November 19, 2016

Hollywood Park

Construction Update

Meeting

PROJECT TEAM

Introduction and Welcome

Michelle Ballard, VP, Community & Citizenship,

Turner-Hunt JV

Infrastructure Update

Juresha Alemayehu, Senior Project Engineer,

Turner

Casino Demo

Elston Ridgle, Safety Manager,

Turner-Hunt JV

Stadium Update

Dave Masel, General Superintendent – Field Operations,

Turner-Hunt JV

Hollywood Park Development

Gerard McCallum, Project Manager,

Wilson Meany

INFRASTRUCTURE

Building Demolition

100% Complete

Site Demo & Crushing

80% Complete

Street Widening & Hardscape

95% Complete

Environmental Remediation: 178 Acres

Grading: 27 Acres

Storm Drain Relocation

99% Complete

Offsite Sewer Improvements

100% Complete

GRADING AREA AROUND STADIUM

BOWL

GRADING AREA AROUND STADIUM

BOWL

Anticipated Work

ANTICIPATED WORK

Onsite

• Infrastructure will continue to remediate unsuitable soil and demo Northern 60 acre parking lot

Prairie

• Ground Cover being planted and irrigation systems undergoing final testing.

• Minor clean-up work will continue to the end of November.

Century

• No Anticipated Work at this time.

Prairie Ave

Landscaping along Prairie

Ave. is nearly complete.

Ground Cover is being

planted and irrigation

systems are undergoing

final testing. Anticipated

completion in early

December 2016.

Paving & Striping on Prairie

Prairie Ave. paving and striping is complete. All

traffic signals are operational including pedestrian

crossing indicators. Minor pickup work remains and

is scheduled for completion by the end of November

2016

Century Blvd

No Anticipated Work at This Time

Casino and Pavilion Demo

Casino and Pavilion Demo

• Casino demo is

nearly complete

aside from

basement.

• Pavilion Soft Demo

is complete (removal

of non structural

items)

• Pavilion Hard Demo

to begin week of

11/28.

Gutting of Pavilion

Casino and Pavilion Demo

Stadium Update

Stadium Update

• Mass Grading

• Nightly Dust Control

• Mobilizing trailer complex

• Engaging local workforce – Ramping up in January

• THJV and the community

Mass Grading

Dust Control

• There are currently 13 pieces of Dust Control Equipment

working

• Water Trucks run continuously from 7:00am to 5:30pm

• The quantity of water that is placed averages 1,300,000

gallons/day

Kiewit Infrastructure West is the subcontractor currently

working on the site. If you or your neighbors have

additional concerns please contact one of the following

Kiewit Managers immediately:

Allison Reinicke (310) 846-2402

Ron Robison (310) 846-8402

Scrapers

Mobilizing Trailer Complex

Engaging Local Workforce

Information and Resource Fair

Date: Thursday, December 1, 2016

Time: 9:00 am to 2:00 p.m.

Location: Rogers Park (Gymnasium & Auditorium), 400

West Beach Avenue, Inglewood, California, 90301

SUMMARY/OVERVIEW

Plan Overview

Stadium –Southeast View

Stadium –Lake Park View

Stadium –Champions Plaza

Stadium – Entrance

Q & A

To receive construction

updates or for questions

email

inglewoodstadium@tcco.comor call

424-750-3598

Dust Control

• There are currently 13 pieces of Dust Control Equipment

working

• Water Trucks run continuously from 7:00am to 5:30pm

• The quantity of water that is placed averages 1,300,000

gallons/day

Kiewit Infrastructure West is the subcontractor currently

working on the site. If you or your neighbors have

additional concerns please contact one of the following

Kiewit Managers immediately:

Allison Reinicke (310) 846-2402

Ron Robison (310) 846-8402