    RodericA.Ellman,Jr.,PE,PartnerMueserRutledgeConsultingEngineers

    NewYork,NY

    DFISlurryWallSeminar:DiaphragmWallinUrbanEnvironment

    July26,2012,Detroit,MI

    Design&Construction

    of97ft deepBasementbyTopDownMethod:MarriottMarquisConventionCenterHotel

    Washington,DC

    2

    Renderings of DC

    Marriott Marquis

  • 7/23/2019 05 Ellman PPT muro colado

    2/22

    3

    10thStreet.

    LStreet

    9thStreet

    Plumbers Building at South East End of Site

    July9,2008

    PlumbersBuilding

    4

    WalterE.WashingtonConvention

    Center

    Location

    MarriottMarquis

    Site

  • 7/23/2019 05 Ellman PPT muro colado

    3/22

    Site Plan

    LStreet

    N.W.

    9thStreetN.W.

    10thStreetN.W.

    PEPCOBuilding(PotomacElectric

    PowerCompany)

    MARRIOTT

    MARQUIS

    propertyline

    PlumbersBldg.

    DuctBank(PowerSupply

    forGovt.Bldgs.)

    WalterE.

    Washington

    ConventionCenter

    2StoryDemolition

    5

    FutureMarriottMarquissite

    September

    2002

  • 7/23/2019 05 Ellman PPT muro colado

    4/22

    7

    Alternates Studied

    Cross Lot Bracing

    Tie-Back Soil Anchors

    Raker Braces

    Top-Down Construction

    8

    Diaphragm Wall & Drilled Shafts Layout Plan

    LStreetN.W.

    9thStreetN.W.

    10thStreetN.W.

    PEPCOBuilding

    WalterE.

    Washington

    ConventionCenter

    Diaphragm(Slurry)Wall

    TemporaryNewTiebacks(Anchors)EL.+66only

    DrilledIn

    Shafts

    with

    PlungedSteelColumns TemporaryDetensioned

    Tiebacks

    used

    duringConventionCenterConstruction

    ConventionCenterSlurryWall

  • 7/23/2019 05 Ellman PPT muro colado

    5/22

    9

    1. Install guide

    walls

    2. Excavate panel

    3. Desandexcavated panel

    4. Install rebar cage

    5. Place concrete

    Slurry Wall Construction

    10

    End Stops Used In Slurry Wall Construction

    Hydromill Joint(93 Panels)

    WaterStopJoint(UsedAlong9th Street)(20 to24 Panels)

    SteelBeam(w)Joint(usedbelowshallowutilities)

    Hydromill Bite

    KEYP=PrimaryPanelS=SecondaryPanelF=FollowupPanel

    6Min.

    PVCWaterstop

    PP

    BlockOutRemovedDuringSecondaryPanelExcavation

    EndStopPulledLaterallyIntoFollowUpExcavation

    P S P

    S P S

    F P

    JointPositionJointPosition

  • 7/23/2019 05 Ellman PPT muro colado

    6/22

    11

    Protection & Monitoring of Existing BuildingDuring Slurry Wall Construction

    BelledPier

    PEPCOBuilding

    TiltMeters(MonitoringPoints)

    Plywoodon2 x4Spacedat4 c.c.

    SlurryWallUnderConstruction

    12

    Top-Down Method of Construction: Sequence

    Install slurry wall & drilled shafts / basementplunge columns

    Excavate to 1st basement level & constructbasement floor as brace

    Excavate below floor; install 2nd basement floor

    Install girders above ballrooms

    Begin superstructure construction

    Continue to progressively excavate & constructpermanent underground floors as bracing

  • 7/23/2019 05 Ellman PPT muro colado

    7/22

    13

    Top-Down Method of Construction:Benefits

    Ideal for urban sites, deep excavations & wideconstruction sites

    Stiff bracing system minimizes impact on adjacentstructures

    Avoids costly underpinning of adjacent structures

    Speeds up project completion as superstructurestarts before excavation is completed

    Reduces project financing costs

    14

    TERRACESAND

    FILL

    EL.70to77

    Diaphragm (Slurry) Wall Construction

    EL.50to65

    EL.22to40

    EL.30to 20

    EL. 50to 60

    GuideWalls

    HARDCLAY

    DENSESAND

    BEDROCK

    (Supports Exterior of Building)

    TipEL. 38to 47

    GroundwaterEL.35

  • 7/23/2019 05 Ellman PPT muro colado

    8/22

    15

    Drilled Shaft Constructionand Plunge Columns Installation

    FinalSubgrade

    PlungeSteelColumn(InteriorSupportColumns)

    DrilledShaftConcretedtoFinalExcavationSubgrade

    EL.70to77

    EL.50to65

    EL.22to40

    EL.30to 20

    EL. 50to 60

    GroundwaterEL.35

    TERRACESAND

    FILL

    HARDCLAY

    DENSESAND

    BEDROCK

    Plunge Steel Columns Installed

    July

    17,

    2012

  • 7/23/2019 05 Ellman PPT muro colado

    9/22

    17

    CompactSoilandApplyBondBreaker

    Excavation for 1st Basement Slab Construction

    WeldSteelBracketto

    Column

    EL.70to77

    EL.50to65

    EL.22to40

    EL.30to 20

    EL. 50to 60

    GroundwaterEL.35

    TERRACESAND

    FILL

    HARDCLAY

    DENSESAND

    BEDROCK

    18

    CreateOpeninginSlabforUnderslabExcavation

    Construct 1st Basement Slab

    S1

    EL.70to77

    EL.50to65

    EL.22to40

    EL.30to 20

    EL. 50to 60

    GroundwaterEL.35

    TERRACESAND

    FILL

    HARDCLAY

    DENSESAND

    BEDROCK

  • 7/23/2019 05 Ellman PPT muro colado

    10/22

    19

    ExcavateUnderSlabandConstruct2nd

    BasementSlab

    Excavation for 2nd Basement Slab Construction

    S1

    EL.70to77

    EL.50to65

    EL.22to40

    EL.30to 20

    EL. 50to 60

    GroundwaterEL.35

    SAND

    FILL

    HARDCLAY

    DENSESAND

    BEDROCK

    20

    Section Looking West

    UpperBallroom

    EL.+70

    EL. 11EL. 13

    LowerBallroom

    ParkingGarage

    Parking Mechanical

    Mass.

    Ave.

    LStreet

    10thStreet

    LStreet

    9thStreet

    TemporaryTiebackAnchors

  • 7/23/2019 05 Ellman PPT muro colado

    11/22

    Section Looking North

    Grand(Upper)Ballroom

    ParkingGarage (EL. 17.0)Junior

    Ballroom

    Junior

    Ballroom

    PEPCOBuilding

    LimitofConventionCenter

    Convention

    CenterConnector

    9th Street

    10thStreet

    LStreet

    9thStreet

    22

    Underslab Drainage System Lower Level

    FinishFloorEL 7.0

    FinishFloorEL 16.0

    DrainLinesUnderSlab

    OnGrade

    CleanUpPoint

  • 7/23/2019 05 Ellman PPT muro colado

    12/22

    23

    Plan at Parking Garage (EL. -7.0)

    HelicalRampShaft

    24

    Truck Loading Dock Cut-Off Openings in Slurry Walls

    J

    G

    MB

    G.5

    RG

    F

    R4

    10 11 12

    E

    RE

    A

    B

    C

    B.9

    C.7

    D

    D.3

    H.2

    H

    HotelSlurryWall

    withCutOff

    Openingsfor

    LoadingDock

    ExistingBracingStrutsforConvention CenterSlurryWall

    ConventionCenterSlurryWallwithCutOffOpeningsforLoadingDock

    9

    th

    StreetAbove

    TruckBays ExcavationSequence

    1. Installpairedhydraulicjacksforeachstrut

    2. Incrementallyloadjackstofullload

    3. Disconnectthebracingsystemfromslurrywall

    4. Sequentiallyexcavate

    in

    5footlifts.Releasejackloads5kipsforeach5feetofexcavation.

    5. Afterexcavationiscomplete,shimandgroutbetweenwallandwalesandremovejacks.

  • 7/23/2019 05 Ellman PPT muro colado

    13/22

    PlumbersBuilding

    Convention Center Construction

    July

    2000

    26

    Convention Center Slurry Wall Looking West

    ConstructionProcedure1. Cut40 WideSlotatPanelJoints2. PlaceStubColumnsinSlotsforPanelSupport3. CutOffandFormOpenings

    NeedleBeam

    Passagewayto

    New

    Elevator

    inConventionCenter

    OpeningforEscalatorConnection

    PermanentGirderSupport

    TruckRamp

    CutOffOpeninginExisting

    SlurryWall

    20 (TYP)

    EL.+50

    EL.+32

    4PanelJoint

  • 7/23/2019 05 Ellman PPT muro colado

    14/22

    27

    PEPCOBuilding

    HelicalRampShaft

    HydroMill

    DrilledShaftRig

    Looking North at West End of Site

    September

    15,

    2011

    Helical Ramp Shaft :

    Shaft Excavation

    September

    15,

    2011

    PEPCOBuilding

  • 7/23/2019 05 Ellman PPT muro colado

    15/22

    February

    16,

    2012October19,2011

    Helical Ramp Shaft :Inner Shaft Constructed

    July

    17,

    2012

    October

    19,

    2011

    Helical Ramp Shaft :

    Ramp SlabUnder Construction

  • 7/23/2019 05 Ellman PPT muro colado

    16/22

    31Feb

    16,

    2012

    ConventionCenter

    32July

    17,

    2012

  • 7/23/2019 05 Ellman PPT muro colado

    17/22

    33Feb

    16,

    2012

    ExcavationOpenings

    S1SlabCompleted

    PreparationforS2Slab

    34Feb

    16,

    2012

    ExcavationOpening

    S1SlabCompleted

    PreparationforS2Slab

  • 7/23/2019 05 Ellman PPT muro colado

    18/22

    35April

    19,

    2012

    ExcavationforGrandBallroom

    PlateGirdersSpanningBallroomBelow

    36

    April

    19,

    2012

    Excavation and Material Supply Openings

    in Completed Slab

  • 7/23/2019 05 Ellman PPT muro colado

    19/22

    37

    Excavator withMuck Bucket

    July

    17,

    2012

    38April

    19,

    2012

    Excavation on Multiple Levels

  • 7/23/2019 05 Ellman PPT muro colado

    20/22

    39April

    19,

    2012

    Excavation onMultiple Levels

    40April

    19,

    2012

    HelicalRampShaft

    PlateGirdersSpanningBallroomBelow

  • 7/23/2019 05 Ellman PPT muro colado

    21/22

    41April

    19,

    2012

    42

    Conclusions

    Innovative use of Top-Down Constructionresulted in the successful 97deep excavation

    Use of hydro-mill to install water stop shearkeys simplified slurry wall construction

    Benefits of Top-Down Construction include:

    Resulting stiff bracing system eliminating needto underpin adjacent structures

    Simultaneous construction below and abovegrade resulting in shorter constructionschedule and lower project costs

  • 7/23/2019 05 Ellman PPT muro colado

    22/22

    DC Marriott Marquis Team

    Owner: Marriott International

    Architect: Cooper Carry ArchitectsTVS Architects JV

    Construction Manager: Hensel Phelps Construction Co.

    Structural Engineering: Thornton Tomasetti

    Slurry Wall / Tie back anchor

    Subcontractor:

    Geotechnical /Foundation Engineering:

    Mueser Rutledge

    Consulting Engineers

    East Coast Slurry Company /

    Trevi Icos JV

    Mueser Rutledge Consult ing

    Engineers14 Penn Plaza, 225 W. 34th St NY, NY 10122

    T: 917 339-9300 F: 917 339-9400

    www.mrce.com