22 July 2013 Revision 7
Contract No. AID-492-C-13-00002
2013 ANNUAL WORKPLAN
Philippines Biodiversity and Watersheds Improved for Stronger Economy and Ecosystem Resilience (B+WISER) Program
This publication was produced for review by the United States Agency for International Development. It was prepared by Chemonics International Inc. The Biodiversity and Watersheds Improved for Stronger Economy and Ecosystem Resilience Program is funded by USAID, Contract No. AID-492-C-13-00002 and implemented by Chemonics International in association with:
Fauna and Flora International (FFI) Haribon Foundation World Agroforestry Center (ICRAF)
The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government.
2013 Annual Workplan
Philippines Biodiversity and Watersheds Improved for Stronger Economy and Ecosystem Resilience
(B+WISER) Program
Revision 7
Implemented with:
Department of Environment and Natural Resources Other National Government Agencies Local Government Units and Agencies
Assisting Organizations
Supported by:
United States Agency for International Development Contract No.: AID-492-C-13-00002
Managed by:
Chemonics International Inc. in partnership with
Fauna and Flora International (FFI) Haribon Foundation
World Agroforestry Center (ICRAF)
22 July 2013
B+WISER | 2013 ANNUAL WORKPLAN | i
CONTENTS
ACRONYMS .................................................................................................................. iii
EXECUTIVE SUMMARY ............................................................................................... vii
I. INTRODUCTION OF THE PROGRAM .................................................................. 1
Program Overview and Approach .......................................................................... 1
Description of Program Results Framework ........................................................... 1
Alignment with GPH Priorities ................................................................................ 2
Alignment with GPH-US and Other Overarching US Priorities ............................... 5
II. THEORY OF CHANGE FRAMEWORK FOR ATTAINING B+WISERMULTIPLE GOALS ................................................................................................ 8
III. APPROACH TO IMPLEMENTATION .................................................................. 10
Work Planning Processes .................................................................................... 10
Components and Technical Activities ................................................................... 12
IV. PROGRAM MANAGEMENT ................................................................................ 24
Program Organization .......................................................................................... 24
Management and Program Operations ................................................................ 26
Management and Coordination ............................................................................ 27
Site Activities ....................................................................................................... 29
Priority Sites for Mangrove Reforestation ............................................................. 30
Role of the Field Coordinators .............................................................................. 30
Biodiversity Related Research Agenda Implemented and Strengthened .............. 31
Communications .................................................................................................. 31
V. PERFORMANCE MONITORING AND EVALUATION ......................................... 33
ii | B+WISER | 2013 ANNUAL WORKPLAN
LIST OF EXHIBITS
Exhibit 1. B+WISER Results Framework ........................................................................ 3
Exhibit 2. B+WISER Linkages to the Philippine Development Plan ................................ 4
Exhibit 3. The DPSIR (Drivers, Pressures, State, Impacts and Responses) Framework for Assessing Forest Degradation and the B+WISER Responses ..................................................................................................... 8
Exhibit 4. B+WISER Organizational Chart ................................................................. 25
Exhibit 5. Membership and Responsibilities in DENR Special Order (No. 2013-317) Creating the National and Regional Working Groups to Support the Implementation of the B+WISER Program .............................................. 28
Exhibit 6. Summary of B+WISER Performance Indicators and Targets ........................ 34
LIST OF ANNEXES
Annex A. Time Line of Mobilization Phase, Year 1 ....................................................... 36
Annex B. Implementation Plan and Timeline: 2013 and 2014 ....................................... 37
Annex C. Summary of Highlights of DENR/B+WISER Planning Workshop (29 April - 03 May 2013, Holiday Inn, Clark) ....................................................... 59
Annex D. B+WISER Priority Sites.............................................................. ....................63
B+WISER | 2013 ANNUAL WORKPLAN | iii
ACRONYMS
AA-EWCC Assistance Agreement for Environment, Water and Climate
Change
ADB Asian Development Bank
ADSDPP Ancestral Domain Sustainable Development and Protection Plan
AILEG Analysis of Investment for Low Emission Growth
B+WISER Biodiversity and Watersheds Improved for Stronger Economy and
Ecosystem Resilience Program
BFAR Bureau of Fisheries and Aquatic Resources
BRB Bicol River Basin
CCC Climate Change Commission
CDCS Country Development Cooperation Strategy
CI Conservation International
CLUP Comprehensive Land Use Plan
COP Chief of Party
CTI Cities Development Initiative
CVPED Cagayan Valley Programme on Environment and Development
DA Department of Agriculture
DAO DENR Administrative Order
DCOP Deputy Chief of Party
DENR Department of Environment and Natural Resources
DILG Department of the Interior and Local Government
DOST Department of Science and Technology
DPSIR Drivers, Pressures, State, Impacts and Responses
DRRM Disaster Risk and Reduction Management
EC-LEDS Enhancing Capacity for Low Emission Development Strategies
EcoGov Philippine Environmental Governance Project
ERDB Ecosystems Research and Development Bureau
FC Field Coordinator
FFI Fauna and Flora International
FI Forest Inventory
FLUP Forest Land Use Plan
FMB Forest Management Bureau
FMP Forest Management Plan
FRI Forest Resources Inventory
FY Fiscal Year
GEF Global Environment Facility
GHG Greenhouse Gas
GIS Geographic Information System
GIZ Deutsche Gesellschaft für Internationale Zusammenarbeit
GPH Government of the Philippines
GSA Guided Self-Assessment on the State of Local Environmental
Governance
HLURB Housing and Land Use Regulatory Board
iv | B+WISER | 2013 ANNUAL WORKPLAN
ICRAF World Agroforestry Centre
IEC Information/Education/Communication
IEM Integrated Ecosystems Management
INREMP Integrated Natural Resources and Environmental Management
Program
IP Indigenous Peoples
IPAF Integrated Protected Areas Fund
IR Intermediate Result
ISF Integrated Social Forestry
JMC Joint Memorandum Circular
KBA Key Biodiversity Area
KP Knowledge Products
KWFR Kaliwa Watershed Forest Reserve
LEAD Low Emissions Asian Development
LEAF Lowering Emissions in Asia’s Forests
LGU Local Government Unit
LOP Life of Project
M&E Monitoring and Evaluation
METT Management Effectiveness Tracking Tool
MKAVI Mt Kitanglad Agri-Ventures Inc.
MKRNP Mt Kitanglad Range Natural Park
MRV Measurement, Reporting and Verification
MWCI Manila Water Company Inc.
NALECC National Law Enforcement Coordinating Committee
NAMRIA National Mapping and Resource Information Authority
NBSAP National Biodiversity Strategy and Action Plan
NCCAP National Climate Change Action Plan
NCIP National Commission on Indigenous Peoples
NewCAPP New Conservation Areas in the Philippines Project
NGGI National Greenhouse Gas Inventory
NGO Non-governmental Organization
NGP National Greening Program
NIA National Irrigation Administration
NIPAS National Integrated Protected Areas System
NOAH National Operational Assessment of Hazards
NPC National Power Corporation
NSMNP Northern Sierra Madre Natural Park
NTFP Non-timber Forest Products
PA Protected Area
PAMB Protected Area Management Board
PAMP Protected Area Management Plan
PASu Protected Area Superintendent
PAWB Protected Areas and Wildlife Bureau
PAWD Philippine Association of Water Districts
PAWS Protected Areas and Wildlife Service
B+WISER | 2013 ANNUAL WORKPLAN | v
PCAARRD-DOST Philippine Council for Agriculture, Aquatic and Natural Resources
Research and Development - Department of Science and
Technology
PDP Philippine Development Plan
PENRO Provincial Environment and Natural Resources Officer
PES Payment for Ecosystem Services
PFG Partnership for Growth
PIDS Philippine Institute of Development Studies
PMP Performance Monitoring Plan
PNRPS Philippine National REDD-plus Strategy
PO Peoples Organization
PPP Public-Private Partnerships
QMS Quality Management System
RA Republic Act
RABA Rapid Agro Biodiversity Appraisal
REDD+ Reduced Emissions from Deforestation and Forest Degradation,
and the Role of Conservation, Sustainable Management of Forests,
and Enhancement of Forest Carbon Stocks in Developing
Countries
REECS Resources, Environment, and Economics Center for Studies
SAF Special Activities Fund
SRPAO Survey and Registration of Protected Area Occupants
SUC State Universities and Colleges
TAF Technical Activities Fund
TNA Training Needs Assessment
TWG Technical Working Group
UMRBPL Upper Marikina River Basin Protected Landscape
UNDP United Nations Development Programme
UP University of the Philippines
USAID United States Agency for International Development
US-DOI United States Department of the Interior
USFS United States Forest Service
VRA Vulnerability and Risk Assessment
WAVES Wealth Accounting and Valuation of Ecosystem Services
WMC Watershed Management Council
WMP Watershed Management Plan
vi | B+WISER | 2013 ANNUAL WORKPLAN
B+WISER | 2013 ANNUAL WORKPLAN | vii
EXECUTIVE SUMMARY
Designed by the Department of Environment and Natural Resources Technical Working
Group (DENR-TWG) in collaboration with United States Agency for International
Development (USAID), the five-year Biodiversity and Watersheds Improved for Stronger
Economy and Ecosystem Resilience (B+WISER) Program’s technical assistance and
services contract was awarded to Chemonics International Inc. on December 28, 2012.
This Year 1 Workplan covers the period January – September 30, 2013 (US FY 2013).
The B+WISER Program broadly contributes to the Government of the Philippines
(GPH)-US Partnership for Growth (PFG)/Country Development Cooperation Strategy
(CDCS) by focusing on inclusive and broad-based economic growth and ecosystem
services. The goals of the B+WISER Program hinge on a recent GPH move towards
watershed-based/integrated ecosystem management (IEM) approach and will support
comprehensive assessments and baseline data to ensure evidence and science-based
planning and decision-making in each of the seven priority watersheds and target
mangrove restoration areas. The B+WISER Program will prioritize four intermediate
results to improve natural resources and environmental services that complement and
support the GPH in implementing environmental policies and programs and complement
the CDCS development objective three, environmental resilience improved. The
intermediate results include: conservation of biodiversity in forest areas; reduction of
forest degradation in priority watersheds; enhanced capacity to conserve biodiversity,
manage forests, and monitor low emissions development; and increased capacity for
disaster management in highly vulnerable areas.
At the conclusion of the B+WISER Program, results will include: 1) improved
management and governance of 780,000 hectares of key biodiversity areas (KBA) and
their associated watersheds; 2) 78,000 hectares of restored forests, including 6,000
hectares of mangroves; 3) 1.9 million tons of greenhouse gases (GHG) (in CO2
equivalent) sequestered per year after the life of program and 3.4 million metric tons
GHG reduced; and 4) $5 million leveraged from public-private partnerships (PPP).
These results will be achieved through a three-phase process for implementation. The
Year 1 Workplan focuses primarily on activities for the first phase (year 1) including
mobilization, assessments, and building partnerships in each of the seven key KBA and
mangrove sites, setting the stage for years two through five. These activities that were
initially based on the original Program proposal and contract requirements and
deliverables were discussed in depth during a Department of Environment and Natural
Resources (DENR)/B+WISER Planning Workshop on 29 April-May 3, 2013 that was led
by the Forest Management Bureau (FMB).
The entry points for the B+WISER Program are the existing Protected Area Management
Plans (PAMP), Forest Land Use Plans (FLUP), Watershed Management Plans (WMP),
Comprehensive Land Use Plans (CLUP) and Ancestral Domain Sustainable
Development and Protection Plans (ADSDPP) that will be analyzed and enhanced in
viii | B+WISER | 2013 ANNUAL WORKPLAN
terms of mainstreaming of biodiversity, climate change, gender and indigenous peoples
(IP) concerns. Detailed forest cover and land use maps will be generated in collaboration
with FMB’s Geographic Information System (GIS) unit; these maps will be analyzed
and, in coordination with the Forestry Master Plan team and Protected Areas and Wildlife
Bureau (PAWB), will enable targeting areas for forest restoration, biodiversity
conservation and mangrove restoration. In addition, information from the DENR surveys
of forest land occupants, Survey and Registration of Protected Area Occupants (SRPAO)
and data from the National Commission on Indigenous Peoples (NCIP) will be analyzed
for targeting the potential participants and beneficiaries of livelihood, forest restoration,
and protection activities
The first phase (Year 1) not only entails benchmarking of the state of natural resources
and environmental services of the sites, where data is current, but also includes design of
integrated assessments of biodiversity, forest and watershed health, governance, climate
risk, and social and economic conditions. These assessments will be harmonized through
an IEM framework that reflects interactions among various dimensions of forest
conservation. These interactions will be examined empirically in subsequent years for
which the detailed methodology and implementation plan will be developed in Year 1.
At the national level, the Program will set the stage for developing a concerted effort on
sustainable financing for protected areas, forest conservation and the maintenance of
watershed services. The Program will also contribute towards the harmonization of
methods among various initiatives for costing how much it takes to protect KBA and
manage protected areas (PA) under realistic site conditions and collaborative design of
training on ecosystems valuation that leads to payments for ecosystem services (PES),
including Reduced Emissions from Deforestation and Forest Degradation, and the Role
of Conservation, Sustainable Management of Forests, and Enhancement of Forest Carbon
Stocks in Development Countries (REDD+) mechanisms. B+WISER will add value by
developing benefits sharing approaches that are particularly targeted at deserving
disadvantaged groups, such as upland community groups, especially women and IP.
Another value adding will be the operationalization of methods for proper valuation of
forest resources and ecosystem services that would support FMB’s forest accounting, in
particular, and more broadly, the GPH efforts in natural capital accounting.
The Program will enhance national programs such as the National Greening Program
(NGP) (terrestrial and coastlines), the Philippine National REDD+ Strategy (PNRPS) and
GHG inventory. For NGP during the first year, support will be provided through the
dissemination of information on a science-based choice of species, sites and planting
materials. In terms of the GHG inventory and PNRPS, Year 1 activities will focus on (1)
updating the maps that are needed for the first set of estimates that are based on local and
the Intergovernmental Panel on Climate Change (IPCC) coefficients as prelude to the
local coefficients to be generated during subsequent years from measurement plots at the
Program’s watersheds. In addition, assistance will be provided to the FMB to substitute
new Forest Resources Inventory (FRI) plots from the KBA for those old plots that cannot
be relocated. In addition, the universe for the inventory plots will be re-examined to
include not only production forestry but also biodiversity protection, improvement of
B+WISER | 2013 ANNUAL WORKPLAN | ix
critical watersheds, community forestry and reforestation sites. Thus, the candidate, new
plot sites will include NGP areas (including mangroves), agro-forests in community-
oriented forestry, and forests in PA and surrounding B+WISER watersheds.
B+WISER supports the preparation of the National Biodiversity Strategy and Action Plan
(NBSAP) through participation in its experts group and contribution of the B+WISER
technical specialists (TS) as resource persons in the regional consultations during Year 1
and funding of participants from the B+WISER sites for broader participation.
Processing of PAWB biodiversity monitoring data will be conducted to contribute to the
statistics that will be presented in the NBSAP.
In terms of capacity development, the Training Needs Assessment (TNA) that was started
in early May will be processed to guide the development of a coordinated training
program that would be jointly implemented by State Universities and Colleges (SUC) and
assisting professionals after Year 1. The training activities and follow through learning
by doing will be designed in Year 1 for implementation in Years 2-4 in coordinated
modules
Among the priority areas identified by the FMB and PAWB are: parks management; IEM
assessments and the most recent biodiversity monitoring tools. Existing training modules
of the World Agroforestry Center (ICRAF) and Ecosystem Research and Development
Bureau (ERDB) on vulnerability and climate risk assessment will be disseminated to
DENR and its partners. With respect to PPP and PES mechanisms, a review of recent
global experience with indigenous communities and women groups will be contracted for
implementation in Year 2.
The IEM framework will guide the Program throughout its implementation. This will
entail strengthening of working relationships among DENR implementers and between
DENR and other institutions, particularly local governments, the NCIP, the Department
of Agriculture (DA) and watershed-wide, multi-sectoral bodies. B+WISER’s value
adding to existing efforts at IEM is the use of economics and institutional analytics to
weave activities across the forest landscape.
The Special Activities Fund (SAF) will be operationalized towards the end of Year 1, and
research and development activities, specifically action research, will be identified. The
development activities for undertaking by ERDB and its partners will be prioritized.
The B+WISER annual workplan and the associated performance monitoring plan (PMP),
communications plan, and gender action plan, will guide program implementation and
reporting. Over the course of Year 1, B+WISER will remain flexible and responsive to
requests and reform priorities of USAID and counterparts from the DENR and other
partner agencies. In addition, more detailed inputs will be gathered during an intensive
period of participatory work planning at the site level and follow-through discussions
with senior program staff and GPH counterparts.
x | B+WISER | 2013 ANNUAL WORKPLAN
B+WISER | 2013 ANNUAL WORKPLAN | 1
I. INTRODUCTION OF THE PROGRAM
PROGRAM OVERVIEW AND APPROACH
Designed by the DENR Technical Working Group in collaboration with USAID, the
B+WISER Program takes an IEM approach to address biodiversity degradation in the
Philippines. With an understanding of current and emerging GPH programs, the
implementation approach is aligned with the realities on the ground and harnesses
opportunities for biodiversity conservation. Program objectives and activities reflect the
driving forces behind the rapid loss to biodiversity and the depletion of watersheds. Some
of these include: pressure for quick economic growth, stress caused by climate change,
insecure property rights, and inadequate information for decision-making and
management.
Philippine biodiversity is among the most endangered in the world. Fueled by pressure
for rapid economic growth, the increasing demand for food, energy and other goods has
destabilized watershed ecosystems and destroyed natural habitats, resulting in alarming
biodiversity loss. Responding to these problems, the B+WISER Program:
Addresses the drivers of biodiversity loss and deforestation such as habitat
destruction and undervaluation of natural resources as well as the failure of
existing governance mechanisms to curb these problems, strengthens targeted
national and local policies related to biodiversity conservation and forest
management, and spurs natural resources-based economic activities.
Implements capacity-enhancement programs at the national/sub national levels,
provides technical assistance to selected government agencies and local
government units, supports scientific and policy research by local higher
education institutions, and fosters “learning by doing.”
Reduces risks from disasters primarily through both mitigative and adaptive
actions such as direct reforestation and forest ecosystem restoration, improved
forest land use planning, and integration of disaster risk reduction principles into
local development plans.
DESCRIPTION OF PROGRAM RESULTS FRAMEWORK
The B+WISER Program’s technical services seek to enhance the resilience of watershed
ecosystems and communities, generate financial incentives for biodiversity and forest
conservation, and build capacity for sustainable watershed management in the
Philippines.
2 | B+WISER | 2013 ANNUAL WORKPLAN
The B+WISER Program has four overarching objectives:
1) Conserve biodiversity in forest areas;
2) Reduce forest degradation in targeted priority watersheds;
3) Build capacity to conserve biodiversity, manage forests, and support low
emissions development, and;
4) Contribute to disaster risk reduction at the sub-national level.
The goals of the Program hinge on a watershed-based/IEM approach. Activities will
support comprehensive assessments and baseline data to ensure science-based planning
and decision-making in each of the seven priority watersheds and target mangrove
restoration areas. The following are some of the key results anticipated at the end of the
program: (1) improved management and governance of 780,000 hectares of key
biodiversity areas and their associated watersheds; (2) restoration of 78,000 hectares
of forests therein including 6,000 hectares of mangroves; (3) 1.9 million tons GHG (in
CO2 equivalent) sequestered per year upon Program completion and 3.4 million tons of
GHG reduced and (4) $5M leveraged from PPP.
The B+WISER Results Framework is presented in Exhibit 1, reflecting current draft
elements of USAID’s CDCS for the Philippines. The results framework is a planning,
communications, and management tool. It conveys the development hypothesis implicit
in the Program’s strategy and the cause-effect relationships between lower level results
and higher level results. By aligning B+WISER Program objectives with USAID’s
strategic objectives for the Philippines, it is ensured that program activities will achieve
mission results. The results framework is the linchpin between the workplan, where
activities are planned to achieve results, and the performance monitoring plan, where
progress is tracked against indicators to ensure that results at all levels of the framework
are being achieved and that the development hypothesis is correct.
ALIGNMENT WITH GPH PRIORITIES
B+WISER will improve natural resource management and environmental services in a
manner that complements and supports the GPH in implementing environmental policies
and programs. The Program includes collaborative activities with partners, knowledge
sharing with local populations, and is inclusive of marginalized groups: upland
communities, women and IP.
B+WISER’s IEM framework with explicit targets for the economy and resilience to
climate change directly contributes to the national strategy for inclusive and broad-based
growth as embodied in the Philippine Development Plan (PDP 2011-2016). The Program
employs approaches that are consistent with the PDP guideposts and directly contribute
to the achievement of sector outcomes. Exhibit 2 illustrates these relationships as well as
indicates numerical targets of the B+WISER Program. It also shows how each of the four
intermediate results directly leads to higher order results: natural resources and
environmental management improved and disaster risks reduced.
B+WISER | 2013 ANNUAL WORKPLAN | 3
Exhibit 1. B+WISER Results Framework
4 | B+WISER | 2013 ANNUAL WORKPLAN
Exhibit 2. B+WISER Linkages to the Philippine Development Plan
B+WISER LOP
Results
PDP Guideposts
and Sector Outcomes
780,00 hectares of hectares of biological
significance and/or natural resources under
improved management
Hectares of biological significance and/or
natural resources showing improved
biophysical conditions
78,000 hectares (including 6,000 hectares of
mangroves) restored and contributed to the
NGP
Integrity of the
Environment and Climate Change
Mitigation and Adaptation
Natural resources conserved,
protected and rehabilitated
Resilience of natural systems
enhanced with improved adaptive
capacity of human communities
Enhanced Environmental Quality
3.4 million metric tons of GHG reduced
1.94 million metric tons per year of GHG
sequestered
Higher number of stakeholders with increased
capacity to adapt to the impacts of climate
vulnerability and change
Improved capacity to conserve biodiversity,
manage forests, and monitor low emissions
Improved METT scores for PAMBs
Improved GSA scores for LGUs
Improved watershed management capacity
for WMCs/interagency coordination
Resource management improved from
enhanced monitoring of biodiversity, forests,
and watersheds
Evidence-based policies and management
plans
Land use overlaps and tenure insecurity
resolved
Anti-Corruption/Transparent,
Accountable and Participatory
Governance
Stable macro-economy achieved
Improved performance of agriculture,
tourism and industry
Higher economic benefits from sustainable
natural resource management and
conservation
Increased income of 10% upland population
in project sites
Increased inclusion of Indigenous Peoples
and women
Increased access to IPAF
Poverty reduction
Empowerment of the poor and
vulnerable
Growth and Increased income in
agriculture and fishery
Rapid, inclusive and sustained
economic growth
Improved performance of tourism,
agriculture and industry
Sustainable financing of forest conservation :
PA and Watersheds
$ 5M investments leveraged from private and
public sectors
Higher economic value of forests from PES/
REDD+ mechanisms
B+WISER | 2013 ANNUAL WORKPLAN | 5
Other significant GPH initiatives include: the National Climate Change Action Plan
(NCCAP), the Philippine National REDD+ Strategy (PNRPS), the National Biodiversity
Strategy and Action Plan (NBSAP), and the National Greening Program (NGP). In
addition to collaboration with the DENR and its attached agencies, particularly the
National Mapping and Resources Information Authority (NAMRIA), B+WISER will
support DENR in strengthening cooperation with national institutions that are key to
these initiatives especially: the NCIP, Climate Change Commission (CCC), the
Department of Agriculture (DA), and the Housing and Land Use Regulatory Board
(HLURB). B+WISER linkages with these are discussed further in Section III.
The broken lines in Exhibit 1 indicate the direct linkages between the four B+WISER IRs
and the two higher level USAID Intermediate Results (IR).
There are a number of linkages between B+WISER and broader outcomes under the
PDP. First, the Program targets marginalized groups both as participants and
beneficiaries of protection, conservation, and restoration activities. Through this,
B+WISER will increase livelihoods and empower disadvantaged groups, particularly IP,
women, and other upland groups. Second, a major Program component includes
development of sustainable financing mechanisms. These include payments for
watershed protection services by downstream users of water, higher user fees for
improved ecotourism, payments for carbon sequestration and reduced carbon emissions,
and increased market access to sustainably produced wood and non-timber forest
products. These are expected to be accompanied by investments from the public and
private sectors and would contribute to improved economic growth from higher
agricultural productivity of irrigated land, nature-based tourism and the multiplier effects
through associated industries. Third, various assessment and monitoring tools will be
implemented to improve the effectiveness of different stakeholders: the government
institutions overseeing forests and protected areas, the IP, and other stakeholders from the
citizenry. These are expected to lead to transparent and well informed decision-making
by natural resource managers at different levels, thereby contributing to more accountable
and participatory governance. Finally, the explicit inclusion of climate change impacts in
planning and implementing land and resource use enhances resilience to climate change.
The benefits accrue not only to on-site resource users but also to off-site and downstream
beneficiaries such as cities, hydropower facilities, and farmers of irrigated land.
By design, the B+WISER Program supports and helps achieve results of key DENR
programs and initiatives. Details on how activities support the DENR are presented in
Exhibit 2, which details how the life of project (LOP) results align with PDP priorities.
ALIGNMENT WITH GPH-US AND OTHER OVERARCHING US PRIORITIES The B+WISER Program will contribute to the achievement of USAID’s CDCS for the
Philippines with the overall goal of fostering a more stable, prosperous, well-governed
nation. In particular, B+WISER will contribute to the attainment of the CDCS’s two
intermediate results (Natural Resources and Environmental Management Improved and
6 | B+WISER | 2013 ANNUAL WORKPLAN
Disaster Risks Reduced), which, in turn, support the Development Objective:
Environmental Resilience Improved.
Within the overall Philippines-US agreement, work in environment is guided by the
GPH-USG bilateral Assistance Agreement for Environment, Water and Climate Change
(AA-EWCC), where the US is represented by USAID and GPH is represented by
National Economic and Development Authority (NEDA). A Program Steering
Committee is chaired by NEDA, and under this committee are four sub-committees, one
of which is the Sub-committee on Forest Conservation and Management which is co-
chaired by FMB and USAID, with the PAWB as vice-chair. B+WISER Program will be
implemented under the umbrella of this bilateral oversight arrangement, and the
B+WISER implementation team, in coordination with USAID, will work closely with the
designated government counterpart partners under the sub-committee on Forest
Conservation and Management.
Linkages to other US Government priorities include:
Enhancing Capacity for Low Emission Development Strategies (EC-LEDS). This
program supports low emissions development through sustainable landscapes
under the Global Climate Change Initiative. The workplan emerging for EC-
LEDS has four major pillars: 1) enhanced coordination and support to the LEDS
process; 2) development/enhancement of the national GHG inventory system; 3)
analytical decision making; and 4) measurable implementation progress in areas
such as renewable energy policy planning; climate-resilient, low-emission land-
use planning; national energy policy implementation and monitoring; and a
monitoring, reporting and verification system for landscape mitigation actions.
B+WISER interventions will support and contribute to these pillars in relation to
inventory work.
Readiness for REDD+. B+WISER will contribute to the coordination of US-led
initiatives to help prepare the country’s participation in REDD+ mechanisms.
These initiatives include the US Forest Service (USFS) providing technical
assistance and capacity-building to the FMB for a national forest inventory (NFI)
system. The NFI is expected to be an integral part of and the creation of a
Measurement, Reporting and Verification (MRV) system for REDD+. A number
of trainings, workshops, and seminars have already been conducted, all aimed at
assisting FMB and the UN-REDD+ program in their efforts to craft forest
inventory and monitoring systems supportive of the REDD+ program. Tools such
as remote sensing, spatial analysis, and development of a forest inventory design
have been presented for this purpose. The UN-REDD+ program is developing
guidelines for reference emission levels and initial design of MRV systems. In
relation to NFI, B+WISER will help the FMB update and refine emission
coefficients for forest lands. In addition, B+WISER’s contribution to improved
management and protection of forests entails reduction in slash and burn
agriculture and therefore lower emissions from agricultural production. All these
will contribute to the development of the PNRPS.
B+WISER | 2013 ANNUAL WORKPLAN | 7
Partnership for Growth (PFG)/Cities Development Initiative (CDI). CDI is a key
urban component of the Partnership for Growth. B+WISER’s work, specifically
at the Mt Kitanglad Range Natural Park (MKRNP) in Mindanao, supports USAID
objectives to enhance sustainable urban development in Cagayan de Oro (CDO)
under the CDI. The Mt Kitanglad area is the source of water and forest resources
for most of northern Mindanao, where CDO is located. B+WISER’s interventions
for managing, protecting, and conserving the watershed of Mt Kitanglad will help
sustain the growth and development not only of CDO but the whole of northern
Mindanao. By preserving the watershed functions of Mt Kitanglad, B+WISER
will contribute to the protection of CDO and the region from natural hazards like
floods, thus assuring that infrastructure improvements, agricultural production,
industrial growth, and public service delivery is sustained, and the water resources
are not depleted. PES interventions of B+WISER will also enable equitable
distribution of the economic benefits of protecting and conserving the watershed
and biodiversity resources of Mt. Kitanglad.
USAID Forward. The B+WISER Program’s work engaging government
institutions, the private sector, and civil society recognizes the significance of
these actors for long-term, sustainable development, consistent with the
development reform agenda under USAID Forward. USAID Forward also spurs
development in Science and Technology and Innovation, which B+WISER will
directly address through engaging colleges and universities in support of
biodiversity conservation and better watershed management.
8 | B+WISER | 2013 ANNUAL WORKPLAN
II. THEORY OF CHANGE FRAMEWORK FOR ATTAINING B+WISER MULTIPLE GOALS
Exhibit 3 shows the model upon which the Program’s intervention theory is based. The
model portrays the drivers and pressures and their effects on the state of natural resources
and on their functions and life-supporting abilities.
Exhibit 3. The DPSIR (Drivers, Pressures, State, Impacts and Responses)
Framework for Assessing Forest Degradation and the B+WISER Responses
DRIVERS B+WISER
RESPONSES
IMPACTS
STATE
PRESSURES
Macroeconomic policies Land use development Population; poverty; land tenure Extreme events: climate change Natural disasters; water stress
Biodiversity, forest conservation and watershed rehabilitation as investments for ecosystem services and resilience to climate change
Strengthened governance and capacity development
Inclusiveness in forest, watershed and protected area management
Payments for ecosystem services (PES) including REDD+
Assessments, monitoring and science-based decision-making
Commitment to international conventions and standards (CBD; GHGI)
Improved information for macroeconomic policies (PSEEA/WAVES)
Demand from competing sectors – agriculture, urban, forestry, etc. Depletion of soil nutrients Service demands – waste disposal Population growth Over-cultivation; overgrazing
FOREST LANDS Deforestation and degradation Land productivity decline Soil degradation; soil contamination Soil erosion; soil salinization Loss of vegetation cover and habitat Loss of biological diversity
OFF-SITE IMPACTS Crop yield decline Poverty and migration Disrupted water cycle Lower carbon storage Habitat destruction Species extinction Global warming Source: Adapted version from World Bank 2004 and OECD 1993
B+WISER | 2013 ANNUAL WORKPLAN | 9
The first step towards achieving the Program’s desired changes is by making a case for
these through credible information on the state of biodiversity, forests, watersheds and
their links with the socio-economic conditions of stakeholders gained from integrated and
science-based assessments. The results of the assessments would inform benchmarking,
generating better understanding of ecosystem functions, and developing the proper
responses to the drivers of Philippine deforestation and land degradation at each of the
priority sites.
These responses should: (a) address the three dimensions of change: environmental,
socio-economic, and institutional that are inherent in the IEM approach; (b) recognize
synergistic relationships of these dimensions throughout the watershed, and (c) reduce
vulnerability from climate risk. Biodiversity, forest conservation and watershed
rehabilitation altogether need to be viewed as investments in natural capital that would
generate economically valuable, ecosystem services and improve resilience to climate
change. The primary instruments for planning such changes are the resource management
plans including the FLUP, ADSDPP, PAMP, WMP and CLUP. These plans need to be
examined in terms of setting aside biodiversity conservation areas, implementation
mechanisms in an accompanying action plan for specific stakeholders, and identification
of funding sources in a supporting investment plan. The management of the supply of
ecosystem services includes restoring forests in degraded forest lands and critical
watersheds, encouraging sustainable production forest management, and effectively
protecting key biodiversity areas. All these need financial resources that may be
generated through budget support, proceeds from PES, and money from PPP.
Rules governing access to and supply of ecosystem goods and services need to be
reviewed. Organizations that oversee forest lands such as the DENR, local governments,
other oversight agencies for watersheds like the National Irrigation Administration (NIA)
and National Power Corporation (NPC) as well as the Protected Area Management Board
(PAMB) need to be strengthened to better adapt to changes in the demand for and supply
of forest ecosystem goods and services. This is a need for transformation from poor
stewardship to good governance. The practice of transparency, accountability, public
participation, rule of law, and other elements of good governance can improve public
trust, legitimacy and credibility. These allow citizens and stakeholders to scrutinize and
participate in the decisions and actions of government and ensure that safeguards are in
place so that government does the right things in the right way.
A full exposition of the Theory of Change for Attaining B+WISER Multiple Goals
Framework is contained in the B+WISER General (Five-Year) Workplan.
10 | B+WISER | 2013 ANNUAL WORKPLAN
III. APPROACH TO IMPLEMENTATION
The Year 1 Workplan discusses how intermediate results and underlying strategies will
drive management decisions and program implementation. It should be read in
conjunction with the annexed Gantt charts that provide the timeline and sequence for
implementation of activities.
The Workplan operates within the context of the Program’s General (Five-Year)
Workplan. The Program results will be achieved through a three-phase process for
implementation. The first four months of the first year focus on mobilizing resources,
formulating implementation arrangements, and identifying complementary initiatives
(Annex A). The succeeding five months include an analysis of initial conditions,
including the drivers of deforestation, threats from climate change, start-up activities of
some components, forging collaboration and building partnerships (Annex B).
WORK PLANNING PROCESSES
In-House Work Planning. B+WISER held several internal workshops that brought
together the majority of staff including field coordinators, technical specialists, and
administrative and support staff, thereby setting the tone for interdisciplinary
collaboration and team building. The workshops represented the first time staff from the
B+WISER Program gathered to discuss Program objectives and goals, and to meet one
another in the context of the new Program. A major focus of the internal team workshops
was to further brainstorm and deliberate on the detailed technical and operational
approaches to achieve the Program’s stated objectives and outcomes as well activities and
inputs that served as a basis for the elaboration of the Program’s annual and five-year
workplans. As a result, the workshops built professional relationships and component
synergies. Complementation built around conversations hinged on the development of the
work plan and implementation plan to achieve Program deliverables.
Joint Work Planning with DENR. B+WISER worked closely with the FMB in
designing a DENR-B+WISER Planning workshop to include DENR staff from the
Central Office and the regions with priority KBA. The workshop was conducted in April
and the weeklong activity produced the Updated Year 1Workplan and drafted the
activities for Year 2. The workshop summary is provided in Annex C.
The workshop was the first venue for intensive interaction among the FMB and PAWB
central office senior official who expressed strong ownership of the Program. It was also
widely participated by DENR officials and staff in the priority sites, including the
Regional Executive Directors (RED), Regional Technical Directors (RTD), Provincial
Environment & Natural Resources Officers (PENRO), Community Environment &
Natural Resources Officers (CENRO), Protected Area Superintendents (PASu), and for
the first time, planning and finance officers of the regional DENR offices, auguring in
strong support for the Program.
B+WISER | 2013 ANNUAL WORKPLAN | 11
The Year 1 Workplan will enable DENR to propose activities to the Department of
Budget and Management to undertake in CY 2014 through DENR financing or
counterpart funds. DENR leadership, with the assistance of the Program tea, will
continue conversations at the national and site levels, and with the LGUs. Continuing
detailed work planning with DENR will ensure that proposed activities of B+WISER
technical assistance are aligned with the Department’s programs and projects. National,
regional, and site level DENR personnel will join discussions on the log frames for
specific IR; they will also be oriented toward the technical basis for the workplans.
B+WISER will strengthen relationships within DENR.
The activities listed in Annex B highlight a detailed approach for Years 1 and 2 in line
with the General (Five-Year) Workplan. Activities are presented by program
components and DENR offices and partners are identified. Additional activities will be
identified through collaboration between B+WISER and DENR.
Interaction with Implementors of Related Programs. B+WISER core staff participated
in the following workshops/discussions organized by USAID and other donor financed
programs and will continue to build synergy with the implementers of these initiatives.
Examples are as follows:
Training for FMB on Forest Land Use Planning (FLUP) and on Forest Inventory
program (US Forest Service)
Assessment of low emission growth program (AILEG, Abt Associates)
Identification of new KBA in NewCAPP (New Conservation Areas in the
Philippines Project - UNDP). Technical discussions on the revision of the existing
CLUP guidelines to integrate resource and other public land management uses
(i.e., forest land use, coastal resource, ancestral lands, protected area,
CCA/Disaster Risk Reduction and Management (DRRM), cultural/heritage areas,
etc.) into an enhanced CLUP framework and guidelines (HLURB)
Economic studies on fourteen sites (of which three are B+WISER sites) for
Sustainable Financing of Protected Areas (WB/Global Environment Facility
(GEF), excluding REDD+
Program Development for PA Valuation (UNDP/GEF)
Preparation of National REDD+ Mechanism for GHG reduction (GIZ)
Experts’ Group Meeting for the NBSAP and inputs from B+WISER FC during
regional consultations
GHG Inventory planning for training (CCC/FMB with US Environmental
Protection Agency (USEPA)-IPCC, CYNERGY, LEAD)
B+WISER will continue to hold discussions with implementors of DENR programs and
projects. A complete list is provided in the General (Five-Year) Workplan.
12 | B+WISER | 2013 ANNUAL WORKPLAN
COMPONENTS AND TECHNICAL ACTIVITIES
Based on the results of the DENR/B+WISER Planning Workshop in April 2013, the
entry points for B+WISER are the existing PAMP, FLUP, ADSDPP, WMP and CLUP
(herein referred to as land and resource management plans). For those sites where these
plans are current, activities that are unfunded and which are B+WISER proposed
activities were identified. The design of baseline, integrated assessments of biophysical,
socio economic, climate risk and vulnerability governance and institutional conditions in
each of the seven KBA and mangroves sites, particularly where existing information is
incomplete or outdated, will be undertaken. These include watershed characterization,
assessment of forest resources, biodiversity, livelihood, forest and socio-demographics
benchmarks in Year 2 that would set the stage for Program activities for years two
through five.
B+WISER will support DENR’s policy and governance reform initiatives that are
strategic and consistent with Program objectives. The policy and governance framework
at both the national and local levels will be strengthened in order to enable more effective
policy, institutional and community responses to address key drivers of biodiversity loss,
deforestation, and watershed degradation. This will mean working on policy reforms,
such as inputs for the draft Department Order on IEM that will more effectively capture
the interrelatedness and interconnectedness of nature, economy, institutions and
communities, as well as will improve the governance of environment and natural
resources as a precondition for sustainable development in the landscape. Additional
policy reforms that would be provided technical assistance are: co-management; tenurial
instruments relevant to the KBAs; securitization, and benefit sharing.
The Program will incentivize the growth and development of sustainable forest and other
natural resource-based economic activities to raise income and increase livelihood
opportunities for communities; and lower the socio-economic and ecological risks arising
from climate change, variability and extremes. The activities include supporting national-
level PES policy agenda as well as local or site-specific actions to address biodiversity
conservation and natural resources management issues in the Program sites, particularly
those that may have sectoral and national governance and economic policy reform
implications.
B+WISER will participate and provide support to the FMB’s leadership of a TWG of the
Sub-committee on Forestry Management and Conservation that will look into all forest
land-related initiatives. The TWG is expected to improve coordination among the
PAMB, the NCIP, the Watershed Management Councils (WMC) and the PES Technical
Working Group.
B+WISER will support DENR, its other partners, and local communities in monitoring
the implementation of resource management for the seven priority watersheds in the
remaining months of Year 1. The technical support and capacity development will
include mainstreaming biodiversity and climate change, inclusion of gender and IP
concerns, and improved resource management for raising incomes of target groups and
B+WISER | 2013 ANNUAL WORKPLAN | 13
estimating the value of nature’s wealth. The outputs and results of the Program’s
baseline assessment and resource inventory will be geo-referenced using GIS and current
satellite imagery and projections. This will be shared with the DENR and site partners,
including LGU and local communities, as inputs to updating and enhancing existing local
land and resource management plans. At the same time, the Program will pilot test and
evaluate Program and site-level monitoring and reporting mechanisms directed toward
regular updates on biodiversity, forest health, vulnerability to climate risk, and
effectiveness of forest protection and management. Another major product of these
activities is the production of a citizen’s report card and state of the watershed report in
key watersheds in the Program’s seven sites.
Program IR1. Biodiversity in Forest Areas Conserved
Program IR1.1 Threats to biodiversity addressed
During year 1, the B+WISER team in collaboration with local partners will conduct
biodiversity baseline assessments in the priority sites using GIS-enabled assessments and
tools to be agreed upon with DENR. The Program will also conduct a critical review and
integrate existing biodiversity studies and information, and geo-referenced data will be
compiled in an information system developed for the Program. The assessment process
leads to the development of a biodiversity index in Year 1 that will be pilot tested at one
site during the final two months of Year 1. A refined assessment process will follow in all
the priority sites for uniformity of methods and data collection and to enable comparative
analysis. Training workshops and subsequent mentoring will be designed and pilot tested
in the first quarter of Year 2 prior to full conduct of the assessments which will be done
throughout the third quarter. The activities will culminate in a workshop on knowledge
sharing that will be held in parallel with a knowledge gap analysis and development of a
research agenda. Threats to biodiversity, specifically those associated with climate
change, will be assessed through literature review, and discussions with scientists and key
informants from communities. The results will be provided as inputs to the NBSAP and
the design of upcoming projects such as the Integrated Natural Resources and
Environmental Management Program (INREMP) and Forestry Sector Program (FSP).
Program IR1.2 Policy and governance frameworks for biodiversity conservation
strengthened
The Program through the Chief of Party (COP) and the Policy and Governance Specialist
will coordinate with PAWB to discuss B+WISER support for updating of the NBSAP,
which is targeted for completion at the end of 2014. The results of the discussion will
enable the Program team to prepare a workplan for the activities that will provide support
to the NBSAP preparation, particularly in terms of the state of biodiversity in the seven
KBA. The updating of the NBSAP is in line with the GPH commitment under the
Strategic Plan for Biodiversity 2011-2020 and the Aichi Targets. B+WISER’s work
contributes to many of the 20 targets and five goals of Aichi, in particular, those
pertaining to climate change vulnerability assessment, capacity-building, governance,
incentives for conservation, resource valuation and incorporating biodiversity values into
14 | B+WISER | 2013 ANNUAL WORKPLAN
national income accounts, sustainable financing and integration of biodiversity into
national and local development and poverty reduction strategies and planning processes.
The Program will establish the baseline management effectiveness performance of each
PA in Year 1, using the Management Effectiveness Tracking Tool (METT). Subsequent
assessments will be done in 2015 (midterm) and 2017 (end of Program). Each assessment
will be followed by an action planning workshop with PA stakeholders to identify
strategies for addressing issues and gaps, as part of adaptive management. The results of
the various baseline biophysical and socio-economic assessments will provide scientific
inputs to these action planning activities for the baseline year.
The Program will help capacitate the PAMB and the PASu access the Integrated
Protected Areas Fund (IPAF), leverage other sustainable financing sources as well as
help improve revenue generation and funds management in Year 2. The objective is to
enhance the sustainability and management effectiveness of the PA sites by facilitating
the identification of more predictable, adequate and sustainable sources of funding for
their various activities.
In addition, a design for special assessments will be discussed with DENR in Year 2 for
areas that were identified that have implications on policy reforms, particularly: what to
do with expiring Certificates of Stewardship Contracts and case studies on actual benefits
sharing experience.
The Program will assess the implementation of conservation policies in the seven sites
and will conduct training in parks management and other capability-building activities to
address gaps in enforcement.
Once the key results of the various assessments mentioned above in Program IR 1.1 have
been completed, the results will be used to enhance relevant local management plans such
as PAMP, FLUP, ADSDPP, and WMP of the priority sites. Monitoring of biodiversity,
forest resources, livelihoods, and gender and IP inclusion will be pilot tested first before
the development of regular monitoring mechanisms during the Program’s lifetime. The
Biodiversity and Forestry Specialist and Development Planning and Land Use Specialist
will conduct a series of workshops with the 35 LGUs initially identified for the priority
areas for the integration of the assessment results in the FLUP, WMP, ADSDPP, and
CLUP. Similar discussions and technical workshops shall also be held with the respective
PAMB and WMC of the Program’s seven sites to enhance its existing protected area
management or watershed management plans based on the assessment and inventory
studies conducted by the Program. These plans will likely need to be harmonized at the
same time that policy refinement on existing policies and guidelines on co-management,
watershed characterization and biodiversity assessment, land use planning and tenurial
arrangements may be undertaken by the Program.
B+WISER | 2013 ANNUAL WORKPLAN | 15
Program IR1.3 Biodiversity related research agenda implemented and strengthened
In support of the bilateral priority in science and technology and innovations, the
B+WISER Program will use, as a starting point, the broader and existing research and
development agenda developed by ERDB, CCC, and the Philippine Council for
Agriculture, Aquatic and Natural Resources Research and Development of the
Department of Science and Technology (PCAARRD-DOST) in identifying a biodiversity
related research agenda. This will be done through conducting workshops engaging the
PAWB, FMB, ERDB and academic universities where the compiled research and
development agenda will be presented for comments and/or improvement. This will
ensure that the research agenda that will be identified by B+WISER will support more
cost effective and targeted biodiversity conservation planning. Prioritization of research
topics will be based on the potential for innovation, immediate application to
development challenges especially in the Program sites and replication will be among the
key criteria for support.
At the outset, as part of testing the Theory of Change framework of the Program behind
the developmental challenges in the sector, discussions with FMB, PAWB and the ERDB
at the national level and with DENR Field Units, LGU, PAMB, IP, NGO and other local
stakeholders at site level, will be held to identify the gaps in understanding how
biodiverse forests contribute to climate resilience and ecosystem services throughout the
landscape. This approach could lead to cost effective biodiversity conservation activities.
A framework for answering the question of how biodiverse forests contribute to climate
resilience and ecosystem services, will be developed through an assessment of existing
literature on similar bioclimatic regions. Subsequent interactions with ERDB,
PCAARRD and State Universities and Colleges (SUC) in the various Program sites will
result in the formulation of a complementary research agenda that will support more cost
effective and targeted biodiversity conservation planning. This research may include:
analysis of biodiverse landscapes’ impacts on nearby agricultural and forest productivity;
comparative analysis of tenure instruments in achieving biodiversity protection; and the
interplay between social capital (of Indigenous Peoples), forest protection, and wealth
creation, among others.
Program IR2. Forest Degradation in Targeted Priority Watersheds Reduced
Program IR2.1 Drivers of deforestation addressed
Assessment of forest cover will be initially conducted using existing information from
remote sensing and past studies; ground validation will be conducted at the sites where
the drivers of deforestation will be analyzed. Initial analysis by the Philippine Institute of
Development Studies (PIDS) on the NGP will be discussed with DENR with the aim of
improving targeting sites and choosing a species mix, as well as determining the timing
of implementation. The first target site for revisiting the Forest Inventory (FI) plots is
Northern Sierra Madre Natural Park (NSMNP), where considerable FI were established
by DENR, Conservation International (CI), Cagayan Valley Programme on Environment
and Development (CVPED) and others.
16 | B+WISER | 2013 ANNUAL WORKPLAN
Program IR2.2 Policy and governance frameworks for forest management
strengthened
The Program will contribute to the operationalization of forestland co-management and
partnerships by providing assistance to the strengthening and implementation of
government policy on devolution and co-management in target sites. In Year 1, the
Program will provide technical inputs to the on-going refinement of the draft Joint
Memorandum Circular (JMC) between DENR and the Department of the Interior and
Local Government (DILG) if there is still sufficient interest within DENR to pursue this
initiative. Based on discussion with FMB’s Policy Section Chief, both the DENR and the
DILG prefer to have the policy approved this year, which will also lift the 2012
suspension order by the DENR Undersecretary for Field Operations of co-management
agreements over forestland. The Program will add value to the existing policies on co-
management and DENR-LGU partnerships on forestland management through this new
JMC, guided by lessons learned in the implementation of previous related issuances
(JMC 98-01 and JMC 2003-01) and analysis of the status of existing co-management
sites, particularly those developed under the EcoGov Project.
The Program will also support consultation activities to enable the LGU leagues to input
and develop ownership of the issuance of this draft JMC. Once approved, B+WISER will
support the conduct of orientation and Information, Education, and Communications
(IEC) on this policy.
The Program will assess forestland areas (including mangrove areas) covered by FLUP
within the program sites, which may be subjected to a co-management arrangement
between the DENR and LGU in the succeeding years of Program implementation The
criteria for selection will be agreed upon with the DENR and may include the following:
LGU willingness to enter into co-management (including acceptance of attendant
responsibilities and commitment of funds), forestland management capability, and good
environmental governance performance (e.g., tied to GSA results). B+WISER will
consider and integrate the EcoGov procedure for establishing co-management. The
Program will add value to the operationalization of co-management, especially in areas
where PES and REDD+ will be established, through the conduct of economic valuation
studies and resources accounting. These studies will feed into the decision-making
process concerning land uses and management options in the preparation of LGU FLUP,
which are usually used as a basis in identifying areas for co-management between the
DENR and LGU.
B+WISER will refine the GSA developed under the EcoGov Project and implement the
baseline assessment in the last quarter of 2013 to early 2014. The GSA is a simple, quick
and inexpensive tool which EcoGov found to be effective not only in tracking
governance improvements of assisted LGU but also in encouraging them to invest in
resources and capacities in order to improve the discharge of their various governance
functions (planning and plan implementation, law enforcement, budgeting, etc.) in a more
transparent, accountable, participatory and functional way. Good environmental
governance is expected to lead to improved conditions of biodiversity, forest and
B+WISER | 2013 ANNUAL WORKPLAN | 17
watersheds. Succeeding assessments to monitor progress in the adoption of good
environmental governance practices among LGU in the seven sites will be done in 2015
and 2017.
The B+WISER policy work will be demand-driven and the Program will be guided by
the priorities of the DENR and Program partners at the local level. Based on
consultations with DENR top officials, there is interest on these topics: 1) forest
securitization, 2) co-management (discussed above), 3) benefits-sharing, 4) phased and
continuing devolution, and 5) what to do with expiring Certificate of Stewardship
Certificates in Integrated Social Forestry (ISF) areas. In Year 2, the Program will build
on the work started under EcoGov in establishing the parameters for determining LGU
readiness for the devolution of other forestland management functions of the DENR.
B+WISER will incentivize the conservation of natural resources by local communities
and stakeholders through the establishment of PES. B+WISER will work with the PES
Technical Working Group on the crafting of a national PES policy that will provide
guidance in PES implementation. The Program will also encourage the growth and
development of sustainable forest and other natural resource-based economic activities to
help alleviate poverty-related drivers of threats to forest and biodiversity by providing
assistance in developing PPP and other investment arrangements and agreements. This
can be piloted in Quinali A Watershed, where an Australian Investment Group has
expressed interest in developing a Pili plantation and agroforestry plantation.
The Program will closely collaborate with the US Department of the Interior in providing
technical assistance to FMB in the finalization and adoption of the Forest Law
Enforcement (FOLEMOP), an initiative started by the EcoGov Project. The draft Manual
can be refined in the light of new issuances by the DENR such as the National Law
Enforcement Coordinating Committee (NALECC). Having standard rules and
procedures for apprehending and prosecuting forest law violators, as well as handling
evidences, will prevent cases where violators are freed due to procedural lapses. The
Program will also explore with FMB other policy initiatives such as the revision of DAO
97-32 (Rules for the Administrative Adjudication of Illegal Forest Products and the
Machinery, Equipment, Tools and Conveyances Used in Connection Therewith). It will
build on EcoGov’s draft DENR Administrative Order (DAO) on Forest Law
Enforcement which tackles administrative adjudication and disposition of confiscated
materials, equipment, machineries, tools and conveyances.
There is also an on-going interest in DENR to prepare an integrated law enforcement
manual that covers not only enforcement of laws and regulations in the forest sector (PD
705, etc.), but also other conservation-related laws such as the National Caves and Caves
Resources Management and Protection Act (RA 9072), the National Integrated Protected
Areas System (RA 7586), and the Wildlife Resources Conservation and Protection Act
(RA 9147). B+WISER will collaborate in the preparation of this proposed integrated
manual should this plan push through.
18 | B+WISER | 2013 ANNUAL WORKPLAN
Another initiative identified in which B+WISER can take the lead in providing technical
assistance is the preparation of a Law Enforcement Manual for Protected Areas. This
was identified as a need during the recent second iteration work and financial planning
for the Upper Marikina River Basin Protected Landscape-Kaliwa Watershed Forest
Reserve (UMRBPL-KWFR) priority site as the absence of a standard protocol for law
enforcement exposes DENR personnel to lawsuits due to perceived lack of due diligence.
This manual can input into the preparation of the integrated manual which is expected to
take a much longer time to complete.
Similarly, the Program shall direct efforts toward developing and strengthening on-site
inter-agency, multi-sectoral and inter-governmental management arrangements in
watersheds. B+WISER will explore and support local convergence initiatives including
coordination mechanisms at sub-watershed and sub-national level and inter-LGU and
inter-provincial level (i.e., Quinali A, Bago, Mt. Apo, and Lake Naujan) resource
management arrangements. The Program will conduct an orientation on IEM in all sites
which will serve as a unifying framework for the different stakeholders to work together
toward their shared vision for the whole landscape.
In the last quarter of Years 2 to 3, the Program will begin developing a sourcebook on
watershed governance that will serve as a reference for watershed stakeholders. It will
contain answers to questions frequently asked by LGUs, communities, private sector,
resource managers and other local stakeholders concerning government policies and
guidelines, as well as provide guidance on how the various stakeholders can jointly
address commonly occurring governance issues within the watershed. This sourcebook
can also be used by academic institutions as reference for students taking watershed
management courses.
The Program will start developing a governance mechanism called the “State of the Local
Watershed Governance Reporting”. The conduct of this activity will provide an
integrating framework and venue for key mandated institutions and actors including tribal
council leaders to report on the status, gaps, and achievements of their office or
organization and plan for needed actions with local stakeholders. Such activities will
serve to promote transparency, functionality, accountability and public participation, as
well as create demand for good environmental governance among the stakeholders in the
watershed. There are plans to hold a Watershed Summit in UMRBPL-KWFR priority
site as part of this activity in Year 2.
The findings on drivers to deforestation along with the impact of climate change and
natural disasters will be used to improve information that feeds into enhancing local
ADSDPP, PAMP and FLUP and eventually, the CLUP. The latter is expected to be
strengthened particularly in the light of renewed efforts of the GPH to finally approve a
Land Use Act, which specifies mainstreaming of ecological considerations, in the
incoming 16th
Philippine Congress. These enhanced local resource management and land
use plans will provide an improved framework for local economic development, public-
private sector investment programming, and identification of PES schemes.
B+WISER | 2013 ANNUAL WORKPLAN | 19
Program IR2.3 Watershed management related agenda implemented
Gaps in information on watershed protection functions and monitoring will be addressed
through a research agenda that will be jointly formulated with ERDB and other
institutions. This may include analysis of hydrological flows and development of
hydrological models under a variety of climate change and land use scenarios that will be
implemented by ICRAF. B+WISER will make arrangements with DOST for data from
the National Operational Assessment of Hazards (NOAH) Project to ensure accessibility
beyond the Program’s implementation period through the formulation of access to
information protocols. Coordination will be sought with upcoming projects, particularly
those that are anticipated to be funded by the Asian Development Bank (INREMP), the
Japan International Cooperation Agency (FSP), and the World Bank (Rural
Development) which will have considerable activities in major watersheds.
B+WISER will develop the strategy for publishing quality research outputs as well as use
the research results as basis for advocating policy improvements.
Program IR2.4 Philippine REDD+ readiness demonstrated
B+WISER will continue to participate in the PNRPS in order to contribute to REDD+
initiatives through preparing participatory schemes for site level measurements of carbon
sequestration, and developing mechanisms that ensure equitable benefits and costs for IP
communities and women groups. FFI currently chairs Code REDD and is in the position
to help develop social safeguard mechanisms for upland communities interested in
REDD+ mechanisms. Continuous sharing of knowledge across sites, with other
initiatives in the country and abroad, will reduce risks that may be associated with
REDD+ mechanisms and developing country conditions. REDD+ readiness activities are
also indicated in IR3.2 on GHG inventory capacity development.
For GHG inventory and PNRPS, Year 1 activities will focus on assisting FMB in
updating the maps that are needed for the first set of estimates that are based on local and
IPCC coefficients as prelude to the local coefficients generated during subsequent years
from measurement plots at the Program’s watersheds. In addition assistance will be
provided to the FMB to design the substitution of new FRI plots at the target KBA and
watersheds to replace the old plots that cannot be relocated. These will be done in
consultation with the USFS support to the FMB, ILEG and SEAGHG implementors.
Among the candidate, new plot sites would include NGP areas (including mangroves),
agro-forests in community-oriented forestry, and forests in PA and surrounding
B+WISER watersheds.
Program IR2.5 Incentives for forest conservation stimulated
The B+WISER Program will develop and operationalize PES in the seven study sites.
PES will be pursued by the Program as a sustainable financing strategy for the
conservation, protection and rehabilitation of the degraded watersheds in the country.
PES is based on a simple market transaction where individuals or communities are paid
20 | B+WISER | 2013 ANNUAL WORKPLAN
or rewarded for undertaking activities that improve the levels of desired ecosystem
services. It involves attributing a certain monetary value to the wide range of tangible
and intangible benefits derived from ecosystem services. It is a challenging task to
develop and make PES work on the ground. The process is quite lengthy because it
involves properly defining the environmental service, identifying key stakeholders,
ensuring a sustainable source of funds to pay the service providers, and developing
appropriate management body and mechanisms suitable to the local setting to ensure that
the funds collected are plowed back for watershed rehabilitation, management and
development.
Hence, the overall Program implementation will involve the following key activities: 1)
formulation of framework, designing economic instruments and conducting valuation
studies; 2) conducting PES awareness and appreciation at different levels of the DENR
and LGU, the private sector and local communities and other resource managers; 3)
conducting technical training on PES and PES mechanisms for technical bureaus of the
DENR and LGU; 4) identifying and piloting PES schemes in selected priority sites; 5)
facilitating the design and implementation of PPP agreements on PES; and 6) preparing
and distributing knowledge products (KP).
The major activities for Year 1 will be focused on desk analysis of the current status of
PES and PES-like activities in the country in order to provide an update on PES
initiatives that integrates lessons learned from global and local initiatives. Year 1
implementation plan of the Program will also entail benchmark analysis of the socio-
economic, political and institutional profiles of the target population and communities.
The REDD+ mechanisms, PPP and other PES mechanisms will be viewed in terms of
increasing the value of natural capital and sustaining PA financing. Economic valuation
studies at selected sites will be designed to contribute to wealth accounting efforts
nationally and more important, to form the basis of sustainable financing mechanisms in
selected sites.
As part of the capacity building activities for B+WISER partners, the Program has lined
up several fora and training-workshops to heighten awareness and appreciation on the
merits of valuing ecosystem services. These will be conducted at different levels of the
DENR, LGU, the private sector, local communities and other resource managers. A
seminar on PES for PAWB and its field Protected Area & Wildlife Sector (PAWS) will
be organized in collaboration with ICRAF, which continues to chair the PES Technical
Working Group. This will trigger further discussion on the topic and will encourage
collaboration with parallel initiatives such as the Sustainable Financing Project that is
being implemented by the Resources, Environment and Economics Center for Studies
(REECS) for the DENR-Environment & Natural Resources Management Program
(ENRMP).
Technical training on the methodologies for conducting valuation studies will also be
scheduled for the technical bureaus of the DENR like the FMB and PAWB. This activity
would lead to better knowledge on forest resources accounting that would contribute to
the efforts of the government towards natural capital accounting. Design of the valuation
B+WISER | 2013 ANNUAL WORKPLAN | 21
studies to be conducted on PA with ecotourism sites after Year 1 will also pave the way
for collecting the right amount of user fees reflecting the full cost of running the site. At
present, entrance fees to many ecotourism sites are very low - they do not recoup the cost
of maintenance and operating expenses in running the site. In the recent joint DENR/
B+WISER Work Planning Workshop held in Clark, Pampanga last April 2013, majority
of the representatives of the different sites expressed their desire to prioritize valuation
studies of ecotourism over other ecosystem services like watershed protection and
biodiversity conservation services. The inability to charge the full cost of running the site
is due to lack of solid basis for increasing the fees. The science-based researches lined up
by the Program will determine how much it costs to protect and manage the PA leading
to the collection of correct payments for enjoying the beauty of the ecotourism sites.
The foremost gap in PES — distribution of costs and benefits from conservation of KBA,
forest restoration, and watershed management — will be addressed through the design of
collaborative research with academic universities near the seven sites for implementation
during Years 2-4. Most of the site level economic valuation work will entail using the
SAF for developing responsible entrepreneurship.
The B+WISER Program will also start linking with the private companies who benefit
from the environmental services by designing and implementing an appropriate public-
private partnership or participation agreement. The Program sees this partnership as a
possible source of sustainable financing for watershed rehabilitation and development.
Collaboration with the private sector is an essential ingredient in the success and
sustainability of development efforts in the selected study sites. This approach will build
on corporate social responsibility policies of private companies. Designing an
appropriate partnership between the local government unit and private companies can
lead to a more sustainable outcome by generating a continuous flow of payments.
One principal environmental service associated with well-managed forests is in the form
of watershed protection. Watershed protection services provided by the forest ecosystem
include water flow regulation; water quality maintenance; erosion and sedimentation
control; and water table regulation, to name a few. In this case, the B+WISER Program
sees a great partnership potential with the different water stakeholders in the study sites.
For example, the UMRBPL is the major source of water supplied by the Manila Water
Company Inc. (MWCI) to its Metro Manila concessioners. Given its strategic importance
as a source of raw water, MWCI can be tapped to leverage an investment in the
watershed in exchange for protection, rehabilitation and development of the watershed.
Other likely sites are NSMNP, where interest in developing watershed protection rewards
and payments has been expressed by NIA (particularly for Tumaini watershed) and
scaling up existing pilot PES in MKRNP. The MKRNP also has a great potential for
scaling up existing pilot PES programs, initiated by Enterprise Works Worldwide/
Philippines. It serves as an important watershed in Northern Mindanao. It supplies the
communities with water for domestic and irrigation purposes. Many multinational agro-
industrial companies are dependent on the water provided by the Park. A collaboration or
partnership can also be worked out by appealing to their CSR policies. The B+WISER
Program will also closely work with companies like the Mt. Kitanglad Agri-Ventures Inc.
22 | B+WISER | 2013 ANNUAL WORKPLAN
(MKAVI) and Dole, Philippines to leverage an investment for watershed protection,
rehabilitation and development.
Finally, in collaboration with different stakeholders, the Program will endeavor to
institutionalize the PES scheme by catalyzing a national PES policy and putting in place a
system or mechanism for collecting charges; making payments; and monitoring,
reporting and verifying provision of services.
Program IR3. Capacity to Conserve Biodiversity, Manage Forests and Monitor
Low Emissions Development Enhanced.
Program IR3.1 Capacity to monitor biodiversity and forest cover status enhanced
The Training and Capacity Building Specialist and the Biodiversity and Forestry
Specialist will collaborate with the USFS team that is providing support to FMB on forest
inventories and FLUP, to continue forest assessments/inventories. An integrated series of
national and priority site-level technical trainings will be designed for PAWB, FMB and
ERDB on biodiversity assessment, methodologies to assess PAMP effectiveness, IEM
approach, recent tools for biodiversity monitoring, forest cover assessments, forest
carbon assessments, valuation of ecosystem goods and services, PES mechanisms, and
other relevant topics for these technical bureaus of DENR. The training program will
partly build on the results of the TNA begun during DENR/B+WISER planning
meetings. The series of technical trainings that will be conducted beginning Year 1 will
be held throughout the Program implementation period.
An approach for helping PAWB process its key biodiversity monitoring data will be
crafted particularly for the B+WISER sites and for implementation in Year 2. Training in
analytical tools and interpretation of the results will be discussed with SUCs for
implementation in the Program’s overall training strategy.
Program IR3.2 Capacity to undertake the National Greenhouse Gas Inventory (NGGI)
enhanced
In the first quarter of Year 2, the REDD+ and MRV Specialist and the Mapping and
Remote Sensing Specialist will conduct a rapid TNA to seek inputs and lessons learned
from the AILEG and SEA GHG projects on their South East Asian efforts. With EC-
LEDS, B+WISER, in coordination with the CCC, will formulate a capacity development
program targeted at the new GIS unit of FMB and NAMRIA for the completion of the
land cover mapping and to prepare for the conduct of the 2015 NGGI. This activity is
also linked to IR 3.1 on forest inventory and assessment.
B+WISER | 2013 ANNUAL WORKPLAN | 23
Program IR4. Capacity for Disaster Management and Highly Vulnerable Areas Increased
Program IR4.1 Disaster preparedness capacity increased
Various Vulnerability and Risk Assessment (VRA) tools will be reviewed through focus
group discussions, including assessment of their implementation. The appropriate tool,
including the most recent one developed by ICRAF, will be pilot tested in a site,
particularly for integration into the local land and resource management plans. Built into
the pilot testing of VRA tools is the capacity building and training of relevant agency and
LGU personnel on the use and application of these tools. On-going development and
update of disaster and climate risk preparedness tools by ERDB and DRRM
implementors will be enhanced with information from the biodiversity, forest, and socio-
economic assessments that will be used to inform high risk communities in the Program
KBA. These will be complemented with local indicators derived from IP and other
upland communities’ ecological knowledge on climate change.
Program IR4.2 Disaster prevention and mitigation enhanced
Targeted disaster prevention and mitigation measures will be enhanced through
information generated by B+WISER that include overlays of data from maps, as well as
socioeconomic and climate risk assessments. B+WISER will provide inputs to and hold
training programs for planners in LGU and DENR regional officials on disaster and
climate risk reduction approaches tied to biodiversity protection, forest land restoration,
and science-based watershed management and climate risk . The Eco-town framework
and green growth strategy promoted by the CCC will also be introduced in the
development of local development plans, particularly the enhancement of CLUP and the
identification of key local mitigation and adaptation measures in selected assisted sites
and LGU.
24 | B+WISER | 2013 ANNUAL WORKPLAN
IV. PROGRAM MANAGEMENT
PROGRAM ORGANIZATION
The B+WISER Program organizational chart is provided in Exhibit 4. The Chief of Party
(COP), Dr. Marian delos Angeles, is responsible for the technical and administrative
management of the Program, including managing the operations team, and coordination
of short-term technical assistance and sub-contractor contributions to the B+WISER
Program efforts.
The COP will oversee specific technical teams organized in three core technical areas:
Biodiversity, Forestry, and Watersheds (including climate risk and adaptation)
Policy and Governance (including gender and IP inclusion)
Sustainable Finance Mechanisms (including REDD+)
Professionals in these teams harness their specialized skills in a concerted manner in
order to harmonize efforts towards addressing multiple economic, social, and
environmental goals. The work of these professionals cuts across all the Program IRs in
all the Program sites. These long-term specialists, together with the COP and DCOP are
supported by other technical and administrative staff.
The COP is supported by the Deputy Chief of Party (DCOP), Mr. Celestino Ulep, who
oversees the IEC and M&E components and site implementation. He will manage the
IEC team, M&E specialist, and the FC at the priority sites. Each priority site has its own
FC, who coordinates with regional and site-based DENR and other public sector
representatives, and other partners such as site-focused NGOs, SUCs, and anticipating
community based organizations and assisting professionals. The Program’s approach of
maximum involvement by local groups is expected to build local capacity as early as
possible through a learning by doing strategy and as a first step to ensure sustainability
beyond B+WISER’s lifetime.
In addition to the four teams, a fifth team is devoted to program office operations and
coordination, led by Operations Manager, Ms. Sarah Simmons. Program monitoring and
evaluation, including monitoring for results, is built into B+WISER not only to enable
oversight by USAID, but also to contribute to the effectiveness of the Program
throughout its duration and with respect to GPH priorities.
B+WISER | 2013 ANNUAL WORKPLAN | 25
Exhibit 4. B+WISER Organizational Chart
26 | B+WISER | 2013 ANNUAL WORKPLAN
MANAGEMENT AND PROGRAM OPERATIONS
The B+WISER Program management strategy is oriented to achieving the contract
results, while also allowing for maximum flexibility to meet the evolving needs of
USAID, the GPH, other local partners and stakeholders. The team will use a highly
collaborative approach with the DENR and other partners. The Program will also put a
great deal of emphasis on managing subcontracts under the SAF.
The management strategy involves regular reviews of staffing and resource needs by the
COP and senior program office management together with Chemonics’ home office. The
COP is responsible for the overall program implementation, and working closely with
USAID to ensure B+WISER continually aligns itself with and contributes to the
achievement of the agency’s development objectives. She will also hold meetings, at least
quarterly, with leadership of other international and national organizations that are
working to address governance and biodiversity issues in the Philippines to coordinate
efforts and identify synergies between programs.
The Deputy DCOP is responsible for providing leadership and oversight of all monitoring
and IEC activities implemented at the national level; he will provide direct management
to the field coordinators located in seven priority areas. He will receive monthly reports
from the field coordinators and conduct regular supervision trips and coordinating
meetings with co-implementers at the seven sites.
The Program will be supported from Chemonics’ home office by a three-person program
management unit (PMU). The PMU Director will liaise with the COP to ensure that the
technical objectives of the Program are being met. The PMU manager will ensure
contractual and financial compliance, and the PMU associate will provide administrative
and logistical support. While day-to-day management of the Program is fully delegated to
the COP, the COP is supported by the PMU who ensures access to home office tools and
departments such as human resources, finance and accounting, and the contracts
department.
The Program will make use of Chemonics’ well-established systems for program
management and home-office/field-office communications. Chemonics is ISO-9001
certified and as part of a company-wide effort to document corporate best practices,
utilizes an internal quality management system (QMS). Our QMS includes 125 process
maps, procedures, and work instructions along with approximately 800 supporting
documents that include templates, forms, and manuals. The home office PMU utilizes the
QMS daily to ensure that the Program is using the most updated templates and follows
the appropriate procedures.
The Program is supported from the field by former home office manager, Sarah
Simmons. As B+WISER Operations Manager, Ms. Sarah Simmons oversees day-to-day
operations of the field office and provides direct support to B+WISER leadership,
including the COP and DCOP. During her involvement with B+WISER, Ms. Simmons
will build the knowledge and capacity of the Chemonics local team to become self-
B+WISER | 2013 ANNUAL WORKPLAN | 27
sufficient in USAID rules and regulations. She will ensure that the appropriate
operational systems are established, including creating program tracking and filing
systems, overseeing recruitment and procurement, and providing contractual and
financial guidance.
Operations are integral to efficient program management, and therefore must be part of
every activity. B+WISER will have well defined policies and procedures, information-
sharing mechanisms, and monitoring and reporting systems. Together, they will result in
streamlined program support services that will create a service-oriented and transparent
culture to support the technical activities of the program. To enable the Program to
provide quality and timely service to external and internal clients, efficient administrative
support is a critical focus for the first two years of operations. It is crucial to establish
and adhere to streamlined accounting and administrative procedures. Key activities
during the first year are to:
Finalize the Program policies and procedures manual with feedback mechanisms
in Year 1. To complete the policies and procedures manual, the Operations
Manager will liaise with a local labor lawyer and the HR department at
Chemonics home office to review existing Chemonics field office policies and
procedures manuals, and use these existing manuals to create policies and
procedures that best fit the program.
Conduct appropriate training for the administrative and technical staff. Specific
tasks will include identifying training needs and conducting training. Training
topics may include accounting procedures, USAID regulations, program-specific
policies and procedures as identified in the manual.
Formulate procedures for the SAF and engaging local service providers for
specific site level activities.
Effective coordination with partners is a key focus of the B+WISER management
strategy. The B+WISER Program will coordinate with partners through active
participation at the upcoming Forestry TWG. The Program will also host events to bring
partners together to share new developments and coordinate plans for communications
activities.
MANAGEMENT AND COORDINATION
B+WISER is directly steered by the Sub-Committee on Forest Conservation and
Management which is one of the four sub-committees under the AA-EWCC Program
between USG (through USAID) and GPH (through NEDA). The Sub Committee on
Forest and Conservation Management is chaired by FMB and USAID, with PAWB as
Vice Chair. This sub-committee also oversees other USAID-assisted forestry initiatives,
thereby ensuring complementarity and coordination in the timing of activities at both
28 | B+WISER | 2013 ANNUAL WORKPLAN
national and local levels. In particular, B+WISER will enhance DENR’s suite of
activities and projects by value adding in the following manner:
Integration of biodiversity into various forest land use planning (e.g., ADSDPP,
FLUP).
Valuation of ecosystem services enables better participation by stakeholders who
are better informed about who benefits and who bears the costs of improved
management of KBA. In addition, it directly supports the DENR component of
the Wealth Accounting and Valuation of Ecosystem Services (WAVES) Program.
Embedding the Program’s technical specialists at DENR office and the Field
Coordinators at the DENR field offices or the departments collaborating
institutions as an important avenue for sustainability.
For operational management of the Program at the national and regional levels, DENR
has issued Special Order No. 2013-317 dated 7 June 2013 creating the national and
regional working groups to support the B+WISER Program. Exhibit 5 shows the
officials and staff who will be members of the working groups as well as their tasks and
responsibilities (see Annex D).
Exhibit 5. Membership and Responsibilities in DENR Special Order (No. 2013-317)
Creating the National and Regional Working Groups to Support the Implementation of the B+WISER Program
Working Group Membership Responsibility
National Working Group
Director, FMB - Chair Director, Office of Undersecretary For Field Operations – Co-Chair Director, PAWB - Member Director, ERDB - Member Director, FASPO - Member
Oversee the implementation of the Program and provide strategic direction for the Program
Regional Working Group (Regions 2, 4A, 4B, 5, 6, 10, 11 and 12)
Regional Executive Directors (REDS) –
Overall Chairperson Regional Technical Director (RTD) for Forestry - Member RTD for PAWCZM - Member RTD for ERDS - Member PENRO concerned - Member PASU concerned - Member Finance/Budget Officer - Member Regional Planning Officer – Member Representative from LGU - Member
Address Program related issues and concerns that need action, decision and support from the DENR, be responsible for the coordination and facilitation of activities, and support in the coordination and interaction with other regional agencies/LGUs
B+WISER | 2013 ANNUAL WORKPLAN | 29
SITE ACTIVITIES
Implementation of B+WISER activities in the field (Annex E) will focus on seven
priority areas identified on the basis of criteria established by DENR and USAID and
through collaboration and oversight with GPH, led by FMB as the co-chair. These areas
are high priority for the conservation of biodiversity, and have significant potential to
reduce GHG emissions and provide other environmental services through forestry
activities.
At the DENR/B+WISER Planning Workshop in Clark in April 2013, the Program was
presented and discussed with DENR including the objectives and strategies focusing on
site level activities. There was agreement for B+WISER and DENR to program training
activities and technical assistance in the context of 2013 and 2014. The terms of reference
of the DENR at the central, regional, and site levels were also discussed and it was agreed
on how the B+WISER Program will carry out Program activities at both national and site
levels. As agreed in the workshop, a special order was issued creating the DENR national
and regional working groups to support the Program (Exhibit 5).
Improved ecosystem management will be enhanced in the priority areas in order to
strengthen the forest ecosystems and help reduce their vulnerability to climate change.
This will therefore enhance the value and ensure the supply of ecosystem goods and
services for various user groups.
The key interventions to be directly implemented at these priority areas will include the
following activities to conserve biodiversity and increase forest cover:
Improve the capabilities and capacities for management and conservation of
biodiversity and watersheds of the managers and stewards of the seven pilot areas
including the prevailing governance bodies such as PAMB,WMC and LGU;
Improve LGU capability for forest land use planning and management in order to
help enhance the supply of forest based commodities including non-timber forest
products (NTFP), stabilize water supply, reduce vulnerabilities to natural disasters
and mitigate GHG emissions;
Facilitate PPP in forest and biodiversity conservation investments.
In accordance with the selection criteria used in developing the scope for the Program,
the priority KBA sites already have advanced levels of planning and implementation
efforts in place, thus giving the Program an opportunity to build on existing frameworks.
Six of the seven sites are considered KBA that are highly threatened by forest habitat
loss. Improving the forest cover in these areas has potential for increasing carbon
sequestration.
Ecosystem services of the priority areas have significant socio-economic importance and
have potential for PES and REDD+, which will provide local economic benefits. The
seven priority sites include:
30 | B+WISER | 2013 ANNUAL WORKPLAN
1. Northern Sierra Madre Natural Park
2. Upper Marikina River Basin Protected Landscape-Kaliwa Watershed Forest
Reserve
3. Naujan Lake National Park sub-watersheds
4. Quinali “A” Watershed
5. Bago River Watershed Forest Reserve
6. Mount Kitanglad Range Natural Park
7. Mount Apo Natural Park
Please see Annex E for further description of the B+WISER priority sites and Annex F
for the map showing the priority sites.
PRIORITY SITES FOR MANGROVE REFORESTATION
In addition to Program activities in the seven priority sites, mangrove reforestation
activities will be implemented in several sites identified by the Philippine Association of
Water Districts (PAWD) and BFAR. These sites are key biodiversity areas where key
programs are ongoing. The mangrove priority areas are:
1. Verde Passage (Batangas, Occidental Mindoro)
2. Polillo Island and Pagbilao, Quezon
3. Ragay Gulf, San Miguel Bay and Eastern Catanduans
4. Iloilo Strait
5. Siargao Island
6. Basilan Natural Biotic Area
7. Tawi Tawi
Reforestation and restoration of mangroves in these sites are expected to contribute to
higher aquatic productivity, richer fauna including birds, and carbon sequestration.
Mechanisms on rolling this out will be defined in a meeting that will be called by FMB
and PAWB, with BFAR and other agencies, as needed.
Assessment of the target sites will preclude actual restoration, when applicable. Methods
for assessment are expected to be sourced from Lowering Emissions in Asia’s Forests
(LEAF) and the forthcoming Low Emission Asian Development (LEAD) Project, both of
which are supported by USAID assistance.
ROLE OF THE FIELD COORDINATORS
There are seven FC, one for each priority site, who are based in the nearest place of
access to the sites. The FC have been active in preparing the field activity work plans for
the first year. They are under the supervision and guidance of the DCOP who will
provide the necessary technical support in collaboration with the B+WISER team of
specialists. The FC will also be given the administrative and logistical support to
B+WISER | 2013 ANNUAL WORKPLAN | 31
facilitate their tasks in the field. B+WISER is exploring the co-location of the FC at
DENR offices in the sites.
The FC are responsible for coordinating, planning, implementing and monitoring the
B+WISER activities in the priority sites, in accordance with the overall Program work
plan. These activities cover all the technical components. They will support the DENR,
particularly in its participation at governance bodies of the priority sites such as PAMB,
WMC and other organizations working in the priority sites. They will work also with
civil society, LGU, academe, IP, NGO and other institutions to facilitate these groups’
implementation of B+WISER activities at the priority sites through the SAF.
During the first quarter of Year 1, B+WISER will conduct a series of workshops and
seminars in collaboration with specialists from local universities for the FC to enhance
their capabilities and enable them to carry out their tasks in the priority sites.
BIODIVERSITY RELATED RESEARCH AGENDA IMPLEMENTED AND STRENGTHENED
Through close collaboration with the DENR, the B+WISER program will use the existing
research and development agenda developed by ERDB, CCC and PCAARRD-DOST as a
starting point in identifying, action research, and a biodiversity related research agenda.
This will be done through conduct of workshops engaging the PAWB, FMB, ERDB and
SUC where the compiled research and development agenda will be presented for
comments and/or improvement. This will ensure that the research agenda that will be
identified by B+WISER will support more cost effective and targeted biodiversity
conservation planning. Prioritization of research topics will be undertaken to determine
which among them will be given financial support for implementation.
COMMUNICATIONS
The B+WISER Program will use communications as an advocacy measure and to create
public awareness. The Program’s five-year communications plan, which incorporates
DENR inputs during the DENR/B+WISER Program planning workshop held in April
2013, will be developed in close consultation with USAID and key stakeholders and start
full implementation in June 2013, emphasizing among others, knowledge sharing of
studies and best practices.
A major communication strategy is the use of multi-media, to include social media whose
power in reaching out to various sectors — especially the youth — has already been
tested and recognized. This approach will be employed to its fullest during the planned
national/sub-national/local communication campaigns.
In preparation for the sub-national/local communication campaigns planned to happen
on-site, scoping/research activities and alliance building will start by June 2013. Results
of these scoping activities will be used as basis for the design of these campaigns.
32 | B+WISER | 2013 ANNUAL WORKPLAN
Scoping activities will include identifying prospective communication campaign partners
at the regional/local level, such as local corporations with strong corporate social
responsibility programs, academic institutions (especially their student organizations),
local chambers of commerce and local associations (i.e., photography/eco-tourism clubs,
civil society organizations, youth organizations involved in environmental advocacy, etc.)
that could serve as “pressure” groups for accountable government agencies and political
leaders to do their jobs in biodiversity conservation. Special attention will be given to
those groups with existing social media network or websites where B+WISER Program
could ride on. These prospective partners’ websites (including DENR’s) could provide
the venue for the B+WISER Program to share its experiences, studies and best practices.
Concerns and messages common to all sub-national/local sites will later be thread
together to come up with a national campaign (which will happen during the latter part of
the B+WISER Program life) in cooperation with DENR, private groups and other key
partners.
The multi-media approach will also include development of briefing/orientation materials
(i.e., brochures, presentations for use in series of orientations/briefings will commence by
June 2013). Also being envisioned is a B+WISER Program newsletter, which could take
the form of an “e-newsletter” that could be housed in DENR websites (national and
regional) and those of other partners’ (i.e., local governments, chambers of commerce,
etc.). Printed copies may be produced as necessary and distributed during significant
events (i.e., PAMB meetings, conferences, etc.). The newsletter is expected to start by the
beginning of 2014. Websites of partners would also be tapped to “house” or publish
knowledge products to be developed later by B+WISER in collaboration with key
partners. Capacity building for journalists (both professional and student journalists) is
scheduled September 2014. Also included in the capacity building plan is tapping
members of local social media networks and making them aware of how important
watersheds and biodiversity are to their daily lives. This activity will complement the
communication campaigns, the first of which is set to start in October 2014.
Assistance in documenting significant Program activities — through development of
bullet stories for submission to USAID — begins in July 2013.
B+WISER | 2013 ANNUAL WORKPLAN | 33
V. PERFORMANCE MONITORING AND EVALUATION
B+WISER’s approach to monitoring and evaluation (M&E) is described in a separate
performance monitoring plan (PMP). The plan will include the M&E system design and
explanation of M&E roles and responsibilities, and fully documents the Program’s
performance indicators, baselines and targets. The initial PMP has been developed
internally in conjunction with this annual work plan and will be revisited each year as
part of the annual work planning process.
Monitoring progress and evaluating results are key functions in any performance-based
management plan. The B+WISER team understands the importance of M&E from the
beginning, including baseline assessments and establishing clear targets, together with
solid systems for collecting data and reporting on performance. The M&E approach will
be spearheaded by the M&E specialist with technical inputs from the technical specialists
and the field coordinators. Please refer to Exhibit 6 for a summary of B+WISER
performance indicators and targets.
34 | B+WISER | 2013 ANNUAL WORKPLAN
Exhibit 6. Summary of B+WISER Performance Indicators and Targets
Objective or Component
Performance Indicators Life of Program Targets
Targets
FY 2013 FY
2014 FY
2015 FY
2016 FY
2017
Program Objective: Natural resources and environmental management improved
1. Number of hectares of biological significance and/or natural resources under improved natural resource management as a result of USG assistance (Outcome) (U, D)
780,000 hectares 7,500
hectares
Program intermediate result (IR) 1: Biodiversity in forest areas conserved
2. Number of hectares of biological significance and/or natural resources showing improved biophysical conditions (also relevant to Program IR 2) (Outcome) (U, D)
780,000 hectares
3. Number of laws, policies, strategies, plans, agreements, or regulations addressing climate change (mitigation or adaptation) and/or biodiversity conservation officially proposed, adopted, or implemented (also relevant to Program IR 2) (Output) (U, D)
At least 2 policies (co-management, PES, data sharing, etc.) At least 7 resource management plans At least 20 FLUPs
5
Program IR2: Forest degradation in priority watershed areas reduced
4. Hectares of forest restored (Outcome) (D)
78,000 hectares (including 6,000 hectares of mangroves)
5. Amount of Greenhouse Gas (GHG) reduced or sequestered (Outcome) (U, D)
3.4 million metric tons reduced 1.94 million metric tons per year sequestered
42,000 tons
6. Amount of investments leveraged from private and public sectors (also relevant to Program IR 1) (Outcome) (U, D)
USD 5 million
7. Number of people with increased economic benefits derived from sustainable natural resource management and conservation** (Outcome) (U. D)
10% of people in the program sites (currently estimated at 90,000, exact number to be determined based on actual assessment)
B+WISER | 2013 ANNUAL WORKPLAN | 35
Objective or Component
Performance Indicators Life of Program Targets
Targets
FY 2013 FY
2014 FY
2015 FY
2016 FY
2017
Program IR3: Capacity to conserve biodiversity, manage forests, and monitor low emissions improved
8. METT (for protected areas) and GSA (for LGUs) scores (Outcome) (D)
Improvement over baseline METT scores for PAMBs Improvements over baseline GSA scores for LGUs Improvements over baseline watershed management capacity assessment scores for WMCs
9. Number of person hours of training in natural resources management and/or biodiversity conservation and climate change (also relevant to Program IR 4) (Output) (U, D)
90,000 person hours
7,100
10. Number of days of technical assistance in natural resources management and/or biodiversity and climate change provided to counterparts or stakeholders (also relevant to Program IR 4) (Output) (U, D)
200
11. Number of research publications (Output), (D)
Program IR4: Capacity for disaster management in highly vulnerable areas increased
12. Number of institutions with improved capacity for disaster management in highly vulnerable areas (Outcome) (U)
5 PAMBs and 2 WMCs] 20 LGUs
Note: U = USAID CDCS Indicators; D = related to DENR MFO indicators; for blank cells, LOP and annual targets will be established after the baseline assessments
**USAID CDCS standard indicators
36 | B+WISER | 2013 ANNUAL WORKPLAN
Annex A. Time Line of Mobilization Phase, Year 1
Key Activities
Month
Oc
t-
Dec
Ja
n
Fe
b
Ma
r
Ap
r
Ma
y
Ju
n
Ju
l
Au
g
Se
p
Mobilization and Start-Up (Days 1-90)
1. Field home-office operations manager and start -up team
2. Negotiate and sign subcontracts, hold subcontractor kickoff meeting
3. Obtain local office, open bank accounts, and set up operations
4. Develop and submit procurement plan; procure program equipment and furniture
5. Hold home-office orientation for chief of party
6. Hire and field key personnel ( Day 30)
7. Hold orientation and team-building and internal work-planning workshop (Day 45)
8. Conduct consultations and coordinating meetings with DENR, LGUs and complementary initiatives
9. Year 1 comprehensive annual plan work plan) and M&E plan submitted to USAID for approval
10. Submit general work plan (Day 60)
11. Submit performance management plan (PMP)
12. Start process clearances as needed for field assessments
13. Prepare for and hold planning workshop with DENR
14. Present B+WISER at PAMB meeting to be organized for 7 sites by DENR
15. Staff field teams and set up operations in programs sites
16. Pay courtesy calls to LGUs
17. Network with other initiatives at sites
18. Set up system for using SAF and TAF and prioritize activities to be funded
19. Prepare for Program launch: national level
B+WISER | 2013 ANNUAL WORKPLAN | 37
Annex B. Implementation Plan and Timeline: 2013 and 2014
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
Mobilization and Start-Up (Days 1-90)
Component 1. Biodiversity in Forest Areas Conserved
1.1. Threats to biodiversity addressed
A. Prepare and implement biodiversity monitoring and action plans in pilot sites with multi-sectoral and community participation
BFS FCs
PAWB PAWCZMS
a. Select/adapt appropriate tools and methods for assessing and monitoring threats to biodiversity
Biodiversity assessment tools identified, assessed, selected/adapted
BFS, FCs, FFI
PAWB, PAWCZMS
b. Conduct baseline assessment on threats to biodiversity in the priority sites
Existing studies reviewed and gaps identified
BFS, FCs, FFI
PAWCZMS
BFAR, LGUs, PAMB
c. Prepare and implement actions plans for addressing threats to biodiversity
Action plans for addressing threats prepared and implemented
LUPS, BFS, FCs
DENR Field Units, PASU
LGUs, WMCs, Local stake-holders
d. Prepare State of the Watershed Reports (SOWR)/Citizen Report Card for selected priority watersheds in key project sites.
Draft SOWRs (Yr2/Yr5) and Citizen Report Cards (Yr3-4)
B. Integrate of biodiversity and climate change considerations into land use plans
FCs LUPS
PWB, FMB
a. Review existing resource management and land use plans in all sites and assess how biodiversity and climate change can be integrated (link with TA to HLURB on enhancing CLUP guidelines) - include economic conditions
38 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
FCs LUPS
PWB, FMB
LGUs, PAMB, DA, NCIP, IPs
b. Provide TA in the updating, refinement and harmonization of existing resource management and land use plans (link with TA to HLURB on preparation of enhanced CLUP Guidelines)
LUPS FMD, PAWB
HLURB, CCC, NCIP
c. Refine and enhance resource management and local planning guidelines issued by national implementation agencies in the integration of biodiversity conservation, CCA/DRRM, ancestral lands and protected areas.
Draft revised agency planning guidelines
FCs, LUPS
PaSUs DENR Field
LGUs, PAMB, IPs + LSPs
d. Review and validate existing status/implementation/adoption of local resource management and development plans (e.g., FLUP, CLUP, PAMP, WMPs and ADSDPP) of identified priority watershed areas in the project sites.
Status report on reviewed local resource managements and development plans
FCs LUPS
PaSUs DENR Field
LGUs, PAMB, DA, NCIP, IPs
e. Update, refine and/or harmonize resource management plans (e.g., FLUP, CLUP, PAMP, WMP and ADSDPP) in identified priority watersheds/subwater-sheds in the project sites.
Draft enhanced resource management and local plans
FCs LUPS
PAWB, FMB
LGUs, PAMB, DA, NCIP, IPs
f. Implement the updated/refined/harmonized plan
PGS, LUPS, BFS
DENR Congress, HLURB, CCC, LGU Leagues
g. Provide TA assistance to national legislative reform advocacies on public land management, sustainable forest management and land use
TA inputs, workshops and policy notes
C. Adopt and strengthen enforcement of conservation policies
B+WISER | 2013 ANNUAL WORKPLAN | 39
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
FCs, PGS
PAWB PAWCZMS
Anti-Illegal Logging Task Force, LGUs, PAMB, etc.
a. Assess the status of implementation of conservation policies in the program sites, including the capability of law enforcers as part of METT); and policy implications (can be linked to action-research agenda
Assessment report
FCs, PGS
PAWB PAWCZMS
Anti-Illegal Logging Task Force, LGUs, PAMB, etc.
b. Identify and implement strategies, including needed capacity-development for strengthening law enforcement in program sites (as part of METT)
Strategies for strengthening law enforcement in biodiversity conservation identified and implemented
FCs, PGS
PAWB PAWCZMS
Anti-Illegal Logging Task Force, LGUs, PAMB, etc.
c. Conduct training on wildlife/biodiversity/forest law enforcement
Training module and report, trained individuals
D. Prepare knowledge products
1. 2. Planning, Policy and Governance Frameworks for Biodiversity Conservation Strengthened or Enhanced
BFS PAWB NBSAP Drafting Team
A. Provide TA in the Updating of the National Biodiversity Strategy and Action Plan (NBSAP)
BFS, TS
PAWB a. Provide TA in the assessment of status (accomplishments, issues) of the previous NBSAP
Assessment report on status of NBSAP
BFS, TS
PAWB b. Participate in the revision/updating of the NBSAP
Participation in NBSAP
Updating
B. Provide TA in the crafting of PES policy and design and implement local training on conflict resolution for PA and biodiversity management (will start in FY 2015)
SFS, ICRAF
FMB, PAWB
NEDA, Acade-mic institu-
a. Reactivate the PES Technical Working Group for purpose of drafting PES policy
Reconvened PES TWG; enhanced inter-agency collaboration; formulated draft PES policy
40 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014 Milestones/
outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
tions/ academic institu-tions, Other research organi-zations
SFS, ICRAF
FMB, PAWB
NEDA, Acade-mic institu-tions/ academic institu-tions, Other research organi-zations
b. Provide TA in the drafting of the PES policy
STTA, PGS, FCs
PAWCZMS
PAMB, LGUs, Tribal Council, WMCs
c. Design and implementtraining on conflict resolution for biodiversity management
Training module and report
C. Strengthen community participation and interagency/inter-local coordination and implementation mechanisms in local PA management
LUPS FMB PAWB
HLURB a. Provide TA to the HLURB TWG on the integration of FLUP, CCA-DRRM, Protected Areas, Ancestral Lands into enhanced guidelines for CLUPs
Enhanced CLUP Guidelines
LUPS, PGS, FCs
FMS, PAWCZMS
DA, DILG, LGUs, PAMB, WMCS, etc.
b. Assess status, issues,and gaps in interagency/inter-local coordination in priority sites (linked to METT)
LUPS, PGS, FCs
FMS, PAWCZMS
DA, DILG, LGUs, PAMB, WMCS, etc.
c. Prepare an action plan/protocol/strategies for strengthening interagency/inter-local coordination in priority sites (linked to METT)
Strategy for inter-agency coordination identified
B+WISER | 2013 ANNUAL WORKPLAN | 41
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
LUPS, PGS, FCs
FMS, PAWCZMS
DA, DILG, LGUs, PAMB, WMCS, etc.
d. Facilitate and evaluate the implementation of the action plan/protocol to refine strategies (linked to METT, will start in 2015)
D. Enhance capacity for accessing IPAF and other financing sources
SFS PGS, Assist-ing Professional, FCs
PAWB PAMB, other govern-ment agencies, private sector, etc.
a. Assess the problems, issues in accessing IPAF and other sources of financing for each site
Assessment report for each site
SFS PGS, Assist-ing Professional, FCs
PAWB PAMB, other govern-ment agencies, private sector, etc.
b. Provide TA, training, and other assistance (e.g., (timely submission of annual work plans; streamlined approval process) to enhance/facilitate each PA's access to financing
Training reports, trained individuals
E. Adapt/enhance and implement METT assessments
PGS PAWB, FMB, FMS, PAWCZMS, Field Units
PAMB, LGUs, WMCs
a. Conduct training on enhanced METT
Trained individuals
PGS, Assist-ing Professional
PAWCZMS, FMS, Field Unit
PAMB, LGUs, WMCs
b. Conduct baseline METT Baseline METT and GSA Results
PGS, Assist-ing Professional
PAWCZMS, FMS, Field Unit
PAMB, LGUs, WMCs
c. Prepare METT reports and conduct feedback/action planning sessions
METT and GSA Reports, Action Plans
BFS PGS
PAWB other DENR and donor-projects
F. Coordinate/collaborate with related projects and initiatives of USAID, DENR and other agencies and donor projects (e.g., NEWCAPP, PAME) and with local stakeholders and
Meeting notes, TA inputs
42 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
communities
1.3. Biodiversity-Related Research Agenda Implemented
A. Establish and implement research agenda (national and subnational) with community participation
TS, FCs, ICRAF
ERDB, PAWB
a. Formulate action research framework and agenda on prioritized biodiversity protection issues including: how biodiverse landscapes enhance ecosystem services; cost effectiveness of approaches to biodiversity protection; invasive species, landscape approach in enhancing climate resilience
Framework formulated
SAF/TAF, TS
ERDB, PAWB
b. Develop manual for evaluating, selecting and implementing research proposals
Manual developed
TS ERDB c. Select partner institutions (e.g., academic institutions) and implement research projects
Partner institutions selected
Component 2. Forest Degradation in Targeted Priority Watersheds Reduced
2.1 Drivers of Deforestation Addressed
A. Conduct baseline assessments of forest cover; prepare forest cover monitoring and action plans and implement in pilot sites with community participation
REDD+S, RSMS, FCs
FMB, FMS, CENRO
LGUs, WMCs
a. Conduct baseline assessment of forest cover and assess drivers of deforestation and forest degradation in target critical watersheds
Forest cover baseline assessment conducted
REDD+S, RSMS, FCs
FMB, FMS, CENRO
LGUs, WMCs
b. Prepare and implement strategies/action plan for addressing drivers of deforestation
Drivers of deforestation identified and strategies formulated
B+WISER | 2013 ANNUAL WORKPLAN | 43
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
REDD+S, RSMS, FCs
FMS CENRO
c. Help improve forest cover monitoring systems (remote and on the ground)
Forest monitoring system improved
LUPS, BFS, FCs
FMB, PAWB, DENR Field
d. Update and refine baseline watershed characterization and biodiversity assessment framework and dataset parameters for the preparation of a more effective and technically sound integrated resource and watershed management plans.
REDD+S ICRAF
FMB B. Develop spatial models for projecting the amount of deforestation, and GIS-based models to identify areas most likely to be deforested (hotspots)
Spatial models developed
C. Strengthen the enforcement of protection/conservation policies and regulations in pilot sites with community and multi-stakeholder participation
Strategies for strengthening law enforcement in forest management identified and implemented
STTA, PGS, FCs
FMB, Field Units
LGUs, WMCs, MFPC, Bantay Gubat, Anti-Illegal Logging Task Force
a. Assess the status of implementation of conservation policies in the program sites, including the capability of law enforcers (linked to Program IR 1.1 C)
STTA, PGS, FCs,
FMB, Field Units
LGUs, WMCs, Anti-Illegal Logging Task Force
b. Identify and implement strategies, including needed capacity-development for strengthening law enforcement in program sites (linked to Program IR 1.1 C)
44 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
STTA, PGS
FMB, Field Units, LGUs, WMCs,
NAECTAF
c. Conduct training on multi-sectoral law enforcement (linked to Program IR 1.1 C)
Trained individuals
D. Implement community-based and multi-sectoral forest restoration program in both upland and coastal areas (link with Program IR 4.2); explore opportunities for private sector participation
FCs, REDD+S
FMB, FMS, CENRO
LGUs, WMCs, IPs, DA, BFAR
a. Establish criteria and identify priority sites for reforestation
FCs, REDD+S
FMB, FMS, CENRO
LGUs, WMCs, IPs, DA, BFAR
b. Prepare and implement forest restoration plan/strategy in priority sites and forest and mangrove restoration in other target sites to contribute to NGP targets, including strategy for maintenance and protection of the reforested site
Forest restoration initially implemented in selected sites
E. Provide Technical assistance to FMB's finalization of the Manual on Forest Law Enforcement (including site level orientation and implementation); Provide TA on other related initiatives on enforcement
B+WISER | 2013 ANNUAL WORKPLAN | 45
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
STTA, PGS
FMB Legal, DENR Legal
Task Force Kalika-san, Anti-Illegal Logging Task Force
a. Coordinate with the DENR and US Department of the Interior (USDOI) the preparation of draft Forest Law Enforcement Manual (FOLEMOP); provide TA on other policy or manualization initiatives on enforcement (e.g., revision of DO 97-32; integrated Law Enforcement Manual, Preparation of Law Enforcement Manual for PA)- Demand Driven
Report, Draft Manual
STTA, PGS
FMB Legal, DENR Legal
Task Force Kalika-san, Anti-Illegal Logging Task Force
b. Conduct pertinent consultations, refine, finalize and submit the Manual for DENR approval
Consultation Report
c. Conduct training/orientation on the approved manual and prepare kit for enforcers to facilitate site-level implementation
TA to FMB provided
F. Integrate forest land use planning and climate change considerations into CLUP
LUPS, FCs
FMS LGUs a. Assess the status of FLUP and CLUP preparation/ implementation in priority sites and identify gaps and needed refinements to integrate climate change and ancestral lands management to strengthen sustainable forest management
FLUP/CLUP implementation status assessed
LUPS, FCs
FMS LGUS b. Refine/Update and integrate the FLUP and CLUP,
G. Prepare knowledge products (will start in FY 2015)
46 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
2.2. Planning, Policy and Governance Frameworks for Forest Management Strengthened
A. Strengthen the national policy on co-management/ partnership over forest lands including its implementation
PGS a. Assess the status of forest land co-management implementation in selected sites and provide policy recommendations (can be part of action research agenda)
Report
STTA, PGS, LUPS
FMB, Policy and Plan-ning
b. Provide inputs in the drafting and finalization of the draft new DENR-DILG JMC on co-management of forest lands if this will be pursued by the DENR
TA inputs
LUPS FMD, PAWB
HLURB, CCC, NCIP
c. Refine and enhance resource management and local planning guidelines issued by national implementtation agencies in the integration of biodiversity conservation, CCA/DRRM, ancestral lands and protected areas.
Draft revised agency planning guidelines
B. Conduct IEM Orientation for PAMB, WMC, LGUs, IPs, POs, other pertinent agencies and organizations in all sites
Report
C. Strengthen community, interagency/local stakeholders coordination in local forest/ watershed management and convergence initiatives
PGS a. Conduct stakeholders’ analysis in the seven sites (to include PA stakeholders)
Report
LUPS, PGS, FCs
FMS. Field Units
LGUs, WMCs, BFAR, etc.
b. Assess status, issues, and gaps in inter-agency/inter-local coordination and local convergence initiatives in
Report
B+WISER | 2013 ANNUAL WORKPLAN | 47
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
priority sites
LUPS, PGS, FCs
FMS. Field Units
LGUs, WMCs, BFAR, etc
c. Prepare an action plan/protocol/strategies for strengthening interagency/inter-local coordination and convergence initiatives in priority sites
Strategy for strengthening coordination identified
LUPS, PGS, FCs
FMS. Field Units
LGUs, WMCs, BFAR, etc
d. Implement and evaluate the implementation of the action plan/protocol/strategies and refine them (will start in 2015)
e. Document experiences in inter-agency/ local stakeholders collaboration for scaling up and possible policy refinement
Paper
D. Refine the existing framework/guidelines for watershed characterization
PGS, TS
E. Prepare a source book on the topic of improving watershed governance
PGS FMB a. Conduct an assessment of topics to include in the Source Book (survey with local partners)
PGS FMB b. Collect references and other pertinent materials and prepare the outline with inputs from partners and team
PGS FMB c. Draft, pilot-test and finalize the Source Book (will start on FY 2015)
Source book drafted
F. Conduct State of the Local Watershed Governance Reporting (will be done in FY 2015 and 2017)
PGS WMCs, LGUs
a. Conduct analysis of local watershed governance actors
PGS WMCs, LGUs
b. Agree on the concept and methods for local watershed governance reporting
48 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
PGS WMCs, LGUs
c. Convene a local watershed governance session including action planning
Watershed Governance Action Plan Formulated and Implemented
PGS WMCs, LGUs
d. Implement the action plan
G. Support the review and analysis of the National Greening Program (NGP)
STTA, PGS, TS, FCs
FMB, PAWB. ERDB, CCC
LGUs, etc.
a. Provide TA to evaluate the National Greening Program (NGP) (possibly as part of action-research agenda)
TA inputs/Report
PGS, TS, FCs
FMB, FASPO, FMB
INREM, etc.
H. Coordinate/collaborate with other USAID/other donor-assisted projects/community stakeholder groups
TA inputs, meeting notes
I. Provide technical assistance to the DENR in the review/crafting of priority policies and regulations (e.g., initially identified by DENR are forest securitization, benefit sharing arrangements, expiring Certificate of Stewardship Contracts, continuing devolution) in support of REDD+, PES, and other program initiatives
J. Adopt/enhance and implement GSA
PGS PAWB, FMB, FMS, PAWCZMS, Field Units
PAMB, LGUs, WMCs
a. Conduct training on enhanced GSA
Trained individuals
PGS, Assist-ing Professional
PAWCZMS, FMS, Field Unit
PAMB, LGUs, WMCs
b. Conduct baseline GSA (and other tools if needed)
Baseline METT and GSA Results
PGS, Assist-ing
PAWCZMS, FMS,
PAMB, LGUs, WMCs
c. Prepare GSA reports and conduct feedback/action planning
METT and GSA Reports, Action Plans
B+WISER | 2013 ANNUAL WORKPLAN | 49
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
Profes-sional
Field Unit
sessions
K. Prepare knowledge products
2.3: Watershed-Related Research Agenda Implemented
A. Establish and implement research agenda (national and subnational; annually) with partners (e.g., opportunity cost of REDD participation, analysis of administrative and transaction costs of REDD+)
ICRAF, PGS, other TS, FCs
FMB, PAWB. ERDB, CCC
Acade-mic institu-tions, other initia-tives (INREM, etc.)
a. Formulate priority action research framework and agenda associated with watershed management issues, with emphasis on climate change resilience and policy-oriented researches
Action Research Framework and Agenda
SAF/TAF, TS
b. Develop manual for evaluating, selecting, and implementing research proposals
SAF/TAF Manual for Priority Research Agenda
SAF/TAF, TS
c. Implement action research agenda with selected partner institutions
Research reports
B. Review and collaborate with FMB/USAID-USFS in refining tools and methods in FRA/NFI
2.4: Philippines REDD+ Readiness Demonstrated
A. Conduct REDD+ orientation in all sites for communities, LGUs, private sector and other local stakeholders
REDD+ orientation conducted
B. Design monitoring, reporting, and verification (MRV) system for REDD+ (forest carbon)
REDD+S, FFI, ICRAF
FMB, PAWB. ERDB, CCC
GIZ a. Examine the scale of implementation of REDD+ in the Philippines including the formation of a national
Report on national and sub-national REDD+ Implementation
50 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
registry
REDD+S, FFI, ICRAF
FMB, PAWB. ERDB, CCC
GIZ, AI, USFS, US EPA
b. Review and select GHG Inventory Methods and Allometric Models
Report
REDD+S, FFI, ICRAF
FMB, PAWB. ERDB, CCC
AI, GIZ, USFS, acade-mic institu-tions
c. Set-up pilot MRV system, pilot test it in selected sites, refine the system
MRV Design for priority sites
REDD+S, FFI, ICRAF
FMB, NAMRIA
AI, GIZ, USFS, acade-mic institu-tions
d. Establish database infrastructure (development and operationalization) with reference to the web portal being developed by NAMRIA
Draft of Spatial Data Infrastructure
REDD+S, FFI, ICRAF
FMB, PAWB. ERDB, CCC
GIZ, acade-mic institu-tions
C. Explore the process of integrating NGP in REDD+ programs
Report
D. Establish REDD + safeguards (mainstream biodiversity and IP concerns, corruption reduction, social equity considerations, etc) and incorporate in policy frameworks
REDD+S, ICRAF
FMB, PAWB. ERDB, CCC
Code REDD
a. Draft REDD+ safeguards
Draft Report
REDD+S, ICRAF, FCs
FMB, PAWB. ERDB, CCC
b. Conduct consultations to finalize the draft REDD+ safeguards
Reports for each site
REDD+S, ICRAF, FCs
c. Integrate the REDD+ safeguards in REDD+ implementation in selected sites
Consolidated Report
E. Explore and support the demonstration of REDD+ in priority sites
REDD+S. FCs
a. Conduct consultations with relevant stakeholders
Reports
B+WISER | 2013 ANNUAL WORKPLAN | 51
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
in selected sites
REDD+S. FCs
b. Set up forest monitoring system for all the selected sites and gather Activity Data (Forest Cover)
Completed Activity Data
REDD+S
c. Set up forest inventory system for all the sites and collect Emission Factor Data (Timber Inventory to measure biomass)
Completed Inventory Data
REDD+S
d. Monitor Activity Data/Emission Factors at all sites
Update Activity and
Emission Factor Data
REDD+S
e. Conduct participatory and community forest monitoring
Report
REDD+S
f. Develop framework and procedures for estimating Reference Emission level/Reference level (Baseline)
Method for setting REL/RL
REDD+S
g. Establish REDD+ Reference Emission Levels (REL)
Report on REL/RL
REDD+S
F. Harmonize REDD+ related systems and methods and methodologies (FMB, NFI, GHG accounting, Forest Monitoring Assessment, satellite imagery/remote sensing) (will start in FY 2015)
Report
G. Prepare knowledge products (will start in FY 2013)
2.5: Incentives for Forest Conservation Introduced
A. Formulate framework and design instrument for ecosystem services valuation
SFS, FCs
a. Document and analyze PES and PES-like activities in the study areas
PES & PES-like activities in the study areas identified and analyzed
SFS b. Conduct an analysis of PES implementation in the Philippines
Status of PES
implementation in the Philippines analyzed
52 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
SFS, FCs
Local Service Providers (LSPs)
c. Conduct socio-economic, political and institutional profiling and analysis of target population and communities
Socio-economic baselines
B. Conduct PES awareness and appreciation at different levels of the DENR & LGUs, the private sector and local communities and resource managers
Laymanized PES handouts
C. Conduct technical training on PES and PES mechanisms for technical bureaus of the DENR and LGUs; with participation from local communities
PES handouts and training materials
D. Conduct economic valuation studies in the 7 sites
SFS, FCs
FMB, PAWB. ERDB
LGUs, Private com-panies that will be identi-fied
a. Identify potential PES schemes
Identified PES schemes to be piloted for the 7 sites
SFS, FCs
Acade-mic institutions in the study sites
b. Conduct feasibility studies in watersheds selected as PES pilot sites
Economic studies of PES schemes to be piloted in the 7 sites
SFS, FCs
Identified stakeholders in the site
c. Conduct consultation meetings to evaluate support from stakeholders
Stakeholder analysis report
SFS, FCs
Target stakeholders
d. Pilot PES Schemes in Selected Priority Sites
Piloted PES scheme
E. Facilitate the design and implementation of Public-Private-Partnership Agreement on Ecosystem Services
MOUs, MOAs for PPP
SFS, FCs
a. Conduct ecosystem services market scanning and scoping
SFS, FCs
b. Identify potential partners among the public
B+WISER | 2013 ANNUAL WORKPLAN | 53
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
and private sectors
SFS, FCs
c. Design appropriate PPP agreements
F. Institutionalize PES scheme as a sustainable financing source
a. Assist and facilitate the formation/enhancement of a formal structure to handle funds to be generated by the PES mechanism
Documentation report
b. Provide assistance to PAMB/PA in improving access to IPAF and other financing sources
Reconvened PES TWG
c. Convene PES Technical Working Group
Draft EO/DAO on PES
d. Draft and formulate policy on PES
SFS, FCs
G Prepare knowledge products
Component 3: Capacity to Conserve Biodiversity, Manage Forests, and Monitor Low-Emissions Development Enhanced
3.1 Capacity to Monitor Biodiversity and Forest Cover Status Enhanced
STTA, PGS, other TS
FMB INREM A. Conduct learning needs assessment for PAMB, WMC, IPs, POs. LGUs; identify and implement learning strategies
Presentation materials, orientation module, individuals oriented on IEM
STTA, PGS, other TS
FMB INREM B. Develop capacity for regular monitoring of threats to biodiversity (e.g., leveraged assistance from the private sector for monitoring equipment)
Presentation materials, orientation module, individuals oriented on IEM
FFI STTA C. Conduct training on utilizing geospatial technologies such as for forest cover and change monitoring, biomass estimation, mapping and biodiversity monitoring applications (also for use in FLUP, CLUP, PAMP, WMP, NGGI, PES and REDD+ ); conduct training on participatory and community-based methodologies to complement these
Training conducted
54 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
FFI STTA D. Assist NAMRIA in the development and finalization of the documentation of methodologies used for producing the 2010 land cover maps; facilitate discussion and provide TAs to NAMRIA on the development 2015 land cover
Documentation report
PGS, TS
PAWB, FMB
PAMB, LGUs
E. Develop Manuals on Biodiversity Monitoring, Forest Inventory, MRV processes, and other pertinent knowledge products; embed community participation in the processes
Manuals developed
3. 2: Capacity to Undertake the National Greenhouse Gas Inventory Enhanced
REDD+S
A. Conduct capacity building for NGGI in forestry: provide TA and training/coaching to implement NGGI at national/FMB and field levels (LGUs, academic institutions, DENR field units)
TA and training conducted
REDD+S
B. Coordinate/collaborate with CCC/NGGI/NAMRIA and other pertinent organizations/ institutions/projects (e.g., EC-LEDS/AILEG/US initiatives) in terms of knowledge exchange, capacity building, research funding, etc.
Collaboration mechanism set up
REDD+S, FFI
C. Prepare knowledge products (will start in FY 2015)
Component 4: Capacity for Disaster Management in Highly Vulnerable Areas Increased
4.1: Disaster Preparedness Capacity Increased
A. Conduct vulnerability assessment; identify mitigation and adaptation measures; put emphasis on community participation
B+WISER | 2013 ANNUAL WORKPLAN | 55
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
and adaptation capacity-building
ICRAF MGB NAMRIA
PAG-ASA CCC
a. Conduct training on Vulnerability and Risk Assessment (VRA), identification and prioritization of mitigation and adaptation measures for the priority sites.
PAMB, WMC, LGUs capacitated on climate proofing
B. Integrate climate change considerations and results of vulnerability assessments into local development plans and long term strategies
DCOP, ICRAF, LUPs, FCs
NDRRMC LGUs PAG-ASA
a. Generate climate scenarios in each project site
Climate scenarios
DCOP, ICRAF, LUPs, FCs
Acade-mic institu-tions
b. Conduct vulnerability assessment using climate scenarios and thematic maps
Vulnerable places and people
DCOP, ICRAF, LUPs, FCs
Acade-mic institu-tions
c. Conduct workshop to present results of the vulnerability assessment (including biodiversity and hydrology) and identify mitigation and adaptation options
Mitigation and adaptation options
DCOP, ICRAF, LUPs, FCs
Acade-mic institu-tions
d. Prioritize mitigation and adaptation options using multi-criteria analysis
List of mitigation and adaptation options by priority
REDD+S, GIL, BFS, Elmer, ICRAF
e. Revision of the plans to integrate climate change
Climate proofed plans
C. Conduct research on role of forests in disaster mitigation (included in research agenda, Components 1 &2)
ICRAF, REDD+S
a. Develop the research agenda on the role of forests, other vegetative cover and other land uses in disaster mitigation
R&D on the role of forests and other land based activities in disaster mitigation
56 | B+WISER | 2013 ANNUAL WORKPLAN
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
D. Draft Data Sharing and Management Policy
PGS FMB PAWB NAMRIA
DOST, PAG-ASA MGB, CCC, DRRMC, OCD, Manila Observatory, BSWM
a. Work on data sharing policy (will start in 2015)
Data sharing policy drafted
REDD+S, ICRAF
E. Conduct training programs on disaster risk reduction and climate change adaptation (PAMB, IPs, trainors, etc.)
F. Prepare knowledge products (will start in FY 2015)
4.2: Disaster Mitigation Measures Enhanced
A. Implement priority mitigation measures identified in Program IR 4.1 including forest restoration program in upland and the coastal areas (same as Component 2)
ICRAF, REDD+S
MGB
NAMRIA
a. Implement forest restoration program identified in Program IR 4.1
[X] hectares reforested
FC b. Implement other mitigation measures identified in Program IR 4.1
Crosscutting
Gender and Inclusiveness
GIS A. Conduct gender analysis and integrate into resource management plans and other TA strategies
GIS B. Formulate B+WISER program Gender Action Plan
Gender action plan formulated
B+WISER | 2013 ANNUAL WORKPLAN | 57
Key Activities FY 2013 FY 2014
Milestones/ outputs
B+ WISER
DENR Other partners
Oct-Dec
Jan Feb Mar Apr May Jun Jul Aug Sep Q1 Q2 Q3 Q4
GIS C. Conduct staff and partner's orientation on protocols for engaging with IPs, e.g., on pertinent government guidelines, best practices for dealing with IPs, communication and reporting protocols, do's and don'ts
Staff orientation on gender conducted
GIS PAFID D. Study the indigenous knowledge systems and practices pertaining to biodiversity, forest and natural resources management, including issues concerning IPs in priority sites
GIS E. Integrate IP concerns in TA provisions (e.g., in planning, enforcement, etc.)
GIS F. Prepare knowledge products
Communications Strategy
CS A. Formulate communication plan
Communication plan formulated
CS B. Develop and produce program materials
CS C. Provide communication support to various components
Communication support provided
CS D. Conduct communications campaigns
Biodiversity campaigns started
CS E. Capacity-building for target groups including journalists
CS F. Capacity building for program champions
CS G. Document and share best practices and program experiences and lessons learned
CS H. Conduct other communication activities (such as newsletter)
58 | B+WISER | 2013 ANNUAL WORKPLAN
Acronyms: ADSDPP Ancestral Domain Sustainable Development and
Protection Plan AI Academic institutions AILEG Analysis and Investment for Low-Emission Growth BFS Biodiversity and Forestry Specialist B+WISER Biodiversity and Watersheds Improved for Stronger
Economy and Ecosystem Resilience CCA Climate Change Adaptation CCC Climate Change Commission CS Communication Specialist DA Department of Agriculture CLUP Comprehensive Land Use Plan DILG Department of the Interior and Local Government DOST Department of Science and Technology DENR Department of Environment and Natural Resources EC-LEDS Enhancing Capacity for Low Emission Development
Strategy ERDB Ecosystem Research and Development Bureau FCs Field Coordinators FFI Fauna and Flora International FLUP Forest Land Use Plan FMB Forest Management Bureau FMS Forest Management Service FRA Forest Resource Assessment FY Fiscal Year GHG Greenhouse Gas GSA Guided Self-Assessment on the State of Local
Environmental Governance GIS Gender and Inclusion Specialist HLURB Housing and Land Use Regulatory Board ICRAF World Agroforestry Center IEM Integrated Ecosystems Management IP Indigenous Peoples IPAF Integrated Protected Areas Fund IR Intermediate Result LGU Local Government Unit LSP Local Service Provider
LUPS Land Use and Planning Specialist METT Management Effectiveness Tracking Tool MRV Measurement, Reporting and Verification NAECTAF National Anti-Environment Crime Task Force NAMRIA National Mapping and Resource Information Authority NBSAP National Biodiversity Strategy and Action Plan NEDA National Economic and Development Authority NCIP National Commission on Indigenous Peoples NFI National Forest Inventory NDRRMC National Disaster Risk Reduction and Management
Council NGP National Greening Program NGGI National Greenhouse Gas Inventory PA Protected Area PAMP Protected Area Management Plan PAFID Philippine Agency for Intercultural Development PAG-ASA Philippine Atmospheric, Geophysical and
Astronomical Services Administration PAWB Protected Area and Wildlife Bureau PAWCZMS Protected Area, Wildlife and Coastal Zone
Management Service PES Payment for Ecosystem Services PGS Policy and Governance Specialist PO Peoples Organization RSMS Remote Sensing and Mapping Specialist REDD+S REDD+ Specialist REL Reference Emission Levels SAF Special Activities Fund SFS Sustainable Financing Specialist STTA Short Term Technical Consultant TA Technical Assistance TAF Technical Assistance Fund USFS United States Forest Service VRA Vulnerability Risk Assessment WMC Watershed Management Council WMP Watershed Management Plan
B+WISER | 2013 ANNUAL WORKPLAN | 59
Annex C. Summary of Highlights of DENR/B+WISER Planning Workshop
29 April - 03 May 2013, Holiday Inn, Clark
Workshop Objectives and Expected Outputs
Designed together with FMB, the workshop objectives and expected outputs were the
following:
1. To discuss with DENR the objectives, strategies and one-year and five-year activities of
the B+WISER Program;
2. To discuss the operationalization of the first-year and 5-year work plans considering the
specific contexts of program sites;
3. To discuss and agree on the roles and responsibilities of the DENR at the central, regional,
and site levels and technical assistance team of the B+WISER Program in carrying out
program activities;
4. To estimate resource requirements of Program activities (travel, etc.) and responsibilities
in supplying these for calendar year 2014 and 2015.
The expected outputs were the following:
1. Shared understanding on the objectives, strategies and 5-year activities of the B+WISER
Program and their resource requirements;
2. Shared understanding and agreement on the 5-year and annual targets for 2013 and 2014
on all the performance indicators;
3. Shared understanding on the overall operational strategy for the sequencing of program
activities in each program site.
4. Identified and programmed training activities and technical assistance needed for Years 1
to 5 identified and programmed;
5. Consensus on the roles and responsibilities of the DENR at the central, regional and site
levels and B+WISER Program in carrying out program activities;
6. Agreement on indicative 5-year program calendar and a 2013 and 2014 program calendar.
Major Workshop Outputs, Agreements, and Resolutions
Workshop objectives 1-3 were achieved. In particular, the Workshop defined with clarity the
following:
1. B-WISER is a DENR program and as such its agenda is aligned with DENR’s thrusts and
priorities with respect to biodiversity conservation and watershed/forest management.
2. B-WISER is a technical assistance (not a loan) of the U.S. Government to the Philippine
Government through the DENR and as such, there will be no direct transfer of funds to the
DENR and its participating bureaus and regional offices. There are funds available from
60 | B+WISER | 2013 ANNUAL WORKPLAN
the SAF through which Chemonics could contract non-government entities, such as
assisting professionals, academic institutions, NGOs, and other service providers to assist
DENR/B+WISER implement the workplan. In the case of assisting professionals, some
of these may be expected to be incorporated into the DENR plantilla as part of the
sustainability plan.
3. The Workshop brought together for the first time the two sectors that are critical for the
biodiversity conservation thrust of the DENR, i.e., protected area management and
watershed/forest management. The implementation arrangements for this, a
Subcommittee on Forest Conservation and Management led by FMB and USAID as co-
chairs and PAWB as vice-chair need further discussion.
4. The role of the PASu is very important and needs to be articulated in the workplans.
5. The proposed activity - improved access to the IPAF is on-going under another PAWB
initiative and need not be tackled by B+WISER.
With respect to workshop objectives 4-5, the following points were raised:
1. All appreciated the IEM framework, but this may be difficult to implement. For example,
six sites have Protected Areas, but the ridge to reef approach is not evident in those sites
where the PA does not span the whole watershed. Some sites have both WMC and
PAMB which augurs for the operationalization of the IEM/ridge to reef approach.
2. DENR identified existing plans (such as PA plans in the case of Naujan, WMP in the case
of ENRMP sites, Quinali A and Bago watersheds), as points of entry for specific
B+WISER activities.
3. Forest “restoration” needs to be defined further.
4. Biodiversity Assessment is different from Biodiversity Monitoring. With respect to the
latter, a review should be conducted on the BMS and potential updates using new tools
and technologies. BWISER was asked to help analyze BM data.
5. Subsequent financial planning will ensue with the FCs working with the regional teams
led by the REDs.
6. Meetings with the PAMB will be scheduled and led by the RED and PASu for which
B+WISER will prepare the presentation materials and reference documents.
7. Roles and responsibilities of both DENR and B-WISER in the implementation of the
Program activities.
8. The first iteration of 2013-2014 Workplans by priority site was prepared by the workshop
groups and presented at plenary. These will be attached to the updated 2013 workplan
(Revision 5).
9. An operational manual is needed to guide all with respect to communication protocols,
sharing of data and resources, and personnel.
10. Office spaces were identified for each of the sites except Regions 11 and 12 (Mt. Apo).
FMB office space has been identified as well.
B+WISER | 2013 ANNUAL WORKPLAN | 61
Next Steps (May-June 2013)
1. Conduct of second iteration of the work plans and resource requirements. This will be
done at the field sites with the guidance of the B-WISER technical specialists.
2. Conduct of post-workshop assessment with FMB and PAWB (May 10 and 6
respectively).
3. Conduct of courtesy calls to the concerned RDCs, PAMBs and WMCs during May and
June
4. Coordination with other DENR offices, i.e., Special Concerns Office, ERDB, and Office
of the Undersecretary for Operations.
5. Coordination with other government agencies, i.e., NCIP, DA/BFAR, LGU (DILG) for
scheduling by DENR and USAID.
6. Coordination with other USAID and other foreign-assisted projects including US DOI
assistance to forest law enforcement.
7. B+WISER team: Draft modules on assessments and prioritized research agenda in
consultation with FMB/PAWB.
8. Drafting of B+WISER-specific operational manual on communication protocols, sharing
of data, resources, and personnel.
B+WISER | 2013 ANNUAL WORKPLAN | 63
Annex D. B+WISER Priority Sites
Brief Description of Seven Priority Sites
1. Northern Sierra Madre Natural Park (NSMNP)
Located in eastern Isabela Province, NSMNP has an area of 359,486 hectares consisting of
287,861 hectares of land and 71,625 hectares of marine areas. It is unique for its extent of
undisturbed lowland dipterocarp rainforest, and it includes undisturbed forests extending
from the coast to the mountain peaks. The rivers and streams flowing from the park’s forests
are the main source of water for domestic, agriculture and industrial use in northeastern
Luzon. NSMNP’s coastline features diverse ecosystems including estuaries, mangroves,
beach forest, sea grass beds and coral reefs supporting marine species such as marine turtles
and dugongs. The pristine forest in NSMNP makes it the most important site for bird
conservation and it is home to the Philippine Eagle. There are a great number of threatened
endemic birds, mammals, amphibians and reptiles. It also holds many endemic and rare
plants.
The park is threatened by agricultural development, tenure related issues, land speculation and
hunting. Several areas in the uplands are settled, where soil erosion and soil nutritional
damage are prevalent as a result of kaingin and illegal logging. The park has a PAMB and a
Protected Area Management Plan.
2. Upper Marikina River Basin Protected Landscape-Kaliwa Watershed Forest Reserve
This priority area covers 2 major watersheds, the Upper Marikina River Basin and Kaliwa
Watershed. Total area is 53,733 hectares, with the Upper Marikina River Basin having a total
area of 29,905 hectares.
The Upper Marikina River Basin is located about 20 km east of Manila. It covers 3
municipalities in Rizal Province. It is accessed via three major roads: the Marcos Highway,
also known as the Marikina-Infanta road, on the side of Antipolo City; and the Rodriguez-
Quezon City Road (Litex Road) and the San Mateo- Rodriguez Road on the side of
Rodriquez.
The major vegetation communities in the watershed include the following: (a) Agricultural
areas/ Agro forestry/ Plantations; (b) Grasslands; (c) Bamboo thickets; (d) Secondary Growth
Vegetation; (e) Lowland evergreen Forest; (f) Forest over Limestone; and (g) Mountain
Forest. Kaingin, is most prevalent in the area. Most areas are also used for small-scale fruit
production.
64 | B+WISER | 2013 ANNUAL WORKPLAN
3. Quinali A Watershed
The Bicol River Basin (BRB) is located within the provinces of Camarines Sur and Albay in
Region V covering a total area of about 317,389 hectares. Quinali Watershed, which is
located within the BRB is around 53,566 hectares located within Albay, and covering 6
municipalities. The BRB has a population that exceeds 1.5 million, and majority of its
population is dependent on agriculture, but their livelihood and settlements are continually
threatened by extensive flooding and inundation caused by tropical storms and typhoons that
frequent the region. The river basin is within the main typhoon belt of the Philippines, and on
the average experiences 15 to 20 typhoons per year, with heavy rainfall and strong winds
leading to severe flooding and damage to crops. The severe degradation of forest and
biodiversity in the watershed areas is manifested by dwindling forest cover and the
endangered species of flora and fauna. The biodiversity of the Bicol River Basin has suffered
severely from degradation of its forest and water resources. The flora and fauna in the
different watershed areas within the Bicol River basin is generally the same, but some areas
have certain unique or endemic species. The forests of the basin have several existing
vegetative cover, which include old growth forest, second growth forest, brush land,
cultivated, cogon/open land, and reforestation areas. Mid-mountain forests (600 - 900 asl) are
dominated by dipterocarp species mixed with narra, almaciga and other important timber tree
species. The basin’s plant composition includes hardwood species, shrubs, ferns, liverworts,
lianas, rattans, orchids, palms, vines and grasses.
4. Naujan Lake National Park Sub-watersheds
The Naujan Lake watershed is about 30,000 hectares, covering 4 municipalities. Its watershed
is drained by various creeks that drain into the Naujan Lake, and the water of the lake exits
via its lone outlet, the Butas River. The Naujan Lake itself, which is the 5th largest lake in the
Philippines, has an area of 8,125 hectares and a maximum depth of 45 meters.
NLNP watershed has 3 major vegetation types: lowland dipterocarp forest, mixed mangrove
swamp-beach forest; and marshland type. The forests are sporadically scattered in narrow
ridges, steep hill slopes, gullies, and precipices along the main waterways, and occupies only
about 15%of the total vegetation present in the whole area. The highly fragmented vegetation
landscape contains 613 vascular plant species, 98 species of vertebrates, 5 species
amphibians, 12 reptiles, 68 avian fauna and 13 mammals.
The NLNP is also home to at least 15 species of water birds. The lake is the habitat of the
endangered freshwater crocodile (Crocodylus mindorensis).
Existing land use within NLNP shows that settlement areas adjacent to the lake are expanding
along the lake's shoreline. Areas irrigated via rivers and tributaries of the lake are devoted to
paddy rice. There has been a large increase in the areas planted to fruit trees and perennial
crops. The lake is a RAMSAR site since 1999, and Mangyans are the IPs in the area.
NLNP has a PAMB and a PA Management Plan.
B+WISER | 2013 ANNUAL WORKPLAN | 65
5. Bago River Forest Watershed Reserve
Bago River Watershed Forest Reserve covers 3 cities and 3 municipalities. It has an area of
61,926 hectares, of which 51% of which is Alienable and Disposable Land and 49% is forest
land. It covers 2 PAs, the Mt. Kanlaon Natural Park covering an approximate area of
12,872.46 hectares (20.79% of the watershed), and the Northern Negros Forest Reserve which
has an area of 18,102.73 hectares (29.23%)
Major plant species in the watershed area are generally found in the areas of Mt. Kanlaon
Natural Park. Dominant species are mostly dipterocarps. Biodiversity in the area is still rich
and abundant; however the basal area/portion of the park/mountains has now been converted
into agricultural land due to rapid encroachment of settlers from lowland. Mossy forest could
be found in the upper most portion of Northern Negros Forest Reserve, and in Mt. Kanlaon
Natural Park. Residual forest is visible in the areas of Don Salvador Benedicto, Murcia and
Talisay. Open grasslands/brush lands are being farmed by the settlers and serve as pasture
area for livestock. Cultivated lands are composed of irrigated and rain fed rice fields, which
are also being farmed for production of vegetables and other seasonal crops.
There is a Watershed Management Plan for Bago, and there are also PAMBs and PA
Management Plans for the 2 PAs within the watershed.
6. Mt. Kitanglad Range Natural Park
Mt Kitanglad Range Natural Park is the major watershed of Northern Mindanao, supplying
lowland communities with water for domestic, irrigation and industrial uses. It has an area of
29,716 hectares. The park includes an extensive mountain range with about a dozen peaks,
containing mountain and mossy forests. It is a popular bird watching site, and is also known
to have a population of Philippine Eagles. There are several important mammals in the park,
including some recently discovered new species of small non-violent mammals. The area is
rich in gymnosperms and ferns, and it has more than 300 species of flora used mostly as
herbal medicines by the indigenous people living in the park. The indigenous inhabitants of
MKRNP- the Talaandigs, Higaonons and Bukidnons. The park is severely affected by human
activities, like high value crops planting, kaingin, and small-scale logging. This major
watershed has a PAMB and PA Management Plan.
7. Mt Apo Natural Park
Mt Apo Natural Park is the major watershed of the Provinces of Davao del Sur, Cotabato
Province and Davao City. It has an area of 72,113 hectares, and it has the highest peak in the
Philippines at 2,954 meters. The northeastern slopes of Mt Apo drain into the Davao rivers
and their tributaries. Mt Apo is one of the wettest areas in the Philippines; with a mean annual
rainfall of 2,500 mm. Mt Apo consists of lowland dipterocarp forest, lower and upper
mountain forests, elfin woodland, scrub and summit grassland. There are 6 ethnic tribes living
in Mt Apo, and it is the ancestral domain of the Bagobo, Manobo and Klata indigenous
peoples. There are large numbers of settlers in the lower slopes. There are many important
66 | B+WISER | 2013 ANNUAL WORKPLAN
endemic birds in Mt Apo, which also is the home of the Philippine Eagle. There are over 800
species of vascular plants, including endemics.
The biggest threat to the park is the encroachment of settlers and kaingin. It has a functional
PAMB and a PA Management Plan.
B+WISER | 2013 ANNUAL WORKPLAN | 67