Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

33
Crane used in setting structural steel

Transcript of Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Page 1: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Crane used in setting structural steel

Page 2: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Structural steel in faculty office area.

Page 3: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Corridor 127. Glass will fill voids between columns.

Looks out on courtyard.

Page 4: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Looking down corridor 127 at the rotunda area

Page 5: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

North side of rotunda. Openings at mechanical attic for louver and entry door

Page 6: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Structural steel set in digital nurse lab.

Crane bringing in load of metal decking.

Page 7: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Steel set at workroom/admin/deans

office area.

Openings in block above are for attic louvers and

entry door

Page 8: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Structural steel erection at SIM lab areas.

Page 9: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Steel at SIM lab. Steel for sloped roof being set.

Page 10: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

The pilaster columns for covered walkway

between old and new bldgs

Page 11: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

In wall plumbing piping for faculty

restrooms.

Page 12: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Conduit stub ups at electrical room

Page 13: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Steel installed at the chemistry labs.

Page 14: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Future Courtyard area.

Page 15: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Pilasters for covered walkway connecting bldgs

Page 16: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Main Entrance

Page 17: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Student Restrooms plumbing and steel

Page 18: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Steel at SIM Labs

Page 19: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Under slab conduits for power to light being installed on pilaster

Page 20: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Steel set in corridor 127

Page 21: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Front entry, looking out to the west.

Page 22: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Forming up for concrete at front entry for revolving

door.

Page 23: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Steel in the medical supplies / beds & equipment areas

Page 24: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Steel set in the nursing fundamentals lab.

Page 25: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

In SIM labs, looking towards the anatomy

classes

Page 26: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Interior view of front entrance of bldg.

Page 27: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Alcoves in front entrance hall for display cases

Page 28: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Metal decking install started in front entrance

Page 29: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Installing metal decking in front entrance

Page 30: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Metal decking installed at student restroom area

Page 31: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Iron worker welding rebar to beam

Page 32: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Exterior west face of bldg., north of front entry

Page 33: Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update

Exterior west face of bldg., south of entrance.