    2.11 ASSESSMENT OF

    CONCRETE STRUCTURES

    2.11.1 Planning

    2.11.2 Test methods

    Physical Tests

    !"a#ility Tests

  • 7/24/2019 2.11 Assessment of Structures

    2/98

    Some o$ the "easons $o" ca""ying

    o!t assessments To dete"mine the nat!"e o$ "e%ai"s. &n this instance the"e

    a"e al'ays (isi#le signs o$ dete"io"ation) e.g. c"ac*ing.

    To decide the (al!e o$ a #!ilding 'hen it is #eing soldo" ins!"ed.

    To dete"mine the e+%ected "emaining !se$!l li$e o$ a#!ilding 'hen "e$!"#ishment o" change o$ !se is #eingconside"ed.

    To dete"mine the a#ility o$ the st"!ct!"e to ta*e aninc"eased loading.

    Ro!tine sa$ety ins%ection ,e.g. "oad #"idges-.

  • 7/24/2019 2.11 Assessment of Structures

    3/98

    Ty%ical

    "e%ai"s

  • 7/24/2019 2.11 Assessment of Structures

    4/98

    Tem%o"a"y li$ting $o" "e%ai"

  • 7/24/2019 2.11 Assessment of Structures

    5/98

    Some o$ the "easons $o" ca""ying

    o!t assessments To dete"mine the nat!"e o$ "e%ai"s. &n this instance the"e

    a"e al'ays (isi#le signs o$ dete"io"ation) e.g. c"ac*ing.

    To decide the (al!e o$ a #!ilding 'hen it is #eing soldo" ins!"ed.

    To dete"mine the e+%ected "emaining !se$!l li$e o$ a#!ilding 'hen "e$!"#ishment o" change o$ !se is #eingconside"ed.

    To dete"mine the a#ility o$ the st"!ct!"e to ta*e aninc"eased loading.

    Ro!tine sa$ety ins%ection ,e.g. "oad #"idges-.

  • 7/24/2019 2.11 Assessment of Structures

    6/98

    Skyline PlazaSkyline PlazaApartmentsApartments

    March 2, 1973March 2, 1973

  • 7/24/2019 2.11 Assessment of Structures

    7/98

    P"o#a#le Ca!se o$ Fail!"e

    P"emat!"e "emo(al o$ $o"m'o"*

    Conc"ete / days old

    A(e"age am#ient tem%e"at!"e 0 C

    The were no specification requirementsfor in-place concrete strength for saferemoval of formwork.

  • 7/24/2019 2.11 Assessment of Structures

    8/98

    Tower 1 completedTower 1 completedin August 1977in August 1977 Construction ofConstruction ofTower 2 halted inTower 2 halted in

    Fall of 1977Fall of 1977

    1.5-m lifts1.5-m liftsLift 28Lift 28

    Willow Island, WestWillow Island, Westir!inia "oolin! #owerir!inia "oolin! #ower

  • 7/24/2019 2.11 Assessment of Structures

    9/98

    State o$ "onstr%ctionat #ime o$ &ail%re

    'i$t 2( cast pre)io%s

    day"oncrete *%cket !oin!

    %p"rackin! so%nd+antry - tilts inward

    GANTRY 4

    April 26

  • 7/24/2019 2.11 Assessment of Structures

    10/98

  • 7/24/2019 2.11 Assessment of Structures

    11/98

    51 Fatalities

  • 7/24/2019 2.11 Assessment of Structures

    12/98

    Concl!sions $"om the

    t'o accidents

    Fail!"e 'as a "es!lt o$ inade!ate conc"etest"ength to s!%%o"t a%%lied const"!ction

    loads Fail!"e co!ld ha(e #een %"e(ented had in3

    %lace tests #een !sed to assess st"ength o$%"e(io!s li$t

  • 7/24/2019 2.11 Assessment of Structures

    13/98

    Some o$ the "easons $o" ca""ying

    o!t assessments To dete"mine the nat!"e o$ "e%ai"s. &n this instance the"e

    a"e al'ays (isi#le signs o$ dete"io"ation) e.g. c"ac*ing.

    To decide the (al!e o$ a #!ilding 'hen it is #eing soldo" ins!"ed.

    To dete"mine the e+%ected "emaining !se$!l li$e o$ a#!ilding 'hen "e$!"#ishment o" change o$ !se is #eingconside"ed.

    To dete"mine the a#ility o$ the st"!ct!"e to ta*e aninc"eased loading.

    Ro!tine sa$ety ins%ection ,e.g. "oad #"idges-.

  • 7/24/2019 2.11 Assessment of Structures

    14/98

    Planning the in(estigation

    o not #e o(e" am#itio!s) a $e' tests clea"ly analysedand "e%o"ted on time a"e $a" mo"e !se than a mass o$data.

    Ens!"e that ade!ate cont"ol a"eas a"e !sed. Almost all o$the tests a"e com%a"ati(e so the"e m!st #e some "es!lts$"om so!nd a"eas to com%a"e 'ith the s!s%ect a"eas.

    4he"e %ossi#le ca""y o!t the tests on a acc!"ately

    meas!"ed g"id. T"y to decide on a method o$ analysis and %"esentation

    #e$o"e 'o"* sta"ts.

  • 7/24/2019 2.11 Assessment of Structures

    15/98

    Plan yo!"

    access

  • 7/24/2019 2.11 Assessment of Structures

    16/98

    Planning the in(estigation

    o not #e o(e" am#itio!s) a $e' tests clea"ly analysedand "e%o"ted on time a"e $a" mo"e !se than a mass o$data.

    Ens!"e that ade!ate cont"ol a"eas a"e !sed. Almost all o$the tests a"e com%a"ati(e so the"e m!st #e some "es!lts$"om so!nd a"eas to com%a"e 'ith the s!s%ect a"eas.

    4he"e %ossi#le ca""y o!t the tests on a acc!"ately

    meas!"ed g"id. T"y to decide on a method o$ analysis and %"esentation

    #e$o"e 'o"* sta"ts.

  • 7/24/2019 2.11 Assessment of Structures

    17/98

    2.11 ASSESSMENT OF

    CONCRETE STRUCTURES

    2.11.1 Planning

    2.11.2 Test methods

    Physical Tests

    !"a#ility Tests

  • 7/24/2019 2.11 Assessment of Structures

    18/98

    Physical Tests

    Meas!"ement o$ c"ac* 'idth

    Ult"asonic %!lse (elocity

    Co(e" mete"s

    Re#o!nd hamme"s

    &m%act echo

    Co"e tests P!ll o!t tests

    5oad tests

  • 7/24/2019 2.11 Assessment of Structures

    19/98

    Meas!"ement

    o$ c"ac* 'idth

  • 7/24/2019 2.11 Assessment of Structures

    20/98

    Physical Tests

    Meas!"ement o$ c"ac* 'idth

    Ult"asonic %!lse (elocity

    Co(e" mete"s Re#o!nd hamme"s

    &m%act echo

    Co"e tests P!ll o!t tests

    5oad tests

  • 7/24/2019 2.11 Assessment of Structures

    21/98

    Ult"asonicTesting

  • 7/24/2019 2.11 Assessment of Structures

    22/98

    Po"ta#leUlt"asonic

    Non3est"!cti(eigital

    &ndicating

    Teste"

  • 7/24/2019 2.11 Assessment of Structures

    23/98

    P"ess!"e 'a(es in a solid

    ,see section 1./-

    E 6 7o!ng8s mod!l!s

    ( 6 %!lse (elocity

    d 6 density

    6 Poisson8s "atio

    -3,1

    -23-,19,1d(6E

    2

  • 7/24/2019 2.11 Assessment of Structures

    24/98

    A""angement

    T

    R

    Direct

    T

    R

    Semi-Direct

    T R

    Surface

    MostReliale

    LeastReliale

  • 7/24/2019 2.11 Assessment of Structures

    25/98

    Ult"asonic testing

  • 7/24/2019 2.11 Assessment of Structures

    26/98

    O!" Ult"asonic Test Machine

    & di t

  • 7/24/2019 2.11 Assessment of Structures

    27/98

    &ndi"ect

    meas!"ements

    ,also !se g"a%h $o"semi3di"ect-

  • 7/24/2019 2.11 Assessment of Structures

    28/98

    Ult"aso!nd at c"ac*

  • 7/24/2019 2.11 Assessment of Structures

    29/98

    Ult"asonic

    Th"o!ghT"ansmission T

    P"esence o$ :de$ects:inc"eases t"a(el time

    ,lo'e" s%eed-

  • 7/24/2019 2.11 Assessment of Structures

    30/98

    S!"$ace Method

    ete"mine de%th o$ inte"$ace) d

    Re!i"es $aste" 'a(e s%eed in #ottom laye"

    Meas!"e t"a(el time as a $!nction o$ distance) X)

    #et'een t"ansd!ce"s

    !" #

    Transmitter Receiver

    $

    %ath 2%ath 2

    %ath 1%ath 1 &amage! concrete

    '!

    (oun! concrete(oun! concrete''ss

  • 7/24/2019 2.11 Assessment of Structures

    31/98

    5aye" thic*ness meas!"ement

  • 7/24/2019 2.11 Assessment of Structures

    32/98

    Physical Tests

    Meas!"ement o$ c"ac* 'idth

    Ult"asonic %!lse (elocity

    Co(e" mete"s Re#o!nd hamme"s

    &m%act echo

    Co"e tests P!ll o!t tests

    5oad tests

  • 7/24/2019 2.11 Assessment of Structures

    33/98

    Co(e"

    mete"s

  • 7/24/2019 2.11 Assessment of Structures

    34/98

    Co(e" mete"s 2 di$$e"ent ty%es

  • 7/24/2019 2.11 Assessment of Structures

    35/98

    Physical Tests

    Meas!"ement o$ c"ac* 'idth

    Ult"asonic %!lse (elocity

    Co(e" mete"s Re#o!nd hamme"s

    &m%act echo

    Co"e tests P!ll o!t tests

    5oad tests

  • 7/24/2019 2.11 Assessment of Structures

    36/98

    odod

    !ush down!ush down

    "oc#$release"oc#$release

    %utton%utton

  • 7/24/2019 2.11 Assessment of Structures

    37/98

    O%e"ation)o!*

    (li!er

    (pring

    Ro!

    %ush )o!*

    +ammerRelease! Reoun!

    +ammer

    Latch

  • 7/24/2019 2.11 Assessment of Structures

    38/98

    SliderSlider

    e%ound num%er & '1e%ound num%er & '1

  • 7/24/2019 2.11 Assessment of Structures

    39/98

    Nea"3s!"$ace E$$ects

    ,ggregate Rough &r* oraronation

    ,ir voi!

    i it l # d h

  • 7/24/2019 2.11 Assessment of Structures

    40/98

    igital "e#o!nd hamme"

  • 7/24/2019 2.11 Assessment of Structures

    41/98

    Cha"ts $o"

    o!" "e#o!ndhamme"s

  • 7/24/2019 2.11 Assessment of Structures

    42/98

    Physical Tests

    Meas!"ement o$ c"ac* 'idth

    Ult"asonic %!lse (elocity

    Co(e" mete"s Re#o!nd hamme"s

    &m%act echo

    Co"e tests P!ll o!t tests

    5oad tests

  • 7/24/2019 2.11 Assessment of Structures

    43/98

    &m%act echo test

    nci!ent/ront

    nci!ent Ra*

    Reflecte! Ra*

    Reflecte!/ront

    mpact Receiver

  • 7/24/2019 2.11 Assessment of Structures

    44/98

    &m%act3Echo Method

    Flaw

    &isplacement

    Time

    ontacttime

    /orce

    Time

    Fi ld T ti S tFi ld T ti S t

  • 7/24/2019 2.11 Assessment of Structures

    45/98

    Field Testing SystemField Testing System

  • 7/24/2019 2.11 Assessment of Structures

    46/98

    &m%act Echo A%%lications

    ;oids o" honeycom#ing

    elaminations ,at "ein$o"cement)as%halt=-

    ;oids in g"o!ted tendon d!cts

  • 7/24/2019 2.11 Assessment of Structures

    47/98

    etection is di$$ic!lt 'hen?

    &m%act Echo

    5imitations

    &eep &efect0verla*

  • 7/24/2019 2.11 Assessment of Structures

    48/98

    Physical Tests

    Meas!"ement o$ c"ac* 'idth

    Ult"asonic %!lse (elocity

    Co(e" mete"s Re#o!nd hamme"s

    &m%act echo

    Co"e tests P!ll o!t tests

    5oad tests

  • 7/24/2019 2.11 Assessment of Structures

    49/98

    Co"ing Machines

  • 7/24/2019 2.11 Assessment of Structures

    50/98

    Reco(e"ed Co"es

    Semi.drypaste/!ro%t

    "oncrete

  • 7/24/2019 2.11 Assessment of Structures

    51/98

    T"aile" mo!nted co"ing machine

    Sa'ing conc"ete

  • 7/24/2019 2.11 Assessment of Structures

    52/98

    Sa'ing conc"ete

    CORE TESTS

  • 7/24/2019 2.11 Assessment of Structures

    53/98

    CORE TESTS

    Fig 2.11.@. sho's ty%ical st"engths. o not e+%ectto get the ta"get mean.

    Co"es a"e tested on end so the ends m!st #eg"o!nd o" ca%%ed #e$o"e testing. The !ality o$ the

    "es!lt is only as good as the !ality o$ this 'o"*. Al'ays !se %lenty o$ 'ate" o" the co"e #it 'ill #edamaged.

    &$ ca""ying o!t chemical tests on the co"e

    "emem#e" that the c!tting 'ate" 'ill ha(e 'ashedo!t some chlo"ides etc $"om nea" the co"e s!"$ace.Use a co(e" mete" to locate the steel and t"y toa(oid it.

  • 7/24/2019 2.11 Assessment of Structures

    54/98

    St"engths o#tained $"om co"e tests

    CORE TESTS

  • 7/24/2019 2.11 Assessment of Structures

    55/98

    CORE TESTS

    Fig 2.11.@. sho's ty%ical st"engths. o not e+%ectto get the ta"get mean.

    Co"es a"e tested on end so the ends m!st #eg"o!nd o" ca%%ed #e$o"e testing. The !ality o$ the

    "es!lt is only as good as the !ality o$ this 'o"*. Al'ays !se %lenty o$ 'ate" o" the co"e #it 'ill #edamaged.

    &$ ca""ying o!t chemical tests on the co"e

    "emem#e" that the c!tting 'ate" 'ill ha(e 'ashedo!t some chlo"ides etc $"om nea" the co"e s!"$ace.Use a co(e" mete" to locate the steel and t"y toa(oid it.

  • 7/24/2019 2.11 Assessment of Structures

    56/98

    Cho% sa' $o" c!tting co"e ends

    CORE TESTS

  • 7/24/2019 2.11 Assessment of Structures

    57/98

    CORE TESTS

    Fig 2.11.@. sho's ty%ical st"engths. o not e+%ectto get the ta"get mean.

    Co"es a"e tested on end so the ends m!st #eg"o!nd o" ca%%ed #e$o"e testing. The !ality o$ the

    "es!lt is only as good as the !ality o$ this 'o"*. Al'ays !se %lenty o$ 'ate" o" the co"e #it 'ill #edamaged.

    &$ ca""ying o!t chemical tests on the co"e

    "emem#e" that the c!tting 'ate" 'ill ha(e 'ashedo!t some chlo"ides etc $"om nea" the co"e s!"$ace.Use a co(e" mete" to locate the steel and t"y toa(oid it.

  • 7/24/2019 2.11 Assessment of Structures

    58/98

    Flo' o$ 'ate" in

    co"e c!tting

    CORE TESTS

  • 7/24/2019 2.11 Assessment of Structures

    59/98

    CORE TESTS

    Fig 2.11.@. sho's ty%ical st"engths. o not e+%ectto get the ta"get mean.

    Co"es a"e tested on end so the ends m!st #e g"o!ndo" ca%%ed #e$o"e testing. The !ality o$ the "es!ltis only as good as the !ality o$ this 'o"*.

    Al'ays !se %lenty o$ 'ate" o" the co"e #it 'ill #edamaged.

    &$ ca""ying o!t chemical tests on the co"e

    "emem#e" that the c!tting 'ate" 'ill ha(e 'ashedo!t some chlo"ides etc $"om nea" the co"e s!"$ace.

    Use a co(e" mete" to locate the steel and t"y toa(oid it.

  • 7/24/2019 2.11 Assessment of Structures

    60/98

    Physical Tests

    Meas!"ement o$ c"ac* 'idth

    Ult"asonic %!lse (elocity

    Co(e" mete"s Re#o!nd hamme"s

    &m%act echo

    Co"e tests P!ll o!t tests

    5oad tests

  • 7/24/2019 2.11 Assessment of Structures

    61/98

    P!ll3o!t test ,1-

    P!ll o!t test ,2-

  • 7/24/2019 2.11 Assessment of Structures

    62/98

    , -

    P ll

  • 7/24/2019 2.11 Assessment of Structures

    63/98

    P!ll o!t tests

    ,=-

  • 7/24/2019 2.11 Assessment of Structures

    64/98

    P!ll3o!t tests ,in

    o!" la#-

  • 7/24/2019 2.11 Assessment of Structures

    65/98

    Physical Tests

    Meas!"ement o$ c"ac* 'idth

    Ult"asonic %!lse (elocity

    Co(e" mete"s Re#o!nd hamme"s

    &m%act echo

    Co"e tests P!ll o!t tests

    5oad tests

  • 7/24/2019 2.11 Assessment of Structures

    66/98

    St"!ct!"al load testing

    0ield

    Stress

    Strain

    Plastic

    &ail%re

    If this is the unloading

    curve the structure has

    been overloaded

  • 7/24/2019 2.11 Assessment of Structures

    67/98

    2.11 ASSESSMENT OF

    CONCRETE STRUCTURES

    2.11.1 Planning

    2.11.2 Test methods

    Physical Tests

    !"a#ility Tests

  • 7/24/2019 2.11 Assessment of Structures

    68/98

    !"a#ility Tests

    &nitial S!"$ace A#so"%tion Test

    Figg Test

    4ate" %enet"ation test

    Potential Ma%%ing

    Resisti(ity Tests

    5inea" Pola"isation

    Co!lom# TestB Phenol%hthalein Test

    Othe" tests

  • 7/24/2019 2.11 Assessment of Structures

    69/98

    &SAT a%%a"at!s

  • 7/24/2019 2.11 Assessment of Structures

    70/98

    &SAT

    Test

    2 5mm

    Reservoir

    (eal

    ap

    8 mm8 mm

    apillar* 3 (cale

    'alve Close (al(e at

    s%eci$ied inte"(als

    $"om sta"t o$ test

    Meas!"e "ate o$

    a#so"%tion

  • 7/24/2019 2.11 Assessment of Structures

    71/98

    &SAT $lo' "ates

    Flo'

    Time

    Flo' 6 A Time3N

  • 7/24/2019 2.11 Assessment of Structures

    72/98

    !"a#ility Tests

    &nitial S!"$ace A#so"%tion Test

    Figg Test

    4ate" %enet"ation test

    Potential Ma%%ing

    Resisti(ity Tests

    5inea" Pola"isation

    Co!lom# TestB Phenol%hthalein Test

    Othe" tests

    % 4

  • 7/24/2019 2.11 Assessment of Structures

    73/98

    Figg Ai"

    Pe"mea#ility

    Test A%%ly (ac!!m to%"esc"i#ed %"ess!"e

    Close (al!e andmeas!"e time $o"%"ess!"e to inc"ease

    to %"esc"i#ed (al!e

    Plug

    2 mm2 mm

    2 mm2 mm

    1 mm1 mm

    %ressure 4age'acuum

  • 7/24/2019 2.11 Assessment of Structures

    74/98

  • 7/24/2019 2.11 Assessment of Structures

    75/98

    !"a#ility Tests

    &nitial S!"$ace A#so"%tion Test

    Figg Test

    4ate" %enet"ation test

    Potential Ma%%ing

    Resisti(ity Tests

    5inea" Pola"isation

    Co!lom# TestB Phenol%hthalein Test

    Othe" tests

  • 7/24/2019 2.11 Assessment of Structures

    76/98

    +_

    -0.28

    Dal$3Cell Potential Method

    ,(TM 86

    7 onnection to ar7 'oltmeter

    7 u-u(0 halfcell

    CuSO4solution

    Copper rod

    Porous plug

    Sponge

    Potential

  • 7/24/2019 2.11 Assessment of Structures

    77/98

    s!"(ey

    and"esisti(ity

  • 7/24/2019 2.11 Assessment of Structures

    78/98

    ASTM C>0@ Classi$ication $o"

    co""osion detectionMeas!"ed %otential ,CSE- Statistical

    "is* o$ co""osion

    mo"e negati(e than 3=m; GH

    32 to 3=m; H

    5ess negati(e than 32m; 1H

    Conto!"s $"om

  • 7/24/2019 2.11 Assessment of Structures

    79/98

    Conto!"s $"om

    %otential

    s!"(ey

  • 7/24/2019 2.11 Assessment of Structures

    80/98

    POTENT&A5 MAPP&NI

    Potential ma%%ing is !ic*) non3dest"!cti(e) and

    chea%. 5a"ge a"eas may #e co(e"ed.

    The "es!lts m!st #e t"eated 'ith ca!tion. Fo"

    e+am%le ca"#onation inc"eases conc"ete "esisti(ity

    and the"e$o"e inc"eases a%%a"ent "est %otential.

    The "es!lts only indicate that co""osion is %ossi#le

    and gi(e no in$o"mation a#o!t co""osion "ates. Prestressin! ca*les in d%cts cannot *e

    tested

  • 7/24/2019 2.11 Assessment of Structures

    81/98

    !"a#ility Tests

    &nitial S!"$ace A#so"%tion Test

    Figg Test

    4ate" %enet"ation test

    Potential Ma%%ing

    Resisti(ity Tests

    5inea" Pola"isation

    Co!lom# TestB Phenol%hthalein Test

    Othe" tests

    # h d #

  • 7/24/2019 2.11 Assessment of Structures

    82/98

    /3P"o#e Method #y 4enne"

    =2 s '

    .

    Current lines()uipotential lines

    %roes

    ,.. source ,mmeter9

    'oltmeter9 '

    s s s

  • 7/24/2019 2.11 Assessment of Structures

    83/98

    Conc"ete "esisti(ity meas!"ement

    Signi$icance o$ conc"ete "esisti(ity

  • 7/24/2019 2.11 Assessment of Structures

    84/98

    g y

    to li*elihood o$ co""osion

    Resisti(ity Cm 5i*elihood o$ signi$icant

    co""osion

    J (e"y high

    31 high

    132 lo'

  • 7/24/2019 2.11 Assessment of Structures

    85/98

    !"a#ility Tests

    &nitial S!"$ace A#so"%tion Test

    Figg Test

    4ate" %enet"ation test

    Potential Ma%%ing

    Resisti(ity Tests

    5inea" Pola"isation

    Co!lom# TestB Phenol%hthalein Test

    Othe" tests

    Th ASTM Chl id P #ili B

  • 7/24/2019 2.11 Assessment of Structures

    86/98

    The ASTM Chlo"ide Pe"mea#ilityB

    insit! test ,meas!"es elect"omig"ation-Sodi!m

    chlo"ide

    9@ (olts

    C!""ent is

    meas!"ed

    Chlo"ide

    ions

    Rein$o"cing

    #a"

    ;olts

    Th ASTM Chl id P #ili B

  • 7/24/2019 2.11 Assessment of Structures

    87/98

    The ASTM Chlo"ide Pe"mea#ilityB

    test on a "eco(e"ed co"e

    Sodi!m

    chlo"ideSodi!m

    hyd"o+ide

    ;olts 9@ (olts

    Chlo"ideions

    Modi$ied ASTM

  • 7/24/2019 2.11 Assessment of Structures

    88/98

    Chlo"ide Pe"mea#ilityB

    test

  • 7/24/2019 2.11 Assessment of Structures

    89/98

    !"a#ility Tests

    &nitial S!"$ace A#so"%tion Test

    Figg Test

    4ate" %enet"ation test

    Potential Ma%%ing

    Resisti(ity Tests

    5inea" Pola"isation

    Co!lom# TestB Phenol%hthalein Test

    Othe" tests

  • 7/24/2019 2.11 Assessment of Structures

    90/98

    Phenol%hthalein

    Test

  • 7/24/2019 2.11 Assessment of Structures

    91/98

    !"a#ility Tests

    &nitial S!"$ace A#so"%tion Test

    Figg Test

    4ate" %enet"ation test

    Potential Ma%%ing

    Resisti(ity Tests

    5inea" Pola"isation

    Co!lom# TestB Phenol%hthalein Test

    Othe" tests

    L

  • 7/24/2019 2.11 Assessment of Structures

    92/98

    L3"ay

    a%%a"at!s

    RAA

  • 7/24/2019 2.11 Assessment of Structures

    93/98

    RAA

    R

    Elect"omagnetic e!i(alent o$SONAR

    = 1

    2

    3

    ,ntenna

    = !ielectricconstant

    C = spee!in air

    V =

    C

    G d = h h

  • 7/24/2019 2.11 Assessment of Structures

    94/98

    G3mm and =3mm a"s at Th"ee e%ths= mm s%acing

    ) 1) 1 mm co(e"

    9 mm *5 mm

    5+ 1++ 15+5+ 1++ 15+ 5+ 1++ 15+5+ 1++ 15+

    Infra-Red Cold Spot

  • 7/24/2019 2.11 Assessment of Structures

    95/98

    CameraSurveys

    ,utwardeat Flow.cooling/

    nwar!+eat /low:heating;

    Cold Spot

    Hot Spot

    I "amera

  • 7/24/2019 2.11 Assessment of Structures

    96/98

    I "amera

    Photo o$ *rid!e

  • 7/24/2019 2.11 Assessment of Structures

    97/98

    Photo o$ *rid!edeck

    (0pansion oint

    I Ima!e

  • 7/24/2019 2.11 Assessment of Structures