GROW session - 06/06/2019: Reinder Jorritsma...AEGIR SJOR HEEREMA PANAMA HEER SJOR SJOR - Slip -...
Transcript of GROW session - 06/06/2019: Reinder Jorritsma...AEGIR SJOR HEEREMA PANAMA HEER SJOR SJOR - Slip -...
14-6-2019 1source: DOT BV
GROW session - 06/06/2019: Reinder Jorritsma
14-6-2019
DOT BV
2
14-6-2019grouted connection bolted connection slip joint
Slip Joint Technology
14-6-2019
Slip Joint Offshore Research (SJOR)
4
Funding program: Hernieuwbare Energie Regeling (HER)
Focus HER: reduction of SDE+ expenses
Project duration: 09/12/16 - 31/12/2019
Budget: 5M (funding: 3.6M)
Project goal:
To investigate the structural behaviour of the slip joint in offshore conditions during installation and under dynamic loads and to investigate the critical areas of the slip joint.
Partners:
14-6-2019 5
State of the Art: Maasvlakte 2016
22-03-16
State of the Art: Maasvlakte 2016
14-6-2019
SJOR - preparations
7
14-6-2019 8
14-6-2019 9
Slip Joint - Results
14-6-2019
Next steps
10
Borssele V, 2020-21Potential follow-up 2020Decommissioning Q3 ‘19
14-6-2019 11
Reinder JorritsmaProject Developer+31 (0)6 14 83 32 [email protected]
Thijs KamphuisResearch lead+31 (0)6 48 76 06 [email protected]
address:Raam 1802611 WP, Delftthe Netherlands