Meadowridge Capital Improvement Project Danée McGee, P.E. Project Manager: Charlotte Storm Water Services Scott Sigmon, P.E. WK Dickson May 10, 2012

Transcript of meadowridge alt an public meeting

Page 1: meadowridge alt an public meeting

Meadowridge Capital Improvement Project

Danée McGee, P.E. Project Manager: Charlotte Storm Water Services

Scott Sigmon, P.E.WK Dickson

May 10, 2012

Page 2: meadowridge alt an public meeting

MEADOWRIDGE DRIVE

MEADOWRIDGE DRIVE

ALL SAINTS LANE

IVYGATE LANE

Page 3: meadowridge alt an public meeting

DID NOT MEET STANDARDS

DID NOT MEET STANDARDS

DID NOT MEET STANDARDS

DID NOT MEET STANDARDS

Page 4: meadowridge alt an public meeting

LOCALIZED STREAM EROSION

EROSION AT PIPE AND

HEADWALL LOCALIZED STREAM EROSION

STRUCTURAL FLOODING

FAILING PIPES

Page 5: meadowridge alt an public meeting

Localized Stream Erosion

Page 6: meadowridge alt an public meeting

Erosion at Pipe and Headwall

Page 7: meadowridge alt an public meeting

Localized Stream Erosion

Page 8: meadowridge alt an public meeting

Meadowridge Drive: Upgrade existing system to increase capacity

MEADO

WRI

DGE

DR

Page 9: meadowridge alt an public meeting

All Saints Lane: Upgrade existing system to increase capacity

Page 10: meadowridge alt an public meeting

Meadowridge Drive: Upgrade existing system to increase capacity and reduce street flooding

Page 11: meadowridge alt an public meeting

Ivygate Lane: Replace cracked and failing pipes

Page 12: meadowridge alt an public meeting

Behind 5721 Trimmings Court:Bank stabilization to reduce erosion and head cut

Page 13: meadowridge alt an public meeting

Final Project Phases – How things Work:

Next Steps

– Design Phase

– 401/404 Permitting

– Easement Acquisition

– Bid and Construction

Page 14: meadowridge alt an public meeting

Questions &

Comments