Milton Middle School Renovation Weekly update June 24, 2010

Transcript of Ms Renovation Weekly

MIDDLE SCHOOL RENOVATION

WEEKLY PROGRESSJUNE 17 - 24

6/17/10

A-POD 1ST FLOOR NORTH SIDE

6/17/10

C-POD 1ST FLOOR SOUTH SIDE

6/17/10

F-POD 2ND FLOOR SOUTH SIDE

6/17/10

GYM (STAGE AREA)

6/21/10

C-POD 1ST FLOOR SOUTH SIDE

6/21/10

E-POD 2ND FLOOR NORTH SIDE

6/21/10

F-POD 2ND FLOOR SOUTH SIDE

6/21/10

GYM (OLD STAGE AREA)

6/21/10

RESTROOMS 1ST FLOOR

6-22-10

D-POD EAST SIDE

6/23/10GYM

SETTING OF STEEL BEAMS

6/23/10WALL THAT WAS BETWEEN LIBRARY 2ND FLOOR AND LARGE GROUP ROOM

6/24/10REMOVAL OF STONE FROM ROOF

6/24/10NEW ROOF

6/24/10LIBRARY 2ND FLOOR

6/24/10WALL THAT WAS BETWEEN

LIBRARY AND LARGE GROUP ROOM

6/24/10

D-POD 2ND FLOOR WALL STUDS COMPLETED

E-POD 2ND FLOOR WALL STUDS STARTED

6/24/10

A-POD 1ST FLOOR NORTH SIDE WALLS STARTED

C-POD CLASSROOM WALLS

6/24/10C-POD CLASSROOM WALLS

6/24/10GYM (WAS STAGE AREA)