2.11 Assessment of Structures
-
Upload
sumanth-reddy -
Category
Documents
-
view
221 -
download
0
Transcript of 2.11 Assessment of Structures
-
7/24/2019 2.11 Assessment of Structures
1/98
2.11 ASSESSMENT OF
CONCRETE STRUCTURES
2.11.1 Planning
2.11.2 Test methods
Physical Tests
!"a#ility Tests
-
7/24/2019 2.11 Assessment of Structures
2/98
Some o$ the "easons $o" ca""ying
o!t assessments To dete"mine the nat!"e o$ "e%ai"s. &n this instance the"e
a"e al'ays (isi#le signs o$ dete"io"ation) e.g. c"ac*ing.
To decide the (al!e o$ a #!ilding 'hen it is #eing soldo" ins!"ed.
To dete"mine the e+%ected "emaining !se$!l li$e o$ a#!ilding 'hen "e$!"#ishment o" change o$ !se is #eingconside"ed.
To dete"mine the a#ility o$ the st"!ct!"e to ta*e aninc"eased loading.
Ro!tine sa$ety ins%ection ,e.g. "oad #"idges-.
-
7/24/2019 2.11 Assessment of Structures
3/98
Ty%ical
"e%ai"s
-
7/24/2019 2.11 Assessment of Structures
4/98
Tem%o"a"y li$ting $o" "e%ai"
-
7/24/2019 2.11 Assessment of Structures
5/98
Some o$ the "easons $o" ca""ying
o!t assessments To dete"mine the nat!"e o$ "e%ai"s. &n this instance the"e
a"e al'ays (isi#le signs o$ dete"io"ation) e.g. c"ac*ing.
To decide the (al!e o$ a #!ilding 'hen it is #eing soldo" ins!"ed.
To dete"mine the e+%ected "emaining !se$!l li$e o$ a#!ilding 'hen "e$!"#ishment o" change o$ !se is #eingconside"ed.
To dete"mine the a#ility o$ the st"!ct!"e to ta*e aninc"eased loading.
Ro!tine sa$ety ins%ection ,e.g. "oad #"idges-.
-
7/24/2019 2.11 Assessment of Structures
6/98
Skyline PlazaSkyline PlazaApartmentsApartments
March 2, 1973March 2, 1973
-
7/24/2019 2.11 Assessment of Structures
7/98
P"o#a#le Ca!se o$ Fail!"e
P"emat!"e "emo(al o$ $o"m'o"*
Conc"ete / days old
A(e"age am#ient tem%e"at!"e 0 C
The were no specification requirementsfor in-place concrete strength for saferemoval of formwork.
-
7/24/2019 2.11 Assessment of Structures
8/98
Tower 1 completedTower 1 completedin August 1977in August 1977 Construction ofConstruction ofTower 2 halted inTower 2 halted in
Fall of 1977Fall of 1977
1.5-m lifts1.5-m liftsLift 28Lift 28
Willow Island, WestWillow Island, Westir!inia "oolin! #owerir!inia "oolin! #ower
-
7/24/2019 2.11 Assessment of Structures
9/98
State o$ "onstr%ctionat #ime o$ &ail%re
'i$t 2( cast pre)io%s
day"oncrete *%cket !oin!
%p"rackin! so%nd+antry - tilts inward
GANTRY 4
April 26
-
7/24/2019 2.11 Assessment of Structures
10/98
-
7/24/2019 2.11 Assessment of Structures
11/98
51 Fatalities
-
7/24/2019 2.11 Assessment of Structures
12/98
Concl!sions $"om the
t'o accidents
Fail!"e 'as a "es!lt o$ inade!ate conc"etest"ength to s!%%o"t a%%lied const"!ction
loads Fail!"e co!ld ha(e #een %"e(ented had in3
%lace tests #een !sed to assess st"ength o$%"e(io!s li$t
-
7/24/2019 2.11 Assessment of Structures
13/98
Some o$ the "easons $o" ca""ying
o!t assessments To dete"mine the nat!"e o$ "e%ai"s. &n this instance the"e
a"e al'ays (isi#le signs o$ dete"io"ation) e.g. c"ac*ing.
To decide the (al!e o$ a #!ilding 'hen it is #eing soldo" ins!"ed.
To dete"mine the e+%ected "emaining !se$!l li$e o$ a#!ilding 'hen "e$!"#ishment o" change o$ !se is #eingconside"ed.
To dete"mine the a#ility o$ the st"!ct!"e to ta*e aninc"eased loading.
Ro!tine sa$ety ins%ection ,e.g. "oad #"idges-.
-
7/24/2019 2.11 Assessment of Structures
14/98
Planning the in(estigation
o not #e o(e" am#itio!s) a $e' tests clea"ly analysedand "e%o"ted on time a"e $a" mo"e !se than a mass o$data.
Ens!"e that ade!ate cont"ol a"eas a"e !sed. Almost all o$the tests a"e com%a"ati(e so the"e m!st #e some "es!lts$"om so!nd a"eas to com%a"e 'ith the s!s%ect a"eas.
4he"e %ossi#le ca""y o!t the tests on a acc!"ately
meas!"ed g"id. T"y to decide on a method o$ analysis and %"esentation
#e$o"e 'o"* sta"ts.
-
7/24/2019 2.11 Assessment of Structures
15/98
Plan yo!"
access
-
7/24/2019 2.11 Assessment of Structures
16/98
Planning the in(estigation
o not #e o(e" am#itio!s) a $e' tests clea"ly analysedand "e%o"ted on time a"e $a" mo"e !se than a mass o$data.
Ens!"e that ade!ate cont"ol a"eas a"e !sed. Almost all o$the tests a"e com%a"ati(e so the"e m!st #e some "es!lts$"om so!nd a"eas to com%a"e 'ith the s!s%ect a"eas.
4he"e %ossi#le ca""y o!t the tests on a acc!"ately
meas!"ed g"id. T"y to decide on a method o$ analysis and %"esentation
#e$o"e 'o"* sta"ts.
-
7/24/2019 2.11 Assessment of Structures
17/98
2.11 ASSESSMENT OF
CONCRETE STRUCTURES
2.11.1 Planning
2.11.2 Test methods
Physical Tests
!"a#ility Tests
-
7/24/2019 2.11 Assessment of Structures
18/98
Physical Tests
Meas!"ement o$ c"ac* 'idth
Ult"asonic %!lse (elocity
Co(e" mete"s
Re#o!nd hamme"s
&m%act echo
Co"e tests P!ll o!t tests
5oad tests
-
7/24/2019 2.11 Assessment of Structures
19/98
Meas!"ement
o$ c"ac* 'idth
-
7/24/2019 2.11 Assessment of Structures
20/98
Physical Tests
Meas!"ement o$ c"ac* 'idth
Ult"asonic %!lse (elocity
Co(e" mete"s Re#o!nd hamme"s
&m%act echo
Co"e tests P!ll o!t tests
5oad tests
-
7/24/2019 2.11 Assessment of Structures
21/98
Ult"asonicTesting
-
7/24/2019 2.11 Assessment of Structures
22/98
Po"ta#leUlt"asonic
Non3est"!cti(eigital
&ndicating
Teste"
-
7/24/2019 2.11 Assessment of Structures
23/98
P"ess!"e 'a(es in a solid
,see section 1./-
E 6 7o!ng8s mod!l!s
( 6 %!lse (elocity
d 6 density
6 Poisson8s "atio
-3,1
-23-,19,1d(6E
2
-
7/24/2019 2.11 Assessment of Structures
24/98
A""angement
T
R
Direct
T
R
Semi-Direct
T R
Surface
MostReliale
LeastReliale
-
7/24/2019 2.11 Assessment of Structures
25/98
Ult"asonic testing
-
7/24/2019 2.11 Assessment of Structures
26/98
O!" Ult"asonic Test Machine
& di t
-
7/24/2019 2.11 Assessment of Structures
27/98
&ndi"ect
meas!"ements
,also !se g"a%h $o"semi3di"ect-
-
7/24/2019 2.11 Assessment of Structures
28/98
Ult"aso!nd at c"ac*
-
7/24/2019 2.11 Assessment of Structures
29/98
Ult"asonic
Th"o!ghT"ansmission T
P"esence o$ :de$ects:inc"eases t"a(el time
,lo'e" s%eed-
-
7/24/2019 2.11 Assessment of Structures
30/98
S!"$ace Method
ete"mine de%th o$ inte"$ace) d
Re!i"es $aste" 'a(e s%eed in #ottom laye"
Meas!"e t"a(el time as a $!nction o$ distance) X)
#et'een t"ansd!ce"s
!" #
Transmitter Receiver
$
%ath 2%ath 2
%ath 1%ath 1 &amage! concrete
'!
(oun! concrete(oun! concrete''ss
-
7/24/2019 2.11 Assessment of Structures
31/98
5aye" thic*ness meas!"ement
-
7/24/2019 2.11 Assessment of Structures
32/98
Physical Tests
Meas!"ement o$ c"ac* 'idth
Ult"asonic %!lse (elocity
Co(e" mete"s Re#o!nd hamme"s
&m%act echo
Co"e tests P!ll o!t tests
5oad tests
-
7/24/2019 2.11 Assessment of Structures
33/98
Co(e"
mete"s
-
7/24/2019 2.11 Assessment of Structures
34/98
Co(e" mete"s 2 di$$e"ent ty%es
-
7/24/2019 2.11 Assessment of Structures
35/98
Physical Tests
Meas!"ement o$ c"ac* 'idth
Ult"asonic %!lse (elocity
Co(e" mete"s Re#o!nd hamme"s
&m%act echo
Co"e tests P!ll o!t tests
5oad tests
-
7/24/2019 2.11 Assessment of Structures
36/98
odod
!ush down!ush down
"oc#$release"oc#$release
%utton%utton
-
7/24/2019 2.11 Assessment of Structures
37/98
O%e"ation)o!*
(li!er
(pring
Ro!
%ush )o!*
+ammerRelease! Reoun!
+ammer
Latch
-
7/24/2019 2.11 Assessment of Structures
38/98
SliderSlider
e%ound num%er & '1e%ound num%er & '1
-
7/24/2019 2.11 Assessment of Structures
39/98
Nea"3s!"$ace E$$ects
,ggregate Rough &r* oraronation
,ir voi!
i it l # d h
-
7/24/2019 2.11 Assessment of Structures
40/98
igital "e#o!nd hamme"
-
7/24/2019 2.11 Assessment of Structures
41/98
Cha"ts $o"
o!" "e#o!ndhamme"s
-
7/24/2019 2.11 Assessment of Structures
42/98
Physical Tests
Meas!"ement o$ c"ac* 'idth
Ult"asonic %!lse (elocity
Co(e" mete"s Re#o!nd hamme"s
&m%act echo
Co"e tests P!ll o!t tests
5oad tests
-
7/24/2019 2.11 Assessment of Structures
43/98
&m%act echo test
nci!ent/ront
nci!ent Ra*
Reflecte! Ra*
Reflecte!/ront
mpact Receiver
-
7/24/2019 2.11 Assessment of Structures
44/98
&m%act3Echo Method
Flaw
&isplacement
Time
ontacttime
/orce
Time
Fi ld T ti S tFi ld T ti S t
-
7/24/2019 2.11 Assessment of Structures
45/98
Field Testing SystemField Testing System
-
7/24/2019 2.11 Assessment of Structures
46/98
&m%act Echo A%%lications
;oids o" honeycom#ing
elaminations ,at "ein$o"cement)as%halt=-
;oids in g"o!ted tendon d!cts
-
7/24/2019 2.11 Assessment of Structures
47/98
etection is di$$ic!lt 'hen?
&m%act Echo
5imitations
&eep &efect0verla*
-
7/24/2019 2.11 Assessment of Structures
48/98
Physical Tests
Meas!"ement o$ c"ac* 'idth
Ult"asonic %!lse (elocity
Co(e" mete"s Re#o!nd hamme"s
&m%act echo
Co"e tests P!ll o!t tests
5oad tests
-
7/24/2019 2.11 Assessment of Structures
49/98
Co"ing Machines
-
7/24/2019 2.11 Assessment of Structures
50/98
Reco(e"ed Co"es
Semi.drypaste/!ro%t
"oncrete
-
7/24/2019 2.11 Assessment of Structures
51/98
T"aile" mo!nted co"ing machine
Sa'ing conc"ete
-
7/24/2019 2.11 Assessment of Structures
52/98
Sa'ing conc"ete
CORE TESTS
-
7/24/2019 2.11 Assessment of Structures
53/98
CORE TESTS
Fig 2.11.@. sho's ty%ical st"engths. o not e+%ectto get the ta"get mean.
Co"es a"e tested on end so the ends m!st #eg"o!nd o" ca%%ed #e$o"e testing. The !ality o$ the
"es!lt is only as good as the !ality o$ this 'o"*. Al'ays !se %lenty o$ 'ate" o" the co"e #it 'ill #edamaged.
&$ ca""ying o!t chemical tests on the co"e
"emem#e" that the c!tting 'ate" 'ill ha(e 'ashedo!t some chlo"ides etc $"om nea" the co"e s!"$ace.Use a co(e" mete" to locate the steel and t"y toa(oid it.
-
7/24/2019 2.11 Assessment of Structures
54/98
St"engths o#tained $"om co"e tests
CORE TESTS
-
7/24/2019 2.11 Assessment of Structures
55/98
CORE TESTS
Fig 2.11.@. sho's ty%ical st"engths. o not e+%ectto get the ta"get mean.
Co"es a"e tested on end so the ends m!st #eg"o!nd o" ca%%ed #e$o"e testing. The !ality o$ the
"es!lt is only as good as the !ality o$ this 'o"*. Al'ays !se %lenty o$ 'ate" o" the co"e #it 'ill #edamaged.
&$ ca""ying o!t chemical tests on the co"e
"emem#e" that the c!tting 'ate" 'ill ha(e 'ashedo!t some chlo"ides etc $"om nea" the co"e s!"$ace.Use a co(e" mete" to locate the steel and t"y toa(oid it.
-
7/24/2019 2.11 Assessment of Structures
56/98
Cho% sa' $o" c!tting co"e ends
CORE TESTS
-
7/24/2019 2.11 Assessment of Structures
57/98
CORE TESTS
Fig 2.11.@. sho's ty%ical st"engths. o not e+%ectto get the ta"get mean.
Co"es a"e tested on end so the ends m!st #eg"o!nd o" ca%%ed #e$o"e testing. The !ality o$ the
"es!lt is only as good as the !ality o$ this 'o"*. Al'ays !se %lenty o$ 'ate" o" the co"e #it 'ill #edamaged.
&$ ca""ying o!t chemical tests on the co"e
"emem#e" that the c!tting 'ate" 'ill ha(e 'ashedo!t some chlo"ides etc $"om nea" the co"e s!"$ace.Use a co(e" mete" to locate the steel and t"y toa(oid it.
-
7/24/2019 2.11 Assessment of Structures
58/98
Flo' o$ 'ate" in
co"e c!tting
CORE TESTS
-
7/24/2019 2.11 Assessment of Structures
59/98
CORE TESTS
Fig 2.11.@. sho's ty%ical st"engths. o not e+%ectto get the ta"get mean.
Co"es a"e tested on end so the ends m!st #e g"o!ndo" ca%%ed #e$o"e testing. The !ality o$ the "es!ltis only as good as the !ality o$ this 'o"*.
Al'ays !se %lenty o$ 'ate" o" the co"e #it 'ill #edamaged.
&$ ca""ying o!t chemical tests on the co"e
"emem#e" that the c!tting 'ate" 'ill ha(e 'ashedo!t some chlo"ides etc $"om nea" the co"e s!"$ace.
Use a co(e" mete" to locate the steel and t"y toa(oid it.
-
7/24/2019 2.11 Assessment of Structures
60/98
Physical Tests
Meas!"ement o$ c"ac* 'idth
Ult"asonic %!lse (elocity
Co(e" mete"s Re#o!nd hamme"s
&m%act echo
Co"e tests P!ll o!t tests
5oad tests
-
7/24/2019 2.11 Assessment of Structures
61/98
P!ll3o!t test ,1-
P!ll o!t test ,2-
-
7/24/2019 2.11 Assessment of Structures
62/98
, -
P ll
-
7/24/2019 2.11 Assessment of Structures
63/98
P!ll o!t tests
,=-
-
7/24/2019 2.11 Assessment of Structures
64/98
P!ll3o!t tests ,in
o!" la#-
-
7/24/2019 2.11 Assessment of Structures
65/98
Physical Tests
Meas!"ement o$ c"ac* 'idth
Ult"asonic %!lse (elocity
Co(e" mete"s Re#o!nd hamme"s
&m%act echo
Co"e tests P!ll o!t tests
5oad tests
-
7/24/2019 2.11 Assessment of Structures
66/98
St"!ct!"al load testing
0ield
Stress
Strain
Plastic
&ail%re
If this is the unloading
curve the structure has
been overloaded
-
7/24/2019 2.11 Assessment of Structures
67/98
2.11 ASSESSMENT OF
CONCRETE STRUCTURES
2.11.1 Planning
2.11.2 Test methods
Physical Tests
!"a#ility Tests
-
7/24/2019 2.11 Assessment of Structures
68/98
!"a#ility Tests
&nitial S!"$ace A#so"%tion Test
Figg Test
4ate" %enet"ation test
Potential Ma%%ing
Resisti(ity Tests
5inea" Pola"isation
Co!lom# TestB Phenol%hthalein Test
Othe" tests
-
7/24/2019 2.11 Assessment of Structures
69/98
&SAT a%%a"at!s
-
7/24/2019 2.11 Assessment of Structures
70/98
&SAT
Test
2 5mm
Reservoir
(eal
ap
8 mm8 mm
apillar* 3 (cale
'alve Close (al(e at
s%eci$ied inte"(als
$"om sta"t o$ test
Meas!"e "ate o$
a#so"%tion
-
7/24/2019 2.11 Assessment of Structures
71/98
&SAT $lo' "ates
Flo'
Time
Flo' 6 A Time3N
-
7/24/2019 2.11 Assessment of Structures
72/98
!"a#ility Tests
&nitial S!"$ace A#so"%tion Test
Figg Test
4ate" %enet"ation test
Potential Ma%%ing
Resisti(ity Tests
5inea" Pola"isation
Co!lom# TestB Phenol%hthalein Test
Othe" tests
% 4
-
7/24/2019 2.11 Assessment of Structures
73/98
Figg Ai"
Pe"mea#ility
Test A%%ly (ac!!m to%"esc"i#ed %"ess!"e
Close (al!e andmeas!"e time $o"%"ess!"e to inc"ease
to %"esc"i#ed (al!e
Plug
2 mm2 mm
2 mm2 mm
1 mm1 mm
%ressure 4age'acuum
-
7/24/2019 2.11 Assessment of Structures
74/98
-
7/24/2019 2.11 Assessment of Structures
75/98
!"a#ility Tests
&nitial S!"$ace A#so"%tion Test
Figg Test
4ate" %enet"ation test
Potential Ma%%ing
Resisti(ity Tests
5inea" Pola"isation
Co!lom# TestB Phenol%hthalein Test
Othe" tests
-
7/24/2019 2.11 Assessment of Structures
76/98
+_
-0.28
Dal$3Cell Potential Method
,(TM 86
7 onnection to ar7 'oltmeter
7 u-u(0 halfcell
CuSO4solution
Copper rod
Porous plug
Sponge
Potential
-
7/24/2019 2.11 Assessment of Structures
77/98
s!"(ey
and"esisti(ity
-
7/24/2019 2.11 Assessment of Structures
78/98
ASTM C>0@ Classi$ication $o"
co""osion detectionMeas!"ed %otential ,CSE- Statistical
"is* o$ co""osion
mo"e negati(e than 3=m; GH
32 to 3=m; H
5ess negati(e than 32m; 1H
Conto!"s $"om
-
7/24/2019 2.11 Assessment of Structures
79/98
Conto!"s $"om
%otential
s!"(ey
-
7/24/2019 2.11 Assessment of Structures
80/98
POTENT&A5 MAPP&NI
Potential ma%%ing is !ic*) non3dest"!cti(e) and
chea%. 5a"ge a"eas may #e co(e"ed.
The "es!lts m!st #e t"eated 'ith ca!tion. Fo"
e+am%le ca"#onation inc"eases conc"ete "esisti(ity
and the"e$o"e inc"eases a%%a"ent "est %otential.
The "es!lts only indicate that co""osion is %ossi#le
and gi(e no in$o"mation a#o!t co""osion "ates. Prestressin! ca*les in d%cts cannot *e
tested
-
7/24/2019 2.11 Assessment of Structures
81/98
!"a#ility Tests
&nitial S!"$ace A#so"%tion Test
Figg Test
4ate" %enet"ation test
Potential Ma%%ing
Resisti(ity Tests
5inea" Pola"isation
Co!lom# TestB Phenol%hthalein Test
Othe" tests
# h d #
-
7/24/2019 2.11 Assessment of Structures
82/98
/3P"o#e Method #y 4enne"
=2 s '
.
Current lines()uipotential lines
%roes
,.. source ,mmeter9
'oltmeter9 '
s s s
-
7/24/2019 2.11 Assessment of Structures
83/98
Conc"ete "esisti(ity meas!"ement
Signi$icance o$ conc"ete "esisti(ity
-
7/24/2019 2.11 Assessment of Structures
84/98
g y
to li*elihood o$ co""osion
Resisti(ity Cm 5i*elihood o$ signi$icant
co""osion
J (e"y high
31 high
132 lo'
-
7/24/2019 2.11 Assessment of Structures
85/98
!"a#ility Tests
&nitial S!"$ace A#so"%tion Test
Figg Test
4ate" %enet"ation test
Potential Ma%%ing
Resisti(ity Tests
5inea" Pola"isation
Co!lom# TestB Phenol%hthalein Test
Othe" tests
Th ASTM Chl id P #ili B
-
7/24/2019 2.11 Assessment of Structures
86/98
The ASTM Chlo"ide Pe"mea#ilityB
insit! test ,meas!"es elect"omig"ation-Sodi!m
chlo"ide
9@ (olts
C!""ent is
meas!"ed
Chlo"ide
ions
Rein$o"cing
#a"
;olts
Th ASTM Chl id P #ili B
-
7/24/2019 2.11 Assessment of Structures
87/98
The ASTM Chlo"ide Pe"mea#ilityB
test on a "eco(e"ed co"e
Sodi!m
chlo"ideSodi!m
hyd"o+ide
;olts 9@ (olts
Chlo"ideions
Modi$ied ASTM
-
7/24/2019 2.11 Assessment of Structures
88/98
Chlo"ide Pe"mea#ilityB
test
-
7/24/2019 2.11 Assessment of Structures
89/98
!"a#ility Tests
&nitial S!"$ace A#so"%tion Test
Figg Test
4ate" %enet"ation test
Potential Ma%%ing
Resisti(ity Tests
5inea" Pola"isation
Co!lom# TestB Phenol%hthalein Test
Othe" tests
-
7/24/2019 2.11 Assessment of Structures
90/98
Phenol%hthalein
Test
-
7/24/2019 2.11 Assessment of Structures
91/98
!"a#ility Tests
&nitial S!"$ace A#so"%tion Test
Figg Test
4ate" %enet"ation test
Potential Ma%%ing
Resisti(ity Tests
5inea" Pola"isation
Co!lom# TestB Phenol%hthalein Test
Othe" tests
L
-
7/24/2019 2.11 Assessment of Structures
92/98
L3"ay
a%%a"at!s
RAA
-
7/24/2019 2.11 Assessment of Structures
93/98
RAA
R
Elect"omagnetic e!i(alent o$SONAR
= 1
2
3
,ntenna
= !ielectricconstant
C = spee!in air
V =
C
G d = h h
-
7/24/2019 2.11 Assessment of Structures
94/98
G3mm and =3mm a"s at Th"ee e%ths= mm s%acing
) 1) 1 mm co(e"
9 mm *5 mm
5+ 1++ 15+5+ 1++ 15+ 5+ 1++ 15+5+ 1++ 15+
Infra-Red Cold Spot
-
7/24/2019 2.11 Assessment of Structures
95/98
CameraSurveys
,utwardeat Flow.cooling/
nwar!+eat /low:heating;
Cold Spot
Hot Spot
I "amera
-
7/24/2019 2.11 Assessment of Structures
96/98
I "amera
Photo o$ *rid!e
-
7/24/2019 2.11 Assessment of Structures
97/98
Photo o$ *rid!edeck
(0pansion oint
I Ima!e
-
7/24/2019 2.11 Assessment of Structures
98/98
!