How...The bond is focused on four key areas:

Prioritize Safety and Security● Security cameras, including cameras on

school buses

● Seismic and roofing upgrades● Playground upgrades

Renovate and Repair Aging Schools● HVAC, plumbing and electrical upgrades

● Significant remodeling at Hilhi &

Reedville● Replacement of 15 portable classrooms

Relieve Crowding, Plan for Growth● Construction of two new elementary schools

and replacement of Brookwood

● Construction of separate gymnasiums at

schools with shared gym & cafeteria space● Expansion of Evergreen and Glencoe

Provide a Modern Education for Students● Student and teacher technology

● Expansion of CTE spaces in high schools

● Flexible classroom furniture● Internet self-sufficiency

Page 3: Final Bond Presentation to Citizen Bond Oversight ...

2018 Bond ProjectsRemodel of Reedville Elementary School

Front Entrance Line-of-Sight ○ CHS, LHS

Elementary Playground Replacements ○ WL Henry, Butternut Creek, Farmington View, West

Union

Parent/Bus Drop-Off Improvements ○ Jackson, Ladd Acres, McKinney, Eastwood

Replace Domestic Water Pipes○ Ladd Acres, Miller Big Picture (David Hill)

Replace Portable Classrooms○ WL Henry, McKinney, Farmington View

Artificial Turf FIelds w/ Lights ○ Glencoe, Hilhi (includes new track)

Flexible Classroom Furniture○ Butternut Creek, Farmington View, Free Orchards,

Groner, Jackson, Lincoln Street, N Plains, Reedville, Tobias, Witch Hazel, Mooberry

Distributed Antenna System-Phase 1○ GHS, CHS, LHS, S. Meadows, Witch Hazel

Replace Student Computers ○ All Schools

Replace Teacher Computers ○ All secondary schools

Security Camera Project-Phase 1 ○ Poynter, Brown, S. Meadows, Miller Big

Picture

Roofing Upgrades ○ N Plains, Tobias, Peter Boscow

Boiler Replacement ○ Brown

Security Cameras on School Buses○ Transportation

Perimeter Fencing○ Ladd Acres

Page 4: Final Bond Presentation to Citizen Bond Oversight ...

Reedville Elementary Site Plan

Page 5: Final Bond Presentation to Citizen Bond Oversight ...

Reedville Elementary Modular Building

Page 6: Final Bond Presentation to Citizen Bond Oversight ...

Elementary Playground Replacements

Page 7: Final Bond Presentation to Citizen Bond Oversight ...

Parent Bus/Drop-Off - Jackson

Page 8: Final Bond Presentation to Citizen Bond Oversight ...

Parent/Bus Drop-Off - Ladd Acres

Page 9: Final Bond Presentation to Citizen Bond Oversight ...

Parent/Bus Drop-Off - McKinney

Page 10: Final Bond Presentation to Citizen Bond Oversight ...

Parent/Bus Drop-Off - Eastwood

Page 11: Final Bond Presentation to Citizen Bond Oversight ...

Replace Portable Building with 3-Classroom Modular - WL Henry

Page 12: Final Bond Presentation to Citizen Bond Oversight ...

Replace Portable Building with 2-Classroom Modular - Farmington View

Page 13: Final Bond Presentation to Citizen Bond Oversight ...

Synthetic Turf Field - Glencoe

Page 14: Final Bond Presentation to Citizen Bond Oversight ...

Synthetic Turf Field/Track - Hilhi

Page 15: Final Bond Presentation to Citizen Bond Oversight ...

Elementary Flexible Classroom Furniture(Butternut Creek, Farmington View, Free Orchards, Groner, Jackson, Lincoln Street, North Plains, Reedville, Tobias,

Witch Hazel, Mooberry

Page 16: Final Bond Presentation to Citizen Bond Oversight ...

Distributed Antenna System(Glencoe, Century, Liberty, South Meadows, Witch Hazel)

Page 17: Final Bond Presentation to Citizen Bond Oversight ...

Other 2018 Bond Projects

Replace Student Computers – 4,700 student computers have been distributed through the District.

Replace Teacher Computers – All Secondary Schools

Security Cameras – Poynter, Brown, South Meadows and Miller Big Picture

Roofing Upgrades – North Plains, Tobias and Peter Boscow

Boiler Replacement – Brown Middle School

Perimeter Fencing – Ladd Acres Elementary School

Page 18: Final Bond Presentation to Citizen Bond Oversight ...

Citizens’ Bond Oversight Committee● First meeting will take place on April 19, 2018

● 12-member committee comprised of 10 local community members and 2 high school students

● Meet monthly to review bond project budgets and schedules

● Report to school board and community quarterly

● All meetings will be open to the public

● All meeting minutes will be posted on the Bond Website

Page 19: Final Bond Presentation to Citizen Bond Oversight ...

Learn More...You can follow the progress of the Hillsboro School District

2017 Bond at:

www.Hillsboro-Bond.orgOr contact:

Adam Stewart, Capital Projects Officer,

[email protected] or 503-844-1340

Jane Siguenza, Bond Marketing Specialist,

[email protected] or 503-844-1500