Meadowridge Capital Improvement Project

Danée McGee, P.E. Project Manager: Charlotte Storm Water Services

Scott Sigmon, P.E.WK Dickson

May 10, 2012

MEADOWRIDGE DRIVE

MEADOWRIDGE DRIVE

ALL SAINTS LANE

IVYGATE LANE

DID NOT MEET STANDARDS

DID NOT MEET STANDARDS

DID NOT MEET STANDARDS

DID NOT MEET STANDARDS

LOCALIZED STREAM EROSION

EROSION AT PIPE AND

HEADWALL LOCALIZED STREAM EROSION

STRUCTURAL FLOODING

FAILING PIPES

Localized Stream Erosion

Erosion at Pipe and Headwall

Localized Stream Erosion

Meadowridge Drive: Upgrade existing system to increase capacity

MEADO

WRI

DGE

DR

All Saints Lane: Upgrade existing system to increase capacity

Meadowridge Drive: Upgrade existing system to increase capacity and reduce street flooding

Ivygate Lane: Replace cracked and failing pipes

Behind 5721 Trimmings Court:Bank stabilization to reduce erosion and head cut

Final Project Phases – How things Work:

Next Steps

– Design Phase

– 401/404 Permitting

– Easement Acquisition

– Bid and Construction