar 0.32 bar 0.34 bar 0.36 bar
Temperature drop0°C
0.37 °C 0.37 °C 0.49 °C 0.52 °C
Pressure drop 0.43 bar 0.38 bar 0.50 bar 0.59 bar
Temperature drop-15°C
0.39 °C 0.49 °C 0.82 °C 0.89 °C
Pressure drop 0.61 bar 0.68 bar 1.25 bar 1.37 bar
Temperature drop-30°C
0.47 °C 0.67 °C 1.41 °C 1.46 °C
Pressure drop 1.05 bar 1.33 bar 3.63 bar 3.93 bar
![Page 13: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/13.jpg)
Comparison @ Tsat=9°
![Page 14: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/14.jpg)
Comparison @ Tsat=0°
![Page 15: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/15.jpg)
Comparison @ Tsat=-15°
![Page 16: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/16.jpg)
Comparison @ Tsat=-30°
![Page 17: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/17.jpg)
Conclusions of tests
• Software of some correlations now fully debugged an operational
• Interesting differences between calculations and measurements remain
• FPIX tube can reliably cool the requested heat load of 124 W
• dT over tube length < 3 degrees C
• dT due to HTC < 3 degrees C
Hans Postema - CERN26 May 2010 17
![Page 18: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/18.jpg)
18 May 2010
• Reached an important milestone
• First time that the Full Scale cooling plant test setup was running
• No problem in priming the pump
• Pump runs very quiet and smooth, no vibrations
• The result of a year of work by a dozen people
Hans Postema - CERN26 May 2010 18
![Page 19: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/19.jpg)
Cooling plant
Hans Postema - CERN26 May 2010 19
![Page 20: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/20.jpg)
Including dummy load
Hans Postema - CERN26 May 2010 20
![Page 21: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/21.jpg)
Chiller part
Hans Postema - CERN26 May 2010 21
![Page 22: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/22.jpg)
View with control rack
Hans Postema - CERN26 May 2010 22
![Page 23: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/23.jpg)
Hans Postema - CERN26 May 2010 23
![Page 24: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/24.jpg)
Control interface
Hans Postema - CERN26 May 2010 24
![Page 25: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/25.jpg)
Next steps
• Commissioning of the plant at ambient temperature
• Test run of Atlas IBL cooling loop
• Installation of accumulator, required for low temperature operation
• Commissioning of the plant at low temperature
Hans Postema - CERN26 May 2010 25
![Page 26: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/26.jpg)
Strategy (1)
• CO2 cooling plants cannot be bought off the shelf
• Relevant experience is not available in industry
• Current activities are generating the necessary experience “in house”
• Future CO2 cooling plants shall be designed and constructed “in house”
Hans Postema - CERN26 May 2010 26
![Page 27: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/27.jpg)
Strategy (2)
• Cooling plant shall be constructed early, leaving 1 year for commissioning on the surface and 1 year for installation in UX
• To avoid schedule constraints, one cooling plant foreseen for detector commissioning in TIF, and one for installation in the CMS cavern
Hans Postema - CERN26 May 2010 27
![Page 28: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/28.jpg)
Qualification
• Engineering and design shall follow the principles applied in aero-space or safety critical industrial applications
• Excellent workmanship shall have a priority over low-cost
• Extended “burn in” period necessary, comparable with satellites (1 year)
Hans Postema - CERN26 May 2010 28
![Page 29: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/29.jpg)
Safety
• High pressure is a safety concern when combined with larger volumes (stored energy)
• Pipe-work and components are in PED class 1 (Pressure Equipment Directive) DN<32 requiring “Good Practice”
• Storage tanks or Accumulators are in class 4 requiring certification
• Accumulator for the full scale test setup will be produced with a CE certificate, by NIKHEF
Hans Postema - CERN26 May 2010 29
![Page 30: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/30.jpg)
Schedule
• 2010 – Testing of Full Scale setup
• 2011-2012 – Engineering and design of detector parts, pipe-work, fittings and final plant
• 2013 – Construction of cooling plants
• 2014 – Burn in of cooling plants in TIF
• 2015 – Installation cooling plant in UX
• 2016 – Installation of detector
Hans Postema - CERN26 May 2010 30
![Page 31: 26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.](https://reader036.fdocuments.us/reader036/viewer/2022070415/56649f3a5503460f94c5877d/html5/thumbnails/31.jpg)
Participating groups
• CERN – Atlas• CERN – CMS• CERN – PH-DT• CERN – EN-CV• CERN – Cryolab• EPFL Lausanne• Fermilab• IPN Lyon
• NIKHEF Atlas LHCb• PSI• RWTH Aachen• SLAC Atlas• University Esslingen• University Karlsruhe
Hans Postema - CERN26 May 2010 31