The Brimfield Trail Committee (BTC)was established in 2006 for the purpose of
establishing recreational trails in theTown of Brimfield.
Organization History
8/14/2019 BTC Town Report
3/38
Brimfield Trail Committee
President:
Richard Costa
Secretary:
Tony Bys
Other Members:
Joe Balou, Jim Lamothe,
Paul Adams, Paul Watson,Scott Gerrish, David Bolte,Jeff Buckel, Bill Simonic,
Richard Haller, Ron Ignotz,Rob Mahlert, Chris Rabbitt,Larry Lowenthal
8/14/2019 BTC Town Report
4/38
Community Partners
Brimfield Board of Selectmen
Brimfield Highway Department
Brimfield Boy Scouts Troop
Local Businesses and Residents
Army Corp of Engineers
8/14/2019 BTC Town Report
5/38
Trail History
The Brimfield Trail System currently takes
advantage of two abandoned rail beds;the Grand Trunk Railroad and the
Springfield and Eastern Street Railway
8/14/2019 BTC Town Report
6/38
Trail History
The Grand Trunk Railway was chartered in 1910
to connect the port of Providence, RI to the CentralVermont Railroad in Palmer, MA . This was thevision of owner/financier Charles M. Hays.
8/14/2019 BTC Town Report
7/38
Trail History
Construction started on the Grand Trunk in 1912despite the death of Mr. Hays during the sinking of theTitanic forever linking the railway to the ill-fated ship.
However, without Mr. Hays, work on the railway endedwhen funding dried up during World War I
8/14/2019 BTC Town Report
8/38
Trail HistoryThe Springfield and Eastern Street
Railway was part of a trolley system that ranfrom Worcester to Springfield until the 1920s
8/14/2019 BTC Town Report
9/38
What has beenaccomplished
so far?
8/14/2019 BTC Town Report
10/38
Handshake Agreement
In 2007 a Handshake Agreement was reached withthe Army Corps of Engineers giving us $7400 with
1:1 matching funds from the Brimfield Trail Committeeand Town of Brimfield in the form of volunteer labor,equipment usage and transportation of trail materials.
8/14/2019 BTC Town Report
11/38
The main work to date has been to re-open theEast Brimfield section of the Grand Trunk and the
Springfield and Eastern trolley beds as recreationaltrails. The sections currently being worked on liewithin the jurisdiction of the Army Corps of
Engineers .
Handshake Agreement
8/14/2019 BTC Town Report
12/38
Handshake Agreement
This funding was used for the creation of aparking area on Five Bridge Road
8/14/2019 BTC Town Report
13/38
Handshake Agreement
Signage and gates
8/14/2019 BTC Town Report
14/38
Handshake Agreement
installation of culverts
8/14/2019 BTC Town Report
15/38
Handshake Agreement
an information kiosk
8/14/2019 BTC Town Report
16/38
Handshake Agreement
trail building and reclamation
8/14/2019 BTC Town Report
17/38
Handshake Agreement
brush clearing for creation of scenic vistas
8/14/2019 BTC Town Report
18/38
Handshake Agreement
and gravel for trail resurfacing.
8/14/2019 BTC Town Report
19/38
Handshake Agreement
We now have 1.5 miles of accessible trail fromFive Bridge Road to the Quinebaug River.
8/14/2019 BTC Town Report
20/38
Current Status
8/14/2019 BTC Town Report
21/38
Current Status
The Brimfield Trail Committee has beenawarded a grant from the
Quinebaug-Shetucket Heritage Corridor, Inc.aka The Last Green Valley.The plan is to use these funds during 2009
on expanding the trail system on the
Army Corps of Engineers land.
8/14/2019 BTC Town Report
22/38
Last Green Valley Grant
$5,000 in 1:1 matching funds
Rental of a wood chipper
Heavy equipment /operators
More gravel
Clearing and reclamation of additional trail
8/14/2019 BTC Town Report
23/38
What is theFuture of the
Trail?
8/14/2019 BTC Town Report
24/38
On the West end of thetrail, a small bridge is
needed to continue thetrail towards theTown center.
The bridge will be builtusing donated old
telephone poles andpressure treated lumber.
Whats the Future of the Trail?
Bridge built on Westville Lake Trail
8/14/2019 BTC Town Report
25/38
Whats the Future of the Trail?
We hope to use thepipeline and come out
onto Holland Road onthe old Trolley Line.
Further West towardsMonson and
Palmer is still beingplanned.
Old Trolley Bridge on Pipeline
8/14/2019 BTC Town Report
26/38
At the East endof the current traila 85' long bridge is
needed to crossthe Quinebaug
River.
Whats the Future of the Trail?
8/14/2019 BTC Town Report
27/38
Whats the Future of the Trail?
With a bridge the trailcan continue to a
planned parking areaon Corp land onEast Brimfield-Holland Road
and further...
8/14/2019 BTC Town Report
28/38
Whats the Future of the Trail?
The Brimfield Trailis part of a much
larger 'Super Trail'that is plannedto run from
Palmer to Franklin
Sturbridge Villager July 18, 2008
8/14/2019 BTC Town Report
29/38
Whats the Future of the Trail?
Titanic Rail Trail Status
8/14/2019 BTC Town Report
30/38
Whats the Future of the Trail?
Palmer
Monson
Brimfield
Holla
nd
Sturbridge
Southbrid
geDudley
Web
ster
Thompson
DouglasUxbridge
Millville Blackstone
Bellin
gh
am
Frankli
n
Palmer
Monson
Brimfield
Holla
nd
Sturbridge
Southbrid
geDudley
Web
ster
Thompson
DouglasUxbridge
Millville Blackstone
Bellin
gh
am
Frankli
n
What does this mean forfuture of the Brimfield Trail?
8/14/2019 BTC Town Report
31/38
Whats the Future of the Trail?
Connect with other points of local interest!Sturbridge section of the Grand Trunk Trail
Streeter Point Recreation AreaCenter of Brimfield (Antique Show)Old Sturbridge Village
Sturbridge shops along Route 20
8/14/2019 BTC Town Report
32/38
How will the Trailbe funded in the
Future?
8/14/2019 BTC Town Report
33/38
8/14/2019 BTC Town Report
34/38
Cost of Bridge Work
The 85ft. bridge over theQuinebaug River has beenestimated to cost $25,000just for the engineering
using existing Big Digbridges the Army Corp hasstored at the boat ramp.
Total cost has been
suggest to be around$200,000 to install thebridge.
8/14/2019 BTC Town Report
35/38
Cost of Bridge Work
To compare, a new bridgedesigned and built for thebike trail using the
Mass Highway system for
quick estimates
Feet in length x $200085 x $2000 = $170,000
8/14/2019 BTC Town Report
36/38
Cost of Trail Building
Handshake agreement: $7,400In kind match: $7,400
LGV Grant: $5,000
In kind match: $5,000Funding total: $24,800
Est. cost total: $125,000
Shortfall: $100,200This does not include the funds needed for bridges
8/14/2019 BTC Town Report
37/38
Funding for Trail Building
How do we get more $$$$? Fundraising
Additional Grants State and Federal Government Assistance
8/14/2019 BTC Town Report
38/38
Thank you for your interest in our trail project.
We hope you will come out and enjoy the trailand tell everyone you know to do the same!
For more information about the trail, visit our website: