Managing Your Integrationsan
Operations Science Approach
Steven RdzakInfrastructure Services
![Page 2: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/2.jpg)
2
Some Background
• webMethods customer since 1999– Started with ActiveWorks
• ES 5.0.1– 80% of integrations are ES based– 5 ES Broker Servers In Production– 125-150 Adapter instances (ILA, Db, XML), many co-located with the
resource they serve
• IS 4.6– 20% of integrations are IS based– 1 IS production server for external customers– 1 IS production server for internal customers
• 350+ Integration Components– Team of 8 integration developers
• Average of 1 million component activations a week
![Page 3: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/3.jpg)
3
What is Integration Management?
• A continuous improvement story for EAI• Application of improvement tools
– Measurement tools, Analysis tools
– Control Charts, Pareto Charts
• Application of improvement techniques– Operations Reviews
– Corrective Action Plans
• Logical flow of analysis and improvement initiatives– Measure the operation (you must inspect what you expect!)
– Change or modify the behavior
– Achieve the desired results (no errors, better performance)
• A.k.a Operations Science
![Page 4: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/4.jpg)
4
Steps to Successful Integration Management
1. Design the Integration • Standard patterns
• Common audit components
2. Measure the Integration • Result metrics
• Measurement framework
3. Analyze the Integration • Key Analysis Questions
• Analysis framework
• Control Charts, Pareto Charts
4. Improve the Integration • Operations reviews
• Corrective action plans
5. Optimize the Integration • Standardization
• Institutionalization
![Page 5: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/5.jpg)
5
Design the Integration
• Standard Patterns– Each Integration Component (Flow or EI) sets up standard Try/Catch
Block– Common audit sub-components are included in each component build
out– Starting timestamp recorded before other processing– On completion, success or error is recorded depending on outcome.– Integration component duration is calculated from start timestamp– Peer review ensures standards are followed
• Common Audit Components– Error and Debug Logging
• Persists integration name, component name, key data, message– Metrics Capture
• Persists component name, outcome, timing data (enqueue duration, component duration), outcome message
– Custom design at Level 3• Never used built-in capabilities like EntLogger adapter
![Page 6: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/6.jpg)
6
Design the Integration (cont.)
• Capture Architecture
SourceAdapter
TargetAdapter
CommonAudit
Components
CommonAudit
Components
IS Server
CommonAudit Flows/
Services
Audit Database
JDBC
ServiceAdapter
Broker IS
![Page 7: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/7.jpg)
7
Measure the Integration
• Result Metrics– Indicators that measure the integration for conformance or non-
conformance– Should be represented in a quantifiable way– Customers can and should validate the chosen indicators
• Result Metric Types– Better
• Represents a quality indicator based on what is important to the integration customer. Example: < 1% error rate for order submit component.
– Faster• Represents a time indicator based on overall time to perform the
integration. Example: component processing time of 5 seconds or less.
– Cheaper• Represents a value indicator based on what is important for the
company. Example: productivity measurement like orders/day. The integration must process > 500 orders per day.
![Page 8: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/8.jpg)
8
Measure the Integration (cont.)
Audit Database
2
34
Capture AdapterReporting Adapter
1
1 .. N
Tables (query)MET_INTEGRATIONMET_COMPONENTMET_COMPLETION_TRANSLATION
Tables (insert)MET_SUMMARYMET_SUMMARY_BREAKDOWNMET_SUMMARY_DURATION
Tables (query)L3_AWORKS_METRICS_UPDATE
1. Query for Integrations/Components to capture2. For each component PR&W for daily summary data3. Query for daily summary data4. Process Data and Update daily summary data
• Our Measurement Framework– Scheduled nightly batch run to summarize result metrics
![Page 9: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/9.jpg)
9
Analyze the Integration
• Key Questions To Ask During Analysis
Past Is the integration in control?
Integration produces consistent output
Present Is the integration performing to specifications?
Integration is capable in its current environment
Future Is the integration able to adapt or be flexible?
Integration is capable of performing in a future environment
![Page 10: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/10.jpg)
10
Analyze the Integration (cont.)
• Our Analysis Framework– Low tech reporting architecture utilizing MS Excel spreadsheets Pivot Table and Charts
fed via an external data query from the Audit database– Reports and Charts are generated from summarized result metrics
Audit Database
Metrics by Day -2003 08 August
Metrics CountsYTD
Metrics Durationby Component
Date Range
Metrics CurrentDay
ODBC
ODBCODBC
ODBC
![Page 11: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/11.jpg)
11
Analyze the Integration (cont.)• Control Chart
![Page 12: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/12.jpg)
12
Analyze the Integration (cont.)• Pareto Chart
Top 10 Errors
9371
6409
15971173
6 1
50.50%
85.04%
93.64%99.96% 99.99% 100.00%
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Seria
l num
ber
alrea
dy e
xists
for
part
Asse
t tag
alrea
dy e
xists
No s
ite re
cord
foun
d
Clar
ify re
turn
edSt
atus
Code
(Jav
aEx
cept
ion)
Rece
ived
Null
Data
in N
IDEq
uipm
ent
Cano
nical
No s
erial
-trac
ked
part
num
ber
reco
rd fo
und
for
part
Error
Coun
t
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
![Page 13: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/13.jpg)
13
Improve the Integration
• Operations Reviews– Formally assess the operation weekly– Prioritize improvement efforts– Why have a review?
• Ensure integrations are meeting customer expectations and achieving corporate objectives
• Review success of corrective actions and formulate new action plans
– Who should attend?• Integration designers/developers
• Integration stakeholders
![Page 14: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/14.jpg)
14
Improve the Integration (cont.)
• Corrective Action Plans– A plan targeted on a specific integration improvement, problem
or defect.– Can be formal or informal– Key Points in the Plan
• What happened
• Why did it happen
• What correction is being taken
• What will this accomplish
• Who is responsible
• When will it be completed
![Page 15: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/15.jpg)
15
Optimize the Integration
• Standardization– Simplification
• Streamline the methods and procedures used to create your integrations
• Promote use of standard components
– Training• Can be formal or informal
• Institutionalization– Peer review of integration design– Make each developer an owner of his or her integration
performance
![Page 16: 1 Managing Your Integrations an Operations Science Approach Steven Rdzak Infrastructure Services steven.rdzak@level3.com.](https://reader035.fdocuments.us/reader035/viewer/2022062718/56649e715503460f94b6ede4/html5/thumbnails/16.jpg)
16
Some Takeaways
• An integration that is not measured is not managed• Don’t go overboard and try to measure the world, you
will end up with no time left for improvement efforts• Data collection, storage and analysis are activities that
add no value until they are used to control or improve your integration.