Crane used in setting structural steel

Structural steel in faculty office area.

Corridor 127. Glass will fill voids between columns.

Looks out on courtyard.

Looking down corridor 127 at the rotunda area

North side of rotunda. Openings at mechanical attic for louver and entry door

Structural steel set in digital nurse lab.

Crane bringing in load of metal decking.

Steel set at workroom/admin/deans

office area.

Openings in block above are for attic louvers and

entry door

Structural steel erection at SIM lab areas.

Steel at SIM lab. Steel for sloped roof being set.

The pilaster columns for covered walkway

between old and new bldgs

In wall plumbing piping for faculty

restrooms.

Conduit stub ups at electrical room

Steel installed at the chemistry labs.

Future Courtyard area.

Pilasters for covered walkway connecting bldgs

Main Entrance

Student Restrooms plumbing and steel

Steel at SIM Labs

Under slab conduits for power to light being installed on pilaster

Steel set in corridor 127

Front entry, looking out to the west.

Forming up for concrete at front entry for revolving

door.

Steel in the medical supplies / beds & equipment areas

Steel set in the nursing fundamentals lab.

In SIM labs, looking towards the anatomy

classes

Interior view of front entrance of bldg.

Alcoves in front entrance hall for display cases

Metal decking install started in front entrance

Installing metal decking in front entrance

Metal decking installed at student restroom area

Iron worker welding rebar to beam

Exterior west face of bldg., north of front entry

Exterior west face of bldg., south of entrance.