GENERAL SPECIFICATION REVISED FEBRUARY 2005 The following Section has been added : Section 6 Protection of Substructure The following Sections have been re-written : Section 3 Excavation & Earthwork Section 4 Concrete Work Section 5 Blockwork General Specification Feb 2005

description

spec

Transcript of Revisions 2005

GENERAL SPECIFICATION

GENERAL SPECIFICATION

REVISED FEBRUARY 2005

The following Section has been added :

Section 6Protection of Substructure

The following Sections have been re-written :

Section 3Excavation & Earthwork

Section 4Concrete Work

Section 5Blockwork

REVISED APRIL 2004

The following sections have been re-written:

Section 7Woodwork

Section 9Floor, Wall and Ceiling Finishings now includes Gypsum Works

Section 13Marble and Granite

The old Electrical Section 19 has now been broken down into nine Sections covering the specializations within Electrical Works. Most of the content is unchanged however, Section 22 has been substantially revised, particularly the Dimming clauses.

There is now a detailed index at the end of the specification

The following Particular Specifications have been revised:

Air Handling Units

Building Management Systems

Catering Equipment

Lifts

Sketch AIRCOND/011 has been revised.

Sketches AIRCOND/042 and 043 covering Gantries and Ceiling Access Doors have been added.

Sketches INTDES/001 Manufactured Boards and INTDES/002 Ceiling Carcassing have also been added and these are referred to in the Section 7.

Finally, in Section 16.2 covering Ductwork, it is now a requirement for A.C. ducting to be pressure tested after installation and before the joints are insulated.

End