Post on 25-Jul-2015
Railways
TASKS PERFORMED
Technical Assistance to the Project Manager (ADIF)
CAD Design: alignments and cross section
Responsible for the written Monitoring Reports
Responsibility for Definition and Implementation of Tracking Test Plan
Monitoring monthly payments to the contractor
Drafting AS BUILT drawings
Rearrangament of tracks between PK 0.000 to 2.600 of L-336 line and Alicante’s Station Terminus
Budget: 26 m€
Rubén Muñoz Gómez – personal portfolio Year: 2014-2015
High Speed Rail
TASKS PERFORMED Technical Assistance to the Project Manager (ADIF)
CAD Design: alignments and cross section Implementation and Audit ISO 9001, ISO 14001 Responsible for the written Monitoring Reports Quality control for the project Responsibility for Definition and Implementation of Tracking Test Plan Environmental Monitoring and Waste Management Monitoring monthly payments to the contractor Drafting AS BUILT drawings
MAIN Features
High Speed Railway Station Terminus
Tracks : 5.143 m UIC60 (6 railway tracks) Underground section: 370 m 3 new platforms High Speed departures concourse Parking lot Replacement of utilities: water supply, sewerage, storm drain, electric supply, natural gas, telecommunications Realignment of roundabout and streets
New High Speed Rail Access to Levante. Section: Access to Alicante, Phase II
Budget: 60 m€
Rubén Muñoz Gómez – personal portfolio
Year: 2012-2014
High Speed Rail
TASKS PERFORMED
Technical Assistance to the Project Manager (ADIF)
Implementation and Audit ISO 9001, ISO 14001 Responsible for the written Monitoring Reports Quality control for the project Responsibility for Definition and Implementation of Tracking Test Plan Environmental Monitoring and Waste Management Monitoring monthly payments to the contractor
MAIN Features
High Speed Railway Platform Section
Total Length: 3,48 km 2 viaducts of 90 and 132 m long Tunnel of 1730 m long (2 tracks section) Earthworks Drain network Sub Ballast Replacement of utilities and rural roads
New High Speed Rail Access to Levante. Section: Aspe - El Carrús. Platform
Budget: 50 m€
Rubén Muñoz Gómez – personal portfolio
Year: 2010-2012
Light Rail Transit
TASKS PERFORMED
Project for Infrastructure owner (FGV)
Railway Design: alignments and cross section
MAIN Features
Light Rail Section duplication project
Total Length: 1,47 km False Tunnel 30 m long Tunnel of 1315 m long “Cut and cover” 125 m long
Variant in Line 1, section of Finca ADOC (Alicante)
Rubén Muñoz Gómez – personal portfolio
Budget: 36 m€
Year: 2008-2009
Light Rail Transit
TASKS PERFORMED Technical Assistance to Infrastructure Owner Design adjustments to original project Site supervision Drafting As Built project
MAIN Features
Light Rail Underground Station
Total Length: 592 km 2 Tracks and central platform Tunnel of 477 m long Structure: piling walls and precast slabs
Tram network of Alicante, 1st phase. Section: Luceros – Mercado Central
Rubén Muñoz Gómez – personal portfolio
Budget: 40 m€
Year: 2007-2008
Light Rail Transit
TASKS PERFORMED
Technical Assistance to Infrastructure Owner
Design adjustments to original project
Quality control for the project
Review structural calculations
Review and adjust drainage system
Monitoring of payments to the Contractor
Drafting “As Built” blueprints
MAIN Features Light Rail Double Track Section
Total Length: 2,47 km Tunnel of 687 m long MARQ underground station Ballastless Tracks Viaduct, 120 m long (Post-Tensioned Concrete) Restore Streets and Utilities
Tram network of Alicante, 1st phase. Section 2: Mercado Central - Finca ADOC
Rubén Muñoz Gómez – personal portfolio
Budget: 42 m€
Year: 2004-2007
Light Rail Transit
TASKS PERFORMED
Technical Assistance to Infrastructure Owner
Design adjustments to original project
Quality control for the project
Review structural calculations
Monitoring of payments to the Contractor
Drafting “As Built” blueprints
MAIN Features
Light Rail Underground Station
Total Length: 170 m Structure: piling walls and precast slabs
Double Ballastless Tracks
Lateral Platforms , 80 m long
4 Escalators, 2 Elevators
Restore Streets and Utilities
Tram network of Alicante, 1st phase. Section: Estación Mercado Central
Rubén Muñoz Gómez – personal portfolio
Budget: 24 m€
Year: 2004-2007
Light Rail Transit
TASKS PERFORMED
Technical Assistance to Infrastructure Owner
Monitoring health and safety along the construction phase
Programming and Compatibility between works and railway operations
Design and implementation of traffic diversions
MAIN Features Light Rail Sections Total Length: 9 km Track duplication, 4.4 km long Double Ballastless Tracks, 4.6 km long 9 Tram Stops, platforms 75 m long New boardwalk, 4 km long 1 Underpass + 1 Viaduct, 120 m long Restore Streets and Utilities
Rubén Muñoz Gómez – personal portfolio
Budget: 55 m€
Tram network of Alicante, 1st phase. Sections 3, 5: FINCA ADOC-COSTABLANCA-SALESIANOS
Year: 2002-2004