1 Jawhar Sircar Additional Secretary & Development Commissioner Ministry of Micro, Small & Medium...

30
1 Jawhar Sircar Additional Secretary & Development Commissioner Ministry of Micro, Small & Medium Enterprises Government of India NMCP SCHEMES NMCP SCHEMES Micro, Small & Medium Enterprises (MSME) 09 May 2008 MEETING OF DIRECTORS OF MSME DIs New Delhi

Transcript of 1 Jawhar Sircar Additional Secretary & Development Commissioner Ministry of Micro, Small & Medium...

1

Jawhar SircarAdditional Secretary & Development Commissioner

Ministry of Micro, Small & Medium Enterprises Government of India

NMCP SCHEMESNMCP SCHEMES

Micro, Small & Medium Enterprises (MSME)

09 May 2008 MEETING OF DIRECTORS OF MSME DIs New Delhi

2

Marketing Support/Assistance to MSMEs BAR CODE Support for Entrepreneurial and Managerial Dev INCUBATORS Enabling Manufacturing Sector to be competitive

thru Quality Mgt. Standard & Quality Tech. Tools QMS/QTT National Campaign for Investment in Intellectual Property IPR National Programme on Application on Lean Mnf. LEAN Mini Tool Rooms proposed to be set up by Min. of MSME MTR Promotion of ICT in Indian Manufacturing Sector ICT Technology & Quality Upgradation Support TECH UP Design Clinic Scheme for design expertise to Mnf. sector DESIGN Marketing Assistance/SMEs and Technology Upgradation

Activities - Ministry of SSI in co-operation with TIFAC/CSIR MARKETING

NATIONAL MANUFACTURING NATIONAL MANUFACTURING COMPETITIVENESS PROGRAMME - COMPONENTSCOMPETITIVENESS PROGRAMME - COMPONENTS

Full Name of the Scheme Short Name

3

NMCP – New ActivitiesNMCP – New Activities(Over next 4 years)(Over next 4 years)

NoNo Name of the Name of the ComponentComponent

4 years4 years 2008-092008-09

GOI Share (BE)GOI Share (BE)Total Project CostTotal Project Cost GOI ShareGOI Share

11 BAR CODEBAR CODE 1.501.50 1.501.50 0.200.20

22 INCUBATORSINCUBATORS 79.4579.45 66.5066.50 8.008.00

33 QMS / QTTQMS / QTT 50.0050.00 40.0040.00 7.007.00

44 IPRIPR 55.0055.00 50.0050.00 8.008.00

55 LEANLEAN 230.00230.00 185.20185.20 20.0020.00

66 MTRMTR 350.00350.00 135.00135.00 20.0020.00

77 ICTICT 100.00100.00 65.5065.50 10.0010.00

88 TECH UPTECH UP 214.56214.56 78.6078.60 10.0010.00

99 DESIGNDESIGN 50.0050.00 41.0041.00 5.005.00

1010 MARKETINGMARKETING 53.0053.00 26.5026.50 4.004.00

TOTALTOTAL 1183.511183.51 689.80689.80 92.2092.20

Rs. Crore

4

STATUS OF NMCP SCHEMESSTATUS OF NMCP SCHEMES

S. S. No.No.

Name of Scheme Name of Scheme

(Cost of Scheme / Rs Cr.)(Cost of Scheme / Rs Cr.)

EFCEFC

ClearanceClearance

RERE

2007- 082007- 08

BEBE

2008 - 092008 - 09

ii Bar Coding (1. 5)Bar Coding (1. 5) Operational Operational from 01/6/07from 01/6/07

0.10.1 0.200.20

iiii Incubators (79.45)Incubators (79.45) 0.10.1 8.008.00

iiiiii QMS / QTT (50)QMS / QTT (50) 0.10.1 7.007.00

iviv IPR (55)IPR (55) 0.10.1 8.008.00

vv Lean (280.80)Lean (280.80) 0.10.1 20.0020.00

vivi MTR (210)MTR (210) 0.10.1 20.0020.00

viivii ICT (100)ICT (100) 0.10.1 10.0010.00

viiiviii TECH UP (93.50)TECH UP (93.50) 0.10.1 10.0010.00

ixix Design (50)Design (50) 0.10.1 5.005.00

xx C Watch (53)C Watch (53) 0.10.1 4.004.00

Total Total 01.001.0 92.2092.20

Rs. in Crore

5

Existing MDA Scheme modified to popularize Bar Coding Existing MDA Scheme modified to popularize Bar Coding

Bar Coding an effective Tool to improve marketabilityBar Coding an effective Tool to improve marketability

Reimbursement allowed :Reimbursement allowed :

One Time Registration FeeOne Time Registration Fee

75% of Annual Fee for 175% of Annual Fee for 1stst 3 years (Bar Code Certificate) 3 years (Bar Code Certificate)

1400 SMEs to be Benefitted during 11th FY Plan1400 SMEs to be Benefitted during 11th FY Plan

Need to Ramp-up Scheme Need to Ramp-up Scheme

In the Context of Retail Boom / ExportsIn the Context of Retail Boom / Exports

Guidelines on Guidelines on www.dcmsme.gov.in

1. BAR CODE1. BAR CODE

6

Object : Object : Assist Incubation of Innovative IdeasAssist Incubation of Innovative Ideas Encourage Ideas to Become SMEsEncourage Ideas to Become SMEs

Total Project cost – Rs. 79.45 crTotal Project cost – Rs. 79.45 cr GOI Share – Rs. 66.50 cr GOI Share – Rs. 66.50 cr 2008-09 BE – Rs. 8.00 cr 2008-09 BE – Rs. 8.00 cr

Final Approval AwaitedFinal Approval Awaited Guidelines on Guidelines on www.dcmsme.gov.in Forms under IssueForms under Issue

Rs. 80 cr Project for 100 Business Incubators (BIs)Rs. 80 cr Project for 100 Business Incubators (BIs)

2. INCUBATORS (E & MD)2. INCUBATORS (E & MD)

1 / 2

7

100 BIs to be Located in R&D Institutes @ 25 p.a100 BIs to be Located in R&D Institutes @ 25 p.a

Govt. Grant (Max. 85%) = Rs. 4 to 8 lakhs per IdeaGovt. Grant (Max. 85%) = Rs. 4 to 8 lakhs per Idea

Each BI to Assist 10 Ideas / UnitsEach BI to Assist 10 Ideas / Units

R&D Institutions and BIs to Suggest & NurtureR&D Institutions and BIs to Suggest & Nurture

Can also be Dovetailed with other SchemesCan also be Dovetailed with other Schemes

Tie Up ‘Successes’ with VC / Angel FundsTie Up ‘Successes’ with VC / Angel Funds

Publicity & Proposals Essential for SuccessPublicity & Proposals Essential for Success

2. INCUBATORS (E & MD)2. INCUBATORS (E & MD)

2 / 2

8

10 Major Tool Rooms set up - German, Dutch, etc. 10 Major Tool Rooms set up - German, Dutch, etc. They are essential for MSMEs for Tools & Industrial Trng.They are essential for MSMEs for Tools & Industrial Trng. Tooling & Training Needs of MSMEs rising rapidly Tooling & Training Needs of MSMEs rising rapidly

As Govt. Funding is Limited, PPP is EmphasisedAs Govt. Funding is Limited, PPP is Emphasised Total Project cost – Rs. 210.00 cr.Total Project cost – Rs. 210.00 cr.

GOI Share – Rs. 135.00 cr.GOI Share – Rs. 135.00 cr. 2008-09 BE – Rs. 20.00 cr. 2008-09 BE – Rs. 20.00 cr.

EFC and FM have Cleared. CCEA Note with CAB SECTEFC and FM have Cleared. CCEA Note with CAB SECT ILFS appointed Transactional AdvisorILFS appointed Transactional Advisor

Guidelines by early JuneGuidelines by early June

3. MINI TOOL ROOMS ON PPP MODE3. MINI TOOL ROOMS ON PPP MODE

1 / 2

9

MTR cost may range from Rs. 2 cr. to Rs. 25 cr. MTR cost may range from Rs. 2 cr. to Rs. 25 cr. Govt’s VGF @ 40% maximumGovt’s VGF @ 40% maximum

Expected Govt. Funding = Rs. 135 cr.Expected Govt. Funding = Rs. 135 cr. Total Cost of Projects : Rs. 350 cr. in 4 yearsTotal Cost of Projects : Rs. 350 cr. in 4 years

To be Managed by Private Partners onlyTo be Managed by Private Partners only Local Industry to gain from Services / SkillsLocal Industry to gain from Services / Skills Traditional Centre-State Option also open Traditional Centre-State Option also open

GoI - Rs. 9 cr. and State - 6 cr. GoI - Rs. 9 cr. and State - 6 cr. Another Option Another Option

GoI – Rs. 9 cr. and State + Pvt. (Rs. 6 cr.)GoI – Rs. 9 cr. and State + Pvt. (Rs. 6 cr.)

3. MINI TOOL ROOMS ON PPP MODE3. MINI TOOL ROOMS ON PPP MODE

2 / 2

10

IPR ToolsIPR Tools Trade SecretTrade Secret Indl. Design Indl. Design G.I. G.I.

Patents Patents Copyrights Copyrights

TrademarkTrademark

Most MSMEs unaware of IPR Benefits / NormsMost MSMEs unaware of IPR Benefits / Norms

Total Project cost – Rs. 55.00 cr. (GoI = Rs. 50.00 cr.)Total Project cost – Rs. 55.00 cr. (GoI = Rs. 50.00 cr.)

2008-09 BE – Rs. 8.00 cr. 2008-09 BE – Rs. 8.00 cr.

EFC has Cleared. Details Thrashed with StakeholdersEFC has Cleared. Details Thrashed with Stakeholders

Scheme Ready. Guidelines Awaiting ApprovalScheme Ready. Guidelines Awaiting Approval

7 FOCUSSED ACTIVITIES :7 FOCUSSED ACTIVITIES :

Immediate Publicity RequiredImmediate Publicity Required

4. IPR CAMPAIGN4. IPR CAMPAIGN

1 / 3

11

1) 150 Awareness & Sensitization Programmes1) 150 Awareness & Sensitization Programmes

Rs. 1 lakh per Programme, by Assn etc. = Rs. 1.5 cr.Rs. 1 lakh per Programme, by Assn etc. = Rs. 1.5 cr.

2) 30 Pilot Studies with Assns./Clusters = Rs. 75 Lakh2) 30 Pilot Studies with Assns./Clusters = Rs. 75 Lakh

Rs. 2.5 lakh each for Diagnosis & Actions Rs. 2.5 lakh each for Diagnosis & Actions

3) 50 Interactive Seminars / Workshops3) 50 Interactive Seminars / Workshops

To Discuss Study Reports and ImplementationTo Discuss Study Reports and Implementation

@ Rs. 2 lakh = Rs. 1 cr.@ Rs. 2 lakh = Rs. 1 cr.

4) Short / Long Term Training of IPR Cadre for MSMEs4) Short / Long Term Training of IPR Cadre for MSMEs

50 ST (2-3 weeks) and 10 LT (6 months)50 ST (2-3 weeks) and 10 LT (6 months)

@ Rs. 6 lakh (ST) and Rs. 45 lakh (LT) = Rs. 7.5 cr.@ Rs. 6 lakh (ST) and Rs. 45 lakh (LT) = Rs. 7.5 cr.

4. IPR CAMPAIGN4. IPR CAMPAIGN

2 / 3

12

5) 40 IP Facilitation Centres by SPV on PPP 5) 40 IP Facilitation Centres by SPV on PPP For Handholding SMEs in IPR, on Low FeesFor Handholding SMEs in IPR, on Low Fees @ Rs. 65 lakh = Rs. 26 cr.@ Rs. 65 lakh = Rs. 26 cr.

6) Financial Assistance for Patents and GIs (Rs. 10 cr.)6) Financial Assistance for Patents and GIs (Rs. 10 cr.)

Patent @ Rs. 25,000 for Domestic, Rs. 2 lakh for Int’lPatent @ Rs. 25,000 for Domestic, Rs. 2 lakh for Int’l

GI Regn. – Rs. 1 lakh per caseGI Regn. – Rs. 1 lakh per case

7) Activities with International Agencies (Rs. 2 cr.)7) Activities with International Agencies (Rs. 2 cr.)

Best Practices, Capacity Building, ExchangesBest Practices, Capacity Building, Exchanges

25 nos. Domestic @ Rs. 5 lakh / 10 Int’l @ Rs. 7.5 lakh25 nos. Domestic @ Rs. 5 lakh / 10 Int’l @ Rs. 7.5 lakh

8) Miscellaneous and Contingency (Rs. 1.25 cr)8) Miscellaneous and Contingency (Rs. 1.25 cr)

4. IPR CAMPAIGN4. IPR CAMPAIGN

3 / 3

13

MSME’s ISO Reimbursement Scheme SuccessfulMSME’s ISO Reimbursement Scheme Successful

QMS: ISO-22000 (Food), ISO-18000 (Health) etc.QMS: ISO-22000 (Food), ISO-18000 (Health) etc.

QTT: Introduce proven Tools like 6-Sigma, 5-S, QTT: Introduce proven Tools like 6-Sigma, 5-S,

Kaizen, TPM, TQM etc. Kaizen, TPM, TQM etc.

Total Project cost – Rs. 50.00 cr (GoI = 80%)Total Project cost – Rs. 50.00 cr (GoI = 80%)

2008-09 BE – Rs. 7.00 cr 2008-09 BE – Rs. 7.00 cr

Scheme Ready. Guidelines Awaiting ApprovalScheme Ready. Guidelines Awaiting Approval

5. QUALITY MGT. SYSTEMS / TOOLS5. QUALITY MGT. SYSTEMS / TOOLS( QMS / QTT )( QMS / QTT )

1 / 3

14

5 Activities to Further Propagate Quality Mgt5 Activities to Further Propagate Quality Mgt::

1) Compulsory Courses in ITIs / Polytechnics1) Compulsory Courses in ITIs / Polytechnics QCI/NPC to prepare Course Curricula QCI/NPC to prepare Course Curricula 1800 ITIs / Rs. 4.25 cr p.a = Rs. 17 cr1800 ITIs / Rs. 4.25 cr p.a = Rs. 17 cr

2) Assist International Study Missions2) Assist International Study Missions For Detailed Study of Best QM InstitutionsFor Detailed Study of Best QM Institutions 2 missions / Rs. 1 cr p.a = Rs. 4 cr2 missions / Rs. 1 cr p.a = Rs. 4 cr

3) Special Programmes for Threatened Products 3) Special Programmes for Threatened Products Detailed Analysis of Selected ImportsDetailed Analysis of Selected Imports Leading to Improved Indian ProductsLeading to Improved Indian Products 2 Sectors / Rs. 0.6 cr p.a = Rs. 4 cr2 Sectors / Rs. 0.6 cr p.a = Rs. 4 cr

5. QUALITY MGT. SYSTEMS / TOOLS5. QUALITY MGT. SYSTEMS / TOOLS( QMS / QTT )( QMS / QTT )

2 / 3

15

4) Implement Quality Mgt Techniques in Clusters4) Implement Quality Mgt Techniques in Clusters

400 Units (in Clusters) to be Studied for QM400 Units (in Clusters) to be Studied for QM

Relevant QMS/QTT to be ImplementedRelevant QMS/QTT to be Implemented

100 Units / Rs. 2.5 cr p.a = Rs. 10 cr100 Units / Rs. 2.5 cr p.a = Rs. 10 cr

5) QM Awareness Programmes among MSMEs5) QM Awareness Programmes among MSMEs

400 Programmes in 4 years in Selected Areas400 Programmes in 4 years in Selected Areas

To Address Both Middle Mgt. & Shop Floor LevelsTo Address Both Middle Mgt. & Shop Floor Levels

100 nos. p.a @ Rs. 1.25 lakh x 4 years = Rs. 5 cr100 nos. p.a @ Rs. 1.25 lakh x 4 years = Rs. 5 cr

5. QUALITY MGT. SYSTEMS / TOOLS5. QUALITY MGT. SYSTEMS / TOOLS( QMS / QTT )( QMS / QTT )

3 / 3

16

Lean Manufacturing (LM) is Production of Goods Lean Manufacturing (LM) is Production of Goods Using less of all InputsUsing less of all Inputs

SMEs either Don’t Know or Can’t AffordSMEs either Don’t Know or Can’t Afford This, Flagship Scheme of NMCPThis, Flagship Scheme of NMCP Total Project cost – Rs. 230.00 cr.Total Project cost – Rs. 230.00 cr.

GOI Share – Rs. 185.20 cr. GOI Share – Rs. 185.20 cr. Rs. 224 cr. for 700 Mini Clusters (80% by GoI) Rs. 224 cr. for 700 Mini Clusters (80% by GoI) Rs. 2 cr. Admn./MonitoringRs. 2 cr. Admn./Monitoring Rs. 4 cr. For Awareness/ PublicityRs. 4 cr. For Awareness/ Publicity

2008-09 BE – Rs. 20.00 cr. 2008-09 BE – Rs. 20.00 cr. EFC Cleared. Discussion with FM (?)EFC Cleared. Discussion with FM (?)

6. LEAN MANUFACTURING6. LEAN MANUFACTURING

1 / 2

17

LMP to Cover 7,000 to 10,000 units in 4 yearsLMP to Cover 7,000 to 10,000 units in 4 years

Thru Mini Clusters @ 10 units per LM ConsultantThru Mini Clusters @ 10 units per LM Consultant

100 to 300 LM Consultants required p.a. – Expensive100 to 300 LM Consultants required p.a. – Expensive

Govt : Private Funding = 80 : 20 (1st Yr), 0 : 100 (2nd Yr)Govt : Private Funding = 80 : 20 (1st Yr), 0 : 100 (2nd Yr)

Rs. 32 lakh per Mini Cluster / Rs. 24 lakh per ConsultantRs. 32 lakh per Mini Cluster / Rs. 24 lakh per Consultant

Industry Associations to Execute, thru IAs & SPVsIndustry Associations to Execute, thru IAs & SPVs

Lead / Locate / Appoint / Pay / MonitorLead / Locate / Appoint / Pay / Monitor

IAs to be paid Rs. 8 lakh for Project Management ServicesIAs to be paid Rs. 8 lakh for Project Management Services

Industry to Drive & Create Capacities in Private SectorIndustry to Drive & Create Capacities in Private Sector

EFC has ordered Review/Stop Work after 1EFC has ordered Review/Stop Work after 1stst 100 ! 100 !

6. LEAN MANUFACTURING6. LEAN MANUFACTURING

2 / 2

18

7) 7) TECH UPTECH UP Scheme under Total RedraftingScheme under Total Redrafting

8) 8) MARKETINGMARKETING Scheme under Total RedraftingScheme under Total Redrafting

9) 9) ICTICT Scheme under Total RedraftingScheme under Total Redrafting

10) 10) DESIGNDESIGN Adviser appointed. Guidelines by June 08Adviser appointed. Guidelines by June 08

3 / 3

OTHER NMCP COMPONENTS:

UNDER FORMULATION

19

THANK YOUTHANK YOU

20

RGUMY to Handhold New EntrepreneursRGUMY to Handhold New Entrepreneurs

Support thru Lead Agencies – Udyami Mitras, i.e:Support thru Lead Agencies – Udyami Mitras, i.e:

-- To Link Entrepreneurs, Projects, Banks & Admn.-- To Link Entrepreneurs, Projects, Banks & Admn.

UMs to assist Project Selection & PreparationUMs to assist Project Selection & Preparation

Pursue with Banks and Government AgenciesPursue with Banks and Government Agencies

UMs to Receive Payment Per Case – Rs. 6000 & aboveUMs to Receive Payment Per Case – Rs. 6000 & above

Support to 1.5 lakh entrepreneursSupport to 1.5 lakh entrepreneurs

Awareness & UM Identification are Essential.Awareness & UM Identification are Essential.

RAJIV GANDHI UDYAMI MITRA YOJANARAJIV GANDHI UDYAMI MITRA YOJANA

OTHER SCHEMESOTHER SCHEMES

21

Total Project cost – Rs. 93.50 cr.Total Project cost – Rs. 93.50 cr. GOI Share – Rs. 76.54 cr. GOI Share – Rs. 76.54 cr. 2008-09 BE – Rs. 10.00 cr. 2008-09 BE – Rs. 10.00 cr.

Revised EFC Finalised. Under SubmissionRevised EFC Finalised. Under Submission Focuses on Energy and CertificationFocuses on Energy and Certification 6 Activities Proposed:6 Activities Proposed:

1) Renewable Energy : 5 Demonstration Projects in 4 yrs1) Renewable Energy : 5 Demonstration Projects in 4 yrs UNIDO / GEF Programme on Bio Fuel / GasUNIDO / GEF Programme on Bio Fuel / Gas R&D Centre of Excellence at IISC BangaloreR&D Centre of Excellence at IISC Bangalore Training / Website / PropagationTraining / Website / Propagation Rs. 1 cr. p.a = Rs. 4 cr.Rs. 1 cr. p.a = Rs. 4 cr. GEF Funding – Rs. 0.8 cr.GEF Funding – Rs. 0.8 cr.

7. TECHNOLOGY UPGRADATION7. TECHNOLOGY UPGRADATION

1 / 3

22

2) Implement Energy Audit Advice in 1200 units 2) Implement Energy Audit Advice in 1200 units Based on PCRA’s Audit of 2000 units (own cost)Based on PCRA’s Audit of 2000 units (own cost) Rs. 9 cr. (on 60% Government Aid) p.a. = Rs. 36 cr.Rs. 9 cr. (on 60% Government Aid) p.a. = Rs. 36 cr.

3) Assessment Study & SPV for CDM3) Assessment Study & SPV for CDM To set up 4 SPVs p.aTo set up 4 SPVs p.a Rs. 0.15 cr. per SPV = Rs. 2.4 cr. for 16 SPVsRs. 0.15 cr. per SPV = Rs. 2.4 cr. for 16 SPVs

4) Awareness Progs. For CER/CDM (Carbon Credits)4) Awareness Progs. For CER/CDM (Carbon Credits)

150 Progs. p.a @ Rs. 33,000 each = Rs. 2 cr. (4 yrs)150 Progs. p.a @ Rs. 33,000 each = Rs. 2 cr. (4 yrs)

May revise CDM Intervention, if successfulMay revise CDM Intervention, if successful

7. TECHNOLOGY UPGRADATION7. TECHNOLOGY UPGRADATION

2 / 3

23

5) Voluntary Product Cert. Reimbursement (Rs. 47.10 cr.)5) Voluntary Product Cert. Reimbursement (Rs. 47.10 cr.)

800 Units/Licences (ISI Mark) p.a800 Units/Licences (ISI Mark) p.a

Rs. 1 lakh (max.) per Unit/Licence = Rs. 27.52 cr. (4 yrs) Rs. 1 lakh (max.) per Unit/Licence = Rs. 27.52 cr. (4 yrs)

325 Units/Licences for 325 Units/Licences for Int’l Cert.Int’l Cert. for CE, ANSI etc. p.a for CE, ANSI etc. p.a

Rs. 2 lakh (max.) per Unit/Licence = Rs. 19.58 cr. (4 yrs)Rs. 2 lakh (max.) per Unit/Licence = Rs. 19.58 cr. (4 yrs)

6) Continuous Appraisal & Miscellaneous (Rs. 2.0 cr.)6) Continuous Appraisal & Miscellaneous (Rs. 2.0 cr.)

For Mid-Course ChangesFor Mid-Course Changes

Outsourcing / Hiring Experts etc. Outsourcing / Hiring Experts etc.

7. TECHNOLOGY UPGRADATION7. TECHNOLOGY UPGRADATION

3 / 3

24

To Survive competition, Indian MSMEs needTo Survive competition, Indian MSMEs need Modern Packaging & Marketing TechniquesModern Packaging & Marketing Techniques To Technically Study Competitors’ Products and To Technically Study Competitors’ Products and

Counter-respondCounter-respond NER Requires integration in Mainstream MarketsNER Requires integration in Mainstream Markets

Wide Ranging exposure to be EncouragedWide Ranging exposure to be Encouraged Total Project cost – Rs. 53.00 cr.Total Project cost – Rs. 53.00 cr.

GOI Share – Rs. 26.50 cr. GOI Share – Rs. 26.50 cr. 2008-09 BE – Rs. 4.00 cr. 2008-09 BE – Rs. 4.00 cr.

Preparing Revised EFC by 15th AprilPreparing Revised EFC by 15th April

8. MARKET ASSISTANCE & TECH. UPGRADATION8. MARKET ASSISTANCE & TECH. UPGRADATION(MARKETING)(MARKETING)

1 / 3

25

Activities Proposed (Still under Preparation):Activities Proposed (Still under Preparation):

1) Tech. Upgradation in Packaging with IIP, NID, IITs1) Tech. Upgradation in Packaging with IIP, NID, IITs Exposure to Best TechnologiesExposure to Best Technologies Cluster-based Studies for Status/ActionsCluster-based Studies for Status/Actions Unit-based Interventions on Cost SharingUnit-based Interventions on Cost Sharing

2) Study Competition for Self-improvement2) Study Competition for Self-improvement Exposure to Competitors’ Products in India & Exposure to Competitors’ Products in India &

AbroadAbroad Detailed study of specific ‘Defeats’, with reasonsDetailed study of specific ‘Defeats’, with reasons Enterprise-led Improvement ProgrammesEnterprise-led Improvement Programmes

8. MARKET ASSISTANCE & TECH. UPGRADATION8. MARKET ASSISTANCE & TECH. UPGRADATION(MARKETING)(MARKETING)

2 / 3

26

3) Modern Management Techniques Adoption3) Modern Management Techniques Adoption Basically Skill Development in Latest TechnologiesBasically Skill Development in Latest Technologies

4) NER Exposure and Marketing Assistance4) NER Exposure and Marketing Assistance Connect NER Entrepreneurs to MainstreamConnect NER Entrepreneurs to Mainstream Through Subsidised Exposure Visits to India’s bestThrough Subsidised Exposure Visits to India’s best Participation in National Fairs, Study Missions and Participation in National Fairs, Study Missions and

WorkshopsWorkshops

8. MARKET ASSISTANCE & TECH. UPGRADATION8. MARKET ASSISTANCE & TECH. UPGRADATION(MARKETING)(MARKETING)

3 / 3

27

Low ICT Usage by SMEs – A Cause of ConcernLow ICT Usage by SMEs – A Cause of Concern Most ICT Cos. Focusing on SMEs – but Slow ProgressMost ICT Cos. Focusing on SMEs – but Slow Progress Intensive Discussions with Stakeholders of Major ICT Cos.Intensive Discussions with Stakeholders of Major ICT Cos. Final EFC Draft being Finalised – Costing being Worked OutFinal EFC Draft being Finalised – Costing being Worked Out Total Project cost – Rs. 100.00 cr.Total Project cost – Rs. 100.00 cr.

GOI Share – Rs. 60.00 cr. GOI Share – Rs. 60.00 cr. 2008-09 BE – Rs. 10.00 cr. 2008-09 BE – Rs. 10.00 cr.

Original Project Cost – Rs. 207.00 cr.Original Project Cost – Rs. 207.00 cr. GOI Share – Rs. 104.00 cr.GOI Share – Rs. 104.00 cr. 2008-09 BE – Rs. 10 cr.2008-09 BE – Rs. 10 cr.

Proposal for PPP / Cost-sharing on Most ActivitiesProposal for PPP / Cost-sharing on Most Activities

9. PROMOTING ICT IN SMEs9. PROMOTING ICT IN SMEs

1 / 2

28

Activities under Consideration:Activities under Consideration:

9. PROMOTING ICT IN SMEs9. PROMOTING ICT IN SMEs

No.No. ActivitiesActivities GoIGoI ClusterCluster

11 25 Clusters25 Clusters

a. Diagnostic Studiesa. Diagnostic Studies

b. E-Readiness Infrastructure (25 locations)b. E-Readiness Infrastructure (25 locations)

c. Web Portals (25)c. Web Portals (25)

d. HRDd. HRD

e. Traininge. Training

2.002.00

13.0013.00

15.0015.00

7.007.00

5.005.00

0.000.00

4.504.50

10.0010.00

3.003.00

9.009.00

Sub Total (Rs. 68.50 cr)Sub Total (Rs. 68.50 cr) 42.0042.00 26.5026.50

22 Association Websites (@ Rs. 8L per Assn for 40 Assn.)Association Websites (@ Rs. 8L per Assn for 40 Assn.) 8.408.40 6.006.00

33 E-Catalogue Building & Hosting (10,000 units)E-Catalogue Building & Hosting (10,000 units) 3.503.50 3.503.50

44 SME Networking Portals (PPP)SME Networking Portals (PPP) 6.006.00 4.004.00

55 Project OfficeProject Office 0.100.10 0.000.00

TOTAL (Rs. 100 cr.)TOTAL (Rs. 100 cr.) 60.0060.00 40.0040.00

2 / 2

Hosted Models & Rolling Fund – Under Consideration

29

Designs make SME Products CompetitiveDesigns make SME Products Competitive

Ballpoint Pens, Tooth-brushes, etc.Ballpoint Pens, Tooth-brushes, etc.

Design Input Essential for Survival of MSMEsDesign Input Essential for Survival of MSMEs

Cluster-based Design “Clinics” ProposedCluster-based Design “Clinics” Proposed

Suggestions / Specific Packages RequiredSuggestions / Specific Packages Required

Need to Work Out Cost and Sharing FormulaNeed to Work Out Cost and Sharing Formula

Previous Proposal mainly GovernmentalPrevious Proposal mainly Governmental

One National Centre with NIDOne National Centre with NID

6 Regional Centres and 225 Design Clinics6 Regional Centres and 225 Design Clinics

10. DESIGN CLINICS / SUPPORT10. DESIGN CLINICS / SUPPORT

1 / 2

30

Total Project cost – Rs. 50.00 cr.Total Project cost – Rs. 50.00 cr. GOI Share – Rs. 41.00 cr. GOI Share – Rs. 41.00 cr. 2008-09 BE – Rs. 5.00 cr. 2008-09 BE – Rs. 5.00 cr.

Scheme held up due to lack of SpecificitiesScheme held up due to lack of Specificities Discussions with FICCI, CII etc. onDiscussions with FICCI, CII etc. on

DPR has been Insisted. DPR has been Insisted. Bids called. Bids called. Thereafter, EFC and CCEA to follow Thereafter, EFC and CCEA to follow 3 months target3 months target

10. DESIGN CLINICS / SUPPORT10. DESIGN CLINICS / SUPPORT

2 / 2