1ada6b ABB BR 33 ABBTEC SistMonitoracao
description
Transcript of 1ada6b ABB BR 33 ABBTEC SistMonitoracao
TEC
–AB
B BA
Pow
er T
rans
form
ers
-1/
08/0
2
INTRODUCTION
PowerIT Transformer Control, type TEC
TEC
–AB
B BA
Pow
er T
rans
form
ers
-2/
08/0
2
Goals with TEC-Project
! The project shall integrate and create a common electronic interface to:" The transformer control cabinet" The tap-changer motor-drive mechanism" Monitoring & Diagnostics of the transformer with components" Voltage Regulation" Protection System for the complete transformer
! The product shall as much as possible use modern electronic technique. (Mainly
POW’s MACH 2 system)
! ABB shall have a product in the forefront of technology (MACH 2 system) in combination with a built in unique knowledge (knowledge from the worlds larges transformer and bushing manufacturer and second largest OLTC manufacturer.)
! Aim in the direction to a maintenance free transformer. (Condition Based Maintenance with transformer temp. balance, OLTC contact wear and OLTC temp. balance
! Have an “Intelligent transformer”. (knowledge from the worlds lagers transformer and bushing manufacturer and second largest OLTC manufacturer.)
TEC
–AB
B BA
Pow
er T
rans
form
ers
-3/
08/0
2
Part # 1A Transformer That Thinks Like You !
TEC
–AB
B BA
Pow
er T
rans
form
ers
-4/
08/0
2
Benefits I
! Cooling & Overloading ForecastsStart cooling prior to an anticipated load increaseCooling control based on calculation, result in immediate reactionsCooling control in multiple stepsSimulate different load conditions
! Real Time Status / AvailabilityMeasured parameters are compared to simulated to detect potential malfunctions
! LifetimeAccurate calculation of hot-spot and presentation of consumed lifetime, according to both IEC and IEEE
TEC
–AB
B BA
Pow
er T
rans
form
ers
-5/
08/0
2
Benefits II
! Condition based maintenanceStatus traffic light provides status indication on TFO & OLTCIn-depth information also available
! Event recordingsKeeps track of the order of transformer trip activities
! Operation and UpdatesEasy-to-understand system from a transformer model on the screenIn-depth information by clicking on the objectComplete transformer and OLTC documentation incorporatedSystem hardware and software based on well-proven ABB industrial standard
TEC
–AB
B BA
Pow
er T
rans
form
ers
-6/
08/0
2
Benefits III
The system has a unique built-in knowledge, helping
You to utilise the assets in a more efficient manner
TEC
–AB
B BA
Pow
er T
rans
form
ers
-7/
08/0
2
Part # 2Feature Overview
TEC
–AB
B BA
Pow
er T
rans
form
ers
-8/
08/0
2
Project Objective
One interface to the complete transformer with:! ABB´s unique TFO & OLTC knowledge ! Monitoring & Diagnostics! Loading forecasts based on fingerprints! Improved transformer control functions! Documentation! Basic protection and regulation
ObjectiveAn IntelligentTransformer
TEC CABINET
Serial communication on Fibre Optic BusCOMMUNICATION MODULECOMMUNICATION MODULE
(For different systems and protocols)(For different systems and protocols)
ON CABINET
ALARM
WARNING
NORMAL
Display
TEC PC in station
TEC
–AB
B BA
Pow
er T
rans
form
ers
-9/
08/0
2
Transformer Control, TEC
TEC CABINET
Serial communication on Fibre Optic BusCOMMUNICATION MODULECOMMUNICATION MODULE
(For different systems and protocols)(For different systems and protocols)
ON CABINET
ALARM
WARNING
NORMAL
Display
TEC PC in station
Sensors
TEC
–AB
B BA
Pow
er T
rans
form
ers
-10
/08/
02
TEC Sensors
T Top Oil
Top Oil Temperature •Temperature Balance•Hot-spot•Cooling Control
Bottom Oil Temperature •Temperature Balance•Hot-spot
CT
TAir
Current Transformer•Temperature Balance•Hot-spot •Load
Air Temperature•Temperature Balance Trafo
TECCabinet
TrafoCabinet
Station battery
LTC
OLTC Position •Contact wear
Cooler status •Temperature balance
OLTC Temperature •OLTC Temperature balance
PC in Control Room
TEC
–AB
B BA
Pow
er T
rans
form
ers
-11
/08/
02
Transformer Temperature Balance
Cooling from Radiators or Coolers
Losses
Cooling from Bushings
T Top Oil
T Bottom Oil
T Air
Cooling from the Tank
Calculated oil temperature are compared with measured. A difference can indicate problem with coolers/radiators that willrestrict the overload capability.
TEC
–AB
B BA
Pow
er T
rans
form
ers
-12
/08/
02
Display Logic on Cabinet
A.
B.
C.
E.
G.
D. I / Irated
F.
Actual Display
A T O P O I L T E M P+ 6 5 o C + 8 5 o F
B 1 H O T - S P O T H V+ 7 5 o C + 1 0 3 o F
B 2 H O T - S P O T L V+ 8 0 o C + 1 1 2 o F
B 3 H O T - S P O T R V+ 7 0 o C + 9 4 o F
C B O T T O M O I L+ 5 0 o C + 5 8 o F
D L O A D I / I r a t1 2 0 %
E O L T C P O S I T I O N2 1
F O P E R A T I O N S1 2 3 4 5 6
G H Y D R O G EN H 21 0 0 P P M
TEC
–AB
B BA
Pow
er T
rans
form
ers
-13
/08/
02
Station Interface
! Actual status of the transformer
! Historic data (load and temperatures etc.)
! Status of coolers (reduced cooling cap.)
! Hydrogen in oil (if sensor connected)
! Hot-spot forecast , with thermal ageing
! Contact Wear in Tap-Changer
! Thermal Balance in Tap-Changer
! Condition in TEC Control Cabinet
Monitoring & Diagnostics
General information in the station interface
! Complete transformer documentation
! Tap-changer maintenance films
TEC
–AB
B BA
Pow
er T
rans
form
ers
-14
/08/
02
Station Interface, example of panels
TEC
–AB
B BA
Pow
er T
rans
form
ers
-15
/08/
02
Complete Transformer Documentation
TEC
–AB
B BA
Pow
er T
rans
form
ers
-16
/08/
02
Cooling Control
SpecialCT Thermometer pocket
with heating
Calibrationresistor
TransformerCabinet
Today With “TEC”
SignalfromCT
TEC Cabinet
T Top Oil
T Bottom Oil Thermometer pocket
Hot-spot temp
ON CABINET
ALARM
WARNING
NORMAL
Display
Algorithms
Group 1
2 Cooler Groups can be controlled
Group 2
Group 1 Group 2
Up to 6 Cooler Groups can be controlled
Group 4 Group 5
Group 3
Group 6
Winding Hot-Spot
TEC
–AB
B BA
Pow
er T
rans
form
ers
-17
/08/
02
Cooling Control
Differences from traditional Cooling
• More sophisticated cooling control• Calculated Hot-Spot• No temperature gauges• Logic to avoid pumps to start at the same time• All coolers used through permutation• Logic to start motors at regular basis• Reduced Maintenance,• Reduced losses from motors• Reduced Noise
TEC
–AB
B BA
Pow
er T
rans
form
ers
-18
/08/
02
Cooling Status
TEC
–AB
B BA
Pow
er T
rans
form
ers
-19
/08/
02
Hot-Spot forecast
TEC
–AB
B BA
Pow
er T
rans
form
ers
-20
/08/
02
Overload Capability
TEC
–AB
B BA
Pow
er T
rans
form
ers
-21
/08/
02
Voltage Control
TEC
–AB
B BA
Pow
er T
rans
form
ers
-22
/08/
02
Trip and Voltage ControlToday on transformer from ABB
Buchholz Pressurerelay Relief vent
With TEC
Resistor
TEC Cabinet ON CABINET
ALARM
WARNING
NORMAL
Display
Event logg in TEC
Trip signal the traditional way to the Breaker also for TEC
! Voltage Control for a single transformer
! R compensation! Over Current Blocking! Under Voltage Blocking! Manual Operation
Control Voltage +Bandwidth
Bus VoltageControl Voltage
Control Voltage -Bandwidth -
T delayT start
T reset
Time
VoltageVoltage Control in TEC
Trip
TEC
–AB
B BA
Pow
er T
rans
form
ers
-23
/08/
02
Part # 3Summary
TEC
–AB
B BA
Pow
er T
rans
form
ers
-24
/08/
02
12 good reasons to use TEC on ABB tfo´s
! Hot spot and top oil forecasts at overload conditions! TEC’s functionality is made from a “fingerprint” of the transformer ! Relative ageing status of the transformer in service and in forecasts! One interface to the complete transformer! Better cooling control
! Up to 6 cooler groups with more sophisticated cooling algorithms! All coolers used on a regular bas! Hot-spot calculated
! All documentation in one place! History data about loading and temperatures in the transformer! Protection system with event logg! Simple Voltage Control! Information about the actual transformer condition in the control room! Prediction for service and contact exchange in the tap-changer! Detection of reduced cooling capacity
TEC
–AB
B BA
Pow
er T
rans
form
ers
-25
/08/
02