CFS Leitrim Drawings

download CFS Leitrim Drawings

of 27

Transcript of CFS Leitrim Drawings

  • 8/12/2019 CFS Leitrim Drawings

    1/27

    W . H. W .H.

    DN

    UP

    DN

    UP

    S S

    UP

    D

    NUP

    UP

    U

    P

    CCCCCCTELEPHONE

    C

    C

    C

    C

    CCCCCCCCCCCCCCCCC

    UP

    UP

    DN

    DN

    UP

    DN

    Project North

    211-2141 Thurston Drive

    Ottawa ON K1G 6C9

    T 613-739-3699

    F 613-739-3965

    [email protected]

    LWG-ai.com Architectural Interior Drawings Key Plan

    Issuedfor:Tender

    Date:December9,2013

    Project Phasing and Temporary Hoarding - Plan A

    Project Phasing and Temporary Hoarding - Plan BFurniture Plan

    Furniture Screen Plan

    Demolition Plan

    Partition Plan

    Reflected Ceiling Plan

    Power/Voice/Data Plan

    Floor and Wall Finish Plan

    Door Schedule and Elevations

    Door Elevations, Sections and Architectural Elevation

    and Section

    Partition Sections

    ID01A

    ID01BID02

    ID03

    ID04

    ID05

    ID06

    ID07ID08

    ID09

    ID10

    ID11

    OPS Fit-up Leitrim

    Ottawa ON

    Mechanical & Electrical Consultants

    McKee Engineering

    Structural Consultant

    Adjeleian Allen Rubeli Ltd

    Mechanical Drawings

    Mechanical - Fire Protection, Legends and Drawing List

    Mechanical - HVAC - Ceiling Plan

    Mechanical - HVAC - Raised Floor Plan

    M-1

    M-2

    M-3

    Electrical DrawingsElectrical - Demolition

    Electrical - Demolition

    Electrical - Legend & Drawing List

    Electrical - Lighting & Fire A larm

    Electrical - Power & Systems

    Electrical - Black Cable Tray

    Electrical - Red Cable Tray

    Electrical - Schedules & DetailsElectrical - Details

    Electrical - Details

    ED-1

    ED-2

    E-1E-2

    E-3

    E-4

    E-5

    E-6E-7

    E-8

    Structural Drawings

    Part Plan & DetailsS01

    Project:OPS

    Fit-upLeitrim

    PWGSCNumber:R.050134.002

    The undersigned has reviewed and takes responsibility for

    this design, and has the qualifications and meets the

    requirements set in the Ontario Building Code to be a

    designer.

    QUALIFICATION INFORMATION

    REGISTRATION INFORMATION

    Requiredunless designis exemptunder2.17.5.1 ofthe building code

    Requiredunless designis exemptunder2.17.4.1 ofthe building code

    NAME SIGNATURE BCIN

    FIRMNAME BCIN

    LWG Architectural InteriorsInc. 42687

    David Gibbons 25030

  • 8/12/2019 CFS Leitrim Drawings

    2/27

    S S

    DN

    915

    Clear

    915

    Clear

    915

    Clear

    915

    Clear

    915Clear

    1525Clear

    915

    Clear

    4420

    915

    Clear

    915Clear

    1525

    Clear

    1146(915

    min.)

    1525

    Clear

    1525

    Clear

    1038

    (915

    Min.)

    9

    15

    Clear

    1525

    Clear

    915

    Clear

    915

    Clear

    915

    Clear

    DN

    UP

    UP CT EL EPHONE

    CCCC

    UP

    UP

    DN

    DN

    UP

    DN

    915C lear

    1525C lear

    915

    Clear

    915

    Clear

    915C lear

    915

    Clear

    915

    Clear

    915

    Clear

    915C lear

    915

    Clear

    915

    Clear

    915

    Clear

    Phasing Legend - Plan A:

    Indicates Phase 1 ofthe project.

    Protect Constructionand Tenant occupiedzone asindicated. Protectionrequired atMain

    Corridors and aroundequipment to remainas shown above - Protectiontype varies.Extent and

    locationto beconfirmedon sitewith Project Manager.Ensure adequatespaceisleftfor

    Occupantaccess toremainderof space.Ensure not toleave constructionmaterialsand

    equipment thatcouldbe a trippinghazard or otherforOccupants. Upon completionofwork,Contractorto removeprotection material. DoNOT perforateand/or damageexisting partitions,

    ceiling,finishes and all other componentsto remainand to adjacentspaces.

    Indicates activities part of Phase1and Phase2of theproject.

    Indicates areanotincluded inPhase1 and/or Phase 2.Area to be mannedandoperational

    duringCo nstruction.Work requiredin these areas mustbe schedulewith Clientahead oftime,

    eitherduring Phase 1 or Phase2.

    Temporary Hoarding Legend - Plan A:

    Protect Construction/Equipmentand Tenant occupiedzone withPOLY 6 mil (minimum)and

    constructiontape onall joints.Ensure not toleave construction materials andequ ipment

    thatcouldbe a trippinghazard or otherforOccupants. Uponcompletionof allwork,

    Contractorto removePOLY. Do NOT perforate and/ordamage existingpartitions,ceiling,

    finishes and allother components toremain and toadjacent spaces. Contractorwill beheld

    responsible for any damagedone to existingspaces.

    Main Corridors

    Ensuread equate space is left for Occupantaccess toremainderof space withineach Main

    Corridors.

    Equipment

    Equipment shown above toremain.Ensure toleave915mmclearspacebetween

    equipment and POLY. Ensureall joints are taped and top and bottomedg es areproperly

    sealed. Ensureno dustand construction debris enters theprotectedspaces.

    Erect temporary hoardingas follows.Partitionto be 65mm metalstudat 410mm,0.45

    gauge o.c.with 13mm gypsum board one sideonly (Exterior sideof room)to u/s of

    suspended T-bar ceiling atapproximately 3016mm A.F.F.51 11

    Temporary Hoarding Notes - Plan A:

    1.Provide adequateventilation (supply and return)inside temporary POLYen closure. Perforatedraised floortiles

    tobe relocated as required surrounding the server racks.

    PWGSC A1 (841x594)

    Administrateurde projets

    TPSGC No. duprojet

    No. dudessin

    Date

    Project Manager

    PWGSC Projectno.

    Drawing no.

    Date

    ReviewedBy

    ApprovedBy

    Date

    Tender

    Date

    DesignedBy

    Drawn By

    Examin par

    Approuvpar

    Soumission

    Conu par

    Dessin par

    drawing

    project

    A

    C C

    B

    A

    B

    dessin

    projet

    C

    A

    c

    1000 10 20mm 40 60 80 120 140 160 180 200mm

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    no.du detail

    surdessinno.

    locationdrawingno.

    drawing no.

    dessinno.

    detailno.

    Canad

    a

    211-2141 ThurstonDrive

    Ottawa ON K1G6C9

    [email protected]

    T 613-739-3699

    F 613-739-3965

    LWG-ai.com

    OPS Fit-up

    Leitrim

    Project Phasing and

    Temporary Hoarding -

    Plan A

    CSD

    2013-01-09

    CSD

    2013-03-06

    BW

    2013-12-09

    -

    -

    -

    -

    R.050134.002

    ID01A

    Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.

    Key Plan

    Project

    North

    Scale 1:100

    OAR ID

  • 8/12/2019 CFS Leitrim Drawings

    3/27

    S S

    DN

    915

    Clear

    1525

    Clear

    915

    Clear

    915

    Clear

    915

    Clear

    915

    Clear

    915

    Clear

    915

    Clear

    915

    Clear

    915

    Clear

    915

    Cl

    ear

    915

    Clear

    DN

    UP

    UP CTEL EPHONE

    CCCC

    UP

    UP

    DN

    DN

    UP

    DN

    9 15Cle ar

    15 2 5Cle a r

    915

    Clear

    915

    Clear

    91 5Cle a r

    915

    Clear

    915

    Clear

    915

    Clear

    9 1 5

    Cl e ar

    915

    Clear

    915

    Clear

    915

    Clear

    Phasing Legend - Plan B:

    Indicates Phase 2 ofthe project.

    Protect Constructionand Tenant occupiedzone asindicated. Protectionrequired atMain

    Corridors and around equipment to remainas shown above - Protectiontype varies.Extent and

    locationto beconfirmedon sitewith Project Manager.Ensure adequatespaceisleftfor

    Occupantaccess toremainderof space.Ensure not toleave constructionmaterialsand

    equipment thatcouldbe a trippinghazard or otherforOccupants. Uponcompletionofwork,Contractorto removeprotection material. DoNOT perforatean d/or damage existingpartitions,

    ceiling,finishes and all other componentsto remainand to adjacentspaces.

    Indicates activities part of Phase1and Phase2of theproject.

    Indicates areanotincluded inPhase1 and/or Phase 2.Area to be mannedandoperational

    duringCo nstruction.Work requiredin these areas mustbe schedulewith Clientahead oftime,

    eitherduring Phase 1 or Phase2.

    Temporary Hoarding Legend - Plan B:

    Protect Construction/Equipmentand Tenant occupiedzone withPOLY 6 mil (minimum)and

    constructiontape onall joints.Ensure not toleave construction materials andequipment

    thatcouldbe a trippinghazard or otherforOccupants. Uponcompletionof allwork,

    Contractorto removePOLY. Do NOT perforate and/ordamage existingpartitions,ceiling,

    finishes and allother components toremain and toadjacent spaces. Contractorwill beh eld

    responsible for any damagedone to existingspaces.

    Main Corridors

    Ensuread equate space is left for Occupantaccess toremainderof space withineach Main

    Corridors.

    Equipment

    Equipment shown above toremain.Ensure toleave915mmclearspacebetween

    equipment and POLY. Ensureall joints are taped and top and bottomedges areproperly

    sealed. Ensureno dustand construction debris enters theprotectedspaces.

    Erect temporary hoardingas follows.Partitionto be 65mm metalstudat 410mm,0.45

    gauge o.c.with 13mm gypsum board one sideonly (Exterior sideof room)to u/s of

    suspended T-bar ceiling atapproximately 3016mm A.F.F.51 11

    Temporary Hoarding Notes - Plan B:

    1.Provide adequateventilation (supply andreturn) inside temporary POLYen closure. Perforatedraised floortiles

    tobe relocated as required surrounding the server racks.

    PWGSC A1 (841x594)

    Administrateurde projets

    TPSGC No. duprojet

    No. dudessin

    Date

    Project Manager

    PWGSC Projectno.

    Drawing no.

    Date

    ReviewedBy

    ApprovedBy

    Date

    Tender

    Date

    DesignedBy

    Drawn By

    Examin par

    Approuvpar

    Soumission

    Conu par

    Dessin par

    drawing

    project

    A

    C C

    B

    A

    B

    dessin

    projet

    C

    A

    c

    1000 10 20mm 40 60 80 120 140 160 180 200mm

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    no.du detail

    surdessinno.

    locationdrawingno.

    drawing no.

    dessinno.

    detailno.

    Canad

    a

    211-2141 ThurstonDrive

    Ottawa ON K1G6C9

    [email protected]

    T 613-739-3699

    F 613-739-3965

    LWG-ai.com

    OPS Fit-up

    Leitrim

    Project Phasing and

    Temporary Hoarding -

    Plan B

    CSD

    2013-01-09

    CSD

    2013-03-06

    BW

    2013-12-09

    -

    -

    -

    -

    R.050134.002

    ID01B

    Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.

    Scale 1:100

    Key Plan

    Project

    North

    OAR ID

  • 8/12/2019 CFS Leitrim Drawings

    4/27

  • 8/12/2019 CFS Leitrim Drawings

    5/27

  • 8/12/2019 CFS Leitrim Drawings

    6/27

    S S

    DN

    RefertoNote #3

    102

    1017102

    1017

    1679

    RefertoNote #2

    RefertoNote #2

    RefertoNote #5

    1017102

    RefertoNote #2

    R R R R

    R

    RefertoNote #7and #10

    R

    R

    R R

    RefertoNote #8

    RefertoNote #9

    RefertoNote #10

    R

    RefertoNote #11

    DN

    UP

    UP CTEL EPHONE

    CCCC

    UP

    UP

    DN

    DN

    UP

    DN

    Demolition Legend:ExistingInterior Tenantpartition to remain.

    InteriorTenant partition to be removed and discarded.

    Above finishedfloor to u/s ofslab. Perimeter gypsumwallboard partition.

    Above finishedfloor to u/s ofsuspended T-barceiling. Gypsum wallboardpartition.

    Above finishedfloor to u/s ofsuspended T-barceiling. Gypsum wallboardpa rtitionc/w acoustic

    panels both sides for the majority of the space. Acoustic panelsto bediscarded.

    Existingdoor, door frame,hardware and componentsto remain.

    Existingdoor, sidelight, frame,hardware and componentsto remain.

    Existingsingle door, doorframe, hardware andcompon ents tobe removed and retainforreuse,

    unless otherwisenoted. Refer todoo r Scheduleon SheetID09.

    Existingdoor,door frame,hardware,glazingassembly c/w blindsandrelatedcomponentstobe

    removed and retainedforrelocation.Referto doorSchedule onSheetID09.

    Existingdouble doors,door frame,hardware, glazingassembly c/w blindsand related

    componentsto beremovedandretained for relocation. Refer todoor Scheduleon SheetID09.

    Denotes doorassembly identificationnu mber for relocationto be read inconjunctionwith Door

    Schedule on Sheet ID09.

    Existingglazing, frame,blinds and related componentsto remain- Sizevaries.

    Existingduplex outletand relatedcompon ents tobe removed and discarded.Refer toElectrical

    Consultant's drawings.

    Demolition Notes:

    1. Existing raisedfloorsystem toremain exceptwhere modifications required toaccommodaten ewpartitions as

    indicated inDemolition Legend.

    2. Modify existingpartitionto accommodate new doorandframewhereindicatedabove. Secureremainderof

    partition as required.

    3. Existing "shield"door and associateddoor hardwareto be removedand turned overto Tenant.Doorframeto

    remain. Dooreq uipped withsecurity alarm tob e disconnectedan dreconnected to new door#010 onPartitionPlan

    on SheetID05. Ensure the security alarmwork is completed by a Contractorthat is familiar withthetype as itis an

    older systeman dno longer availablein North America.

    4.All door, frame and glazing not reusedto beremovedanddiscarded. All door hardware not reusedtobeturned

    overto Tenant.

    5.Removeanddiscardexisting top ofpartition152mmhigh x 64mm widebrushedaluminum channelsecuredto

    suspended T-bar ceiling.

    6.Refer toElectrical,Demolition Planon Sheet ED-1for theremoval of electricalcomponents withinraisedfloor

    system.

    7.Cut back existing partition as shown ande nsure stability.Ensure nodamage toremainder ofpartition. Cutback

    existingwall mounted acoustic panelto suitnew partitionlength. Ensure cut is straight and fabric securedtopan el

    backing.

    8. Reserved.

    9. Existing gypsumwallboard partitionoutside of enclosedoffices as shown above tobe cutopen toaccommodate

    new blockingforequipmen t. Referto Partition Legend on Sheet ID05for additional information.

    10.Whe re existing partitionfinished withbrushed aluminum top channel below ceiling requires to becutdu eto

    adjacentpartitionto beremoved, ensurecutis straightandno damageis doneto remainingportionas shown.

    Retaintopchannelfrom demolitionforpatching as identified on PartitionPlan on SheetID05.

    11.Existing circular trapdoor located above baseboard tobe removed and discarded.Cute xistingpiping forcentral

    vacuumbelow raised floor and cap pipingto remain.

    Demolition Legend (Cont'):Existingtelephone outlet and related components to beremoved andd iscarded.Refer to

    ElectricalConsultant's drawings.

    Existingcombined voice/dataoutlet and related components to beremoved anddiscarded.

    Refer toElectrical Consultant's drawings.

    Existingblank plate, junctionbox andrelated components tobe removedand discarded.

    Refer toElectrical Consultant's drawings.

    Existingdoor belland relatedcompon ents tobe removed anddiscarded.

    Existinglight switch and related components to beremoved anddiscarded. Referto Electrical

    Consultant's drawings.

    Indicates existingoutlet or lightswitch and related components to be removedand retained

    for relocation. Refer toPo wer/Voice/Data Planand ReflectedCeiling Plan on SheetID06 and

    ID07.

    Indicates areawhereexisting raisedfloorsystem to be modifiedto suitnewslabtoslab

    partition.Refer to Partition Planon Sheet ID05for location.

    Note:

    - Raisedfloor supportsystem to be modified. Refer toStructural Consultant's drawings for

    additional informationand details.

    Indicates areawhere existing suspended T-bar ceiling tobe removed and discarded.Secure

    remainder ofsuspendedT-bar ceilingwithin InteriorTenant space and gypsumwallboard

    bulkhead in MainCorridors as required.

    R

    PWGSC A1 (841x594)

    Administrateurde projets

    TPSGC No. duprojet

    No. dudessin

    Date

    Project Manager

    PWGSC Projectno.

    Drawing no.

    Date

    ReviewedBy

    ApprovedBy

    Date

    Tender

    Date

    DesignedBy

    Drawn By

    Examin par

    Approuvpar

    Soumission

    Conu par

    Dessin par

    drawing

    project

    A

    C C

    B

    A

    B

    dessin

    projet

    C

    A

    c

    1000 10 20mm 40 60 80 120 140 160 180 200mm

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    no.du detail

    surdessinno.

    locationdrawingno.

    drawing no.

    dessinno.

    detailno.

    Canada

    211-2141 ThurstonDrive

    Ottawa ON K1G6C9

    [email protected]

    T 613-739-3699

    F 613-739-3965

    LWG-ai.com

    OPS Fit-up

    Leitrim

    Demolition Plan

    CSD

    2013-01-09

    CSD

    2013-03-06

    BW

    2013-12-09

    -

    -

    -

    -

    R.050134.002

    ID04

    Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.

    Scale 1:100

    Key Plan

    Project

    North

    OAR ID

  • 8/12/2019 CFS Leitrim Drawings

    7/27

  • 8/12/2019 CFS Leitrim Drawings

    8/27

    S S

    DN

    Referto

    Note #1

    RefertoNote #2

    RefertoNote #2

    RR

    R

    R

    R

    RR

    CLCL

    CL

    R

    RefertoNote #4

    DN

    UP

    UP CTEL EPHONE

    CCCC

    UP

    UP

    DN

    DN

    UP

    DN

    Reflected Ceiling Legend:

    Denotes existingBuilding Standardfluorescent fixtureto remain.

    Denotes existingBuilding Standardfluorescent fixtureto berelocated.

    Denotes relocated and/ornew fluorescentfixture. Where new required, supplyand installnew to

    match existingBuilding Standard.

    Denotes existingsuspended T-barceiling to remain.

    Denotes new suspended T-bar ceiling tobe centeredwithin new Vestibule.Ceiling heightto

    match existing, +/- 3016mmA.F.F..

    Denotes areawhere existing gypsumwallboard finished ceiling tobe extended. Constructionto

    match existing. Prepare surface toreceive newp aintfinish. Ensure transitionbetween newand

    existingis smoothand seamless. Contractorto ensurestability.

    Denotes existinglight switch toremain.

    Denotes light switchto bemounted to match existingheight unlessothe rwisenoted. Bodyand

    cover plate tomatch existing styleand colour.

    Relocated light switchand relatedcompon ents retained from demolition. Heightto match

    existingunless otherwisenoted.

    120V Duplex outlet above suspended T-bar ceiling withinplenum space.Refer toElectrical

    Consultant'sdrawings.CL

    R

    Reflected Ceiling Notes:1. Existing suspended T-bar ceiling tobe modifiedto suitnew securedpartition Type 3.Existingsuspended T-bar,

    ceiling tiles and related components within Vestibule tobe removed and discarded.Modify suspendedT-bar and

    cut ceiling tiles as required onoutside of Vestibule.Secure remainder ofsuspende dT-bar and supply andinstall

    new "L" trimalong newpa rtition.

    2.Paint new and existing gypsum wallboard bulkheadon all exposed surfaces as shown.

    3.Open existing gypsumwallboard partitionwere requiredto accommodate new electricalconduits. Repair,patch,

    sanda ndmake good ready to receive new paintfinish.

    4. Supply and install blank cover plate where existinglightswitch was removed.

    PWGSC A1 (841x594)

    Administrateurde projets

    TPSGC No. duprojet

    No. dudessin

    Date

    Project Manager

    PWGSC Projectno.

    Drawing no.

    Date

    ReviewedBy

    ApprovedBy

    Date

    Tender

    Date

    DesignedBy

    Drawn By

    Examin par

    Approuvpar

    Soumission

    Conu par

    Dessin par

    drawing

    project

    A

    C C

    B

    A

    B

    dessin

    projet

    C

    A

    c

    1000 10 20mm 40 60 80 120 140 160 180 200mm

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    no.du detail

    surdessinno.

    locationdrawingno.

    drawing no.

    dessinno.

    detailno.

    Canada

    211-2141 ThurstonDrive

    Ottawa ON K1G6C9

    [email protected]

    T 613-739-3699

    F 613-739-3965

    LWG-ai.com

    OPS Fit-up

    Leitrim

    Reflected Ceiling Plan

    CSD

    2013-01-09

    CSD

    2013-03-06

    BW

    2013-12-09

    -

    -

    -

    -

    R.050134.002

    ID06

    Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.

    Scale 1:100

    Key Plan

    Project

    North

    OAR ID

  • 8/12/2019 CFS Leitrim Drawings

    9/27

    FAX

    PHOTO

    COPIER

    S S

    DN

    BF

    BF

    BF

    BF

    BF

    BF BFBF BF

    BF BF BF BFBF BF

    BF BF BF BFBF BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BFBFBF

    BFBF

    BF BF

    BF BF BF BF BF BF BF BF BF BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF

    BF BF

    BF

    BF

    BF

    BF

    BF

    RefertoNote #2

    RefertoNote #2

    RefertoNote #1

    RefertoNote #1

    RefertoNote #2

    RefertoNote #2

    RefertoNote #2

    RefertoNote #1

    RefertoNote #3

    RefertoNote #1

    RefertoNote #1

    CL CL CL

    CLBF

    DN

    UP

    UP CTEL EPHONE

    CCCC

    UP

    UP

    DN

    DN

    UP

    DN

    Power/Voice/Data Legend:

    120V Duplex outletmounted. Refer toElectrical Consultant'sdrawings.

    Duplex outlet withinsystem's furniture panelby others.

    Existingduplex outletandrelatedcomponents toremain.

    Combinedvoice/data outletwithin systemfurniture panel byothers.

    Existingtelephone outlet and related components toremain.

    Existingcombined voice/dataoutlet and related componentsto remain.

    Existingblank plateandrelatedcomponents toremain.

    Systems furniture basefeed module- plug connection. Coordinate installationwith systems

    furniture Contractor/Installer.

    Indicates duplex outlet above suspended T-bar ceiling withinplenum space.

    BF

    CL

    Power/Voice/Data Notes:

    1. Existingequipment and associated desks to remain. Protect fromdust and constructiondebris as identifiedon

    Project Phasing and Temporary Hoard onSh eetID01.

    2. Existing recessedelectrical panel and other wallmounted electrical devices and transformers toremain.

    3. RelocatedA/V rack and related components by others.

    PWGSC A1 (841x594)

    Administrateurde projets

    TPSGC No. duprojet

    No. dudessin

    Date

    Project Manager

    PWGSC Projectno.

    Drawing no.

    Date

    ReviewedBy

    ApprovedBy

    Date

    Tender

    Date

    DesignedBy

    Drawn By

    Examin par

    Approuvpar

    Soumission

    Conu par

    Dessin par

    drawing

    project

    A

    C C

    B

    A

    B

    dessin

    projet

    C

    A

    c

    1000 10 20mm 40 60 80 120 140 160 180 200mm

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    no.du detail

    surdessinno.

    locationdrawingno.

    drawing no.

    dessinno.

    detailno.

    Canada

    211-2141 ThurstonDrive

    Ottawa ON K1G6C9

    [email protected]

    T 613-739-3699

    F 613-739-3965

    LWG-ai.com

    OPS Fit-up

    Leitrim

    Power/Voice/Data Plan

    CSD

    2013-01-09

    CSD

    2013-03-06

    BW

    2013-12-09

    -

    -

    -

    -

    R.050134.002

    ID07

    Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.

    Scale 1:100

    Key Plan

    Project

    North

    OAR ID

  • 8/12/2019 CFS Leitrim Drawings

    10/27

    S S

    DN

    Referto

    Note #1W

    DN

    UP

    UP CT EL EPHONE

    CCCC

    UP

    UP

    DN

    DN

    UP

    DN

    Floor Finish Legend:Existingraised floor tilesystem toremain.

    Wall Finish Legend:

    General OfficePaint

    Colour: White

    Finish: Gloss, Level3

    DoorPaint

    Colour: Light grey

    Finish: Gloss, Level4

    Door FramePaint

    Colour: Black

    Finish: Gloss, Level5

    GypsumWallboard CeilingBulkhead Paint

    Colour: White

    Finish: Gloss,Level 1

    SecurePa rtitionPaint

    Colour: White

    Finish, Gloss,Level 6

    Note: 1 coatprimer/sealerand3 coats paint

    Floor Finish Notes:

    1F.New partitions within InteriorTenant and Main Corridor sideto receive new black vinyl baseboard,unless

    otherwise noted.Newpartitions insideand outsideof EnclosedOffice #171to receive PVC snaponbaseboard-

    Refer toDetail 7/8/8.

    Wall Finish Notes:

    1W.Paint existingmetal window frame P3inside and outside ofroom.

    Existing raised floor

    system

    Base J-Hook

    PVC Base ClipOn

    Floor Track

    Gypsum wallboard

    19mm Plywood

    blocking requiredto reinforce base.

    PWGSC A1 (841x594)

    Administrateurde projets

    TPSGC No. duprojet

    No. dudessin

    Date

    Project Manager

    PWGSC Projectno.

    Drawing no.

    Date

    ReviewedBy

    ApprovedBy

    Date

    Tender

    Date

    DesignedBy

    Drawn By

    Examin par

    Approuvpar

    Soumission

    Conu par

    Dessin par

    drawing

    project

    A

    C C

    B

    A

    B

    dessin

    projet

    C

    A

    c

    1000 10 20mm 40 60 80 120 140 160 180 200mm

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    no.du detail

    surdessinno.

    locationdrawingno.

    drawing no.

    dessinno.

    detailno.

    Canada

    211-2141 ThurstonDrive

    Ottawa ON K1G6C9

    [email protected]

    T 613-739-3699

    F 613-739-3965

    LWG-ai.com

    OPS Fit-up

    Leitrim

    Floor and Wall Finish Plan

    CSD

    2013-01-09

    CSD

    2013-03-06

    BW

    2013-12-09

    -

    -

    -

    -

    R.050134.002

    ID08

    Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson the site and reportany discrepancytothedesigner. Donotscale this drawing.

    Scale 1:100

    Key Plan

    Project

    North

    OAR ID

  • 8/12/2019 CFS Leitrim Drawings

    11/27

    DN

    UP

    UP CTELEPHONE

    CCCC

    UP

    UP

    DN

    DN

    UP

    DN

    Door Schedule

    001

    002

    003

    004

    005

    006

    007

    008

    009

    010

    166

    167

    168

    169

    170

    171

    172

    173

    174

    175

    176

    177

    178

    Existing

    A

    Existing

    Existing

    Existing

    B

    Existing

    Existing

    Existing

    D

    C

    C

    C

    C

    C

    C

    C

    Existing

    Existing

    Existing

    Existing

    C

    C

    PR 915 x 2134 x 44.5

    PR 915 x 2134 x 44.5

    PR 915 x 2134 x 44.5

    PR 915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    915 x 2134 x 44.5

    Existing

    Solid core-paint grade

    Existing

    Existing

    Existing

    Solid core-paint grade

    Existing

    Existing

    Existing

    Heavy cold rolled - paint grade

    Solid core-paint grade

    Solid core-paint grade

    Solid core-paint grade

    Solid core-paint grade

    Solid core-paint grade

    Solid core-paint grade

    Solid core-paint grade

    Existing

    Existing

    Existing

    Existing

    Solid core-paint grade

    Solid core-paint grade

    P2

    P2

    P2

    P2

    P2

    P2

    Existing

    Existing

    Existing

    P2

    P2

    P2

    P2

    P2

    P2

    P2

    P2

    P2

    P2

    P2

    P2

    P2

    P2

    Existing

    Reused

    Existing

    Existing

    Existing

    Metal-paint grade

    Existing

    Existing

    Existing

    Metal-paint grade

    Metal-paint grade

    Metal-paint grade

    Metal-paint grade

    Metal-paint grade

    Metal-paint grade

    Metal-paint grade

    Metal-paint grade

    Existing

    Existing

    Existing

    Existing

    Metal-paint grade

    Metal-paint grade

    P3

    P3

    P3

    P3

    P3

    P3

    Existing

    Existing

    Existing

    P3

    P3

    P3

    P3

    P3

    P3

    P3

    P3

    P3

    P3

    P3

    P3

    P3

    P3

    Existing

    H1

    Existing

    Existing

    Existing

    H2

    Existing

    Existing

    Existing

    H3

    H4

    H4

    H4

    H4

    H4

    H4

    H4

    Existing

    Existing

    Existing

    Existing

    H4

    H4

    Refer to note #8

    Refer to note #3 and #8

    Refer to note #7 and #8

    Refer to note #8

    Refer to note #8

    Refer to note #4 and #8

    --

    --

    --

    3/4 Hr fire rated door and frame. Refer to note #13, #14 and #17

    --

    --

    --

    --

    --

    --

    --

    --

    --

    --

    --

    --

    --

    Hardware Notes:1.All hardware to match BaseBuilding standard, unless otherwisenoted.

    2. Ensure all doorhardware is installedper Manufacturer's instructions.

    3. Reuseexisting metal frame and doorhardware D01 retained from demolition. New doorleaves required.Refer toDemolitionPlan onSheetID04.

    4. Reuseexisting metal frame and doorhardware D04 retainedfrom demolition. Refer toDemolition Planon Sheet

    ID04.

    5. Reuseexisting doorleaves #D02, D03,D04 , D06 and D07 onDemolition Plan on Sheet ID04in goodcondition

    where possibleinstead of purchasingnew.

    6. Reuseexisting doorhardware #D02,D03, D04,D06and D07on DemolitionPlan onSheetID04 wherepossibleinstead ofpurchasing new.Existing orbital knobs tobe replacedwith leverhandles.

    7. Existing orbital doorknob tobe removed and replacedwith lever handle. Style and standardfinish tosuit Unicanlock. Ensurecompatibility.

    8.Paint new,existing and reusedsolidcore wooddoor and steel frame #001, 002,003, 004,005 and006on allexposed edges and bothsides.

    9. Paintallnew, existingandreused enclosedoffice doors onallexposededges and bothsides.

    10. Ensure all new and reusedsteel door frame depth suitpartition type.

    11. Allsurplus door hardwareto beturned overtoTenant.

    12.New lock cylinderto beby Tenant.

    13. Installand reconnectto new door #010 security alarmretained from demolition.Ensure the security alarmwork is

    completed by aContractor thatis familiarwith the typeas itis anolder system and nolong er availableinNorth

    America.Refer to DemolitionNotes, Note #4.

    14.Ad ditionalnotes regardingdo or and doorhardwa re H3as follows:

    - Deadbolts must haveat least 25mmthrowandconformto BuildingCode

    - Doorframeis tobe bracedhorizontally halfway up oneither sidebetweenstuds andframetopreventforceentry

    - Doorhinges shouldb e located onthe interior;otherwise exterior hinges must betamper-proofor pinned

    - Havean STC rating of 51unless a vestibule is constructed

    15. Existing doorstop for door#001,003and 005may need tobe relocated tosuit new adjacentpartitionlocation.

    16. Allmetal doors andframes tobe painted withpaint suitable for metal application.Properly prepare metaldoor and

    frame as required and ensureno pealing,etc...

    17. Heavy cold rolleddoor and metal frame for door#0 10 tobe painted with Gloss, Level1 finish.

    18.Supply andinstallcaulking suitableforpainting aroundall door frame insideand outsideofroom.

    2178SiteDimensionRequired

    1920 SiteDimensionRequired

    Relocated metaldoorframe.Paint to be appliedbothsides.

    990

    SiteDimensionRequired

    New solid corewood.Paint to be appliedbothsides.

    Reusedunican lock c/wwithlever handle. Adjusttosuit newdoorswing.

    Active doorleaf Fixed doorleaf

    New full height steelastragal.

    EQ

    3061 SiteDimensionRequired

    EQ

    305Site

    DimensionRequired

    305Site

    DimensionRequired

    Relocated frameless glazing.Relocateexisting blinds locatedon Interior sideofRoom.

    Line of partition.

    Align 12mmx 12mm revealpainted blackto matchdoor frame - bothsidesof partition.

    New black vinyl baseboard.

    102

    9

    2

    10

    9

    4

    10

    Line of partition.

    2178SiteDimensionRequired

    1003 SiteDimension Required

    990

    SiteDimensionRequired

    Reusedmetaldoor frame.Paint tobeappliedbothsides.

    New solid corewood door.Paint tobeappliedbothsides.

    Reusedunicanlock c/wwithlever handle.

    12mmx 12mm revealpainted black tomatchdoor frame - bothsidesof partition.

    9

    2

    10

    Reusedkickplate.

    Line of partition.

    Line of partition.

    2185SiteDimensionRequired

    1017 SiteDimensionRequired

    990

    SiteDimensionRequired

    New metaldoorframe. Paintto beappliedbothsides.

    New/reusedsolidcore wooddoor.Paint tobeappliedbothsides.

    New lever lockset,mortise.

    51

    9

    3

    10

    9

    510

    PWGSC A1 (841x594)

    Administrateurde projets

    TPSGC No. duprojet

    No. dudessin

    Date

    Project Manager

    PWGSC Projectno.

    Drawing no.

    Date

    ReviewedBy

    ApprovedBy

    Date

    Tender

    Date

    DesignedBy

    Drawn By

    Examin par

    Approuvpar

    Soumission

    Conu par

    Dessin par

    drawing

    project

    A

    C C

    B

    A

    B

    dessin

    projet

    C

    A

    c

    1000 10 20mm 40 60 80 120 140 160 180 200mm

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    no.du detail

    surdessinno.

    locationdrawingno.

    drawing no.

    dessinno.

    detailno.

    Canada

    211-2141 ThurstonDrive

    Ottawa ON K1G6C9

    [email protected]

    T 613-739-3699

    F 613-739-3965

    LWG-ai.com

    OPS Fit-up

    Leitrim

    Door Schedule

    and Elevations

    CSD

    2013-01-09

    CSD

    2013-03-06

    BW

    2013-12-09

    -

    -

    -

    -

    R.050134.002

    ID09

    Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.

    Scale 1:100

    Key Plan

    Project

    North

    OAR ID

  • 8/12/2019 CFS Leitrim Drawings

    12/27

  • 8/12/2019 CFS Leitrim Drawings

    13/27

    DN

    UP

    UP CTELEPHONE

    CCCC

    UP

    UP

    DN

    DN

    UP

    DN

    16mm gypsumboard both

    sides on 150mm,0.81 gaugemetal studs at 400mmo.c.

    Tape, fillandsand smooth

    ready forpaint.

    65mm soundattenuation

    batts suitablefor metalstudapplication.

    Baseboard asapplicable.Refer toFloorFinish Plan

    ID08.

    150mm metal runner.

    U/S ofexisting SteelShield

    Lineof finished

    suspended T-bar ceiling

    Lineof finishedraised

    floor systemto remain.

    Acoustical caulk

    3016SiteDimensionRequired

    584SiteDimensionRequired

    180Site Dimension Required

    25Site

    Dimension

    Required

    Note:

    - Approximate 25mmspacingfrom top ofmetaltrack andu/s of steel shieldto be maintained.

    Baseboard as applicable.Refer toFloorFinish Plan

    ID08.

    65mm metal runner

    Lineof finishedraised floor

    systemto remain.

    Acoustical caulk

    65mm soundattenuation

    batts suitablefor metal

    studapplication

    13mm gypsumboard both

    sides on 65mm, 0.45gauge

    steel studs at400mm o.c.Tape, filland sand smooth

    ready forpaint.

    U/S ofexisting suspendedT-bar ceiling

    Lineof finishedsuspended

    T-bar ceiling

    Acousticalbuilding feltliner

    "L" trim (Typical)

    Buildingstandard ceiling 'T'clip

    90

    3016SiteDimensionRequired

    584SiteDimensionRequired

    Two layersof 16mm

    fire-resistantgypsumboard bothsides. First

    layer tobe affixed

    horizontallyand caulkedateach joint.Second

    layer tobe affixed

    perpendicularlyandcaulked ateach joints.

    65mm soundattenuationblankets betweenstuds.

    Baseboardvinyl

    baseboard.Refer to FloorFinishPlanID08.

    150mm metal runner.

    U/S ofexisting SteelShield

    Lineof finished

    suspended T-bar ceiling

    Lineof concreteslab.

    Firerated acoustical caulk.

    3613Site

    DimensionRequired

    217

    Unsecure

    SideSecureSide

    13mm rubber boardgasket

    150mm metalrunner

    Lineof finishedraised

    floor systemto remain.

    13mm rubber boardgasket

    40mm x 20mm x 2.6gauge

    weldedwire meshto faceofstuds.

    32mm x 150mm x1.22mmgalvanizedsteel studat

    300mm o.c.

    Firerated acoustical caulk.

    65mm metal runner

    Lineof finishedraised floorsystemto remain.

    Acoustical caulk

    13mm gypsumboard one

    sideonly (Exterior sideof

    room) on 65mm, 0.45gauge

    steel studs at400mm o.c.Joints to betight against

    eachother. Filljoints asrequiredandensure nodust

    and constructiondebrisenters theprotectedspaces.

    U/S ofexisting suspended

    T-bar ceiling

    Lineof finishedsuspended

    T-bar ceiling

    "L" trim (Typical)

    Buildingstandard ceiling 'T'clip

    90

    3016SiteDimensionRequired

    584SiteDimensionRequired

    PWGSC A1 (841x594)

    Administrateurde projets

    TPSGC No. duprojet

    No. dudessin

    Date

    Project Manager

    PWGSC Projectno.

    Drawing no.

    Date

    ReviewedBy

    ApprovedBy

    Date

    Tender

    Date

    DesignedBy

    Drawn By

    Examin par

    Approuvpar

    Soumission

    Conu par

    Dessin par

    drawing

    project

    A

    C C

    B

    A

    B

    dessin

    projet

    C

    A

    c

    1000 10 20mm 40 60 80 120 140 160 180 200mm

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    no.du detail

    surdessinno.

    locationdrawingno.

    drawing no.

    dessinno.

    detailno.

    Canada

    211-2141 ThurstonDrive

    Ottawa ON K1G6C9

    [email protected]

    T 613-739-3699

    F 613-739-3965

    LWG-ai.com

    OPS Fit-up

    Leitrim

    Partition Sections

    CSD

    2013-01-09

    CSD

    2013-03-06

    BW

    2013-12-09

    -

    -

    -

    -

    R.050134.002

    ID11

    Thisdrawing is the propertyof the designer. Copyright isreserved.Noreproduction may bemade without prior consentof thedesigners and suchcopies mustbear their names.Thisdrawing shallnot be usedfor constructionpurposes untilsignedby the designer.The contractoris toverify dimensionsand datanoted hereinwiththe conditionson thesi te and reportany discrepancytothedesigner. Donotscale this drawing.

    Scale 1:100

    Key Plan

    Project

    North

    OAR ID

  • 8/12/2019 CFS Leitrim Drawings

    14/27

    PART PLAN1 :5 0

    1S01

    SECTION1 :1 0

    NEW SLAB TOSLAB PARTITION

    CUT EXISTINGCHANNEL ANDCONNECT TONEW POST

    NEW POST41.3mmGALVANIZED STEELCHANNEL OR

    EQUIVALENT CONNECT TOEXISTING CHANNEL

    w/3 SIDED WINGSHAPE FITTING

    EXISTINGCHANNEL & VERT.

    SUPPORT TOREMAIN

    POST TOBEAR ON SLAB ON GRADE w/POSTBASE AND BRACKET ANCHOR TOSLAB w/

    MIN.2 CONCRETE EXPANSION ANCHORS

    LEVELw/ NON SHRINK GROUT OR EPOXY

    EXISTINGSLAB ON GRADE

    EXISTINGRAISED FLOOR

    TOREMAIN

    2S01

    SECTION1 :1 0

    NEW SLAB TOSLAB PARTITION

    NEWP

    OST

    POST TOBEAR ON SLAB ON GRADE w/POST

    BASE AND BRACKET.ANCHOR TOSLAB w/

    MIN.2 CONCRETE EXPANSION ANCHORSLEVELw/ NON SHRINK GROUT OR EPOXY

    EXISTINGSLAB ON GRADE

    NEWP

    OST

    NEWP

    OST

    NEWP

    OST

    NEW 41.3mmGALVANIZED STEELCHANNEL

    (TOES DOWN) TOSUPPORT EDGE OF RAISED

    FLOOR TILES

    CONNECT EXISTING

    CHANNELTO NEW POST

    EXISTINGOF WALLBEYOND

    TYPICAL DETAILSLAB TO SLAB WALL

    1 : 1 0

    WELD DEFLECTION TRACK TO

    EXISTINGSTEELPANELFOR A

    LATERALLOAD OF 1.0kN/m

    DEFLECTION TRACK TOALLOW

    FOR 25mmVERTICAL

    MOVEMENT

    EXISTINGSTEELPANEL

    REFER TOID DRAWINGS FOR

    WALLCONSTRUCTION

    NEWP

    OST

    PWGSC A1 (841x594)

    Administrateur de projets

    No. du projet

    No. du dessin

    Date

    Project Manager

    Project no.

    Drawing no.

    Date

    Reviewed By

    Approved By

    Date

    Tender

    Date

    Designed By

    Drawn By

    Soumission

    drawing

    project

    A

    C C

    B

    A

    B

    dessin

    projet

    C

    A

    c

    1000 10 20mm 40 60 80 120 140 160 180 200mm

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    (yyyy/mm/dd)

    no. dudetail

    surdessinno.

    locationdrawingno.

    drawingno.

    dessinno.

    detailno.

    Canada

    211-2141ThurstonDrive

    OttawaON K1G 6C9

    [email protected]

    T 613-739-3699

    F 613-739-3965

    LWG-ai.com

    OPS Fit-up

    Leitrim

    Part Plan & Details

    N.M.

    2013

    R.C. / XY.ZHANG

    2013-

    N.M.

    2013/03/27

    J.M.

    2013/03/28

    -

    -

    12108spti

    S01

  • 8/12/2019 CFS Leitrim Drawings

    15/27

  • 8/12/2019 CFS Leitrim Drawings

    16/27

  • 8/12/2019 CFS Leitrim Drawings

    17/27

  • 8/12/2019 CFS Leitrim Drawings

    18/27

  • 8/12/2019 CFS Leitrim Drawings

    19/27

  • 8/12/2019 CFS Leitrim Drawings

    20/27

  • 8/12/2019 CFS Leitrim Drawings

    21/27

  • 8/12/2019 CFS Leitrim Drawings

    22/27

  • 8/12/2019 CFS Leitrim Drawings

    23/27

  • 8/12/2019 CFS Leitrim Drawings

    24/27

  • 8/12/2019 CFS Leitrim Drawings

    25/27

  • 8/12/2019 CFS Leitrim Drawings

    26/27

  • 8/12/2019 CFS Leitrim Drawings

    27/27