PROJECT BACKGROUND
FEBRUARY 2019
Background
• The Wisconsin Department of Transportation (WisDOT) is preparing preliminary engineering plans and conducting environmental analyses for the proposed County KR improvements between County H and Old Green Bay Road in Racine and Kenosha counties. The project begins 400 feet east of the County KR/County H intersection and extends east for 2.8 miles to end 1,600 feet east of the County KR/Old Green Bay Road intersection.
• WisDOT, Racine County and Kenosha County entered into a state trunk highway jurisdictional transfer agreement in April 2018 for the County KR improvements between I-94 and Old Green Bay Road. The agreement allows WisDOT to complete design and construction activities for this section of County KR. The counties are responsible for right of way acquisition and relocations. After construction, WisDOT will return jurisdiction of the roadway to the counties for ongoing control, access rights and maintenance. The design and construction of the section of County KR between I-94 and County H is being completed as part of a separate project. The section between County H and Old Green Bay Road is being evaluated in the Environmental Assessment and is referred to as the County KR-Phase 2 project.
Project/Study Location Map
Pike RiverCrossing
CANADIAN PACIFIC RRCANADIAN PACIFIC RR
UNION PACIFIC RRUNION PACIFIC RR
STURTEVANT
UNION GROVE
MOUNT PLEASANT
SOMERS
R A C I N E C O U N T Y
K E N O S H A C O U N T Y
R A C I N E C O U N T Y
K E N O S H A C O U N T Y
Pike RiverPike River
A
E
11
KR
45 D
EA
MB
H
94
41
31
Braun RdBraun Rd
Woo
d R
dW
ood
Rd
Mea
chem
Rd
Mea
chem
Rd
56th Rd56th Rd
1st St1st St
7th St7th St
Somers RdSomers Rd
Braun RdBraun Rd
Old Green Bay
Rd
Taylor Ave
90th
Ave
90th
Ave
Gre
en B
ay R
d
Gre
en B
ay R
d
105t
h A
ve10
5th
Ave
NOT TO SCALE
Project Limits Railroad Crossing
PURPOSE & NEED
FEBRUARY 2019
Purpose
• The purpose of the project is to upgrade the County KR infrastructure to safely and efficiently handle projected traffic volumes anticipated from local economic development activities occurring in the project area, and to provide a safe and well-connected transportation corridor that serves the communities in Racine County and Kenosha County.
Need
• Travel DemandThe existing two-lane undivided rural roadway configuration along County KR is not adequate to handle increased travel demand anticipated from local economic development projects and land use plans including Foxconn. The existing two-lane roadway currently handles about 9,000 to 9,500 vehicles per day. Future traffic volume on County KR is expected to more than double to 18,000 to 20,000 vehicles per day by the year 2042.
• System Linkage and Route ImportanceCounty KR is an important east-west local arterial road for Racine and Kenosha counties. County KR connects I-94 with WIS 31 and WIS 32 and serves the existing population and employment base in the cities of Kenosha and Racine, as well as the expanding employment base in Mount Pleasant and Somers.
• Roadway DeficienciesCounty KR does not meet standards for distances required for vehicles to come to a complete stop. No bike or pedestrian facilities are present along most of the roadway. Narrow shoulders are inadequate for vehicle refuge. Inadequate cross slopes cause poor drainage. Based on engineering judgement, these deficiencies, combined with future travel demand on County KR, impact safety for vehicular, bike and pedestrian travel.
• SafetyWithin the project limits, County KR experienced 50 crashes between 2013 and 2017 and had a crash rate of 140.2 crashes per 100 million vehicle miles. This crash rate exceeds the statewide crash rate threshold of 115.9 crashes/100 million vehicle miles. Most of the crashes in the project area, 37 crashes, occurred at the intersection of County KR and WIS 31. According to the traffic report prepared for the project, modifications such as intersection and capacity improvements would be needed to accommodate the projected 2042 traffic volumes along County KR to maintain safety.
PROJECT DESCRIPTION
FEBRUARY 2019
Roadway
• The Build Alternative - Reconstruction would replace the existing two-lane rural undivided roadway with a four-lane divided urban roadway.
• The Build Alternative - Reconstruction would reconstruct and expand County KR with two 12-foot travel lanes in each direction that are divided by a median.
• The raised median between County H and 90th Street would be 36-feet and the median for the remainder of the corridor would typically be 30-feet.
• Between the UPRR and 56th Avenue, County KR would have a 22-foot raised median and 8-foot shoulders to allow vehicles to decelerate to and accelerate from driveways.
• East of Old Green Bay Road, the 30-foot raised median would end just west of 43rd Avenue. Then, the median, which tapers to match the existing road width, would be painted to facilitate full access across County KR.
• Proposed right of way for the Build Alternative - Reconstruction would vary from 224 feet to 380 feet, depending on location.
• One note of importance is that while the preferred median access option in the EA between the UPRR and 56th Avenue is a full raised median with no access, Racine and Kenosha counties have both indicated their support for option 3, Two Way Left Turn Lane (TWLTL), that allows continuous cross access from driveways in this area. WisDOT would like feedback on this option from people tonight.
Intersections
• The Build Alternative - Reconstruction would include improvements to maintain traffic operations at the County KR intersections with WIS 31 and Old Green Bay Road and it would realign 90th Street on the north with County EA (72nd Avenue) on the south.
• Each of these intersections would be signalized and have exclusive left turn and right turn lanes.
Railroad Grade Separations
• New bridges (grade separations) for County KR would replace the existing at-grade railroad crossings at CPRR and UPRR.
• The new bridges would have a 23-foot, 3-inch clearance over the railroad tracks to meet design standards for railroad grade separations.
• The grade separation at UPRR would include a retaining wall on the south side of County KR that ranges in height from 2 feet to 28 feet and an access road off County KR to provide access to residential properties to the south of County KR.
PROJECT DESCRIPTION
FEBRUARY 2019
Pedestrian and Bicycle Accommodations
• The Build Alternative – Reconstruction would build a 10-foot shared-use path on both sides of the road between County H and 90th Street. The path would be constructed on the north side of County KR between 90th Street and Vicksburg Drive, just east of Old Green Bay Road.
• The Kenosha County shared-use path on the south side of County KR between 56th Avenue and WIS 31 would be replaced in generally the same configuration.
• The existing bridge for the path over the Pike River would be removed and bicyclists and pedestrians would be rerouted onto a bike/pedestrian lane on the new County KR bridge over the Pike River.
Stormwater and Drainage Facilities
• The Build Alternative – Reconstruction would replace existing drainage ditches with curb and gutter, and stormwater would be conveyed to one of four detention ponds at the following general locations:
North of County KR, between County H and CPRRSouth of County KR, east of 72nd AvenueNorth of County KR, west of the Pike RiverSouth of County KR, between the Pike River and WIS 31
Pike River Bridges
• The Build Alternative – Reconstruction would replace the existing 3-cell (12-foot x 13.5-foot/cell) box culvert that conveys the Pike River under County KR with two new 233-foot concrete slab span bridges over the Pike River. Slab span bridges are thick reinforced concrete slabs (no beams/girders) that span the stream crossing to the supporting foundations (piers and abutments).
REGIONAL TRANSPORTATION COMPATIBILITY
FEBRUARY 2019
The Southeastern Wisconsin Regional Planning Commission (SEWRPC) amended VISION 2050, the region’s long-range land use and transportation plan, in December 2018 to incorporate changes to accommodate additional residents and jobs related to the Foxconn campus. The amended plan incorporates transportation improvements to serve the Foxconn campus area.
The County KR – Phase 2 project is consistent with the VISION 2050 plan recommendations:
• Widens County KR (County H to Old Green Bay Road) to four lanes.• Provides enhanced bicycle facility along County KR that links with other regional trails.• Accommodates and supports recommended transit service along County KR.
VISION 2050 Arterial Street & Highway System Recommendations
VISION 2050 Bicycle Network Recommendations
VISION 2050 Transit Service Recommendations
88
6 4
6
6
6
66 6
4
6
6
6
444
4
4
64 44
6
6 6
6
4
4
44
4
4
!
!
!
!
4
")H
")T
")X
")KR
")G")EA
")KR
")H
**
³±
##
20
**
³±
##
11
**
³±
##
32
,-41
0141
,-94
")A
")C
YorkvilleSomers
STURTEVANT
RACINE
ELMWOODPARK
SOMERS
MOUNTPLEASANT
FREEWAY INTERCHANGE
EXISTING!
ARTERIAL STREET OR HIGHWAY
SEWRPCSource:
0 1 2 Miles
WIDENING AND/OR OTHER IMPROVEMENT TO PROVIDE SIGNIFICANT ADDITIONAL CAPACITY
RESURFACING OR RECONSTRUCTION TOPROVIDE ESSENTIALLY THE SAME CAPACITY
NUMBER OF TRAFFIC LANES FOR NEW ORIMPROVED FACILITY, INCLUDING RIGHT-OF-WAY RESERVATIONS (2 LANES WHERE UNNUMBERED)
4RESERVE RIGHT-OF-WAY TO ACCOMMODATEPOTENTIAL FUTURE IMPROVEMENT BEYOND 2050 (ADDITIONAL LANES OR NEW FACILITY)
NEW
")H
")T
")X
")KR")KR
")H
**
³±
##
20
**
³±
##
11,-41
0141
,-94
")A
")C
Yorkville
STURTEVANT
RACINE
ELMWOODPARK
SOMERS
MOUNTPLEASANT
Somers **
³±
##
32
BICYCLE FACILITIES
SEWRPCSource:
0 1 2 Miles
Corridor would include an enhanced bicycle facility—suchas a protected bike lane, a separate path within the roadright-of-way, or a buffered bike lane—located on oralong an arterial or, alternatively, a neighborhoodgreenway on a nearby parallel nonarterial.
aARTERIAL STREET OR HIGHWAY WITHBICYCLE ACCOMMODATION (IF FEASIBLE)
OFF-STREET BICYCLE PATH
NONARTERIAL STREET CONNECTIONTO OFF-STREET BICYCLE NETWORK
aRECOMMENDED CORRIDOR FORENHANCED BICYCLE FACILITY
!!
!!
!!
!!
!!
!!
!!
!!
!!!!!!!!
!! !!!!
!!
Norway Raymond
Yorkville
Paris
Somers
BAY
WIND
NORTH
POINT
UNIONGROVE
ELMWOODPARK
STURTEVANT
LAKEPADDOCK
PLEASANT
PRAIRIE
ELMGROVE
BUTLER
WEST
GREENDALE
MILWAUKEE
SHOREWOOD
CORNERS
BAY
HALES
CALEDONIA
MOUNT PLEASANT
BRISTOL
SOMERS
ST.
SOUTH
CUDAHY
FRANCIS
FRANKLINOAK
MILWAUKEE
WAUWATOSA
MILWAUKEE
GREENFIELD
WESTALLIS
CREEKMUSKEGO
NEW BERLIN
BROOKFIELD
RACINE
KENOSHA
W A U K E S H A C O . M I L W A U K E E C O .
K E N O S H A C O .
R A C I N E C O .**
³±
##
32
**³±
##
38
**
³±
##
32
**
³±
##
24
**
³±
##
57
**
³±
##
59
**
³±
##
36
**
³±
##
100
**
³±
##
145
**
³±
##
190
**
³±
##
181
**³±
##
119
**
³±
##100
**
³±
##
32
**
³±##
794
**
³±
##
36
**
³±
##
31
**
³±
##
32
**
³±
##
38
**
³±
##
20
**
³±
##
11
**
³±
##
83
**
³±
##
50
**
³±
##
32
**
³±
##
31
**
³±
##
50
**
³±
##
31
**
³±
##
158
**
³±
##
165
**
³±
##
32
**
³±##
241
**
³±
##
175
0141
0118
0145
0141
0141
0145
0145
0145
0141
,-94
,-43
,-94
,-94
,-794
,-894
,-43 ,-894
,-94
,-41
,-41
,-41
,-41
,-41
TRANSIT SERVICES LOCAL TRANSIT SERVICE AREA AND PEAK FREQUENCY
STREETCAR LINE
INTERCITY RAIL
COMMUTER BUS ROUTE & PARK-RIDE
COMMUTER RAIL LINE & STATION
EXPRESS BUS ROUTE
RAPID TRANSIT LINE
!!
TO BURLINGTON
EVERY 15 MINUTES OR BETTER
LESS FREQUENT THAN EVERY 15 MINUTES
ONE DAY ADVANCE-RESERVATION SHARED-RIDE TAXI
SEWRPCSource:
0 1 2 3 Miles
ENVIRONMENTAL IMPACTS SUMMARY
FEBRUARY 2019
Evaluation Factors No BuildBuild Alternative - Reconstruction
PROJECT PARAMETERSLength (miles) 2.8 2.8
Total project cost YOE (million $) $0.92 $59
Right of way width (feet) 66 224 to 380
Number of lanes 2 4
Pedestrian and bicycle facilitiesLimited to south side of County KR between 56th Avenue and WIS 31
10-foot shared-use path on both sides of County KR between County H and 90th Street and on the north side of County KR between 90th Street and Vicksburg Drive
Stormwater facilities Roadside ditches Storm sewers and detention ponds
Railroad crossings Two at-grade crossings Two grade separated crossings
Pike River crossingBox culverts (capacity for 5-year flood event)
Bridges (capacity for 100-year flood event)
Driveway and intersection accessFew restrictions on right and left turns
• Typically left turns restricted to median openings at public intersections.
• Between the UPRR and 56th Avenue the median width is reduced, and the shoulder width is increased to allow vehicles to decelerate to and accelerate from driveways.
• East of 43rd Avenue the median would be painted to facilitate full access across County KR.
TRAFFIC OPERATIONS IN DESIGN YEAR 2042County KR - County H to 90th Street (LOS) E C
County KR - 90th Street to WIS 31 (LOS) E B
County KR - WIS 31 to County M (LOS) E B
LAND CONVERSION AND REAL ESTATE REQUIREMENTSAcres converted to new right of way 0 68.9
Acres required from farm operations 0 53.4 (23 acres purchased by Mount Pleasant for Foxconn)
Number of farms impacted 0 14
Housing units required 0 5
ENVIRONMENTAL IMPACTSResidences impacted by traffic noise (number) 0 23
Historic properties (number) 0 0
Archaeological sites (number) 0 0
Aesthetic/visual changes No Yes
Environmental justice concerns No No
Floodplain impact (acres) 0 2.7
Wetland impact (acres) 0 7.44
Environmental corridor impact (acres) 0 3.49
Pike River restoration area impact (acres) 0 0.38
Future Biex Ramcke Homstead Park impact (acres) 0 2.08
Stream crossings (Pike River) 1 1
Threatened and endangered species (potential for impacts) No No (mitigation measures proposed for Rusty Patched Bumble Bee)
Air quality concerns No No
Contaminated sites (recommended for further investigation) 0 3
Potential for indirect effects No
Indirect effects to resources may occur from the Build Alternative-Reconstruction if induced development occurs. Local, state and federal regulations and policies are in place to manage resources and minimize indirect effects.
Potential for cumulative effects No
The project’s direct impacts and indirect effects, in combination with other projects implemented by other parties may contribute to cumulative effects on resources. Local, state and federal regulations and policies are in place to manage resources and minimize cumulative effects.
REGIONAL TRANSPORTATION COMPATIBILITY
FEBRUARY 2019
The Southeastern Wisconsin Regional Planning Commission (SEWRPC) amended VISION 2050, the region’s long-range land use and transportation plan, in December 2018 to incorporate changes to accommodate additional residents and jobs related to the Foxconn campus. The amended plan incorporates transportation improvements to serve the Foxconn campus area.
The County KR – Phase 2 project is consistent with the VISION 2050 plan recommendations:
• Widens County KR (County H to Old Green Bay Road) to four lanes.• Provides enhanced bicycle facility along County KR that links with other regional trails.• Accommodates and supports recommended transit service along County KR.
VISION 2050 Arterial Street & Highway System Recommendations
VISION 2050 Bicycle Network Recommendations
VISION 2050 Transit Service Recommendations
88
6 4
6
6
6
66 6
4
6
6
6
444
4
4
64 44
6
6 6
6
4
4
44
4
4
!
!
!
!
4
")H
")T
")X
")KR
")G")EA
")KR
")H
**
³±
##
20
**
³±
##
11
**
³±
##
32
,-41
0141
,-94
")A
")C
YorkvilleSomers
STURTEVANT
RACINE
ELMWOODPARK
SOMERS
MOUNTPLEASANT
FREEWAY INTERCHANGE
EXISTING!
ARTERIAL STREET OR HIGHWAY
SEWRPCSource:
0 1 2 Miles
WIDENING AND/OR OTHER IMPROVEMENT TO PROVIDE SIGNIFICANT ADDITIONAL CAPACITY
RESURFACING OR RECONSTRUCTION TOPROVIDE ESSENTIALLY THE SAME CAPACITY
NUMBER OF TRAFFIC LANES FOR NEW ORIMPROVED FACILITY, INCLUDING RIGHT-OF-WAY RESERVATIONS (2 LANES WHERE UNNUMBERED)
4RESERVE RIGHT-OF-WAY TO ACCOMMODATEPOTENTIAL FUTURE IMPROVEMENT BEYOND 2050 (ADDITIONAL LANES OR NEW FACILITY)
NEW
")H
")T
")X
")KR")KR
")H
**
³±
##
20
**
³±
##
11,-41
0141
,-94
")A
")C
Yorkville
STURTEVANT
RACINE
ELMWOODPARK
SOMERS
MOUNTPLEASANT
Somers **
³±
##
32
BICYCLE FACILITIES
SEWRPCSource:
0 1 2 Miles
Corridor would include an enhanced bicycle facility—suchas a protected bike lane, a separate path within the roadright-of-way, or a buffered bike lane—located on oralong an arterial or, alternatively, a neighborhoodgreenway on a nearby parallel nonarterial.
aARTERIAL STREET OR HIGHWAY WITHBICYCLE ACCOMMODATION (IF FEASIBLE)
OFF-STREET BICYCLE PATH
NONARTERIAL STREET CONNECTIONTO OFF-STREET BICYCLE NETWORK
aRECOMMENDED CORRIDOR FORENHANCED BICYCLE FACILITY
!!
!!
!!
!!
!!
!!
!!
!!
!!!!!!!!
!! !!!!
!!
Norway Raymond
Yorkville
Paris
Somers
BAY
WIND
NORTH
POINT
UNIONGROVE
ELMWOODPARK
STURTEVANT
LAKEPADDOCK
PLEASANT
PRAIRIE
ELMGROVE
BUTLER
WEST
GREENDALE
MILWAUKEE
SHOREWOOD
CORNERS
BAY
HALES
CALEDONIA
MOUNT PLEASANT
BRISTOL
SOMERS
ST.
SOUTH
CUDAHY
FRANCIS
FRANKLINOAK
MILWAUKEE
WAUWATOSA
MILWAUKEE
GREENFIELD
WESTALLIS
CREEKMUSKEGO
NEW BERLIN
BROOKFIELD
RACINE
KENOSHA
W A U K E S H A C O . M I L W A U K E E C O .
K E N O S H A C O .
R A C I N E C O .**
³±
##
32
**³±
##
38
**
³±
##
32
**
³±
##
24
**
³±
##
57
**
³±
##
59
**
³±
##
36
**
³±
##
100
**
³±
##
145
**
³±
##
190
**
³±
##
181
**³±
##
119
**
³±
##100
**
³±
##
32
**
³±##
794
**
³±
##
36
**
³±
##
31
**
³±
##
32
**
³±
##
38
**
³±
##
20
**
³±
##
11
**
³±
##
83
**
³±
##
50
**
³±
##
32
**
³±
##
31
**
³±
##
50
**
³±
##
31
**
³±
##
158
**
³±
##
165
**
³±
##
32
**
³±##
241
**
³±
##
175
0141
0118
0145
0141
0141
0145
0145
0145
0141
,-94
,-43
,-94
,-94
,-794
,-894
,-43 ,-894
,-94
,-41
,-41
,-41
,-41
,-41
TRANSIT SERVICES LOCAL TRANSIT SERVICE AREA AND PEAK FREQUENCY
STREETCAR LINE
INTERCITY RAIL
COMMUTER BUS ROUTE & PARK-RIDE
COMMUTER RAIL LINE & STATION
EXPRESS BUS ROUTE
RAPID TRANSIT LINE
!!
TO BURLINGTON
EVERY 15 MINUTES OR BETTER
LESS FREQUENT THAN EVERY 15 MINUTES
ONE DAY ADVANCE-RESERVATION SHARED-RIDE TAXI
SEWRPCSource:
0 1 2 3 Miles
ESTI
MAT
ED P
ROJE
CT S
CHED
ULE
FEBR
UARY
201
9
Act
ivit
y20
1820
1920
2020
2120
22
Env
ironm
enta
l Doc
umen
t (E
nviro
nmen
tal A
sses
smen
t)
Pub
lic H
earin
g fo
r E
nviro
nmen
tal A
sses
smen
t
Find
ing
of N
o S
igni
fican
t Im
pact
(FO
NS
I)
Pre
limin
ary
Des
ign
Fina
l Des
ign
Rea
l Est
ate
Acq
uisi
tion
Rel
ocat
ions
/Bui
ldin
g D
emo
Util
ity R
eloc
atio
ns
Pro
ject
Let
for
Bid
Con
stru
ctio
n
Upc
omin
g M
ilest
ones
• P
ublic
com
men
t per
iod
on E
nviro
nmen
tal A
sses
smen
t end
s M
arch
7, 2
019.
• P
endi
ng re
sults
of p
ublic
hea
ring,
Wis
DO
T m
ay is
sue
a Fi
ndin
g of
No
Sig
nific
ant I
mpa
ct (F
ON
SI)
by th
e en
d of
Mar
ch 2
019,
indi
catin
g st
ate
appr
oval
of t
he
pref
erre
d al
tern
ativ
e.•
Pen
ding
the
FON
SI,
final
eng
inee
ring
and
right
of w
ay a
cqui
sitio
ns w
ould
beg
in s
prin
g 20
19 a
nd c
ontin
ue to
ear
ly s
prin
g 20
20.
At t
he e
nd o
f the
doc
umen
t ava
ilabi
lity
perio
d, th
e pr
ojec
t tea
m w
ill re
view
and
con
side
r al
l pub
lic h
earin
g te
stim
ony
rece
ived
on
the
Env
ironm
enta
l A
sses
smen
t. Th
is in
put w
ill as
sist
the
proj
ect t
eam
in s
elec
ting
the
pref
erre
d al
tern
ativ
e.