South Gas Regional Initiative

Page 2: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

2

Agenda

I. Opening

I.1 Welcome

I.2 Approval of the agenda (for approval)

II. Work Plan 2015-2016

II.1 Main areas, responsibilities and deadlines (for information by NRAs)

III. CAM

III.1 Monthly auctions: results (for information by TSOs)

III.2 Next steps (for discussion)

IV. CMP: last developments of OSBB proposal (for information by TSOs)

V. Iberian Gas market integration: evaluation of responses to public consultation on the “Study on

models for integration of the Spanish and Portuguese gas markets” (for information by NRAs)

VI. Balancing NC implementation in the three countries (for information by NRAs)

VII. Interoperability and data exchange NC: Calendar and detailed tasks for the harmonisation: gas

day, nomination and renomination procedures, data exchange– priorities for 1st Nov 2015 (for

discussion)

VIII. Infrastructures

VIII.1 Update of the meetings of Regional groups for PCI identification (for information by

NRAs)

VIII.2 Candidate projects of common interests in the Region (for information by TSOs)

VIII.3 ENTSOG CBA methodology (for information by TSOs)

IX. AOB and next meetings

Page 3: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

3

II. WP 2015-2016

The WP was submitted to public consultation on the ACER website from 3 to 24 October 2014

11 responses received: 3 TSOs: ENAGAS, TIGF, GRTGaz 4 shippers: EDP, GNF, GDFSuez, UFG (confidential) 4 associations: AGN, EDP, EFET, UPRIGAZ

General comments: All stk welcome the WP and emphasize the importance of

harmonising and making compatible rules in the three countries to facilitate cross-border flows and gas markets regional integration towards the internal energy market.

A coordinated early implementation of network codes as a permanent objective. Adapting national rules in time, transparency, coordination and close collaboration.

They insist on more active participation of NRAs and TSOs in the Iberian gas market creation, as a first step to enable gas flows between the Iberian Peninsula and France.

Page 4: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

4

II. WP 2015-2016

Significant suggestions that amended the WP: 1 TSO suggested postpone deadline for the implementation of

incremental capacity until Q1 2016 3 TSOs and 1 shipper suggested that the implementation of ST

UIOLI mechanism requires a detailed analysis to decide if all conditions for its implementation are fulfilled in the region.

One shipper and one association suggested the adoption of a common roadmap with clear commitments for Iberian hub development taking into consideration the comments received to the Public consultation of the “Study about models for integration of the Spanish and Portuguese gas markets in a common Iberian natural gas market”.

Six respondents (4 shippers, 1 association and 1 TSO) proposed that the harmonisation of the reference temperature needs to be further analysed. They support the provision established in article 14 of the draft Interoperability and Data Exchange Network code which specifies that alternative reference temperatures can be used if conversion factors are provided and used accordingly.

Page 5: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

5

III. Work Plan 2015-2016I. CAM

Task Responsible Start Deadline

I.1. Continue working on early implementation of CAM NC, allocating yearly, quarterly, monthly, daily and within-day capacity products at the two VIPs. Preparing the first day-ahead and within-day capacity auctions in the two VIPS for November 2015

NRAs-TSOs-stk

Permanent – binding in November 2015

I.2. Participating in the ACER Roadmap for the early implementation of the CAM NC as part of the Core Group, CAM Coordination Group and EU Stakeholders group. Revisions and updates are coordinated by ACER/ENTSOG

NRAs-TSOs Permanent – binding in November 2015

I.3. Implementation jointly in the region the CAM NC on incremental and new capacity

NRAs-TSOs-stk

January 2015

Q1 2016

Page 6: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

6

II. CMP

Task Responsible Start Deadline

II.1. Assessment of the operational mechanisms from 1 October 2013: UIOLI LT, capacity surrender and OSBB. Cooperation works to approve the proposals by the TSOs in the region about incentive-based oversubscription and buy-back schemes

NRAs-TSOs Initiated Q1 2015

I.2. Analysis of the conditions for the implementation of firm day-ahead UIOLI by July 2016 in the region if the considered IP is declared congested in ACER’s annual monitoring report.

NRAs-TSOs

Q3 2015 Q2 2016

III. Work Plan 2015-2016

Page 7: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

7

III. Balancing

Task Responsible Start Deadline

III.1. Exchange information on the implementation of the Balancing NC in the three countries. Exchange experiences and updating of the process of merging the French balancing zones between PEG GRTgaz Sud and TIGF – foreseen in April 2015. Analyse the current configuration of national balancing zones and the integration in the region to help developing hubs. Regulators work in cooperation to progress on the harmonisation of balancing regimes.

NRAs-TSOs Initiated 1 October 2016

III. Work Plan 2015-2016

Page 8: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

8

II. Evaluation of responses

Task Responsible Start Deadline

IV.1. Definition of specific actions and measures to be taken in coordination with NRAs, TSOs and stakeholders in the Region, on the harmonisation of the gas year, gas day, nomination and renomination procedures, data exchange as the priorities by 1st November 2015

NRAs-TSOs-stk Initiated 1 November 2015

IV. Interoperability and data exchange

Page 9: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

9

Task Responsible Start Deadline

V.1. Input from the NRAs and TSOs in the region to ENTSOG for the preparation of the EU-wide investment plan. Next TYNDP is expected to be published in 2015. Elaboration of the third edition of GRIP South will be published in 2016

NRAs-TSOs Q1 2015 Q2 2016

V.2. Participation in the regional working group focused on the PCIs identification process: second Union list of gas PCIs is foreseen to be adopted by the EC in 2015. Regional cooperation to take decision on CBCA under requested by TSOs in the South Region. Monitoring the development of the PCIs in the region

NRAs-TSOs Permanent

V. Infrastructures

III. Work Plan 2015-2016

Page 10: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

10

Task Responsible Start Deadline

VI.1. Evaluation of responses received by stakeholders in the public hearing to the study elaborated by Regulators for analyzing the models for the integration of the Spanish and Portuguese gas markets in a common Iberian natural gas hub

NRAs-TSOs-STK Initiated Q1 2015

VI.2. Preliminary analysis, impact assessment and roadmap design for the integration of Spain and Portugal gas markets into an integrated gas market in the South Region. Definition of tasks, responsibilities and deadlines

NRAs-TSOs-STK Q3 2015 Q4 2016

VI. Hub development

III. Work Plan 2015-2016

Page 11: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

11

III.1. Results of the last monthly auctions

(for information by TSOs)

III. CAM NC

Page 12: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

12

III.2. Next steps

Preparing daily auctions from November 2015

Is it necessary to take actions from the NRAs?

Is there any change with regard to PRISMA as the IT

platform?

Any suggestion?

(for discussion)

III. CAM NC

Page 13: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

13

(for information by TSOs)

IV. CMP: last development of OSBB proposal

Page 14: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

14

IV. CMP: last development of OSBB proposal

CNMC preliminary evaluation of the OSBB methodology proposal to offer additional capacity, submitted by ENAGÁS:

• Positive evaluation, complying with European rules on CMP (EC Decision of 24 August 2012) and Circular 1/2013 of CNMC.

• Buy-back methodology proposal is missing. When it will be ready?• Level of agreement among adjacent TSOs: TIGF / REN ?• Open issues:

Date of entering into force Frequency of updating: parameters and methodology

• A public consultation will take place before approval: SGRI? Both methodologies (OS&BB)?

Page 15: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

15

(for information by NRAs)

V. Iberian gas market integration

Evaluation of responses to public consultation on the “Study on models for integration of the Spanish and Portuguese gas markets”

Page 16: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

16

V. Iberian gas market integrationEvaluation of responses to public consultation on the “Study on models for integration of the Spanish and Portuguese gas markets”

. The public consultation on Iberian Natural Gas Market was carried out through a dedicated questionnaire on the Spanish and Portuguese Energy Regulators website. The deadline for responses was 15th September 2014.

. Stakeholders are asked to have in mind the need for short term concrete positive developments in the market integration of the wholesale gas markets of Portugal and Spain and the longer term, and also the necessary steps to reach those goals, taking into account the current regulatory framework in both countries.

. As a result of the public consultation we received 23 responses.

. Analysis of the feedback received by stakeholders in the public hearing and Final document to be approved by CNMC- ERSE (2015-Q1)

Page 17: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

17

(for information by NRAs)

VI. Balancing NC implementation in the three countries

Page 18: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

18

VI. Balancing NC implementation in the three countries

FRANCE

SPAIN

PORTUGAL

• Oral update

• In September 2014, GTS (the Technical System Manager, the agent in charge of the balancing) –following article 52 - sent a justified request to the CNMC asking for an extension of the period to implement the code – by 1 October 2016.

• In October 2014, CNMC accepted the request. The answer was also sent to European Commission and ACER.

• CNMC is currently preparing the legal act “Circular” to regulate the gas balancing regime.

• Oral update

Page 19: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

19

(for discussion)

VII. Interoperability and data exchange NC

Calendar and detailed tasks for the harmonisation: gas day, nomination and renomination procedures, data exchange– priorities for 1st Nov 2015

Page 20: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

20

Is it necessary to adapt some national regulation?

A detailed plan for the TSOs is needed?

(for discussion)

VII. Interoperability and data exchange NC

Calendar and detailed tasks for the harmonisation: gas day, nomination and renomination procedures, data exchange– priorities for 1st Nov 2015

Page 21: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

21

(for information by NRAs)

VIII. Infrastructures

VIII.I. Update of the meetings of Regional groups for PCI

Page 22: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

22

VIII. Infrastructures

VIII.I. Update of the meetings of Regional groups for PCI• A new meeting to select the second list of PCIs was held on 21 November

2014. The following issues were presented/discussed:The terms of reference of the Regional Groups (decision making powers

are restricted to Member States and the Commission only)The methodology for the assessment of the candidates (ENTSOG CBA

methodology –cost and benefits-, and Joint Research Center methodology – project ranking -)

A preliminary candidates listThe projects clustering, to be proposed by ENTSOGThe Regional Groups’ work calendar

• Comments to the ToR were expected by 5 December• Comments by project promoters (PPs) on the preliminary list were also

expected on 5 December (missing projects, projects in wrong corridors, etc.)• PPs to make the information on their candidates public on 5 December• Ministries approving candidates in their territory on 9 January• On 3 December an email was sent to NRAs asking for their comments on

ENTSOG projects clustering proposal. The answer must be sent by 12 December.

Page 23: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

23

VIII. Infrastructures

VIII.I. Update of the meetings of Regional groups for PCI

LNG-N-227 Fos Cavaou LNG Terminal Expansion Elengy FR 2020

TRA-F-041 Eridan GRTgaz FR 2020

TRA-N-253 Est Lyonnais pipeline GRTgaz FR 2020

TRA-N-269 Fosmax (Cavaou) LNG expansion GRTgaz FR 2020

TRA-N-043 Val de Saône project GRTgaz FR 2019TRA-N-331 Artere Gascogne Midi TIGF FR 2018

TRA-N-391Gascogne-Midi : adaptation of stations in Cruzy and St Martin

GRTgaz FR 2018

GR_65

GR_66

Cluster PCI Project promoter

Country Starting operation

date

Page 24: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

24

VIII. Infrastructures

VIII.I. Update of the meetings of Regional groups for PCI

TRA-N-013 OS GRTgaz/CreosCreos Luxembourg S.A.

LU 2017

TRA-N-044 New interconnection to Luxembourg GRTgaz FR 2021

GR_67

TRA-N-168 Interconnection ES-PT (3rd IP) Enagás S.A. ES 2018/2020/2022

TRA-N-283PT-ES Interconnector Pipeline Spanish Border-Celorico

REN - Gasodutos, S.A.

PT 2018

TRA-N-168 Interconnection ES-PT (3rd IP) Enagás S.A. ES 2020

TRA-N-284PT-ES Interconnector Cantanhede Compressor Station

REN - Gasodutos, S.A.

PT 2020

TRA-N-168 Interconnection ES-PT (3rd IP) Enagás S.A. ES 2022

TRA-N-285PT-ES Interconnector Pipeline Cantanhede-Mangualde

REN - Gasodutos, S.A.

PT 2022

GR_82

GR_81

GR_83

Cluster PCI Project promoter

Country Starting operation

date

Page 25: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

25

VIII. Infrastructures

VIII.I. Update of the meetings of Regional groups for PCI

TRA-F-041 Eridan GRTgaz FR 2020

TRA-N-161Iberian-French corridor: Eastern Axis - Midcat Project

Enagás S.A. ES

TRA-N-252Iberian-French corridor: Eastern Axis-Midcat Project

TIGF FR

TRA-N-256Iberian-French corridor: Eastern Axis-Midcat Project (CS Montpellier and CS Saint Martin de Crau)

GRTgaz FR

2021

GR_64

Cluster PCI Project promoter

Country Starting operation

date

Page 26: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

26

VIII. Infrastructures

VIII.I. Update of the meetings of Regional groups for PCI

NRAs Concerns about: Cluster of infrastructures. Lack of technical assessment. Unclear CBA methodology. CBCA

Complicated process for the PCI assessment from a regional perspective.How are we going to tackle this?

Page 27: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

27

(for information by TSOs)

IX. Infrastructures

IX.II. Candidate projects of common interests in the Region

Page 28: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

28

(for information by TSOs)

IX. Infrastructures

IX.III. ENTSOG CBA methodology

Page 29: 1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.

29

Next meetings:

• SG meeting in January?• IG physical meeting in January?

VI. AOB and next meetings

JANUARY FEBRUARY MARCHL M X J V S D L M X J V S D L M X J V S D

1 2 3 4 1 15 6 7 8 9 10 11 2 3 4 5 6 7 8 2 3 4 5 6 7 8

12 13 14 15 16 17 18 9 10 11 12 13 14 15 9 10 11 12 13 14 1519 20 21 22 23 24 25 16 17 18 19 20 21 22 16 17 18 19 20 21 2226 27 28 29 30 31 23 24 25 26 27 28 23 24 25 26 27 28 29

30 31

SOUTH GRI Agenda - 2015

OCTOBER NOVEMBER DECEMBERL M X J V S D L M X J V S D L M X J V S D

1 2 3 4 5 1 2 1 2 3 4 5 6 76 7 8 9 10 11 12 3 4 5 6 7 8 9 8 9 10 11 12 13 14

13 14 15 16 17 18 19 10 11 12 13 14 15 16 15 16 17 18 19 20 2120 21 22 23 24 25 26 17 18 19 20 21 22 23 22 23 24 25 26 27 2827 28 29 30 31 24 25 26 27 28 29 30 29 30 31