MOSES KOTANE HOSPITAL MAINTENANCE PROJECT: SUMMARY OF BOQ
PART AMOUNT
1 ARCHITECTURAL WORKS2 CIVIL WORKS3 STRUCTURAL WORKS4 MECHANICAL WORKS5 ELECTRICAL WORKS
SUB TOTAL (1) -
CONTINGENCIES AT 0% -
SUB TOTAL (2) -
VAT AT 14% -
GRAND TOTAL -
Description

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNT
SECTION NO.2
ALTERATIONS
Bill No. 1
ALTERATIONS
TEMPORARY BARRIERS, SCREENS,
ETC
Temporary barriers, screens, etc
including removal
1 Screen barrier 1500mm including all necessary supports, m 600
corners, ends, etc
REMOVAL OF EXISTING WORK
Taking out doors, windows, etc including
thresholds, sills, etc and handing to employer
2 Timber double fire door and frame 1800 x 2100mm high No 14
overall from one brick wall
Taking up and removing vinyl floor coverings,
carpeting, etc
3 Vinyl floor covering including preparing screed for new m² 190
vinyl floor covering
Hacking up/off and removing granolithic, screeds, plaster,
etc from concrete or brickwork and preparing surfaces for
new screeds, plaster, etc
4 Plaster and rhinolite on walls m² 212
Taking out/off and removing sundry metalwork
5 Burglar bars Item 1
MAKING GOOD OF FINISHES ETC
Repair doors, etc
6 Repair and make good to double door No 2
BUDGETARY ALLOWANCES
7 Allow R10,000.00 (ten thousand rands only) for loading and Item 1,00
removing all rubble, taking away to a dumping site within 50km
from site.
Total Carried to Summary
DESCRIPTION
Page 1

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SECTION NO. 3
Bill No.2
ROOF COVERINGS, ETC
CHROMADEK METAL SHEETING AND ACCESSORIES
Chromadek IBR iron roofing sheets
Repair existing
1 Inspect and repair existing roof covering including replacing m² 130,00
missing roof bolts, sealing joints between sheets fixing and
flashing, prepare and paint with roof paint
Total Carried to Section Summary
Page 2

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Bill No.3
CARPENTRY AND JOINERY
DOORS
FIRE DOORS
Fire doors are to be in accordance to SANS 10400 part T
1 1675 x 2100mm Supawood Rubidor fire door complete No 14
with 100 x 300mm max glazed viewing panel all to
manufacture's specification
2 2400 x 2100 Supawood Rubidor fire door complete with No 2
100 x 300mm max glazed viewing panel all to manufacture
specification
Total Carried to Section Summary
Page 3

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Bill No.4
IRONMONGERY
THE FOLLOWING IRONMONGERY FIXED TO DOORS, ETC
Locks, Bolts and latches
1 TS 5000 R-ISM - Door closer with electromechanical
hold-open device andsmoke control unit No 16,00
2 300 x 32mm laminated clad beam bumper rail by specialist m 15
with bullnose on top and bottom
3 TCS hygien SD-8-1250ml stainless steel manually operated No 2
soap dispenser
4 Franke stainless steel paper towel dispenser No 2
Code STRX 600
5 Italtile Rectangular Frameless Bevelled mirror No 2
600 x 400 x 10mm (SKU: BSMR4060R)
Total Carried to Section Summary
Page 4

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Bill No.5
METALWORK
ALUMINIUM WINDOWS, DOORS, ETC
Aluminium doors - Natural anodised
1 1600 x 2100mm KAL slenderline grade AA10 natural anodised No 1,00
alluminium double door with horizontal two side panel 225mm
both sides complete with 8mm Africa glass frosted toughened
safety glass, all to Architect's approval
2 1600 x 2100mm KAL slenderline grade AA10 natural anodised No 1,00
alluminium double door with horizontal two side panel 4287mm
and 1650mm complete with 8mm Africa glass frosted toughened
safety glass, all to Architect's approval
3 1600 x 2100mm KAL slenderline grade AA10 natural anodised No 5,00
alluminium double door with horizontal two side panel 603mm
both sides complete with 8mm Africa glass frosted toughened
safety glass, all to Architect's approval
4 1600 x 2100mm KAL slenderline grade AA10 natural anodised No 1,00
alluminium double door with horizontal two side panel 403mm
both sides complete with 8mm Africa glass frosted toughened
safety glass, all to Architect's approval
5 1600 x 2100mm KAL slenderline grade AA10 natural anodised No 3,00
alluminium double door with horizontal two side panel 1000mm
both sides complete with 8mm Africa glass frosted toughened
safety glass, all to Architect's approval
6 1600 x 2100mm KAL slenderline grade AA10 natural anodised No 1,00
alluminium double door with horizontal two side panel 628mm
and 150mm complete with 8mm Africa glass frosted toughened
safety glass, all to Architect's approval
7 1600 x 2100mm KAL slenderline grade AA10 natural No 1,00
anodised alluminium double door with horizontal two
side panel 898mm and 2440mm complete with 8mm
Africa glass frosted toughened safety glass, all to
Architect's approval
8 1600 x 2100mm KAL slenderline grade AA10 natural No 1,00
anodised alluminium double door complete with 8mm
Africa glass frosted toughened safety glass, all to
Architect's approval
Total Carried Forward
Page 5

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
Aluminium shopfronts -Natural anodised
9 Alter fixed glazing panel to make openable panel windows Item
Total Carried to Section Summary
Page 6

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Bill No.6
PLASTERING
One Coat steel trowelled plaster and rhinolite on brickwork
1 On walls internally( to receive paint) m² 740,00
Total Carried to Section Summary
Page 7

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Bill No.7
FLOOR COVERING, WALL LINNING, ETC
FLOOR COVERING
Vinyl Floor
1 2mm thick "tarkett Optima" momogenous vinyl floor m² 70,00
sheeting(code:856) installed in strict accordance with
manufacture's specification
Total Carried to Section Summary
Page 8

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Bill No.8
PLUMBING AND DRAINAGE
Sanitary Fittings, Tanks, Geysers, Etc
1 Vaal Sanitaryware Bantam Cloakroom 456 x 290mm White No 2,00
vitreous china wash hand basin complete with and including
elbow action pillar type 1/4 turn mixer with aerated swivel outlet,
1/2 BSP male inlets (code: 521-21). Italtile pop up basin waste
with overflows (SKU:TVAC1034/CH) and Cobra chromated
bottle trap (Code:345/50)
Total Carried to Section Summary
Page 9

Part 1: Architectural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Bill No.9
PAINTING
Paint to walls
1 Two coats morning sigh 6 plascon enamel on base coat and m² 740,00
under coat to manufacture's specification existing
Paint to Ceiling
2 Prepare, paint two coats plascon ceiling paint to manufacture's m² 52
specificatio. Colour white
Total Carried to Section Summary
Page 10

Part 1: Architectural Works
AMOUNT
ALTERATIONS
ROOF COVERINGS, ETC
CARPENTRY AND JOINERY
IRONMONGERY
METALWORK
PLASTERING
FLOOR COVERING, WALL LINNING, ETC
PLUMBING AND DRAINAGE
PAINTING
Carried to Final Summary -
SUMMARY OF SECTIONSSECTION
SECTION 2
SECTION 3

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNT
SANS SECTION 1: SITE CLEARANCE
1,1 CLEAR SITE
1 .1.1 8.2.1 Clear and grub Site m² 1 000,0
8.2.2 Remove and grub large trees and tree stumps of girth Over and up to
1.1.2 1 m 2 m No. 2,0 Rate Only
1.1.3 2 m 3 m No. 1,0 Rate Only
1.1.4 3 m upwards in 1 m steps No. 0,0 Rate Only
1.1.5 8.2.4 Reclear surfaces (provisional) (where ordered by Engineer) ha 0,5
1.1.6 8.2.5 Take down existing fences m 15,0
1.1.7 8.2.6 Clear hedge and, where not scheduled separately, fence m 50,0
1.1.8 8.2.7 Dismantle and remove pipelines (not encased in concrete), m 5,0 Rate Only
electricity transmission lines, cables, etc.
1.1.9 8.2.7 Dismantle and remove pipelines encased in concrete m 5,0 Rate Only
1.1.10 8.2.7 Excavate carefully, lift, recover and deliver pipes tositestore. m 5,0 Rate Only
(Excavation and backfilling measured elsewhere)
1.1.11 8.2.8 Dismantle steelwork, etc. t 0,3
1.1.13 8.2.9 Cart materials and debris to approved sites and dump t.km 200,0
(provisional), off site ALTERNATIVE
1.1.14 PSC8.2.10 Remove topsoil to depth ordered by the Engineer and stockpile m³ 50,0
PSC8.2.11 Remove and dispose off site:
1.1.15 (a) Asphalt surfacing and asphalt kerbs m³ 30,0 Rate Only
1.1.16 (b) Kerbing and/or channelling m 30,0
(c) Structures:
1.1.17 (i) plain concrete m³ 10,0
1.1.18 (ii) reinforced concrete m³ 3,0
1.1.19 (iii) brick work m³ 20,0
1.1.20 (iv) stone masonry m³ 10,0
1.2.21 (v) interlocking concrete segmental paving blocks (all colours) m² 20,0
1.2.22 (vi) concrete slabs (450 x 450mm) m² 20,0
1.2.23 (vii) brick paving m² 30,0
1.2.24 (viii) grassing m² 100,0
Total Carried Forward
DESCRIPTION
Page 1

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
Backfilling and reinstatement of roads
(i) 150mm base m² 30,0
(ii) 150mm subbase m² 30,0
(iii) 150mm selected subgrade m² 30,0
Surfacing
(i) 30mm Bitumen hot - mix: Fine m² Rate Only
(ii) 30mm Premix m² 10,0 Rate Only
Backfilling and reinstatement of footways
a) Using removed materials:
(i) interlocking concrete segmental paving blocks (all colours) m² 75,0
(ii) concrete slabs (450 x 450mm) m² 10,0
(iii) Brick paving m² 10,0 Rate Only
(iv) Grassing m² 500,0
(v) Kerbing (all types of kerbing) m² 100,0
b) Using new supplied materials:
(i) 30mm premix m² 100,0 Rate Only
(ii) Interlocking concrete segmental paving blocks, including a 20mm
river sand bedding layer, jointing sand (plaster sand) and mortar infill
between edge restraint and blocks
1) Grey blocks m² Rate Only
2) Coloured blocks m² Rate Only
(iii) Concrete slabs (450 x 450mm) including a 20mm river sand m² 10,0
bedding layer, jointing mortar
(iv) Brick paving uncluding a 20mm river sand bedding layer, m² 30,0
jointing sand (plaster sand) and mortar infill between edge
restraint and bricks
(v) Unreinforced concrete ≤ 75mm thick (15MPa) m² 25,0 Rate Only
(vi) Reinforced concrete ≤ 75mm thick m² 25,0
(vii) Grassing m² 2 000,0
(viii) Kerbing, including a 50mm bedding (cement and river sand), m² 30,0
jointing mortar and 15MPa concrete haunching at all jointsc) Steel Palisade fences (2.1m height) m 10,0
1.1.21 8.2.3 Remove and grub all trees and tree stumps regardless of girth No. 3,0
1.1.22 Remove existing paving and dispose off site m² 25,0
1.1.23 Remove existing paving and stockpile for reuse m² 25,0
Total Carried to Section Summary
Page 2

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SECTION 1: EARTHWORKS (SMALL WORKS)
2,1 SANS CLEARING
2.1.1 8.2.1 Clear Site incl. remove trees up to 1 m girth to approved areas off Site m² 1 000,0
8.2.2 Remove trees of girth: Over and up to
2.1.2 1,0 m 2,0 m No. 0,0 Rate Only
2.1.3 2,0 m 3,0 m No. 0,0 Rate Only
2,2 1200 DA EXCAVATION
2.2.1 8.3.1 Remove topsoil to nominal depth 150 mm, stockpile, and maintain m² 100,0
8.3.2 Excavate in all materials and backfill or place embankment for: m³ 150,0
2,3 Extra-over item .2.1 for excavation in:
2.3.1 Intermediate material m³ 15,0
2.3.2 Hard rock material m³ 5,0
2,4 8.3.3 Overhaul (Prov.) m³.km 0,0
2.4.1 (a) Limited overhaul m³ 15,0
2.4.2 (b) Long overhaul m³.km 20,0
2,5 8.3.4 IMPORT MATERIAL
2.5.1 To complete embankment : from borrow pits m³ 70,0
2,6 FINISHINGS
2.6.1 8.3.6 Topsoiling m² 1 000,0
2.6.2 Local vegetation m² 1 000,0
Total Carried to Section Summary
Page 3

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SANS SECTION 4: PIPE TRENCHES
4 .1 PSDB 8.3.1 SITE CLEARANCE
4 .1.1 Clear vegetation and trees of girth up to 1 m m² 25,0
4.1.2 Clear trees of girth over 1 m and up to 2 m No. 1,0 Rate Only
4 .1.4 Remove topsoil to depth of 100mm m² 50,0
4 .2 EXCAVATION
PSDB 8.3.2 Excavate in all materials beyond the specified minimum trench base
width for manholes, catch pits, chambers, anchor blocks and beams,
cut-off collars and the like, backfill, compact and dispose of surplus
material:
4.2.1 PSDB 8.3.2 (1) depth 0m up to 1,0m m³ 30,0
4.2.2 (2) depth over 1,0m up to 2,0m m³ 10,0
4.2.3 (3) depth over 3m m³ 5,0 Rate Only
(iii) Extra over items 8.3.2(a)(i) and (ii) for hand excavation where
ordered by the Engineer:
(1) In soft material m³ 5,0 Rate Only
(2) In intermediate material m³ 2,0 Rate Only
Over-excavate bottom of trench, refill and compact m³ 2,0 Rate Only
Hard rock excavation where blasting is Prohibited by the Engineer m³ 5,0 Rate Only
Over excavate bottom of trench in waterlogged and refill with 19mm m³ 2,0 Rate Only
stone where ordered in writing by the Engineer
Extra over items 8.3.2(a)(i) and (ii) for hand excavation where ordered m³ 5,0 Rate Only
by the Engineer:4.2.4 Intermediate excavation m³ 2,0 Rate Only
4.2.5 Hard rock excavation m³ 2,0 Rate Only
4.2.6 8.3.2(c) Excavate and dispose of unsuitable material from trench bottom m³ 5,0
(Provisional)
4,3 EXCAVATION. ANCILLARIES Make up deficiency in backfill
material (Provisional)
4.3.1 8.3.3.1(a from other necessary excavations on site m³ 20,0 Rate Only
4.3.2 8.3.3.1(b by importation from designated borrow pits m³ 10,0 Rate Only
4.3.3 8.3.3.1(c by importation from commercial or off-site sources selected by the C m³ 10,0 Rate Only
4.3.4 8.3.3.2 Open up and close down approved borrow pit Sum 1,0 Rate Only
Total Carried Forward
Page 4

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
4.3.5 8.3.3.3 Compaction in areas subject to road traffic
4.3.5.1 (a) Under roadways m³ 5,0
4.3.5.2 (b) Elsewhere m³ 5,0
8.3.3.4 Overhaul
4 .3.6 Special haul : Over 50 m up to 0,5 km (provisional) m³ 10,0 Rate Only
4.3.7 Limited overhaul (provisional) m³ 10,0 Rate Only
4.3.8 Long overhaul (provisional) m³.km 50,0 Rate Only
4.3.9 8.3.4(b) Temporary works : Control water inflow from excavations
4.3.9.1 Provide equipment Sum 1,0 Rate Only
4.3.9.2 Operate and maintain Days 1,0 Rate Only
4.3.9.3 Remove equipment Sum 1,0 Rate Only
4 .4 EXISTING SERVICES
8.3.5 Services across and in trenches
Location
4.4.1 Supply or hire of specialist equipment for the detection of a Sum 1,0 Rate Only
particular service
4.4.2 The use of equipment in item .4.1 h 10,0 Rate Only
4.4.3 Excavate by hand in soft material to expose identified services m³/daywk 10,0 Rate Only
8.3.5(a) Services that intersect a trench
4.4.6 Cables No. 2,0 Rate Only
4.4.7 House water connections No. 2,0 Rate Only
4.4.8 Water mains up to 300 mm diam. No. 2,0 Rate Only
4.4.9 Water mains over 300 mm diam. No. 2,0 Rate Only
4.4.10 Stormwater pipes up to 600 mm No. 1,0 Rate Only
8.3.5(b) Services that adjoin a trench
4.4.11 Cables m 5,0 Rate Only
4.4.12 Water mains up to 300 mm diam. m 5,0 Rate Only
MISCELLENEOUS
4,5 Provision for repair and reinstatement of existing sprinkler system Prov Sum 1,0
4,6 Provision for additional Sprinker system Prov Sum 1,0
Total Carried to Section Summary
Page 5

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SANS SECTION 5: GABIONS AND PITCHING
5,1 EXCAVATION See Section D, DA, DE as applicable
5,2 PITCHING
5.2.1 8.2.5 Ordinary pitching, of thickness at least 300 mm on slope of bank where sho m² 100,0
Total Carried to Section Summary
Page 6

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SECTION 9: WATER MAINS
0,2 SANS PIPELINE
5,1 8.2.1 Supply, lay, bed (class B bedding), test and disinfect, backfill complete
with victaulic couplings denso wrapped, high impact uPVC Class
16 pipes:a. DN110 m 10,0
b.DN160 m 10,0
c. DN200 m 10,0
5,6 PSL 8.2.17 a) Supply, fixing and bedding of valves with its fittings complete (including
chambers as per drawing JW100-DET03-W01). Gate Valves Class 16,
anti-clockwise closing for the following pipe sizesi)Replace Ball valve for Ground Reservoir. Automation by others No. 1,0
Total Carried to Section Summary
Page 7

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SANS SECTION 10: BEDDING
10,1 PROVISION OF BEDDING
Available from trench within 0,5 km (Subclause 3.4.1)
10.1.1 8.2.1 a) Selected granular material m³ 15,0
10.1.2 b) Selected fill material m³ 10,0
Imported from
8.2.2.1 a) Other necessary excavations within 0.5 km (Provisional)
10.1.3 1) Selected granular material m³ 5,0
10.1.4 2) Selected fill blanket m³ 5,0
8.2.2.2 b) Borrow pits (Provisional)
10.1.5 1) Selected granular material m³ 5,0 Rate Only
10.1.6 2) Selected fill material m³ 5,0 Rate Only
8.2.2.3 c) Commercial sources (Provisional)
10.1.7 1) Selected granular material m³ 5,0 Rate Only
10.1.8 2) Selected fill material m³ 5,0 Rate Only
10.1.9 8.2.3 Concrete bedding (Provisional) m³ 2,0 Rate Only
8.2.5 Overhaul of material for bedding (Provisional) where ordered Extra-
over items .1.1 to .1.610.1.10 a) Selected granular material m³.km 5,0 Rate Only
10.1.11 b) Selected fill material m³.km 10,0 Rate Only
Total Carried to Section Summary
Page 8

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SANS SECTION 11: CABLE DUCTS
11,1 SITE CLEARANCE - Refer Other Sections
11,2 8.2.2 EXCAVATION
Extra-over item ....... for excavating in ..... (provisional) m³ 5,0
Excavate unsuitable material and dispose (provisional) m³ 5,0
8.2.3 Shore trench opp...building
11,3 8.2.5 SUPPLY, LAY, BED, AND PROVE DUCTS
11.3.1 100 mm diam. pitch-impregnated fibre pipes m 5,0
11.3.1 160 mm diam. uPVC pipes m 5,0
11,4 8.2.6 IMPORT BEDDING MATERIAL (provisional) m³ 10,0
11,5 8.2.7 DRAW PITS/MANHOLES COMPLETE WITH TYPE APPROVED
COVER AND FRAME - TP MATCH EXISTING ONES ON SITE
11.5.1 Draw pit 600 mm x 600 mm No. 1,0
11.5.2 Manhole 1 m x 1 m No. 1,0
11,6 PSLC 3.4 CABLE PROTECTION
11.6.1 Precast concrete cable cover slabs to H.V. cables (PLSC 2.2and 3. m 5,0 Rate Only
11.6.2 Polyethylene cable cover strips to L.V. cables (PSLC 2.1.2 and 3.3. m 5,0 Rate Only
11,7 8.2.8 CABLE ROUTE MARKERS Complete, installed, and record submitted No. 5,0 Rate Only
11,8 8.2.4 REINSTATE ROAD SURFACES COMPLETE WITH ALL COURSES
11.8.1 Gravel on shoulders m² 5,0
11.8.2 Bitumin premix 30 mm thick m² 2,0 Rate Only
11,9 8.2.9 OVERHAUL (provisional) where ordered m³.km 5,0
Total Carried to Section Summary
Page 9

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SANS SECTION 12: SEWERS
0,1 SITE CLEARANCE
0,2 EXCAVATION
.2.1 Clear Site
Excavate in all materials, select materials, backfill, and dispose of
.2.2 surplus and unsuitable material
0,3 1200 LD PIPEWORK
8.2.1 Supply, lay, joint, backfill on class B bedding and test the following pipes
as detailed in the project specification:
a) Class 34 Upvc heavy duty sewer pipe
i) DN110 m 10,0
ii) DN160 m 10,0
.3.1 iii) DN200 m 10,0
.3.2 iv) DN250 m 10,0
.3.3 iv) DN315 m 10,0 Rate Only
8.2.2 Extra-over item .3 for supply, lay, joint, bed Class and test specials
.3.5 150 mm 45 deg. access bends No. 15,0
.3.6 225 mm x 100 mm pipe junctions No. 0,0
.3.7 375 mm end caps No. 0,0 Rate Only
0,4 1200 LB BEDDING MATERIALS Supply and deliver
.4.1 Selected granular material m³ 10,0
.4.2 Selected fill material m³ 10,0
0,5 1200 LD Manholes
.5.1 Manholes 1,250mm diameter complete with cover and frame
.5.2 (a) > 0m but ≤ 1.5m deep No. 10,0
.5.3 (b) > 1.5m but ≤ 2.0m deep No. 10,0
Manholes 1,500mm diameter complete with cover and frame
(a)> 2m but ≤ 3.5m deep No. 1,0
(b) > 3.5m No. 1,0 Rate Only
Total Carried Forward
Page 10

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
Existing services
C2.1.6.1 Manhole bottom repair and/or replacement
a) Repairs without channel replacement
i) 150 > and ≤ 250mm diameter m² 55,0
ii) 250 > and ≤ 315mm diameter m² 25,0
b) Channel replacement
i) 150 > and ≤ 250mm diameter m² 55,0
ii) 250 > and ≤ 315mm diameter m² 25,0
C2.1.6.2 Step iron repair and/or replacement
a) Re-instatement of existing step-irons No. 2,0
b) New step-irons No. 10,0
C2.1.6.3 Stopping active manhole wall leaks No. 5,0
C2.1.6.4 Surface stabilisation of concrete manholes (where necessary) m² 5,0
C2.1.6.5 Patching masonry walls m² 20,0
C2.1.6.6 Manhole waterproofing m² 10,0
C2.1.6.7 Replace benching in existing manholes m² 25,0
C2.1.6.8 Reseal existing manholes
(a) Masonry walls m²
(b) Pre-cast concrete rings m²
.5.4 Extra-over item .5 for Type 2A cover and frame in road areas No. 5,0
8.2.4 Extra-over item .5 for construction of backdrops and ramps including
extra excavation, formwork, joints, etc., to Dwg No. ...................for
depths over and up to .5.5 - 1,0 m No. 0,0
.5.6 1,0 m 2,0 m No. 0,0
.5.7 2,0 m 3,0 m No. 0,0
Total Carried Forward
Page 11

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
8.2.6 Erf Connections Direct as per Dwg. No. LD-7
.5.8 100 mm, 4-5 m long, to sewers up to 225 mm No. 2,0
.5.9 156 mm, 4-5 m long, to sewers up to 375 mm No. 2,0
Sloping drop as per Dwg. No. LD-8, max. slope 1:20
.5.10 100 mm, 2-3 m long, to sewers up to 225 mm No. 0,0
0,6 SUNDRIES
.6.1 8.2.7 Casing to pipes, concrete mix ...... m³ 1,0 Rate Only
.6.2 8.2.8 Anchor blocks, concrete mix ...... m³ 1,0 Rate Only
.6.3 8.2.9 Marker posts, complete, installed No. 3,0
.6.4 8.2.10 Permanent plug stoppers No. 2,0
.6.5 8.2.11 Break into and connect to existing manhole at ... including flexible Sum 1,0
joints as Dwg. No. LD-2 and make good all benching
.6.6 8.2.12 Raising or lowering of existing manholes No. 1,0 Rate Only
Total Carried to Section Summary
Page 12

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SECTION :STORMWATER DRAINAGE SITE CLEARANCE AND
EXCAVATION
0,1 Clear Site
0,2 Excavate, select materials, backfill and dispose of surplus/unsuitable material
0,3 SANS PIPES
8.2.1 Supply, handle, lay, bed Class B Ogee concrete pipes, Class 100D
.3.1 a) 300 mm diameter m 10,0 Rate Only
.3.2 b) 450 mm diameter m 10,0 Rate Only
.3.3 c) 600 mm diameter m 10,0 Rate Only
d) 900 mm diameter m Rate Only
.3.4 PS.... d) 300 mm diameter open joints with geofabric m 0,0
.3.5 SANS e) Extra-over item 13.3.2 for precast inlet and outlet for 450 mm pipe No. 0,0 Rate Only
.3.6 8.2.3 f) Extra-over item 13.3.3 for approx. 30 deg. skew ends on 600 mm No. 0,0 Rate Only
pipeline
0,5 SANS BOX CULVERTS (PRECAST CONCRETE) Supply, bed and install
a) complete with invert slabs
.5.1 1,5 m x 1,0 m m 1,0 Rate Only
.5.2 3,0 m x 2,0 m m 1,0 Rate Only
b) without invert slabs
.5.3 3,0 m x 2,0 m m 0,0
.5.4 8.2.5 c) cast-in-situ concrete 30 MPa/40 mm slabs m³ 0,0
.5.6 8.2.7 e) Precast inlets and outlets to Dwg No. ............ No. 0,0
0,7 8.2.8 MANHOLES Construct complete with covers and frames
.7.1 a) Type ..., Dwg No ... 1,5 m deep No. 1,0
.7.2 b) Type ..., Dwg No ... 2,5 m deep No. 1,0
0,8 8.2.8 CATCHPITS Construct complete with grid inlets
.8.1 a) To match existing on site No. 1,0 Rate Only
MANHOLES:
Construct manholes complete with covers, frames, to match existing
for the following depthsa) 0 to 1 m No. 1,0
b) 1 to 2m No. 1,0
Total Carried Forward
Page 13

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
0,9 MISCELLANEOUS
.9.1 8.2.11 Anchors for pipes No. 0,0
.9.2 8.2.12 Extra-over item ...3 for construction of inclined pipe culverts up to
450 mm diameter m 0,0
0,7 BRICKWORK
.7.1 8.2.9(a) 115 mm thick m² 30,0 Rate Only
.7.2 230 mm thick m² 10,0 Rate Only
.7.3 345 mm thick m² 10,0 Rate Only
.7.4 8.2.9(b) Plaster (not less than 10 mm and not more than 15 mm thick) m² 10,0
.7.5 8.2.9(c) Benching in prescribed mix 20 concrete with granolithic rendering m² 5,0
8.2.10 ACCESSORIES
.7.7 Grid inlets (Heavy Duty Grating) including frames No. 10,0
.7.8 Step irons No. 50,0
.7.9 SUBSURFACE DRAINS No. 0,0
8.2.14 Pipes in subsurface drains:
Class 4 uPVC pipes complete with couplings:
110 mm internal diam, perforated m 33,0
Class 6 uPVC pipes complete with couplings:
110 mm internal diam, perforated m 5,0
Heavy-duty fittings:
Stop ends, 110 mm internal diam No. 3,0
8.2.15 Geofabric (Bidim B5) m² 100,0
Total Carried to Section Summary
Page 14

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SANS SECTION : ERF CONNECTIONS
0,1 ERF CONNECTIONS
5,9 Reconnect house connections including 110/160mm saddles, HDPE
Class 12.5, PE100, SDR 13.6 lead and all fittings necessary to tie into
existing house connection and meter box See Drawing JW100-
DET07-W01a) Short house connections (Not more than 5 metres) rate to No. 5,0
include stopcock
b) Long house connection, road crossing inclusive of drilling under No. 5,0
road (Not more than 20 metres) The rate shall include launching
and reception pits, drilling and material
5,1 Replacement of domestic water meters with new 20mm above ground No. 2,0
water meters.
5,11 a) Provisional Sum for fittings and specials in addition to those Prov Sum 1,0
measured above as per Engineer's instruction
5,12 b) Profit on item 5.11a above % 50 000,0
Total Carried to Section Summary
Page 15

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SECTION : SEGMENTED PAVING
16,1 SANS CONSTRUCTION BELOW DESIGNATED TOP OF SUBBASE
16.1.1 Earthworks, subgrade and subbase
16.1.2 SANS Strengthen substandard layers as specified in PSMJ... to the applicable m² 10,0
tolerances given in Subclause 6.2 of SANS 1200 MJ
8,1 Adjust levels of existing subbase pavement to the applicable tolerances
given in Subclause 6.2 of SANS 1200 MJ and dispose of spoil where
relevanta) As specified in Subclause 5.1.2 of SANS 1200 MJ
16.1.3 1) Areas that are too high m² 20,0
16.1.4 2) Areas that are too low m² 20,0
16.1.5 b) Lower subbase to designated levels as specified in Subclause m² 20,0
5.1.2.2 of SANS 1200 MJ
16.1.6 c) Lower existing surface by 150-200 mm, and prepare stabilized ..... m² 20,0
subbase for block as specified in Subclause 5.1.2.3, of SANS 1200
MJ on Area 2 to ... levels as shown on Dwg.
16,2 8.2.1 SEGMENTEDPAVING
16.2.1 a) Concrete edge resraints complete m 50,0
16.2.2 b) Supply and lay 60mm thick concrete pavers including 20mm bed m 50,0
16.2.3 c) Supply and lay 60mm thick concrete pavers including 20mm bed m 30,0
16,3 8.2.3 CUT UNITS TO FIT EDGE RESTRAINTS m 50,0
16,4 8.2.2 Cutting of units to fit edge restraints m² 30,0
16,5 8.4.6 Test section m² 5,0
16,6 Geocells:75mm to manufacturer's specification m Rate Only
Total Carried to Section Summary
Page 16

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SANS SECTION 17: KERBING AND CHANNELLING
17 .1 CONCRETE KERBING AND CHANNELLING
Type half-battered, Fig.3 kerb and Type tapered, Fig.14 channel
17 .1.1 8.2.2 (SANS 927) m 50,0
8.2.3 Variation of tests on extruded kerbing
17.1.2 a) Transverse strength test (Prov.) No. 1,0
17.1.3 b) Set of 3 cubes (Prov.) No. 2,0
17.1.4 c) Set of 3 cores (Prov.) No. 2,0
17,2 ANCILLARIES OPEN DRAINS TO DWG. ........
17.2.1 8.2.6.2 a) Trim excavations in soft and intermediate material m² 0,0
17.2.2 8.2.8 c) Concrete,specified strength 20 MPa m³ 0,0
8.2.9 d) Formwork
17.2.3 1) internal face only m² 0,0
17.2.4 2) ends of slabs m² 0,0
17.2.5 8.2.10 e) Sealed joints m 0,0
Total Carried to Section Summary
Page 17

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SANS SECTION 20: ANCILLARY ROADWORKS
18,1 PERMANENT TRAFFIC SIGNS
8.3.1 Sign faces with painted or galvanized (as stated) background. Symbols,
characters, legend, and borders in engineering grade retroreflective
material with signboards constructed from
18.1.1 a) Aluminium sheet (2,0 mm thick), of area over 2 m2 and up to 10 m2 m² 10,0
18.1.2 b) Aluminium extrusions (alloy and temper condition stated), all sizes m² 15,0
c) Sheet steel (1,6 mm thick),of area Over and Up to
18.1.3 - 2 m2 m² 10,0
18.1.4 2 m2 10 m2 m² 20,0
18.1.5 10 m2 15 m2 m² 5,0
d) Weather-resistant particle board (12,7 mm thick), of area Over and
Up to18.1.6 - 2 m2 m² 0,0
18.1.7 2 m2 10 m2 m² 0,0
8.3.2 Extra-Over Item .2 for using
18.1.8 a) Engineering grade retroreflective background (Dwg ...) (Prov.) m² 0,0
18.1.9 8.3.2 b) High intensity grade retroreflective background, characters, symb m² 0,0
18.1.10 c) High intensity grade characters, symbols, legend and borders. En m² 0,0
18,2 8.3.3 Sign Supports
18.2.1 a) Structural steel (Dwg.....) painted No. 2,0
18.2.2 b) Steel tubing (Dwg ....) galvanized No. 0,0
18.2.5 8.1.1 & Excavation for sign supports and backfilling with in-situ material m³ 20,0
18.2.6 8.3.5 Distance markers No. 0,0
18.2.7 8.3.7 Statutory signs, street names, and the like, supplied and erected compl No. 0,0
18,3 8.3.7 Dismantling and re-erection of road signs having a surface area of
Over and Up to18.3.1 - 2 m2 No. 1,0
18.3.2 2 m2 5 m2 No. 1,0
Total Carried Forward
Page 18

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
18.3.3 5 m2 10 m2 No. 1,0
18.3.4 10 m2 15 m2 No. 1,0
18,4 ROAD MARKINGS
8.4.1 Non-reflectorized paint applied at nominal rate of 0,42 l/m2 (or proprietary
brand roadmarking material applied at a nominal rate of ... l/m2)
18.4.1 a) White lines (broken or unbroken) (width ... mm) km 0,5
18.4.2 b) Yellow lines (broken or unbroken) (width ... mm) km 0,3
18.4.3 c) White characters and symbols m² 100,0
18.4.4 d) Yellow characters and symbols m² 50,0
18.4.5 e) Traffic island markings (any colour) m² 20,0
8.4.2 Variation in rate of application from that stated for item .3
18.4.6 a) White paint ℓ 0,0 Rate Only
18.4.7 b) Yellow paint ℓ 0,0 Rate Only
18.4.8 c) Glass beads kg 0,0
18.4.9 d) Proprietary brand roadmarking material ℓ 0,0 Rate Only
18.4.10 8.4.3 Road studs (Type ...., size, shape, and colour, as given on Dwg .....) No. 0,0 Rate Only
18.4.11 8.4.4 Setting out and premarking of lines (excluding traffic island markings, km 1,0
characters, and symbols)
Total Carried to Section Summary
Page 19

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
6 SCHEDULE 6: CCTV CAMERA SURVEY
6,1 C2.1.3 Manhole length isolation
6.1.1 a) Plugging Conduits:
1) 0 ≥ 150mm diameter No. 5,0
2) 150 > and ≤ 200mm diameter No. 5,0
3) 250 > and ≤ 315mm diameter No. 10,0
4) >315mm diameter No. 4,0
6.1.2 b) Over-pumping including any plugging required
1) 0 ≥ 150mm diameter No. 10,0
2) 150 > and ≤ 200mm diameter No. 16,0
3) 250 > and ≤ 315mm diameter No. 10,0
4) >315mm diameter No. 12,0
6,2 C2.1.5 CCTV surveys
6.2.1 CCTV camera surveys of pipelines before of the following diameters
a) 0 ≥ 150mm diameter m 10,0
b) 150 > and ≤ 200mm diameter m 16,0
c) 250 > and ≤ 315mm diameter m 10,0
d) > 315mm diameter m 12,0
Total Carried to Section Summary
Page 20

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
CLEANING
7,1 C2.1.3 Manhole length isolation
7.1.1 a) Plugging Conduits:
1) 150mm diameter No. 5,0 Rate Only
2) 150 > and 200mm diameter No. 6,0 Rate Only
3) 250 > and 315mm diameter No. 10,0 Rate Only
4) > 315mm diameter No. 4,0
7.1.2 b) Over-pumping including any plugging required
1) 150mm diameter hours 10,0 Rate Only
2) 150 > and 200mm diameter hours 8,0 Rate Only
3) 250 > and 315mm diameter hours 15,0 Rate Only
4) >315mm diameter hours 5,0 Rate Only
7,3 C2.1.4 Cleaning of conduits
7.3.1 Clean existing sewers from all obstructions prior to works or inspections
of pipes of the following diameter:
a) 150mm diameter m 50,0
b) 150 > and 200mm diameter m 10,0
c) 250 > and 315mm diameter m 10,0
d) > 315mm diameter m 5,0 Rate Only
Cleaning of sewers of the following diameters after construction
a) 200mm diameter m 50,0
b) 250mm diameter m 20,0
c) 315mm diameter m 5,0
Total Carried to Section Summary
Page 21

Part 2: Civil Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
LOCALISED POINT REPAIRS- SEWERS
8,1 Pipework
8.1.1 C2.1.6.9 Remove and dispose of damaged pipe
(a) 150mm diameter m 30,0
(b) 200mm diameter m 10,0
c) 250mm diameter m 10,0
d) 315mm diameter m 15,0
8.1.2 SANS Supply, lay, joint, bed (Class B) bedding and test new pipe
(a) 150mm nominal diameter m 150,0
Class 34 Upvc heavy duty sewer pipe
8,2 C2.1.3 Manhole length isolation
8.2.1 a) Plugging Conduits:
1) 0 ≥ 150mm diameter No. 5,0
2) 150 > and ≤ 200mm diameter No. 5,0
3) 250 > and ≤ 315mm diameter No. 10,0
4) >315mm diameter No. 4,0
8.2.2 b) Over-pumping including any plugging required
1) 0 ≥ 150mm diameter No. 10,0
2) 150 > and ≤ 200mm diameter No. 8,0
3) 250 > and ≤ 315mm diameter No. 15,0
4) >315mm diameter No. 5,0
Total Carried to Section Summary
Page 22

Part 2: Civil Works
AMOUNT
SITE CLEARANCE
EARTHWORKS (SMALL WORKS)
PIPE TRENCHES
GABIONS AND PITCHING
WATER MAINS
BEDDING
CABLE DUCTS
SEWERS
STORMWATER DRAINAGE, SITE CLEARANCE AND EXCAVATION
ERF CONNECTIONS
SEGMENTED PAVING
KERBING AND CHANNELLING
ANCILLARY ROADWORKS
SCHEDULE 6: CCTV CAMERA SURVEY
CLEANING
LOCALISED POINT REPAIRS- SEWERS
Carried to Final Summary -
SECTION 20
SECTION 17
SECTION 9
SECTION 10
SECTION 11
SECTION
SECTION
SECTION
SECTION 12
SECTION 5
SECTION SUMMARY OF SECTIONS
SECTION 1
SECTION 1
SECTION 4

Part 3: Structural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNT
SANS SECTION : CONCRETE (STRUCTURAL)
0,1 8.1.3 CONCRETE
8.4.2 Blinding layer in 15 MPa/40 mm concrete
.1.1 50 mm minimum thickness m² 500,0
Strength concrete: 30 MPa/20mm
.1.5 Concrete Aprons m³ 30,0
.1.7 Floor slabs m³ 90,0
0,2 8.1.1 FORMWORK
8.2.1 Rough walls below ground
.2.1 Vertical plane m² 30,0
.2.2 Vertical curved m² 30,0
8.2.2 Smooth vertical plane to:
.2.7 8.2.5 Vertical narrow widths up to 300 mm wide m 100,0
0,3 8.1.2 REINFORCEMENT
8.3.2 High-tensile welded mesh reinforcement
.3.17 Type reference 245 in 2.4m (SQUARE) standard sheets m² 600,0
.3.18 Type reference 193 in .... non-standard sheets m² 0,0
0,4 8.4.4 UNFORMED SURFACE FINISHES
Wood-floated finish
0,5 8,5 JOINTS
.5.1 Type A,to match existing on site m 250,0
Rake out existing joints sealant system, reinstate and make good m 250,0
Total Carried to Section Summary
DESCRIPTION
Page 1

Part 3: Structural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SANS SECTION 8: CORROSION PROTECTION OF STRUCTURAL STEELWORK
8,1 8.2.3 SURFACE PREPARATION AND COATING APPLICATION
Shopwork. Prepare surface and apply coat(s) as specified.
8.1.1 Hot-rolled sections t 0,1
8.1.2 Cold-formed sections t 0,1
8.1.3 Floor plates (painted area) m² 25,0
8.1.4 Handrailing (including knee rail and stanchions) m 20,0
8.1.5 Kickplates m 5,0
8.1.6 Bolts and nuts t 0,050
8,2 Sitework. Clean down surfaces, touch up damaged shop coats and
apply finish coats as specified OR to match existing
8.2.1 Hot-rolled sections t 0,1
8.2.2 Cold-formed sections t 0,1
8.2.3 Floor plates (painted area) m² 100,0
8.2.4 Handrailing (including knee rail and stanchions) m 30,0
8.2.5 Kickplates m 30,0
8.2.6 Bolts and nuts t 0,1
Total Carried to Section Summary
Page 2

Part 3: Structural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
SECTION 20: CONCRETE REPAIRS
19,1 Remove all loose tiles from concrete floors and dispose off site m² 800,0
Remove all loose plaster and paint from walls m 2 250,0
Concrete Repairs
19,2 CSP5 Break out defective concrete to spoil
19.2.1 Spall depths not exceeding 25mm m³ 0,5
19.2.2 Spall depths exceeding 25mm and not exceeding 50mm deep m³ 0,5
19.2.3 Spall depths exceeding 50mm and not exceeding 100mm deep m³ 1,0
19.2.4 Concrete contact surface preparation m² 160,0
19,3 CSP14.5 Cleaning reinforcing to specified finish and application of corrosion m² 60,0
protection coating to reinforcing
19,4 CSP14.4 Extra over for grit m² 40,0
19,5 CSP14.6 Bonding layer to existing m² 20,0
19,6 CSP11 Patch repair (hand placing)
19.6.1 <25mm in thickness m³ 2,0
19.6.2 >25mm but <50mm in thickness m³ 2,0
19,7 CSP12 Patch repair (Grout)
19.7.1 >50mm in thickness m³ 1,0
19,8 CSP8 Formwork m³ 50,0
19,9 Supply, replace badly corroded (high yield) reinforcing t 0,2
19,2 Cost of testing PC SUM 1,0
19,21 Charge on prime cost sum % 4 000,0
19,22 CSP14.10 Curing m² 200,0
19,23 CSP 4.1 Hammer test m² 800,0
19,24 CSP 13.1 Cementitious skimming motar (fairing coat) to a thickness of 1mm as pe m² 250,0
Cleaning and Waterproofing
19,25 TWS 4.1 High pressure wash walls, floors, etc, with 350 bar pressure at 16 m² 2 500,0
litres / minute
Total Carried Forward
Page 3

Part 3: Structural Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
19,3 TWS 9.3 Mask cracks and waterproof with a 120mm wide Cemflex bandage m 900,0
19,31 TWS8 Waterproof floors using a reinforced Cemflex membrane or similar
approved m² 900,0
19,32 TWS8 Waterproof walls using an approved paint system m² 1 200,0
19,37 MCI 6 Apply migrating corrosion inhibitor to prepared surfaces as per m² 60,0
manufacturer's instructions
Total Carried to Section Summary
Page 4

Part 3: Structural Works
AMOUNT
CONCRETE (STRUCTURAL)
CORROSION PROTECTION OF STRUCTURAL STEELWORK
CONCRETE REPAIRS
Carried to Final Summary -
SECTION SUMMARY OF SECTIONS
SECTION
SECTION 8
SECTION 20

Part 4: Mechanical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNT
1.0 GENERAL INFORMATION
0,01 Hot Water Systems shall be as per relevant specifications, TD-HWG, info
TD-HWD, schedules, scope of works, drawings and technical
information.
0,02 Hot Water Systems equipment offered shall generally be of a good info
quality standard and shall be approved.
0,03 The engineer and/or Client will authorize the servicing or info
replacement as well as ordering equipment by way of signing off
each pre-defined building area's audit and scope of works report.
0,04 Provisional Amounts Will Only Be Used With The Written Consent info
And Authorization Of The Engineer and/or Client.
0,05 NB: The Tenderer shall provide a rate for each item in this Schedule info
0,06 The Tenderer shall indicate the manufacturer/supplier of the info
equipment that will form part of his tender offer. The Tenderer's offer
shall be for the full quota of Hot Water System Equipment as per this
bill of quantities.
Total Carried to Section Summary
DESCRIPTION
Page 1

Part 4: Mechanical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
2.0 BULK HOT WATER PLANT
2,1 Water Heating0,01 Primary Heating (Heat Pump) ea 2
2,2 Water Pumps0,01 Hot Water Supply in to Ring Main ea 2
0,02 Tank-Heat Pump Circulation ea 3
0,03 Hot Water Shunting as per SANS 893-2 (provisional) ea 3
0,04 Allow for alignment and vibration omission sum 1
2,3 Valves0,01 Thermostatic Mixing Valves (R/Main) ea 30
0,02 Shut Off Valves ea 22
0,03 Non-Return Valves ea 22
2,4 Measurement0,01 Temperature probe with 0 to 100 degrees range in order to conform ea 11
to SANS 893-20,02 Flowmeter with range 0 to 15l/s in order to conform to SANS 893-2 ea 6
0,03 Pressure measurement with range 0 to 3 bar in order to conform to ea 6
SANS 893-2
2,5 Electrical & Controls0,01 Power Distribution Board ea 1
0,02 Electronic (PLC / Control Board) in order to conform to ea 1
SANS 893-2
Inter-connecting piping2,6 Allow for the supply and installation of inter-connecting Class 0 Copper
piping complete with capillary fittings, insulation, and cladding:0,01 diam 67mm Copper pipe m 15
0,02 diam 108mm Copper pipe m 10
2,7 Allow for the supply, installation, and commisioning to full operation of
the following pipe fittings:
Heat Pump
0,01 diam 108mm - 67mm reducer ea 4
0,02 diam 67mm ball valve ea 4
0,03 diam 67mm strainer ea 4
0,04 diam 67mm swing type non return valve ea 4
0,05 inline circulation pump ea 4
0,06 Temperature / Pressure Safety Relief Valve
Hot Water Storage Tank0,07 diam 108mm - 67mm reducer ea 2
0,08 diam 67mm ball return valve ea 2
0,09 Temperature / Pressure Safety Relief Valve ea 2
Total Carried Forward
Page 2

Part 4: Mechanical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
Municipal Cold Water Supply PRV Station0.10 diam 108mm ball valve ea 2
0.11 diam 108mm strainer ea 2
0.12 diam 108mm PRV @ 3.0 Bar ea 1
2,8 Commissioning0,01 Optimise / Test & Commmission to full operation as specified sum 1
Total Carried to Section Summary
Page 3

Part 4: Mechanical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
3.0 IDENTIFICATION AND LABELLING OF HOT WATER SYSTEM EQUIPMENT
Identification and labelling of all Hot Water System equipment in
accordance with the specification
0,01 Identification & Labelling off Bulk Hot Water Storage Tanks sum 1
0,02 Identification & Labelling off Heat Pumps and Inline Heaters sum 1
0,03 Identification & Labelling of Hot Water Plantroom. sum 1
0,04 Identification & Labelling of electrics supporting hot water installatio sum 1
Total Carried to Section Summary
Page 4

Part 4: Mechanical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
4.0 AS-BUILT DRAWINGS AND TECHNICAL DATA
As-built drawings, technical data and operating manuals of all
equipment installed
0,01 As-built drawings indicating the exact position of all hot water Sum 1
systems equipment and hot water piping runs.
0,02 Technical data, specification sheets and spares lists of all equipmen Sum 1
0,03 Test Certificates Sum 1
5.0 ALLOW FOR VENTILATION IN PLANT & STORE ROOMS (300 l/s) ea 3
Total Carried to Section Summary
Page 5

Part 4: Mechanical Works
AMOUNT
BULK HOT WATER PLANT
IDENTIFICATION AND LABELLING OF HOT WATER SYSTEM EQUIPMENT
AS-BUILT DRAWINGS AND TECHNICAL DATA
Carried to Final Summary -
SECTION SUMMARY OF SECTIONS
SECTION 02
SECTION 03
SECTION 04

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNT
BOQ No. 2: Internal Small Power(COC)
2,1 Testing of Electrical Installations
This part allows for the testing of all electrical installations in the
Hospital, and the preparation of a report per distribution board. This
report must indicate all correction items required for the issuing of a
COC according to SANS 10142-1, A cost estimate must be done to
repair the installations up to a standard where a COC can be issued.
2.1.1 Testing of Electrical installations in Theaters (Master Electrician) ea 1
2.1.2 Testing of Electrical installations in ICU (Master Electrician) ea 2
2.1.3 Testing of Electrical installations of all standard three and single ea 30
phase Distribution Boards(Installation Electrician 3 Phase)
2.1.4 Costing of non-compliance items for the issuing of a COC sum 1
2.1.5 Re-Inspection of theatre after repairing of non-complying items ea 1
2.1.6 Re-Inspection of ICU after repairing of non-complying items ea 1
2.1.7 Re-Inspection of standard 3 phase installations after repairing of non- ea 30
complying items
2,2 Repair existing Luminaires
Replacement of faulty flourescent tubes and lamps.
2.2.1 0.6m Flourescent Tubes
Supply ea 295
Install ea 295
2.2.2 18W Ballast
Supply ea 30
Install ea 30
2.2.3 1.2m Flourescent Tubes
Supply ea 700
Install ea 700
2.2.4 40W Ballast
Supply ea 60
Install ea 60
2.2.5 5W LED Downlighters
Supply ea 60
Install ea 60
2.2.6 16W 2D Tubes
Supply ea 20
Install ea 20
2.2.7 15W CFL Tube
Supply ea 60
Install ea 60
2.2.8 20W CFL Tubes
Supply ea 30
Install ea 30
Total Carried Forward
DESCRIPTION
Page 1

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
2,3 Emergency Lighting
This part allows for the replacement of emergency lights batteries.
2.3.1 Provisional amount for the replacement of emergency lights
batteries sum 1
2,4 16A Socket outlet
Replacement of faulty socket outlets and the installation of additional
outlets to make provision for inadequate power points. This is
provisional quantities for the repair and installation of socket outlets
2.4.1 Replace 4X4 Double Switched Socket outlet
Supply ea 50
Install ea 50
2.4.2 New installation of 4X4 Double Switched Socket outlet
Supply ea 40
Install ea 40
2.4.3 Replace 2X4 Switched Socket outlet
Supply ea 35
Install ea 35
2.4.4 New installation of 2X4 Switched Socket outlet
Supply ea 20
Install ea 20
2,5 UVC Lights
This part allows for the replacement of all UV lamps, cleaning of units
and allow a provisional amount for fans and ballasts
2.5.1 UV Lamps
Supply ea 128
Install ea 128
2.5.2 Fans
Supply ea 20
Install ea 20
2.5.3 Ballast
Supply ea 30
Install ea 30
2.5.4 Cleaning of UV Units
UVGI Cleaning kit ea 1
Cleaning of UV Units ea 32
Total Carried to Section Summary
Page 2

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
BOQ No. 3: Earthing and Lightning Protection
3,1 Lightning Protection and Earthing System (LPS)
The System must be desigmed and installed in accordance with the
latest SANS Codes of Practice 10313 (2012) in conjunction with
SANS 62305-1-2-3-4:2011 and IEC 62305-1-2-3-4:2010, as well
as SANS 10199 (2016), SANS 1063 (2015) and SANS 62561:
1-7:2013.
Desgin, Supply and installation of an Lightning Protection System. The
following buildings and structures where tested and do not comply.
3.1.1 High Water Tank
1.2m Earth spike ea 4
35mm² BCEW m 40
Install sum 1
Testing of completed installation sum 1
3.1.2 Magalies Water Tank
1.2m Earth spike ea 6
35mm² BCEW m 80
Install sum 1
Testing of completed installation sum 1
3.1.3 Water Pump House
1.2m Earth spike ea 4
35mm² BCEW m 40
Install sum 1
Testing of completed installation sum 1
3.1.4 Pool House
1.2m Earth spike ea 4
35mm² BCEW m 40
Install sum 1
Testing of completed installation sum 1
3.1.5 Guard House and Boom
1.2m Earth spike ea 6
35mm² BCEW m 90
Install sum 1
Testing of completed installation sum 1
3.1.6 Diesel Bay
1.2m Earth spike ea 4
35mm² BCEW m 40
Install sum 1
Testing of completed installation sum 1
Total Carried Forward
Page 3

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
3.1.7 Stores
1.2m Earth spike ea 4
35mm² BCEW m 40
Install sum 1
Testing of completed installation sum 1
3.1.8 Maintenance small Office
1.2m Earth spike ea 4
35mm² BCEW m 40
Install sum 1
Testing of completed installation sum 1
3.1.9 Sewage Plant
1.2m Earth spike ea 4
35mm² BCEW m 40
Install sum 1
Testing of completed installation sum 1
3.1.10 Oxygen Tank
1.2m Earth spike ea 4
35mm² BCEW m 40
Install sum 1
Testing of completed installation sum 1
Note
The following specialists can be contacted for quotations:
HHK Earthing and Lightning Protection Systems or Advanced
Lightning Protection.
Total Carried to Section Summary
Page 4

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
BOQ No. 4: Nurse Call System
4,1 Nurse Call System
This part allows for the replacement of faulty parts on the existing
Micro Nursecall System.
4.1.1 Surgigal B
Supply - BHU R02 UB4 Patient Handset Unit ea 6
Install ea 6
Supply - MB-EBU-R Bed Unit ea 6
Install ea 6
Supply - MW-PPL-4x4 Latching Pull Cord ea 3
Install ea 3
Supply - Latching Push Button MW-PBL-C ea 3
Install ea 3
Supply - Outdoor Lights MI-ODL-C ea 2
Install ea 2
4.1.2 Surgigal A
Supply - BHU R02 UB4 Patient Handset Unit ea 6
Install ea 6
Supply - MB-EBU-R Bed Unit ea 6
Install ea 6
Supply - MW-PPL-4x4 Latching Pull Cord ea 3
Install ea 3
Supply - Latching Push Button MW-PBL-C ea 3
Install ea 3
Supply - Outdoor Lights MI-ODL-C ea 1
Install ea 1
4.1.3 Medical B
Supply - BHU R02 UB4 Patient Handset Unit ea 5
Install ea 5
Supply - MB-EBU-R Bed Unit ea 5
Install ea 5
Supply - MW-PPL-4x4 Latching Pull Cord ea 4
Install ea 4
Supply - Latching Push Button MW-PBL-C ea 4
Install ea 4
4.1.4 Medical A
Supply - BHU R02 UB4 Patient Handset Unit ea 4
Install ea 4
Supply - MB-EBU-R Bed Unit ea 4
Install ea 4
Supply - MW-PPL-4x4 Latching Pull Cord ea 3
Total Carried Forward
Page 5

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
Install ea 3
Supply - Latching Push Button MW-PBL-C ea 3
Install ea 3
Supply - Outdoor Lights MI-ODL-C ea 2
Install ea 2
4.1.5 MDR
Supply - MM-Mimic Panel ea 1
Install ea 1
Supply - Power Supply ea 1
Install ea 1
Supply - BHU R02 UB4 Patient Handset Unit ea 3
Install ea 3
Supply - MB-EBU-R Bed Unit ea 3
Install ea 3
Supply - MW-PPL-4x4 Latching Pull Cord ea 4
Install ea 4
Supply - Latching Push Button MW-PBL-C ea 4
Install ea 4
Supply - Outdoor Lights MI-ODL-C ea 2
Install ea 2
4.1.6 Casualties
Supply - BHU R02 UB4 Patient Handset Unit ea 2
Install ea 2
Supply - MB-EBU-R Bed Unit ea 2
Install ea 2
Supply - MW-PPL-4x4 Latching Pull Cord ea 2
Install ea 2
Supply - Outdoor Lights MI-ODL-C ea 3
Install ea 3
4.1.7 NN ICU
Supply - BHU R02 UB4 Patient Handset Unit ea 2
Install ea 2
Supply - MB-EBU-R Bed Unit ea 2
Install ea 2
Supply - Outdoor Lights MI-ODL-C ea 2
Install ea 2
4.1.8 ICU
Supply - BHU R02 UB4 Patient Handset Unit ea 10
Install ea 10
Supply - MB-EBU-R Bed Unit ea 10
Total Carried Forward
Page 6

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
Install ea 10
Supply - Latching Push Button MW-PBL-C ea 6
Install ea 6
Supply - Outdoor Lights MI-ODL-C ea 1
Install ea 1
4.1.9 Peadiatric
Supply - BHU R02 UB4 Patient Handset Unit ea 12
Install ea 12
Supply - MB-EBU-R Bed Unit ea 12
Install ea 12
Supply - MW-PPL-4x4 Latching Pull Cord ea 8
Install ea 8
Supply - Outdoor Lights MI-ODL-C ea 2
Install ea 2
4.1.10 Delivery
Supply - BHU R02 UB4 Patient Handset Unit ea 1
Install ea 1
Supply - MB-EBU-R Bed Unit ea 1
Install ea 1
Supply - MW-PPL-4x4 Latching Pull Cord ea 1
Install ea 1
Supply - Outdoor Lights MI-ODL-C ea 2
Install ea 2
4.1.11 Maternity Ward
Supply - BHU R02 UB4 Patient Handset Unit ea 1
Install ea 1
Supply - MB-EBU-R Bed Unit ea 1
Install ea 1
Supply - MW-PPL-4x4 Latching Pull Cord ea 1
Install ea 1
Supply - Outdoor Lights MI-ODL-C ea 3
Install ea 3
4.1.12 Ante Natal Care
Supply - BHU R02 UB4 Patient Handset Unit ea 2
Install ea 2
Supply - MB-EBU-R Bed Unit ea 2
Install ea 2
Supply - MW-PPL-4x4 Latching Pull Cord ea 2
Install ea 2
Total Carried Forward
Page 7

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
Supply - Outdoor Lights MI-ODL-C ea 2
Install ea 2
4.1.13 Provisional Amounts
Allowance for the repair of Mimic Panels sum 1
Replace faulty cables sum 1
Total Carried to Section Summary
Page 8

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
BOQ No. 5: Psychiatric Ward
5,1
Internal Lighting, Switch Socket Outlets and Nurse Call System
This part make provision for the upgrading of the Psychiatric Ward
to be utilised as a normal medical ward. It will allow for the installation
of a Nurse Call System, additional switch socket outlets and the
replacement of existing Vandalproof luminaires.
5.1.1 Luminaires
5.1.1.1 1.5M Recessed Flourescent Luminaires
Supply ea 14
Install ea 14
5.1.1.2 1.5M Flourescent Tubes
Supply ea 80
Install ea 80
5.1.1.3 Recessed Downlighter PL9 Tubes
Supply ea 12
Install ea 12
5.1.1.4 15W LED Bulkhead
Supply ea 6
Install ea 6
5.1.2 Switch Socket Outlets
Supply ea 18
Install ea 18
5.1.3
The existing nurse call system is a "Micro Nursecall System".
The new system in the planned medical ward must be from the
same supplier.
Supply - MM-Mimic Panel ea 1
Install ea 1
Supply - Power Supply ea 1
Install ea 1
Supply - BHU R02 UB4 Patient Handset Unit ea 18
Install ea 18
Supply - MB-EBU-R Bed Unit ea 18
Install ea 18
Supply - MW-PPL-4x4 Latching Pull Cord ea 7
Install ea 7
Supply - Latching Push Button MW-PBL-C ea 5
Install ea 5
Supply - Outdoor Lights MI-ODL-C ea 16
Total Carried Forward
Page 9

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
Install ea 16
Supply - Junction Box ea 1
Install ea 1
Supply 2X4 Adaptors ea 18
Install ea 18
Supply - Cable sum 1
Install sum 1
Allowance for Trunking sum 1
Total Carried to Section Summary
Page 10

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
BOQ No. 6: Area Lighting
6,1 20m High Mast
Supply and installation of a 20m high mast as per specifications.
6.1.1 20m Mid-hinge mast c/w 6-way bracket and electrcal control panel.
Supply ea 3
Install ea 3
6.1.2 Excavation and casting of 25Mpa mast plinth, c/w soil and cube
tests, HD Bolts & Templates. All earthing materials per mast including
the lightning spike on top of the high mast and earth resistance of
than 10 Ohm. Complete installation as specified, with test certificate. ea 3
6.1.3 Delivery of masts to site sum 1
6,2 Luminaires
Supply and installation of Luminaires as per specification
6.2.1 250 W LED Luminaires
Supply ea 18
Install ea 18
6,3 Maintenance Kit
6.3.1 Supply of a portable Handwinch c/w Cable as per specification sum 1
6,4 Low Voltage (400V) supply Cables to High Mast
Supply & install low voltage (600/1000V) cable in ground, wire
channels, sleeves, conduits, and/or on racking in configurations
as indicated on site and or according to specifications.
600/1000V Grade PVC insulated stranded copper conductors
(SANS 1507-2) and drawn in conduits and/or sleeves:
6.4.1 600/1000V 16mm² x 4 core, PVC/SWA/PVC, Cu Cable
Supply m 400
Install m 400
6.4.2 Cable terminations c/w glands, shrouds, termination lugs and fixing
accessories for the above cables.
600/1000V 16mm² x 4 core, PVC/SWA/PVC, Cu Cable
Supply ea 6
Install ea 6
6.4.3 Low Voltage Cable Joint Kit
600/1000V 16mm² x 4 core, PVC/SWA/PVC, Cu Cable
Supply ea 3
Install ea 3
Total Carried Forward
Page 11

Part 5: Electrical Works
ITEMPayment
ClauseUNIT BILL QTY RATE AMOUNTDESCRIPTION
Total Brough Forward
6.4.4 Cable Warning Tape
Cable-warning PVC chevron tape laid in cable trenches at a
minimum depth of 300mm above the buried electrical cables.
Supply ea 300
Install ea 300
6,5 Circuit Breaker, 3 Pole, 6kA [CBI, QF 3(27)-D, Curve 1]
Supply ea 3
Install ea 3
6,6 Excavation
Excavate for cable and sleeve trenches including temporary
support of sides, keeping excavations dry, backfilling and
compaction. [Bedding under and fill around cable and sleeves
comprising of sifted sand.
Note: Contractor to make own assessment of % picable/soft
rock/hard rock. (Rate per running meter)
6.6.1 Cable Trenches 400mm wide and 500mm deep m 500
6,6 Additional cost for mast
Provisional amount for the excavation of the foundations in case of sum 1
poor soil conditions.
Total Carried to Section Summary
Page 12

Part 5: Electrical Works
AMOUNT
Internal Small Power(COC)
Earthing and Lightning Protection
Nurse Call System
Psychiatric Ward
Area Lighting
Carried to Final Summary -
BOQ No. 6
BOQ No. 5
SECTION SUMMARY OF SECTIONS
BOQ No. 2
BOQ No. 3
BOQ No. 4