Final Bond Presentation to Citizen Bond Oversight ...

Post on 26-Apr-2022

3 views 0 download

Transcript of Final Bond Presentation to Citizen Bond Oversight ...

How...The bond is focused on four key areas:

Prioritize Safety and Security● Security cameras, including cameras on

school buses

● Seismic and roofing upgrades● Playground upgrades

Renovate and Repair Aging Schools● HVAC, plumbing and electrical upgrades

● Significant remodeling at Hilhi &

Reedville● Replacement of 15 portable classrooms

Relieve Crowding, Plan for Growth● Construction of two new elementary schools

and replacement of Brookwood

● Construction of separate gymnasiums at

schools with shared gym & cafeteria space● Expansion of Evergreen and Glencoe

Provide a Modern Education for Students● Student and teacher technology

● Expansion of CTE spaces in high schools

● Flexible classroom furniture● Internet self-sufficiency

2018 Bond ProjectsRemodel of Reedville Elementary School

Front Entrance Line-of-Sight ○ CHS, LHS

Elementary Playground Replacements ○ WL Henry, Butternut Creek, Farmington View, West

Union

Parent/Bus Drop-Off Improvements ○ Jackson, Ladd Acres, McKinney, Eastwood

Replace Domestic Water Pipes○ Ladd Acres, Miller Big Picture (David Hill)

Replace Portable Classrooms○ WL Henry, McKinney, Farmington View

Artificial Turf FIelds w/ Lights ○ Glencoe, Hilhi (includes new track)

Flexible Classroom Furniture○ Butternut Creek, Farmington View, Free Orchards,

Groner, Jackson, Lincoln Street, N Plains, Reedville, Tobias, Witch Hazel, Mooberry

Distributed Antenna System-Phase 1○ GHS, CHS, LHS, S. Meadows, Witch Hazel

Replace Student Computers ○ All Schools

Replace Teacher Computers ○ All secondary schools

Security Camera Project-Phase 1 ○ Poynter, Brown, S. Meadows, Miller Big

Picture

Roofing Upgrades ○ N Plains, Tobias, Peter Boscow

Boiler Replacement ○ Brown

Security Cameras on School Buses○ Transportation

Perimeter Fencing○ Ladd Acres

Reedville Elementary Site Plan

Reedville Elementary Modular Building

Elementary Playground Replacements

Parent Bus/Drop-Off - Jackson

Parent/Bus Drop-Off - Ladd Acres

Parent/Bus Drop-Off - McKinney

Parent/Bus Drop-Off - Eastwood

Replace Portable Building with 3-Classroom Modular - WL Henry

Replace Portable Building with 2-Classroom Modular - Farmington View

Synthetic Turf Field - Glencoe

Synthetic Turf Field/Track - Hilhi

Elementary Flexible Classroom Furniture(Butternut Creek, Farmington View, Free Orchards, Groner, Jackson, Lincoln Street, North Plains, Reedville, Tobias,

Witch Hazel, Mooberry

Distributed Antenna System(Glencoe, Century, Liberty, South Meadows, Witch Hazel)

Other 2018 Bond Projects

Replace Student Computers – 4,700 student computers have been distributed through the District.

Replace Teacher Computers – All Secondary Schools

Security Cameras – Poynter, Brown, South Meadows and Miller Big Picture

Roofing Upgrades – North Plains, Tobias and Peter Boscow

Boiler Replacement – Brown Middle School

Perimeter Fencing – Ladd Acres Elementary School

Citizens’ Bond Oversight Committee● First meeting will take place on April 19, 2018

● 12-member committee comprised of 10 local community members and 2 high school students

● Meet monthly to review bond project budgets and schedules

● Report to school board and community quarterly

● All meetings will be open to the public

● All meeting minutes will be posted on the Bond Website

Learn More...You can follow the progress of the Hillsboro School District

2017 Bond at:

www.Hillsboro-Bond.orgOr contact:

Adam Stewart, Capital Projects Officer,

stewarta@hsd.k12.or.us or 503-844-1340

Jane Siguenza, Bond Marketing Specialist,

siguenzj@hsd.k12.or.us or 503-844-1500