GENERAL SPECIFICATION
GENERAL SPECIFICATION
REVISED FEBRUARY 2005
The following Section has been added :
Section 6Protection of Substructure
The following Sections have been re-written :
Section 3Excavation & Earthwork
Section 4Concrete Work
Section 5Blockwork
REVISED APRIL 2004
The following sections have been re-written:
Section 7Woodwork
Section 9Floor, Wall and Ceiling Finishings now includes Gypsum Works
Section 13Marble and Granite
The old Electrical Section 19 has now been broken down into nine Sections covering the specializations within Electrical Works. Most of the content is unchanged however, Section 22 has been substantially revised, particularly the Dimming clauses.
There is now a detailed index at the end of the specification
The following Particular Specifications have been revised:
Air Handling Units
Building Management Systems
Catering Equipment
Lifts
Sketch AIRCOND/011 has been revised.
Sketches AIRCOND/042 and 043 covering Gantries and Ceiling Access Doors have been added.
Sketches INTDES/001 Manufactured Boards and INTDES/002 Ceiling Carcassing have also been added and these are referred to in the Section 7.
Finally, in Section 16.2 covering Ductwork, it is now a requirement for A.C. ducting to be pressure tested after installation and before the joints are insulated.
End
General Specification Feb 2005