Meadowridge Capital Improvement Project
Danée McGee, P.E. Project Manager: Charlotte Storm Water Services
Scott Sigmon, P.E.WK Dickson
November 10, 2011
![Page 2: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/2.jpg)
Project Team & Meeting Purpose
Charlotte Storm Water Services: Project Management
WK Dickson: Design Consultant
Explanation of Storm Water Program: Why Are We Here?
Obtain Public Input:Your Part in the Process…
Provide Project Overview: What Are We Doing?
Explanation of Next Steps:What is Coming Next…
![Page 3: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/3.jpg)
Charlotte’s Storm Water Program
Water Quality
Maintenance
Capital Improvements
![Page 4: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/4.jpg)
During the project:
Public Input
– Mailers Every Four Months
– Website Updates: http://Stormwater.Charmeck.Org
– Public Meetings
– Questionnaires and Property Owner Surveys
– Email and Phone Contact as Needed
![Page 5: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/5.jpg)
Project Phases1. Planning
2. Design
3. Permitting (401/404)
4. Easement Acquisition
5. Bid & Construction
– Public Involvement Throughout
![Page 6: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/6.jpg)
Summary of Existing Conditions
![Page 7: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/7.jpg)
MEADOWRIDGE DRIVE
MEADOWRIDGE DRIVE
ALL SAINTS LANE
![Page 8: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/8.jpg)
DID NOT MEET STANDARDS
DID NOT MEET STANDARDS
DID NOT MEET STANDARDS
![Page 9: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/9.jpg)
LOCALIZED STREAM EROSION
EROSION AT PIPE AND
HEADWALL LOCALIZED STREAM EROSION
STRUCTURAL FLOODING
SEDIMENT DEPOSITION
![Page 10: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/10.jpg)
Localized Stream Erosion
![Page 11: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/11.jpg)
Erosion at Pipe and Headwall
![Page 12: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/12.jpg)
Sediment Deposition
![Page 13: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/13.jpg)
Localized Stream Erosion
![Page 14: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/14.jpg)
Final Project Phases – How things Work:
Next Steps
– Additional Planning, Modeling and Field Surveys
– Design Phase
– 401/404 Permitting
– Easement Acquisition
– Bid and Construction
![Page 15: meadowridge rev Nov 9 2011](https://reader037.fdocuments.us/reader037/viewer/2022110109/58703bba1a28ab4e2c8b4c7b/html5/thumbnails/15.jpg)
Questions &