DAILY WORK REPORT
PROJECT : NESTLE DISTRIBUTION CENTER
NO.
WORK
CONTENTS WORK ITEMS ILLUSTRATING IMAGES NOTES
1
FOOTING
EXCAVATION
OF THE 1/C->EAXIS
FACTORY
2
POUR LINING
CONCRETE OF
THE 1/C->E
AXIS
FACTORY
![Page 2: 09.04.2016 Daily Work Report Nestle](https://reader030.fdocuments.us/reader030/viewer/2022021216/577c7b471a28abe05497a31c/html5/thumbnails/2.jpg)
8/16/2019 09.04.2016 Daily Work Report Nestle
http://slidepdf.com/reader/full/09042016-daily-work-report-nestle 2/3
CÔNG TY CỔ PHẦN XÂY DỰ NG BÔNG SEN VÀNG
127 Nguyễn Du , P . Bến Thành , Q 1 . TPHCMNgày
09/04/2016
Page 2 of 3
NO. WORK WORK ITEMS ILLUSTRATING IMAGES NOTES
3
INSTALL
REBAR AND
FORMWORK
FOUNDATION
OF THE 1/C->E
& 7/D->E & D/1-
>7 & E/1->7
AXIS
FACTORY
4
POUR
CONCRETE
FOUNDATION
OF THE E/1->7
AXIS
FACTORY
![Page 3: 09.04.2016 Daily Work Report Nestle](https://reader030.fdocuments.us/reader030/viewer/2022021216/577c7b471a28abe05497a31c/html5/thumbnails/3.jpg)
8/16/2019 09.04.2016 Daily Work Report Nestle
http://slidepdf.com/reader/full/09042016-daily-work-report-nestle 3/3
CÔNG TY CỔ PHẦN XÂY DỰ NG BÔNG SEN VÀNG
127 Nguyễn Du , P . Bến Thành , Q 1 . TPHCMNgày
09/04/2016
Page 3 of 3
NO. WORK WORK ITEMS ILLUSTRATING IMAGES NOTES
5
FOOTING
EXCAVATION
OF THE
FENCING WAY
OF THE A25 ->
A36AXIS
FENCING
WAY
4
FABRICATE
STEEL &
FORMWORK
FACTORY &
FENCING WAY