Project North
211-2141 Thurston Drive
Ottawa ON K1G 6C9
T 613-739-3699
F 613-739-3965
info@LWG-ai.com
LWG-ai.com Architectural Interior Drawings Key Plan
Issuedfor:Tender
Date:December9,2013
Project Phasing and Temporary Hoarding - Plan A
Project Phasing and Temporary Hoarding - Plan BFurniture Plan
Furniture Screen Plan
Demolition Plan
Partition Plan
Reflected Ceiling Plan
Power/Voice/Data Plan
Floor and Wall Finish Plan
Door Schedule and Elevations
Door Elevations, Sections and Architectural Elevation
and Section
Partition Sections
ID01A
ID01BID02
ID03
ID04
ID05
ID06
ID07ID08
ID09
ID10
ID11
OPS Fit-up Leitrim
Ottawa ON
Mechanical & Electrical Consultants
McKee Engineering
Structural Consultant
Adjeleian Allen Rubeli Ltd
Mechanical Drawings
Mechanical - Fire Protection, Legends and Drawing List
Mechanical - HVAC - Ceiling Plan
Mechanical - HVAC - Raised Floor Plan
M-1
M-2
M-3
Electrical DrawingsElectrical - Demolition
Electrical - Demolition
Electrical - Legend & Drawing List
Electrical - Lighting & Fire A larm
Electrical - Power & Systems
Electrical - Black Cable Tray
Electrical - Red Cable Tray
Electrical - Schedules & DetailsElectrical - Details
Electrical - Details
ED-1
ED-2
E-1E-2
E-3
E-4
E-5
E-6E-7
E-8
Structural Drawings
Part Plan & DetailsS01
Project:OPS
Fit-upLeitrim
PWGSCNumber:R.050134.002
The undersigned has reviewed and takes responsibility for
this design, and has the qualifications and meets the
requirements set in the Ontario Building Code to be a
designer.
QUALIFICATION INFORMATION
REGISTRATION INFORMATION
Requiredunless designis exemptunder2.17.5.1 ofthe building code
Requiredunless designis exemptunder2.17.4.1 ofthe building code
NAME SIGNATURE BCIN
FIRMNAME BCIN
LWG Architectural InteriorsInc. 42687
David Gibbons 25030
8/12/2019 CFS Leitrim Drawings
2/27
S S
DN
915
Clear
915
Clear
915
Clear
915
Clear
915Clear
1525Clear
915
Clear
4420
915
Clear
915Clear
1525
Clear
1146(915
min.)
1525
Clear
1525
Clear
1038
(915
Min.)
9
15
Clear
1525
Clear
915
Clear
915
Clear
915
Clear
DN
UP
UP CT EL EPHONE
CCCC
UP
UP
DN
DN
UP
DN
915C lear
1525C lear
915
Clear
915
Clear
915C lear
915
Clear
915
Clear
915
Clear
915C lear
915
Clear
915
Clear
915
Clear
Phasing Legend - Plan A:
Indicates Phase 1 ofthe project.
Protect Constructionand Tenant occupiedzone asindicated. Protectionrequired atMain
Corridors and aroundequipment to remainas shown above - Protectiontype varies.Extent and
locationto beconfirmedon sitewith Project Manager.Ensure adequatespaceisleftfor
Occupantaccess toremainderof space.Ensure not toleave constructionmaterialsand
equipment thatcouldbe a trippinghazard or otherforOccupants. Upon completionofwork,Contractorto removeprotection material. DoNOT perforateand/or damageexisting partitions,
ceiling,finishes and all other componentsto remainand to adjacentspaces.
Indicates activities part of Phase1and Phase2of theproject.
Indicates areanotincluded inPhase1 and/or Phase 2.Area to be mannedandoperational
duringCo nstruction.Work requiredin these areas mustbe schedulewith Clientahead oftime,
eitherduring Phase 1 or Phase2.
Temporary Hoarding Legend - Plan A:
Protect Construction/Equipmentand Tenant occupiedzone withPOLY 6 mil (minimum)and
constructiontape onall joints.Ensure not toleave construction materials andequ ipment
thatcouldbe a trippinghazard or otherforOccupants. Uponcompletionof allwork,
Contractorto removePOLY. Do NOT perforate and/ordamage existingpartitions,ceiling,
finishes and allother components toremain and toadjacent spaces. Contractorwill beheld
responsible for any damagedone to existingspaces.
Main Corridors
Ensuread equate space is left for Occupantaccess toremainderof space withineach Main
Corridors.
Equipment
Equipment shown above toremain.Ensure toleave915mmclearspacebetween
equipment and POLY. Ensureall joints are taped and top and bottomedg es areproperly
sealed. Ensureno dustand construction debris enters theprotectedspaces.
Erect temporary hoardingas follows.Partitionto be 65mm metalstudat 410mm,0.45
gauge o.c.with 13mm gypsum board one sideonly (Exterior sideof room)to u/s of
suspended T-bar ceiling atapproximately 3016mm A.F.F.51 11
Temporary Hoarding Notes - Plan A:
1.Provide adequateventilation (supply and return)inside temporary POLYen closure. Perforatedraised floortiles
tobe relocated as required surrounding the server racks.
PWGSC A1 (841x594)
Administrateurde projets
TPSGC No. duprojet
No. dudessin
Date
Project Manager
PWGSC Projectno.
Drawing no.
Date
ReviewedBy
ApprovedBy
Date
Tender
Date
DesignedBy
Drawn By
Examin par
Approuvpar
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
1000 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no.du detail
surdessinno.
locationdrawingno.
drawing no.
dessinno.
detailno.
Canad
a
211-2141 ThurstonDrive
Ottawa ON K1G6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Project Phasing and
Temporary Hoarding -
Plan A
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID01A
Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.
Key Plan
Project
North
Scale 1:100
OAR ID
8/12/2019 CFS Leitrim Drawings
3/27
S S
DN
915
Clear
1525
Clear
915
Clear
915
Clear
915
Clear
915
Clear
915
Clear
915
Clear
915
Clear
915
Clear
915
Cl
ear
915
Clear
DN
UP
UP CTEL EPHONE
CCCC
UP
UP
DN
DN
UP
DN
9 15Cle ar
15 2 5Cle a r
915
Clear
915
Clear
91 5Cle a r
915
Clear
915
Clear
915
Clear
9 1 5
Cl e ar
915
Clear
915
Clear
915
Clear
Phasing Legend - Plan B:
Indicates Phase 2 ofthe project.
Protect Constructionand Tenant occupiedzone asindicated. Protectionrequired atMain
Corridors and around equipment to remainas shown above - Protectiontype varies.Extent and
locationto beconfirmedon sitewith Project Manager.Ensure adequatespaceisleftfor
Occupantaccess toremainderof space.Ensure not toleave constructionmaterialsand
equipment thatcouldbe a trippinghazard or otherforOccupants. Uponcompletionofwork,Contractorto removeprotection material. DoNOT perforatean d/or damage existingpartitions,
ceiling,finishes and all other componentsto remainand to adjacentspaces.
Indicates activities part of Phase1and Phase2of theproject.
Indicates areanotincluded inPhase1 and/or Phase 2.Area to be mannedandoperational
duringCo nstruction.Work requiredin these areas mustbe schedulewith Clientahead oftime,
eitherduring Phase 1 or Phase2.
Temporary Hoarding Legend - Plan B:
Protect Construction/Equipmentand Tenant occupiedzone withPOLY 6 mil (minimum)and
constructiontape onall joints.Ensure not toleave construction materials andequipment
thatcouldbe a trippinghazard or otherforOccupants. Uponcompletionof allwork,
Contractorto removePOLY. Do NOT perforate and/ordamage existingpartitions,ceiling,
finishes and allother components toremain and toadjacent spaces. Contractorwill beh eld
responsible for any damagedone to existingspaces.
Main Corridors
Ensuread equate space is left for Occupantaccess toremainderof space withineach Main
Corridors.
Equipment
Equipment shown above toremain.Ensure toleave915mmclearspacebetween
equipment and POLY. Ensureall joints are taped and top and bottomedges areproperly
sealed. Ensureno dustand construction debris enters theprotectedspaces.
Erect temporary hoardingas follows.Partitionto be 65mm metalstudat 410mm,0.45
gauge o.c.with 13mm gypsum board one sideonly (Exterior sideof room)to u/s of
suspended T-bar ceiling atapproximately 3016mm A.F.F.51 11
Temporary Hoarding Notes - Plan B:
1.Provide adequateventilation (supply andreturn) inside temporary POLYen closure. Perforatedraised floortiles
tobe relocated as required surrounding the server racks.
PWGSC A1 (841x594)
Administrateurde projets
TPSGC No. duprojet
No. dudessin
Date
Project Manager
PWGSC Projectno.
Drawing no.
Date
ReviewedBy
ApprovedBy
Date
Tender
Date
DesignedBy
Drawn By
Examin par
Approuvpar
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
1000 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no.du detail
surdessinno.
locationdrawingno.
drawing no.
dessinno.
detailno.
Canad
a
211-2141 ThurstonDrive
Ottawa ON K1G6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Project Phasing and
Temporary Hoarding -
Plan B
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID01B
Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.
Scale 1:100
Key Plan
Project
North
OAR ID
8/12/2019 CFS Leitrim Drawings
4/27
8/12/2019 CFS Leitrim Drawings
5/27
8/12/2019 CFS Leitrim Drawings
6/27
S S
DN
RefertoNote #3
102
1017102
1017
1679
RefertoNote #2
RefertoNote #2
RefertoNote #5
1017102
RefertoNote #2
R R R R
R
RefertoNote #7and #10
R
R
R R
RefertoNote #8
RefertoNote #9
RefertoNote #10
R
RefertoNote #11
DN
UP
UP CTEL EPHONE
CCCC
UP
UP
DN
DN
UP
DN
Demolition Legend:ExistingInterior Tenantpartition to remain.
InteriorTenant partition to be removed and discarded.
Above finishedfloor to u/s ofslab. Perimeter gypsumwallboard partition.
Above finishedfloor to u/s ofsuspended T-barceiling. Gypsum wallboardpartition.
Above finishedfloor to u/s ofsuspended T-barceiling. Gypsum wallboardpa rtitionc/w acoustic
panels both sides for the majority of the space. Acoustic panelsto bediscarded.
Existingdoor, door frame,hardware and componentsto remain.
Existingdoor, sidelight, frame,hardware and componentsto remain.
Existingsingle door, doorframe, hardware andcompon ents tobe removed and retainforreuse,
unless otherwisenoted. Refer todoo r Scheduleon SheetID09.
Existingdoor,door frame,hardware,glazingassembly c/w blindsandrelatedcomponentstobe
removed and retainedforrelocation.Referto doorSchedule onSheetID09.
Existingdouble doors,door frame,hardware, glazingassembly c/w blindsand related
componentsto beremovedandretained for relocation. Refer todoor Scheduleon SheetID09.
Denotes doorassembly identificationnu mber for relocationto be read inconjunctionwith Door
Schedule on Sheet ID09.
Existingglazing, frame,blinds and related componentsto remain- Sizevaries.
Existingduplex outletand relatedcompon ents tobe removed and discarded.Refer toElectrical
Consultant's drawings.
Demolition Notes:
1. Existing raisedfloorsystem toremain exceptwhere modifications required toaccommodaten ewpartitions as
indicated inDemolition Legend.
2. Modify existingpartitionto accommodate new doorandframewhereindicatedabove. Secureremainderof
partition as required.
3. Existing "shield"door and associateddoor hardwareto be removedand turned overto Tenant.Doorframeto
remain. Dooreq uipped withsecurity alarm tob e disconnectedan dreconnected to new door#010 onPartitionPlan
on SheetID05. Ensure the security alarmwork is completed by a Contractorthat is familiar withthetype as itis an
older systeman dno longer availablein North America.
4.All door, frame and glazing not reusedto beremovedanddiscarded. All door hardware not reusedtobeturned
overto Tenant.
5.Removeanddiscardexisting top ofpartition152mmhigh x 64mm widebrushedaluminum channelsecuredto
suspended T-bar ceiling.
6.Refer toElectrical,Demolition Planon Sheet ED-1for theremoval of electricalcomponents withinraisedfloor
system.
7.Cut back existing partition as shown ande nsure stability.Ensure nodamage toremainder ofpartition. Cutback
existingwall mounted acoustic panelto suitnew partitionlength. Ensure cut is straight and fabric securedtopan el
backing.
8. Reserved.
9. Existing gypsumwallboard partitionoutside of enclosedoffices as shown above tobe cutopen toaccommodate
new blockingforequipmen t. Referto Partition Legend on Sheet ID05for additional information.
10.Whe re existing partitionfinished withbrushed aluminum top channel below ceiling requires to becutdu eto
adjacentpartitionto beremoved, ensurecutis straightandno damageis doneto remainingportionas shown.
Retaintopchannelfrom demolitionforpatching as identified on PartitionPlan on SheetID05.
11.Existing circular trapdoor located above baseboard tobe removed and discarded.Cute xistingpiping forcentral
vacuumbelow raised floor and cap pipingto remain.
Demolition Legend (Cont'):Existingtelephone outlet and related components to beremoved andd iscarded.Refer to
ElectricalConsultant's drawings.
Existingcombined voice/dataoutlet and related components to beremoved anddiscarded.
Refer toElectrical Consultant's drawings.
Existingblank plate, junctionbox andrelated components tobe removedand discarded.
Refer toElectrical Consultant's drawings.
Existingdoor belland relatedcompon ents tobe removed anddiscarded.
Existinglight switch and related components to beremoved anddiscarded. Referto Electrical
Consultant's drawings.
Indicates existingoutlet or lightswitch and related components to be removedand retained
for relocation. Refer toPo wer/Voice/Data Planand ReflectedCeiling Plan on SheetID06 and
ID07.
Indicates areawhereexisting raisedfloorsystem to be modifiedto suitnewslabtoslab
partition.Refer to Partition Planon Sheet ID05for location.
Note:
- Raisedfloor supportsystem to be modified. Refer toStructural Consultant's drawings for
additional informationand details.
Indicates areawhere existing suspended T-bar ceiling tobe removed and discarded.Secure
remainder ofsuspendedT-bar ceilingwithin InteriorTenant space and gypsumwallboard
bulkhead in MainCorridors as required.
R
PWGSC A1 (841x594)
Administrateurde projets
TPSGC No. duprojet
No. dudessin
Date
Project Manager
PWGSC Projectno.
Drawing no.
Date
ReviewedBy
ApprovedBy
Date
Tender
Date
DesignedBy
Drawn By
Examin par
Approuvpar
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
1000 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no.du detail
surdessinno.
locationdrawingno.
drawing no.
dessinno.
detailno.
Canada
211-2141 ThurstonDrive
Ottawa ON K1G6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Demolition Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID04
Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.
Scale 1:100
Key Plan
Project
North
OAR ID
8/12/2019 CFS Leitrim Drawings
7/27
8/12/2019 CFS Leitrim Drawings
8/27
S S
DN
Referto
Note #1
RefertoNote #2
RefertoNote #2
RR
R
R
R
RR
CLCL
CL
R
RefertoNote #4
DN
UP
UP CTEL EPHONE
CCCC
UP
UP
DN
DN
UP
DN
Reflected Ceiling Legend:
Denotes existingBuilding Standardfluorescent fixtureto remain.
Denotes existingBuilding Standardfluorescent fixtureto berelocated.
Denotes relocated and/ornew fluorescentfixture. Where new required, supplyand installnew to
match existingBuilding Standard.
Denotes existingsuspended T-barceiling to remain.
Denotes new suspended T-bar ceiling tobe centeredwithin new Vestibule.Ceiling heightto
match existing, +/- 3016mmA.F.F..
Denotes areawhere existing gypsumwallboard finished ceiling tobe extended. Constructionto
match existing. Prepare surface toreceive newp aintfinish. Ensure transitionbetween newand
existingis smoothand seamless. Contractorto ensurestability.
Denotes existinglight switch toremain.
Denotes light switchto bemounted to match existingheight unlessothe rwisenoted. Bodyand
cover plate tomatch existing styleand colour.
Relocated light switchand relatedcompon ents retained from demolition. Heightto match
existingunless otherwisenoted.
120V Duplex outlet above suspended T-bar ceiling withinplenum space.Refer toElectrical
Consultant'sdrawings.CL
R
Reflected Ceiling Notes:1. Existing suspended T-bar ceiling tobe modifiedto suitnew securedpartition Type 3.Existingsuspended T-bar,
ceiling tiles and related components within Vestibule tobe removed and discarded.Modify suspendedT-bar and
cut ceiling tiles as required onoutside of Vestibule.Secure remainder ofsuspende dT-bar and supply andinstall
new "L" trimalong newpa rtition.
2.Paint new and existing gypsum wallboard bulkheadon all exposed surfaces as shown.
3.Open existing gypsumwallboard partitionwere requiredto accommodate new electricalconduits. Repair,patch,
sanda ndmake good ready to receive new paintfinish.
4. Supply and install blank cover plate where existinglightswitch was removed.
PWGSC A1 (841x594)
Administrateurde projets
TPSGC No. duprojet
No. dudessin
Date
Project Manager
PWGSC Projectno.
Drawing no.
Date
ReviewedBy
ApprovedBy
Date
Tender
Date
DesignedBy
Drawn By
Examin par
Approuvpar
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
1000 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no.du detail
surdessinno.
locationdrawingno.
drawing no.
dessinno.
detailno.
Canada
211-2141 ThurstonDrive
Ottawa ON K1G6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Reflected Ceiling Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID06
Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.
Scale 1:100
Key Plan
Project
North
OAR ID
8/12/2019 CFS Leitrim Drawings
9/27
FAX
PHOTO
COPIER
S S
DN
BF
BF
BF
BF
BF
BF BFBF BF
BF BF BF BFBF BF
BF BF BF BFBF BF
BF
BF
BF
BF
BF
BF
BF
BF
BFBFBF
BFBF
BF BF
BF BF BF BF BF BF BF BF BF BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF BF
BF
BF
BF
BF
BF
RefertoNote #2
RefertoNote #2
RefertoNote #1
RefertoNote #1
RefertoNote #2
RefertoNote #2
RefertoNote #2
RefertoNote #1
RefertoNote #3
RefertoNote #1
RefertoNote #1
CL CL CL
CLBF
DN
UP
UP CTEL EPHONE
CCCC
UP
UP
DN
DN
UP
DN
Power/Voice/Data Legend:
120V Duplex outletmounted. Refer toElectrical Consultant'sdrawings.
Duplex outlet withinsystem's furniture panelby others.
Existingduplex outletandrelatedcomponents toremain.
Combinedvoice/data outletwithin systemfurniture panel byothers.
Existingtelephone outlet and related components toremain.
Existingcombined voice/dataoutlet and related componentsto remain.
Existingblank plateandrelatedcomponents toremain.
Systems furniture basefeed module- plug connection. Coordinate installationwith systems
furniture Contractor/Installer.
Indicates duplex outlet above suspended T-bar ceiling withinplenum space.
BF
CL
Power/Voice/Data Notes:
1. Existingequipment and associated desks to remain. Protect fromdust and constructiondebris as identifiedon
Project Phasing and Temporary Hoard onSh eetID01.
2. Existing recessedelectrical panel and other wallmounted electrical devices and transformers toremain.
3. RelocatedA/V rack and related components by others.
PWGSC A1 (841x594)
Administrateurde projets
TPSGC No. duprojet
No. dudessin
Date
Project Manager
PWGSC Projectno.
Drawing no.
Date
ReviewedBy
ApprovedBy
Date
Tender
Date
DesignedBy
Drawn By
Examin par
Approuvpar
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
1000 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no.du detail
surdessinno.
locationdrawingno.
drawing no.
dessinno.
detailno.
Canada
211-2141 ThurstonDrive
Ottawa ON K1G6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Power/Voice/Data Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID07
Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.
Scale 1:100
Key Plan
Project
North
OAR ID
8/12/2019 CFS Leitrim Drawings
10/27
S S
DN
Referto
Note #1W
DN
UP
UP CT EL EPHONE
CCCC
UP
UP
DN
DN
UP
DN
Floor Finish Legend:Existingraised floor tilesystem toremain.
Wall Finish Legend:
General OfficePaint
Colour: White
Finish: Gloss, Level3
DoorPaint
Colour: Light grey
Finish: Gloss, Level4
Door FramePaint
Colour: Black
Finish: Gloss, Level5
GypsumWallboard CeilingBulkhead Paint
Colour: White
Finish: Gloss,Level 1
SecurePa rtitionPaint
Colour: White
Finish, Gloss,Level 6
Note: 1 coatprimer/sealerand3 coats paint
Floor Finish Notes:
1F.New partitions within InteriorTenant and Main Corridor sideto receive new black vinyl baseboard,unless
otherwise noted.Newpartitions insideand outsideof EnclosedOffice #171to receive PVC snaponbaseboard-
Refer toDetail 7/8/8.
Wall Finish Notes:
1W.Paint existingmetal window frame P3inside and outside ofroom.
Existing raised floor
system
Base J-Hook
PVC Base ClipOn
Floor Track
Gypsum wallboard
19mm Plywood
blocking requiredto reinforce base.
PWGSC A1 (841x594)
Administrateurde projets
TPSGC No. duprojet
No. dudessin
Date
Project Manager
PWGSC Projectno.
Drawing no.
Date
ReviewedBy
ApprovedBy
Date
Tender
Date
DesignedBy
Drawn By
Examin par
Approuvpar
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
1000 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no.du detail
surdessinno.
locationdrawingno.
drawing no.
dessinno.
detailno.
Canada
211-2141 ThurstonDrive
Ottawa ON K1G6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Floor and Wall Finish Plan
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID08
Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson the site and reportany discrepancytothedesigner. Donotscale this drawing.
Scale 1:100
Key Plan
Project
North
OAR ID
8/12/2019 CFS Leitrim Drawings
11/27
DN
UP
UP CTELEPHONE
CCCC
UP
UP
DN
DN
UP
DN
Door Schedule
001
002
003
004
005
006
007
008
009
010
166
167
168
169
170
171
172
173
174
175
176
177
178
Existing
A
Existing
Existing
Existing
B
Existing
Existing
Existing
D
C
C
C
C
C
C
C
Existing
Existing
Existing
Existing
C
C
PR 915 x 2134 x 44.5
PR 915 x 2134 x 44.5
PR 915 x 2134 x 44.5
PR 915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
915 x 2134 x 44.5
Existing
Solid core-paint grade
Existing
Existing
Existing
Solid core-paint grade
Existing
Existing
Existing
Heavy cold rolled - paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Solid core-paint grade
Existing
Existing
Existing
Existing
Solid core-paint grade
Solid core-paint grade
P2
P2
P2
P2
P2
P2
Existing
Existing
Existing
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
P2
Existing
Reused
Existing
Existing
Existing
Metal-paint grade
Existing
Existing
Existing
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Metal-paint grade
Existing
Existing
Existing
Existing
Metal-paint grade
Metal-paint grade
P3
P3
P3
P3
P3
P3
Existing
Existing
Existing
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
P3
Existing
H1
Existing
Existing
Existing
H2
Existing
Existing
Existing
H3
H4
H4
H4
H4
H4
H4
H4
Existing
Existing
Existing
Existing
H4
H4
Refer to note #8
Refer to note #3 and #8
Refer to note #7 and #8
Refer to note #8
Refer to note #8
Refer to note #4 and #8
--
--
--
3/4 Hr fire rated door and frame. Refer to note #13, #14 and #17
--
--
--
--
--
--
--
--
--
--
--
--
--
Hardware Notes:1.All hardware to match BaseBuilding standard, unless otherwisenoted.
2. Ensure all doorhardware is installedper Manufacturer's instructions.
3. Reuseexisting metal frame and doorhardware D01 retained from demolition. New doorleaves required.Refer toDemolitionPlan onSheetID04.
4. Reuseexisting metal frame and doorhardware D04 retainedfrom demolition. Refer toDemolition Planon Sheet
ID04.
5. Reuseexisting doorleaves #D02, D03,D04 , D06 and D07 onDemolition Plan on Sheet ID04in goodcondition
where possibleinstead of purchasingnew.
6. Reuseexisting doorhardware #D02,D03, D04,D06and D07on DemolitionPlan onSheetID04 wherepossibleinstead ofpurchasing new.Existing orbital knobs tobe replacedwith leverhandles.
7. Existing orbital doorknob tobe removed and replacedwith lever handle. Style and standardfinish tosuit Unicanlock. Ensurecompatibility.
8.Paint new,existing and reusedsolidcore wooddoor and steel frame #001, 002,003, 004,005 and006on allexposed edges and bothsides.
9. Paintallnew, existingandreused enclosedoffice doors onallexposededges and bothsides.
10. Ensure all new and reusedsteel door frame depth suitpartition type.
11. Allsurplus door hardwareto beturned overtoTenant.
12.New lock cylinderto beby Tenant.
13. Installand reconnectto new door #010 security alarmretained from demolition.Ensure the security alarmwork is
completed by aContractor thatis familiarwith the typeas itis anolder system and nolong er availableinNorth
America.Refer to DemolitionNotes, Note #4.
14.Ad ditionalnotes regardingdo or and doorhardwa re H3as follows:
- Deadbolts must haveat least 25mmthrowandconformto BuildingCode
- Doorframeis tobe bracedhorizontally halfway up oneither sidebetweenstuds andframetopreventforceentry
- Doorhinges shouldb e located onthe interior;otherwise exterior hinges must betamper-proofor pinned
- Havean STC rating of 51unless a vestibule is constructed
15. Existing doorstop for door#001,003and 005may need tobe relocated tosuit new adjacentpartitionlocation.
16. Allmetal doors andframes tobe painted withpaint suitable for metal application.Properly prepare metaldoor and
frame as required and ensureno pealing,etc...
17. Heavy cold rolleddoor and metal frame for door#0 10 tobe painted with Gloss, Level1 finish.
18.Supply andinstallcaulking suitableforpainting aroundall door frame insideand outsideofroom.
2178SiteDimensionRequired
1920 SiteDimensionRequired
Relocated metaldoorframe.Paint to be appliedbothsides.
990
SiteDimensionRequired
New solid corewood.Paint to be appliedbothsides.
Reusedunican lock c/wwithlever handle. Adjusttosuit newdoorswing.
Active doorleaf Fixed doorleaf
New full height steelastragal.
EQ
3061 SiteDimensionRequired
EQ
305Site
DimensionRequired
305Site
DimensionRequired
Relocated frameless glazing.Relocateexisting blinds locatedon Interior sideofRoom.
Line of partition.
Align 12mmx 12mm revealpainted blackto matchdoor frame - bothsidesof partition.
New black vinyl baseboard.
102
9
2
10
9
4
10
Line of partition.
2178SiteDimensionRequired
1003 SiteDimension Required
990
SiteDimensionRequired
Reusedmetaldoor frame.Paint tobeappliedbothsides.
New solid corewood door.Paint tobeappliedbothsides.
Reusedunicanlock c/wwithlever handle.
12mmx 12mm revealpainted black tomatchdoor frame - bothsidesof partition.
9
2
10
Reusedkickplate.
Line of partition.
Line of partition.
2185SiteDimensionRequired
1017 SiteDimensionRequired
990
SiteDimensionRequired
New metaldoorframe. Paintto beappliedbothsides.
New/reusedsolidcore wooddoor.Paint tobeappliedbothsides.
New lever lockset,mortise.
51
9
3
10
9
510
PWGSC A1 (841x594)
Administrateurde projets
TPSGC No. duprojet
No. dudessin
Date
Project Manager
PWGSC Projectno.
Drawing no.
Date
ReviewedBy
ApprovedBy
Date
Tender
Date
DesignedBy
Drawn By
Examin par
Approuvpar
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
1000 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no.du detail
surdessinno.
locationdrawingno.
drawing no.
dessinno.
detailno.
Canada
211-2141 ThurstonDrive
Ottawa ON K1G6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Door Schedule
and Elevations
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID09
Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.
Scale 1:100
Key Plan
Project
North
OAR ID
8/12/2019 CFS Leitrim Drawings
12/27
8/12/2019 CFS Leitrim Drawings
13/27
DN
UP
UP CTELEPHONE
CCCC
UP
UP
DN
DN
UP
DN
16mm gypsumboard both
sides on 150mm,0.81 gaugemetal studs at 400mmo.c.
Tape, fillandsand smooth
ready forpaint.
65mm soundattenuation
batts suitablefor metalstudapplication.
Baseboard asapplicable.Refer toFloorFinish Plan
ID08.
150mm metal runner.
U/S ofexisting SteelShield
Lineof finished
suspended T-bar ceiling
Lineof finishedraised
floor systemto remain.
Acoustical caulk
3016SiteDimensionRequired
584SiteDimensionRequired
180Site Dimension Required
25Site
Dimension
Required
Note:
- Approximate 25mmspacingfrom top ofmetaltrack andu/s of steel shieldto be maintained.
Baseboard as applicable.Refer toFloorFinish Plan
ID08.
65mm metal runner
Lineof finishedraised floor
systemto remain.
Acoustical caulk
65mm soundattenuation
batts suitablefor metal
studapplication
13mm gypsumboard both
sides on 65mm, 0.45gauge
steel studs at400mm o.c.Tape, filland sand smooth
ready forpaint.
U/S ofexisting suspendedT-bar ceiling
Lineof finishedsuspended
T-bar ceiling
Acousticalbuilding feltliner
"L" trim (Typical)
Buildingstandard ceiling 'T'clip
90
3016SiteDimensionRequired
584SiteDimensionRequired
Two layersof 16mm
fire-resistantgypsumboard bothsides. First
layer tobe affixed
horizontallyand caulkedateach joint.Second
layer tobe affixed
perpendicularlyandcaulked ateach joints.
65mm soundattenuationblankets betweenstuds.
Baseboardvinyl
baseboard.Refer to FloorFinishPlanID08.
150mm metal runner.
U/S ofexisting SteelShield
Lineof finished
suspended T-bar ceiling
Lineof concreteslab.
Firerated acoustical caulk.
3613Site
DimensionRequired
217
Unsecure
SideSecureSide
13mm rubber boardgasket
150mm metalrunner
Lineof finishedraised
floor systemto remain.
13mm rubber boardgasket
40mm x 20mm x 2.6gauge
weldedwire meshto faceofstuds.
32mm x 150mm x1.22mmgalvanizedsteel studat
300mm o.c.
Firerated acoustical caulk.
65mm metal runner
Lineof finishedraised floorsystemto remain.
Acoustical caulk
13mm gypsumboard one
sideonly (Exterior sideof
room) on 65mm, 0.45gauge
steel studs at400mm o.c.Joints to betight against
eachother. Filljoints asrequiredandensure nodust
and constructiondebrisenters theprotectedspaces.
U/S ofexisting suspended
T-bar ceiling
Lineof finishedsuspended
T-bar ceiling
"L" trim (Typical)
Buildingstandard ceiling 'T'clip
90
3016SiteDimensionRequired
584SiteDimensionRequired
PWGSC A1 (841x594)
Administrateurde projets
TPSGC No. duprojet
No. dudessin
Date
Project Manager
PWGSC Projectno.
Drawing no.
Date
ReviewedBy
ApprovedBy
Date
Tender
Date
DesignedBy
Drawn By
Examin par
Approuvpar
Soumission
Conu par
Dessin par
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
1000 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no.du detail
surdessinno.
locationdrawingno.
drawing no.
dessinno.
detailno.
Canada
211-2141 ThurstonDrive
Ottawa ON K1G6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Partition Sections
CSD
2013-01-09
CSD
2013-03-06
BW
2013-12-09
-
-
-
-
R.050134.002
ID11
Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.
Scale 1:100
Key Plan
Project
North
OAR ID
8/12/2019 CFS Leitrim Drawings
14/27
PART PLAN1 :5 0
1S01
SECTION1 :1 0
NEW SLAB TOSLAB PARTITION
CUT EXISTINGCHANNEL ANDCONNECT TONEW POST
NEW POST41.3mmGALVANIZED STEELCHANNEL OR
EQUIVALENT CONNECT TOEXISTING CHANNEL
w/3 SIDED WINGSHAPE FITTING
EXISTINGCHANNEL & VERT.
SUPPORT TOREMAIN
POST TOBEAR ON SLAB ON GRADE w/POSTBASE AND BRACKET ANCHOR TOSLAB w/
MIN.2 CONCRETE EXPANSION ANCHORS
LEVELw/ NON SHRINK GROUT OR EPOXY
EXISTINGSLAB ON GRADE
EXISTINGRAISED FLOOR
TOREMAIN
2S01
SECTION1 :1 0
NEW SLAB TOSLAB PARTITION
NEWP
OST
POST TOBEAR ON SLAB ON GRADE w/POST
BASE AND BRACKET.ANCHOR TOSLAB w/
MIN.2 CONCRETE EXPANSION ANCHORSLEVELw/ NON SHRINK GROUT OR EPOXY
EXISTINGSLAB ON GRADE
NEWP
OST
NEWP
OST
NEWP
OST
NEW 41.3mmGALVANIZED STEELCHANNEL
(TOES DOWN) TOSUPPORT EDGE OF RAISED
FLOOR TILES
CONNECT EXISTING
CHANNELTO NEW POST
EXISTINGOF WALLBEYOND
TYPICAL DETAILSLAB TO SLAB WALL
1 : 1 0
WELD DEFLECTION TRACK TO
EXISTINGSTEELPANELFOR A
LATERALLOAD OF 1.0kN/m
DEFLECTION TRACK TOALLOW
FOR 25mmVERTICAL
MOVEMENT
EXISTINGSTEELPANEL
REFER TOID DRAWINGS FOR
WALLCONSTRUCTION
NEWP
OST
PWGSC A1 (841x594)
Administrateur de projets
No. du projet
No. du dessin
Date
Project Manager
Project no.
Drawing no.
Date
Reviewed By
Approved By
Date
Tender
Date
Designed By
Drawn By
Soumission
drawing
project
A
C C
B
A
B
dessin
projet
C
A
c
1000 10 20mm 40 60 80 120 140 160 180 200mm
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
(yyyy/mm/dd)
no. dudetail
surdessinno.
locationdrawingno.
drawingno.
dessinno.
detailno.
Canada
211-2141ThurstonDrive
OttawaON K1G 6C9
info@LWG-ai.com
T 613-739-3699
F 613-739-3965
LWG-ai.com
OPS Fit-up
Leitrim
Part Plan & Details
N.M.
2013
R.C. / XY.ZHANG
2013-
N.M.
2013/03/27
J.M.
2013/03/28
-
-
12108spti
S01
8/12/2019 CFS Leitrim Drawings
15/27
8/12/2019 CFS Leitrim Drawings
16/27
8/12/2019 CFS Leitrim Drawings
17/27
8/12/2019 CFS Leitrim Drawings
18/27
8/12/2019 CFS Leitrim Drawings
19/27
8/12/2019 CFS Leitrim Drawings
20/27
8/12/2019 CFS Leitrim Drawings
21/27
8/12/2019 CFS Leitrim Drawings
22/27
8/12/2019 CFS Leitrim Drawings
23/27
8/12/2019 CFS Leitrim Drawings
24/27
8/12/2019 CFS Leitrim Drawings
25/27
8/12/2019 CFS Leitrim Drawings
26/27
8/12/2019 CFS Leitrim Drawings
27/27