Minewater 3.0
Sustainability Vision
Minewater Corporation Heerlen
The Netherlands
27 February 2013 Louis Hiddes ([email protected])
Director Mijnwater BV
2
Minewater 3.0 Pilot project: Minewater 1.0
February 2014
HLN2
HLN1
HLN3
HH1
HH2
CBS
HHC
3
HLN2
HLN1 HLN3
HH1
HH2
Minewater 3.0 Final situation
February 2014
Return well HLN3 out of order
Hot to Hot (HH2) Cold to Cold (HLN2)
Thot supply 28˚C Tcold supply 16˚C Thot return 28˚C Tcold return 16˚C
4
HLN2
HLN1 HLN3
HH1
HH2
Minewater 3.0 Final situation
February 2014
All wells bidirectional
5
HLN2
HLN1 HLN3
HH1
HH2
Minewater 3.0 Final situation
February 2014
CLUSTER B CBS-
Maankwartier
CLUSTER D Componenta-Otterveurdt
CLUSTER A Arcus-APG
CLUSTER C Weller HHC
Cluster grids
6
HLN2
HLN1 HLN3
HH1
HH2
Minewater 3.0 Minewater 2.0: situation 2013
February 2014
CLUSTER A Arcus-APG
CBS
HHC
Arcus
APG
7
HLN2
HLN1 HLN3
HH1
HH2
Minewater 3.0 Minewater 2.0: situation 2013
February 2014
CLUSTER A Arcus-APG
CBS
HHC
Arcus
APG
8
HLN2
HLN1 HLN3
HH1
HH2
Minewater 3.0 Minewater 2.0: situation 2013
February 2014
CLUSTER A Arcus-APG
CBS
HHC
Arcus
APG
9
HLN2
HLN1 HLN3
HH1
HH2
Minewater 3.0 Minewater 2.0: situation 2013
February 2014
CLUSTER A Arcus-APG
CBS
HHC
Arcus
APG
10 February 2014
Artist impression Minewater 2.0
Minewater 3.0 Smart grid: Minewater 2.0
MI-HLN1
MI-HLN2
MI-HH1
MI-HH2 MI-Cluster
MI-Building
11 February 2014
Minewater 3.0
Comfort
Health
Well being
Entertainment
Mobility
Affordability
Conventional living
12 February 2014
Minewater 3.0
Comfort
Health
Well being
Entertainment
Mobility
Affordability
Sustainable living
Time & Intelligence
13 February 2014
• Prepare for energy neutral future by choosing all-electric solutions now
• Shift Trias Energetica nessesary for energy neutral future • Eliminate fossil use and ad reuse /exchange energy
Reduce energy demand Reduce energy demand
Minewater 3.0 Shift Trias Energetica
14 February 2014
Minewater 3.0 Sustainability creates space
15
-600
-400
-200
0
200
400
600
800
1000
1200
0 1.000 2.000 3.000 4.000 5.000 6.000 7.000 8.000
W-piek
W-basis
W-Verlies
W-TW
K
February 2014
Minewater 3.0 Low-Ex and energy storage
Peak load 200 – 400 hours (10–20 days): Additional generation + storage at clusterlevel
Feed temperature 38 – 45 ˚C
Base load 3600 hours (5 months): Generation + storage at buildinglevel + storage at clusterlevel
Feed temperature 30 – 38 ˚C
Hot water demand 8760 hours: Heatloss HT-network 25% total heat generation;
LT-network + booster HP < 5%
16 February 2014
Minewater 3.0 Low-Ex, storage and exchange
Periods with extreme change in demand => though storage at
building and cluster level instand (passive) exchange of heat and cold
Peak load 200 – 400 hours (10–20 days): Additional generation + storage at clusterlevel
Feed temperature 38 – 45 ˚C
Base load 3600 hours (5 months): Generation + storage at buildinglevel + storage at clusterlevel
Feed temperature 30 – 38 ˚C
17 February 2014
Conventional energy supply = 100% fossil + 100% loss of energy
Minewater 3.0 Conventional energy supply
18
Minewater 3.0 District heating with CHP
February 2014
19 February 2014
Heat pump
Energy exchange + storage = energy re-use = reduction energy loss and CO2-emission up to 100% in combination with renewable sources
Minewater 3.0 Sustainable energy supply: MW 2.0
20 February 2014
Heat pump
Energy exchange + storage = energy re-use = reduction energy loss and CO2-emission up to 100% in combination with renewable sources
Minewater 3.0 Sustainable energy supply: MW 2.0
21
Minewater 3.0 Creating a brave new area
February 2014
Sustainable energy - Minewater and OU Campus Cluster APG – Arcus:
• 25 potential buildings to attach till medio 2017 • Total 1.000.000 m2 floor area • Reduction of circa 20 billion m3 natural gas, 35.000 ton
CO2 for heating and 6.500 ton CO2 for cooling Casus Experience Parkstad important contribution for location O.U., Zuyd University, Arcus en Datacentre. First calculations show a surplus of heat in combination with other locations.
How to use this surplus of heat for customers with a heat demand besides a cold demand?
22
Minewater 3.0 Creating a brave new area
February 2014
Zero-energy greenhouse OU Campus • Typical example of a “Sustaining living” project • 10.000 m2 in combination with a bio CHP and mine water to
provide sustainable heating, cooling and electricity to the buildings on the campus and greenhouse.
• Utilized for various purposes, such as a 'living lab', production of sustainable and healthy food, hydroponic cultivation, various health aspects, research quality indoor climate
• Function as ‘hot spot’ for students on campus, but also for Heerlen’s inhabitants.
• The recently signed EU climate agreement certainly offers good perspectives for this project in Heerlen.
• Offers development chances for entrepreneurs and centers of expertise and employment opportunities for the local and regional population.
23
Minewater 3.0 Cluster Educationcampus
CLUSTER A
February 2014
APG
Zuyd
Arcus OU
LD IKEA
Rabo
MAB Tobias
Atrium
KAS
Data center
BMC
24
Minewater 3.0 Creating a brave new area
February 2014
Multifunctional Energy Greenhouse in Heerlen
25
Minewater 3.0 Creating a brave new area
February 2014
Summery of functions
ENERGY
FOOD
APPLIED
RESEARCH
HEALTH
EDUCATION
CATERING
MEETINGS
CULTURE
RELAXATION
26
Minewater 3.0 Creating a brave new area
February 2014
Villa Flora (Floriade Venlo NL)
27
Minewater 3.0 Creating a brave new area
February 2014
Impressions ‘other’ Greenhouses
Geenhouse on roof terrace InHolland
Greenhouse kiosk with pizza buffet
Multifunctional Geenhouse City border Rotterdam
28
Minewater 3.0 Creating a brave new area
February 2014
Geenhouse Hortus Botanicus Leiden
29
Minewater 3.0 Creating a brave new area
February 2014
Closed geenhouse
30
Minewater 3.0
February 2014