    PROVIDING ENGINEERING FOR OPERATION TRAINING

    MV SWITCHGEAR WITH SEPAM RELAY AND POWERQUALITY DISTURBANCES

    Sepam - Modularities

  • 7/24/2019 07 Sepam- Installation of Modules

    2/26

    Schneider Electric 2- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Functional enhancement#$ optional modules

    % To specificall$ fit $our needs

    % To evolve in step &ith $ourinstallation

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$A!%&"#e%#u!e modua"!e Sepam

  • 7/24/2019 07 Sepam- Installation of Modules

    3/26

    Schneider Electric '- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    % Functional enhancement

    by optional modules

    % To specifically fityour needs

    % To evolve in step with yourinstallation

    % Optional modules may beadded at any time

    % Easy to connect and

    commission via simpleparameter settingprocedure

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ '( ) $e!"e$ *(

  • 7/24/2019 07 Sepam- Installation of Modules

    4/26

    Schneider Electric (- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Sepam base unit

    % )ser Machine *nterface

    integrated in front panel

    or

    % +emote )ser Machine*nterface

    ,DSM''.

    For installationin the most convenient

    place for the user

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ '( ) $e!"e$ *(

  • 7/24/2019 07 Sepam- Installation of Modules

    5/26

    Schneider Electric /- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    % 0ith integrated advanced )ser Machine *nterface

    % 0ith remote advanced )ser Machine *nterface ,DSM''.

    Sepam #ase unit

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ '( ) $e!"e$ *(

  • 7/24/2019 07 Sepam- Installation of Modules

    6/26

    Schneider Electric 1- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Additionalinputs / output modules

    % ( rela$ outputs on theSepam #ase unit

    % etended #$ adding onemodule &ith3% 4 logic inputs

    - 2( - 2/ V D5 ,MES44(.

    - 44 V !5 6 D5 ,MES44(E.

    - 22 V !5 6 D5 ,MES44(F.% ( rela$ outputs

    To perform the controland monitoring functions

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ '( ) $e!"e$ *(

  • 7/24/2019 07 Sepam- Installation of Modules

    7/26Schneider Electric 7- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Temperature acquisition

    remote module

    % MET4(8 - 2

    % Measurement of 8 or 41

    temperatures

    % 9$ "t4: Ni4 or Ni42temperature sensors

    % Sepam series 2 3

    4 module 6 8 temperature inputs% Sepam series ( 3

    2 modules 6 41 temperature

    inputs

    For better transformers,

    motors and generators

    protection

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ '( ) $e!"e$ *(

  • 7/24/2019 07 Sepam- Installation of Modules

    8/26Schneider Electric 8- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    analog outputremote module

    % MS! 4(4

    % -4m!: -2m! ou (-2m!

    To have one

    remote measurement

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ '( ) $e!"e$ *(

  • 7/24/2019 07 Sepam- Installation of Modules

    9/26Schneider Electric ;- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    !ommunication interfacesand converters% !5E;(;-2: !5E;/;: !5E;'7:

    !5E;1;T": !5E;1;FO:!5E8/T" and !5E8/FO

    % !5E;;-2: !5E;4;5!: !5E;4;55:E

  • 7/24/2019 07 Sepam- Installation of Modules

    10/26Schneider Electric 4- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    #$ E%clusive choice between S&'A( and E&'A()

    #*$ (ot simultaneously # protocole par application$

    #+$ (ot available with odbus protocol)

    #-$ Soon available for Sepam series -. and series .

    4 #ase F=

    464 #ase T

    Fi#er optic ST

    +S(8/

    *E5 148/

    Mod#us T5"6*"

    *E5 187-/-4'

    DN"'

    Mod#us +T)

    2-&ire(-&ire

    Star

    +ing

    4 port

    4 port

    S-L!N

    or E-L!N ,4.

    S-L!N

    or E-L!N ,4.

    S-L!N

    or E-L!N ,4.

    S-L!N E-L!N S-L!N E-L!N S-L!N and

    E-L!N

    S-L!N and

    E-L!N

    P&+$"%a ",#e!a%e

    P!o#o%o

    T+pe o ,e#.o!/

    ,'.

    ,'.

    ,'.

    ,'.

    ,'.

    ,'.

    ,'. ,'.

    ,'. ,'.

    ,2.

    ACE0*0-' ACE010 ACE023 ACE040TP ACE040FO ACE51(TP ACE51(FO

    ,(. ,(.

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR WITH

    SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Sepam Se!"e$ '( ) $e!"e$ *( - Commu,"%a#"o, ",#e!a%e$ $ee%#"o, 6u"de

  • 7/24/2019 07 Sepam- Installation of Modules

    11/26

    Schneider Electric 44- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    #$ The supervisor protocol is the same as the Sepam protocol (ote 0 All these converters accept the E&'A( protocol

    DN"'

    Mod#us +T)

    Distri#uted po&er suppl$

    +S(8/

    "h$sical interface

    *E5 148/

    Mod#us T5"6*"

    *E5 187-/-4'

    DN"'

    Mod#us +T)

    4 port +S2'2 4 port +S(8/

    2 &ire

    4 port +S(8/

    2 &ire

    To Sepam

    Co,7e!#e!

    ACE0(0-' ACE080CA ACE080CC

    4 Ethernet port

    464 #ase T

    EG98((

    2 Ethernet ports

    464 #ase T

    4 #ase F=

    EG9*((

    4 Ethernet port

    464 #ase T

    ECI51(

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    *E5 187-/-4'

    "h$sical interface

    4 port +S(8/2 &ire

    4 port +S(8/2 &ire

    4 port +S(8/2 &ire

    4 port +S(8/2 or ( &ire 2 "orts +S(8/2 or ( &ires 4 port +S(8/2 or ( &ires

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Sepam Se!"e$ '( ) $e!"e$ *( - Co,7e!#e!$ $ee%#"o, 6u"de

  • 7/24/2019 07 Sepam- Installation of Modules

    12/26

    Schneider Electric 42- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Sepam software tools

    % SFT28(4: soft&are for

    %Sepam parameters%protection settings

    %local or remote operation

    % SFT2821:distur#ance recordingdata displa$ soft&are

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ '( ) $e!"e$ *(

  • 7/24/2019 07 Sepam- Installation of Modules

    13/26

    Schneider Electric 4'- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Sepam series 2 6 series (maimum configuration

    %4 inputs 6 8 outputs,4 MES44( module.

    %4 analog output,4 MS!4(4 module.

    %4 communication ports,4 !5E interface.

    %Temperature sensor inputs% Series 23 8 inputs

    ,4 MET4(8-2 module.% Series (3 41 inputs

    ,2 MET4(8-2 modules.

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$You! $ou#"o, a# #&e :e$# %o$#;

  • 7/24/2019 07 Sepam- Installation of Modules

    14/26

    Schneider Electric 4(- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    % Functional enhancement

    by optional modules

    % To specifically fit yourneeds

    % To evolve in step with yourinstallation

    % Optional modules may beadded at any time

    % Easy to connect and

    commission via simpleparameter settingprocedure

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ 5(

  • 7/24/2019 07 Sepam- Installation of Modules

    15/26

    Schneider Electric 4/- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Sepam base unit

    % Mimic-#ased )serMachine *nterface &ithlocal-control functions

    %!dvanced )ser Machine*nterface

    %integrated in front panel or%installed remotel$ ,DSM''.

    for installation in the most

    onvenient place for the user

    % +emova#le memor$ cartridgeto simplify maintenance

    operations

    % 9ac>up #atter$

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ 5(

  • 7/24/2019 07 Sepam- Installation of Modules

    16/26

    Schneider Electric 41- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    % 0ith integrated advanced)ser Machine *nterface

    % 0ith mimic-#ased)ser Machine *nterfacefor local control of devices

    1emovable memorycartridge and bac"upbattery

    % 0ith remote advanced

    )ser Machine *nterface

    Sepam base unit

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ 5(

  • 7/24/2019 07 Sepam- Installation of Modules

    17/26

    Schneider Electric 47- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Additional

    inputs / output modules

    % / rela$ outputs on the Sepam#ase unit

    % Etended #$ adding modules&ith

    % 4( logic inputs- 2( to 2/ V D5 ,MES42.- 44 to 42/ V D5 ,MES

    42?.- 22 to 2/ V D5

    ,MES42

  • 7/24/2019 07 Sepam- Installation of Modules

    18/26

    Schneider Electric 48- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Temperature acquisition

    remote module

    % MET4(8 - 2

    % Measurement of 41temperatures

    % 9$ "t4: Ni4 or Ni42

    temperature sensors

    For better transformers,

    motors and generators

    protection

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ 5(

  • 7/24/2019 07 Sepam- Installation of Modules

    19/26

    Schneider Electric 4;- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    analog output

    remote module

    % MS! 4(4

    % -4m!: -2m! ou (-2m!

    To have one

    remote measurement

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ 5(

  • 7/24/2019 07 Sepam- Installation of Modules

    20/26

    Schneider Electric 2- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    1emote synchro&chec"module

    % M5S2/% For su#station: transformer:

    generator and #us#ar applications

    % Measurement of t&o phase-to-neutral or phase-to-phase voltages

    % 5hec> on difference in voltage:

    fre@uenc$ and phase #et&een t&o

    net&or>s% 5onfiguration #$ the #ase unit

    % ' rela$ outputs to ena#le coupling:used #$ Sepam to control closing

    of s&itchgear

    To enable coupling oftwo networ"s

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ 5(

  • 7/24/2019 07 Sepam- Installation of Modules

    21/26

    Schneider Electric 24- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    !ommunication interfacesand converters% !5E;(;-2: !5E;/;: !5E;'7:

    !5E;1;T": !5E;1;FO:!5E8/T" and !5E8/FO

    % !5E;;-2: !5E;4;5!: !5E;4;55:

    E

  • 7/24/2019 07 Sepam- Installation of Modules

    22/26

    Schneider Electric 22- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    #$ E%clusive choice between S&'A( and E&'A()

    #*$ (ot simultaneously # protocole par application$

    #+$ (ot available with odbus protocol)

    #-$ Soon available for Sepam series -. and series .

    4 #ase F=

    464 #ase T

    Fi#er optic ST

    +S(8/

    *E5 148/

    Mod#us T5"6*"

    *E5 187-/-4'

    DN"'

    Mod#us +T)

    2-&ire

    (-&ire

    Star

    +ing

    4 port

    4 port

    S-L!N

    or E-L!N ,4.

    S-L!N

    or E-L!N ,4.

    S-L!N

    or E-L!N ,4.

    S-L!N E-L!N S-L!N E-L!N S-L!N and

    E-L!N

    S-L!N and

    E-L!N

    P&+$"%a ",#e!a%e

    P!o#o%o

    T+pe o ,e#.o!/

    ,'.

    ,'.

    ,'.

    ,'.

    ,'.

    ,'.

    ,'. ,'.

    ,'. ,'.

    ,2.

    ACE0*0-' ACE010 ACE023 ACE040TP ACE040FO ACE51(TP ACE51(FO

    ,(. ,(.

    4 #ase F=

    464 #ase T

    Fi#er optic ST

    +S(8/

    *E5 148/

    Mod#us T5"6*"

    *E5 187-/-4'

    DN"'

    Mod#us +T)

    2-&ire

    (-&ire

    Star

    +ing

    4 port

    4 port

    S-L!N

    or E-L!N ,4.

    S-L!N

    or E-L!N ,4.

    S-L!N

    or E-L!N ,4.

    S-L!N E-L!N S-L!N E-L!N S-L!N and

    E-L!N

    S-L!N and

    E-L!N

    P&+$"%a ",#e!a%e

    P!o#o%o

    T+pe o ,e#.o!/

    ,'.

    ,'.

    ,'.

    ,'.

    ,'.

    ,'.

    ,'. ,'.

    ,'. ,'.

    ,2.

    ACE0*0-' ACE010 ACE023 ACE040TP ACE040FO ACE51(TP ACE51(FO

    ,(. ,(.

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Sepam Se!"e$ 5( - Commu,"%a#"o, ",#e!a%e$

  • 7/24/2019 07 Sepam- Installation of Modules

    23/26

    Schneider Electric 2'- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant#$ T he supervisor protocol is the same as the Sepam protocol (ote 0 All these converters accept the E&'A( protocol

    DN"'

    Mod#us +T)

    Distri#uted po&er suppl$

    +S(8/

    "h$sical interface

    *E5 148/

    Mod#us T5"6*"

    *E5 187-/-4'

    DN"'

    Mod#us +T)

    4 port +S2'2 4 port +S(8/

    2 &ire

    4 port +S(8/

    2 &ire

    To Sepam

    Co,7e!#e!

    ACE0(0-' ACE080CA ACE080CC

    4 Ethernet port

    464 #ase T

    EG98((

    2 Ethernet ports

    464 #ase T

    4 #ase F=

    EG9*((

    4 Ethernet port

    464 #ase T

    ECI51(

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    *E5 187-/-4'

    "h$sical interface

    4 port +S(8/2 &ire

    4 port +S(8/2 &ire

    4 port +S(8/2 &ire

    4 port +S(8/2 or ( &ire 2 "orts +S(8/2 or ( &ires 4 port +S(8/2 or ( &ires

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    ,4.

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Sepam Se!"e$ 5( - Co,7e!#e!$

  • 7/24/2019 07 Sepam- Installation of Modules

    24/26

    Schneider Electric 2(- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Sepam software tools

    % SFT28(4: soft&are for% Sepam parameters% protection settings

    % local or remoteoperation

    % SFT2821:distur#ance recordingdata displa$ soft&are

    % SFT288/:optional Logipamprogramming soft&arefor Sepam series 8

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ 5(

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

  • 7/24/2019 07 Sepam- Installation of Modules

    25/26

    Schneider Electric 2/- Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Sepam series 8maimum configuration

    % (2 inputs 6 2' outputs,' MES42 modules.

    % 41 temperature sensor inputs,2 MET4(8-2 modules.

    % 4 analog output,4 MS!4(4 module.

    % 4 s$nchro-chec>module M5S2/

    % 2 communication ports,2 !5E interfaces.

    PROVIDING ENGINEERING FOR OPERATION TRAINING MV SWITCHGEAR

    WITH SEPAM RELAY AND POWER QUALITY DISTURBANCES

    Sepam - Modua!"#"e$Modua! a!%&"#e%#u!e - Sepam Se!"e$ 5(

  • 7/24/2019 07 Sepam- Installation of Modules

    26/26

    Schneider Electric 21Field Services Division Operation training for electrical engineer - NESTLE Viet nam Tri !n "lant

    Than"s2

    a"e the most of your energy

    21