Meadowridge Capital Improvement Project
Danée McGee, P.E. Project Manager: Charlotte Storm Water Services
Scott Sigmon, P.E.WK Dickson
May 10, 2012
MEADOWRIDGE DRIVE
MEADOWRIDGE DRIVE
ALL SAINTS LANE
IVYGATE LANE
DID NOT MEET STANDARDS
DID NOT MEET STANDARDS
DID NOT MEET STANDARDS
DID NOT MEET STANDARDS
LOCALIZED STREAM EROSION
EROSION AT PIPE AND
HEADWALL LOCALIZED STREAM EROSION
STRUCTURAL FLOODING
FAILING PIPES
Localized Stream Erosion
Erosion at Pipe and Headwall
Localized Stream Erosion
Meadowridge Drive: Upgrade existing system to increase capacity
MEADO
WRI
DGE
DR
All Saints Lane: Upgrade existing system to increase capacity
Meadowridge Drive: Upgrade existing system to increase capacity and reduce street flooding
Ivygate Lane: Replace cracked and failing pipes
Behind 5721 Trimmings Court:Bank stabilization to reduce erosion and head cut
Final Project Phases – How things Work:
Next Steps
– Design Phase
– 401/404 Permitting
– Easement Acquisition
– Bid and Construction
Questions &
Comments