14-6-2019 1source: DOT BV

GROW session - 06/06/2019: Reinder Jorritsma

14-6-2019

DOT BV

2

14-6-2019grouted connection bolted connection slip joint

Slip Joint Technology

14-6-2019

Slip Joint Offshore Research (SJOR)

4

Funding program: Hernieuwbare Energie Regeling (HER)

Focus HER: reduction of SDE+ expenses

Project duration: 09/12/16 - 31/12/2019

Budget: 5M (funding: 3.6M)

Project goal:

To investigate the structural behaviour of the slip joint in offshore conditions during installation and under dynamic loads and to investigate the critical areas of the slip joint.

Partners:

14-6-2019 5

State of the Art: Maasvlakte 2016

22-03-16

State of the Art: Maasvlakte 2016

14-6-2019

SJOR - preparations

7

14-6-2019 8

14-6-2019 9

Slip Joint - Results

14-6-2019

Next steps

10

Borssele V, 2020-21Potential follow-up 2020Decommissioning Q3 ‘19

14-6-2019 11

Reinder JorritsmaProject Developer+31 (0)6 14 83 32 45reinder@dotpower.nl