STARBUCK IB, K-8 Campus New Home of Jefferson and West Ridge Students
Three-Pronged Approach for Improving Student Achievement Our long-range plan uses a three-pronged approach for improving student achievement:
• Strong Academics • Resources Aligned to our Vision • Excellent Learning Environments
If passed, the referendum would provide the funding needed to make the following improvements at Starbuck: SAFETY & SECURITY:
• Update for ADA-compliant access • Replace fire alarm, clock and PA systems • Install security cameras and emergency backup generator
K-8 LEARNING SPACES:
• Create new Elementary STEM and Middle School Tech Ed Labs, Art Room
• Create breakout spaces and student support areas • Add/expand Kindergarten classrooms • Repurpose current gymnasium for Elementary School cafeteria
NEW ADDITIONS:
• Build two-story classroom addition with Library, Band and Music space
• Construct new gymnasium, Middle School cafeteria and kitchen/receiving
• Add outdoor classroom and Elementary playground INFRASTRUCTURE:
• Refresh building interiors (LED lighting, flooring, ceilings, casework, paint walls)
• Address building maintenance (doors, HVAC updates, plumbing, roofing, exterior masonry and retro-commissioning)
Starbuck – IB, K-8 Campus *** CONCEPT ONLY ***