© Minewater BV 2012

Minewater 3.0

Sustainability Vision

Minewater Corporation Heerlen

The Netherlands

27 February 2013 Louis Hiddes (l.hiddes@mijnwater.com)

Director Mijnwater BV

2

Minewater 3.0 Pilot project: Minewater 1.0

February 2014

HLN2

HLN1

HLN3

HH1

HH2

CBS

HHC

3

HLN2

HLN1 HLN3

HH1

HH2

Minewater 3.0 Final situation

February 2014

Return well HLN3 out of order

Hot to Hot (HH2) Cold to Cold (HLN2)

Thot supply 28˚C Tcold supply 16˚C Thot return 28˚C Tcold return 16˚C

4

HLN2

HLN1 HLN3

HH1

HH2

Minewater 3.0 Final situation

February 2014

All wells bidirectional

5

HLN2

HLN1 HLN3

HH1

HH2

Minewater 3.0 Final situation

February 2014

CLUSTER B CBS-

Maankwartier

CLUSTER D Componenta-Otterveurdt

CLUSTER A Arcus-APG

CLUSTER C Weller HHC

Cluster grids

6

HLN2

HLN1 HLN3

HH1

HH2

Minewater 3.0 Minewater 2.0: situation 2013

February 2014

CLUSTER A Arcus-APG

CBS

HHC

Arcus

APG

7

HLN2

HLN1 HLN3

HH1

HH2

Minewater 3.0 Minewater 2.0: situation 2013

February 2014

CLUSTER A Arcus-APG

CBS

HHC

Arcus

APG

8

HLN2

HLN1 HLN3

HH1

HH2

Minewater 3.0 Minewater 2.0: situation 2013

February 2014

CLUSTER A Arcus-APG

CBS

HHC

Arcus

APG

9

HLN2

HLN1 HLN3

HH1

HH2

Minewater 3.0 Minewater 2.0: situation 2013

February 2014

CLUSTER A Arcus-APG

CBS

HHC

Arcus

APG

10 February 2014

Artist impression Minewater 2.0

Minewater 3.0 Smart grid: Minewater 2.0

MI-HLN1

MI-HLN2

MI-HH1

MI-HH2 MI-Cluster

MI-Building

11 February 2014

Minewater 3.0

Comfort

Health

Well being

Entertainment

Mobility

Affordability

Conventional living

12 February 2014

Minewater 3.0

Comfort

Health

Well being

Entertainment

Mobility

Affordability

Sustainable living

Time & Intelligence

13 February 2014

• Prepare for energy neutral future by choosing all-electric solutions now

• Shift Trias Energetica nessesary for energy neutral future • Eliminate fossil use and ad reuse /exchange energy

Reduce energy demand Reduce energy demand

Minewater 3.0 Shift Trias Energetica

14 February 2014

Minewater 3.0 Sustainability creates space

15

-600

-400

-200

0

200

400

600

800

1000

1200

0 1.000 2.000 3.000 4.000 5.000 6.000 7.000 8.000

W-piek

W-basis

W-Verlies

W-TW

K

February 2014

Minewater 3.0 Low-Ex and energy storage

Peak load 200 – 400 hours (10–20 days): Additional generation + storage at clusterlevel

Feed temperature 38 – 45 ˚C

Base load 3600 hours (5 months): Generation + storage at buildinglevel + storage at clusterlevel

Feed temperature 30 – 38 ˚C

Hot water demand 8760 hours: Heatloss HT-network 25% total heat generation;

LT-network + booster HP < 5%

16 February 2014

Minewater 3.0 Low-Ex, storage and exchange

Periods with extreme change in demand => though storage at

building and cluster level instand (passive) exchange of heat and cold

Peak load 200 – 400 hours (10–20 days): Additional generation + storage at clusterlevel

Feed temperature 38 – 45 ˚C

Base load 3600 hours (5 months): Generation + storage at buildinglevel + storage at clusterlevel

Feed temperature 30 – 38 ˚C

17 February 2014

Conventional energy supply = 100% fossil + 100% loss of energy

Minewater 3.0 Conventional energy supply

18

Minewater 3.0 District heating with CHP

February 2014

19 February 2014

Heat pump

Energy exchange + storage = energy re-use = reduction energy loss and CO2-emission up to 100% in combination with renewable sources

Minewater 3.0 Sustainable energy supply: MW 2.0

20 February 2014

Heat pump

Energy exchange + storage = energy re-use = reduction energy loss and CO2-emission up to 100% in combination with renewable sources

Minewater 3.0 Sustainable energy supply: MW 2.0

21

Minewater 3.0 Creating a brave new area

February 2014

Sustainable energy - Minewater and OU Campus Cluster APG – Arcus:

• 25 potential buildings to attach till medio 2017 • Total 1.000.000 m2 floor area • Reduction of circa 20 billion m3 natural gas, 35.000 ton

CO2 for heating and 6.500 ton CO2 for cooling Casus Experience Parkstad important contribution for location O.U., Zuyd University, Arcus en Datacentre. First calculations show a surplus of heat in combination with other locations.

How to use this surplus of heat for customers with a heat demand besides a cold demand?

22

Minewater 3.0 Creating a brave new area

February 2014

Zero-energy greenhouse OU Campus • Typical example of a “Sustaining living” project • 10.000 m2 in combination with a bio CHP and mine water to

provide sustainable heating, cooling and electricity to the buildings on the campus and greenhouse.

• Utilized for various purposes, such as a 'living lab', production of sustainable and healthy food, hydroponic cultivation, various health aspects, research quality indoor climate

• Function as ‘hot spot’ for students on campus, but also for Heerlen’s inhabitants.

• The recently signed EU climate agreement certainly offers good perspectives for this project in Heerlen.

• Offers development chances for entrepreneurs and centers of expertise and employment opportunities for the local and regional population.

24

Minewater 3.0 Creating a brave new area

February 2014

Multifunctional Energy Greenhouse in Heerlen

25

Minewater 3.0 Creating a brave new area

February 2014

Summery of functions

ENERGY

FOOD

APPLIED

RESEARCH

HEALTH

EDUCATION

CATERING

MEETINGS

CULTURE

RELAXATION

26

Minewater 3.0 Creating a brave new area

February 2014

Villa Flora (Floriade Venlo NL)

27

Minewater 3.0 Creating a brave new area

February 2014

Impressions ‘other’ Greenhouses

Geenhouse on roof terrace InHolland

Greenhouse kiosk with pizza buffet

Multifunctional Geenhouse City border Rotterdam

28

Minewater 3.0 Creating a brave new area

February 2014

Geenhouse Hortus Botanicus Leiden

29

Minewater 3.0 Creating a brave new area

February 2014

Closed geenhouse

30

Minewater 3.0

February 2014

Thank your for your attention