Project Aspirations

At Building C 45 Waterloo Road John

Holland aim to incorporate the highest

level of BIM and smart building

technology

Project Aspirations

✓Clash Detection and Coordination

Project Aspirations

✓Clash Detection and Coordination

✓Cost Estimating

Project Aspirations

✓Clash Detection and Coordination

✓Cost Estimating

✓Construction Sequencing

Project Aspirations

✓Clash Detection and Coordination

✓Cost Estimating

✓Construction Sequencing

✓Integrated Building Automation

Project Aspirations

✓Clash Detection and Coordination

✓Cost Estimating

✓Construction Sequencing

✓Integrated Building Automation

✓BIM Dashboard and Digital Twin

Project Aspirations

✓Clash Detection and Coordination

✓Cost Estimating

✓Construction Sequencing

✓Integrated Building Automation

✓BIM Dashboard and Digital Twin

✓BIM to Support FM

Project Aspirations

✓Clash Detection and Coordination

✓Cost Estimating

✓Construction Sequencing

✓Integrated Building Automation

✓BIM Dashboard and Digital Twin

✓BIM to Support FM

✓On Site Verification to LOD500

Project strategy

Consultants and subcontractors chosen on the basis of professional backgrounds for optimal building design and performance

Partner Page

Project strategy

Digital capabilities augmented by Atlas

• single point of responsibility

• consistent, complete, and high quality models

• Subcontractors may access to Atlas’ services, ensuring a

competitive environment

1 | Februaruy 2018www.atlasindustries.com

Macquaire Park Stage 1 – Digital PresentationMacquarie Park Stage 1

Using Connected Digital Data to Improve Construction Productivity, Quality and Safety

Management,

Project Control

Design

Modelling

Documentation

Administration

Management,

Project Control

Design

Modelling

Documentation

Administration

Partner Page

Explore. Collaborate. Create.

International Collaborations

We have been early adopters of BIM, not just authoring, but have attempted to extend its use at every opportunity

Currently we are exploring the ability of BIM to: facilitate the collaborative process

To obtain benefits of IPDIn a traditional structure

Building C

9 Storey Building

2 Basement Levels 34,500

sqm Office NLA 932 sqm

Retail NLA

PCA A Grade Office Quality

5 Star Green Star Design and As Built

5 Star NABERS Energy

4 Star NABERS Water

• 4270 sqm NLA - Total

• 1876 sqm NLA - North Plate

• 2094 sqm NLA - South Plate

• 300 sqm NLA - Bridge Link

• Atrium

• Central Amenities

• Vertical Transportation

• Communication Stairs

• 360° Vista

Typical Levels

Digital Strategy

• Developed by Ridley with John Holland –

– The key Principal objectives for Digital are to drive a

Digital process right from Design through to

Construction & Operations for 3D models (6D, LOD

500), asset data & linked to Live Building Controls in

order to increase innovation & consistency, reduce the

risk of rework & improve the project outcome in both

delivery & operations.

Macquarie Park Stage 1

Atlas Supporting the Digital Delivery Teams

Model Creation Delivery Structure

1Collaborate.

consultant team focusses on designand management

Autodesk have created a BIM ecosystem in the

Revit Cloud Worksharing BIM360 platform

High and low trust connections.

Real-time and managed connections.

Full engagement with the models by all parties

High and low trust connections.

Real-time and managed connections.

1 | Februaruy 2018www.atlasindustries.com

Macquaire Park Stage 1 – Digital PresentationMacquarie Park Stage 1

Using Connected Digital Data to Improve Construction Productivity, Quality and Safety

• expertise in arcane tools • each discipline at the same level of

completeness• timeliness across all disciplines• flexibility in resourcing

1 | Februaruy 2018www.atlasindustries.com

Macquaire Park Stage 1 – Digital PresentationMacquarie Park Stage 1

Using Connected Digital Data to Improve Construction Productivity, Quality and Safety

1 | Februaruy 2018www.atlasindustries.com

Macquaire Park Stage 1 – Digital PresentationMacquarie Park Stage 1

Using Connected Digital Data to Improve Construction Productivity, Quality and Safety

• maintain the BIM environment• reliable models with all aspects of

the design up to date• all discipline models in context, in

the original authoring environment

Aconex Stack

Communication:• Documentation Guidelines• complex parametric families

Revit Worksharing Collaboration – All

Documentation

Communication:• We are active in the model• We communicate through the

model

Manage systems ourselves: • fire compartmentation,• doors, • acoustics, • thermal performance

We produce example views and provide view templates, and then have the work completed by Atlas

CAPTURE, CONNECT, COLLABORATE

• Create tasks

• Add tags

• Assign

• Attach

• Comment

• Resolve

2Coordination

Multiple Lines of Defence• internal processes and

engagement• Atlas’ project team review and

issue-raising• regular reports and issue

tracking

Working

multidisciplinary

views in Revit

Clash Avoidance

Level Room IDs Room Name Room Number Room Area Ceiling HeightPercentage Area of

Encroachment into

300mm Tenancy Zone

Level 2 1118831 COMMERCIAL OFFICE L2.01 2059.303857 2700 11.55

Level 3 1118829 COMMERCIAL OFFICE L3.02 2067.872072 2700 11.55

Level 5 1118825 COMMERCIAL OFFICE L5.02 2059.278803 2700 11.54

Level 6 1118823 COMMERCIAL OFFICE L6.02 2059.278803 2700 11.54

Level 7 1118821 COMMERCIAL OFFICE L7.02 2059.278803 2700 11.54

Level 8 1118819 COMMERCIAL OFFICE L8.02 2059.465335 2700 11.54

Level 4 1118827 COMMERCIAL OFFICE L4.02 2064.547312 2700 11.54

Level 1 1154853 COMMERCIAL OFFICE L1.01 4007.149681 3900 10.49

Level 3 4336709 COMMERCIAL OFFICE 1835.272233 2700 9.35

Level 5 4336737 COMMERCIAL OFFICE L.04 1839.36996 2700 9.32

Level 6 4336751 COMMERCIAL OFFICE 1839.36996 2700 9.32

Level 7 4336764 COMMERCIAL OFFICE 1839.370526 2700 9.32

Level 8 4336778 COMMERCIAL OFFICE 1839.555053 2700 9.32

Level 2 3849406 COMMERCIAL OFFICE L2.05 1840.494728 2700 9.3

Level 4 4336721 COMMERCIAL OFFICE 1843.550646 2700 9.3

Not Clash Detection it’s

Clash Avoidance

Benefits of adopting BIM is

the potential for better

avoidance of clashes, that

is, it can help ensure there

is spatial co-ordination

between the different

components that make up

the asset.

Coordination – Validation

When Accuracy Matters, Validation

Is Crucial

An important part of our BIM strategy

is the validation and auditing of our

BIM Geometry models.

Use of Dynamo scripting has helped

us automate this process to ensure

consistency over each models

Macquarie Park Stage 1

5D Data Transfer Workflow

Independent Model ValidationMB Deliverables - Leveraging the BIM

Independent Model Verification

Point Cloud Verification

Verify the accuracy of installed elements

Verity™ software from ClearEdge3D resultis in more

more accurate as-builts, and fewer schedule delays.

3Risk

BIM as a Single

Point of Truth

A ‘risk aware’ process

217

217Aconex Distribution List

4,500

4,500Aconex Messages

I’m Copied Into

40,519

40,519Files in our

Project Folder

21

00

mm

HIG

H

DDA ENVELOPE

Mission Control | Real-time Revit Usage and Model-Data Reporting

Image: NASA

WINDOWS CLOUD

Synchronizing Event• CentralPath• LocalPath• SyncTimeStart• SyncTimeEnd• SyncMbSizeStart• SyncMbSizeEnd• Comments• Compact• EventTime

Document Changed Event• TransactionName• ElementId

Hardware Information• Processor• Hard Drive space• RAM

Application Initialized Event• WindowsUser• MachineName• RevitUser• VersionName• VersionNumber• VersionBuild• Product• FamilyTemplatePath• SharedParametersFilename

Software Information• Windows Version• Revit Versions Installed• Add-ins Installed

Data Visualization• User activity information.• User hardware.• User software.• Revit sessions per user.• Revit models active.• Revit opening and sync times.• Has Central been compacted• Time worked in all the models.• Elements deleted in models.• Model errors.

Automate• Send Model alerts.• User Notifications.

Mission Control | Real-time Revit Usage and Model-Data ReportingWHY

Summary

The end goal is to

build the BIM as it

is in real life

Surprising how many people don’t get it

“It’s correct in the CAD file”

“its in the standard detail”

Its in the (PDF schedule)

Its in the Bluebeam markup

It cannot be in any of those places. It needs to be in the model. That is what “single point of truth” means

Team collaborating to produce rigorous models that support defined documentation standards and optimal design and process

Coordination processes have enabled multiple lines of defence against errors and have allowed the team to deal with changing project requirements

BIM has been used to provide a single point of truth that genuinely improves design outcomes and lowers risks

Rodd Perey Principal,Group Design Technology Manager ArchitectusM +61 412 451 493

rodd.perey@architectus.com.auwww.architectus.com.au