    The Brimfield Trail Committee (BTC)was established in 2006 for the purpose of

    establishing recreational trails in theTown of Brimfield.

    Organization History

  • 8/14/2019 BTC Town Report

    3/38

    Brimfield Trail Committee

    President:

    Richard Costa

    Secretary:

    Tony Bys

    Other Members:

    Joe Balou, Jim Lamothe,

    Paul Adams, Paul Watson,Scott Gerrish, David Bolte,Jeff Buckel, Bill Simonic,

    Richard Haller, Ron Ignotz,Rob Mahlert, Chris Rabbitt,Larry Lowenthal

  • 8/14/2019 BTC Town Report

    4/38

    Community Partners

    Brimfield Board of Selectmen

    Brimfield Highway Department

    Brimfield Boy Scouts Troop

    Local Businesses and Residents

    Army Corp of Engineers

  • 8/14/2019 BTC Town Report

    5/38

    Trail History

    The Brimfield Trail System currently takes

    advantage of two abandoned rail beds;the Grand Trunk Railroad and the

    Springfield and Eastern Street Railway

  • 8/14/2019 BTC Town Report

    6/38

    Trail History

    The Grand Trunk Railway was chartered in 1910

    to connect the port of Providence, RI to the CentralVermont Railroad in Palmer, MA . This was thevision of owner/financier Charles M. Hays.

  • 8/14/2019 BTC Town Report

    7/38

    Trail History

    Construction started on the Grand Trunk in 1912despite the death of Mr. Hays during the sinking of theTitanic forever linking the railway to the ill-fated ship.

    However, without Mr. Hays, work on the railway endedwhen funding dried up during World War I

  • 8/14/2019 BTC Town Report

    8/38

    Trail HistoryThe Springfield and Eastern Street

    Railway was part of a trolley system that ranfrom Worcester to Springfield until the 1920s

  • 8/14/2019 BTC Town Report

    9/38

    What has beenaccomplished

    so far?

  • 8/14/2019 BTC Town Report

    10/38

    Handshake Agreement

    In 2007 a Handshake Agreement was reached withthe Army Corps of Engineers giving us $7400 with

    1:1 matching funds from the Brimfield Trail Committeeand Town of Brimfield in the form of volunteer labor,equipment usage and transportation of trail materials.

  • 8/14/2019 BTC Town Report

    11/38

    The main work to date has been to re-open theEast Brimfield section of the Grand Trunk and the

    Springfield and Eastern trolley beds as recreationaltrails. The sections currently being worked on liewithin the jurisdiction of the Army Corps of

    Engineers .

    Handshake Agreement

  • 8/14/2019 BTC Town Report

    12/38

    Handshake Agreement

    This funding was used for the creation of aparking area on Five Bridge Road

  • 8/14/2019 BTC Town Report

    13/38

    Handshake Agreement

    Signage and gates

  • 8/14/2019 BTC Town Report

    14/38

    Handshake Agreement

    installation of culverts

  • 8/14/2019 BTC Town Report

    15/38

    Handshake Agreement

    an information kiosk

  • 8/14/2019 BTC Town Report

    16/38

    Handshake Agreement

    trail building and reclamation

  • 8/14/2019 BTC Town Report

    17/38

    Handshake Agreement

    brush clearing for creation of scenic vistas

  • 8/14/2019 BTC Town Report

    18/38

    Handshake Agreement

    and gravel for trail resurfacing.

  • 8/14/2019 BTC Town Report

    19/38

    Handshake Agreement

    We now have 1.5 miles of accessible trail fromFive Bridge Road to the Quinebaug River.

  • 8/14/2019 BTC Town Report

    20/38

    Current Status

  • 8/14/2019 BTC Town Report

    21/38

    Current Status

    The Brimfield Trail Committee has beenawarded a grant from the

    Quinebaug-Shetucket Heritage Corridor, Inc.aka The Last Green Valley.The plan is to use these funds during 2009

    on expanding the trail system on the

    Army Corps of Engineers land.

  • 8/14/2019 BTC Town Report

    22/38

    Last Green Valley Grant

    $5,000 in 1:1 matching funds

    Rental of a wood chipper

    Heavy equipment /operators

    More gravel

    Clearing and reclamation of additional trail

  • 8/14/2019 BTC Town Report

    23/38

    What is theFuture of the

    Trail?

  • 8/14/2019 BTC Town Report

    24/38

    On the West end of thetrail, a small bridge is

    needed to continue thetrail towards theTown center.

    The bridge will be builtusing donated old

    telephone poles andpressure treated lumber.

    Whats the Future of the Trail?

    Bridge built on Westville Lake Trail

  • 8/14/2019 BTC Town Report

    25/38

    Whats the Future of the Trail?

    We hope to use thepipeline and come out

    onto Holland Road onthe old Trolley Line.

    Further West towardsMonson and

    Palmer is still beingplanned.

    Old Trolley Bridge on Pipeline

  • 8/14/2019 BTC Town Report

    26/38

    At the East endof the current traila 85' long bridge is

    needed to crossthe Quinebaug

    River.

    Whats the Future of the Trail?

  • 8/14/2019 BTC Town Report

    27/38

    Whats the Future of the Trail?

    With a bridge the trailcan continue to a

    planned parking areaon Corp land onEast Brimfield-Holland Road

    and further...

  • 8/14/2019 BTC Town Report

    28/38

    Whats the Future of the Trail?

    The Brimfield Trailis part of a much

    larger 'Super Trail'that is plannedto run from

    Palmer to Franklin

    Sturbridge Villager July 18, 2008

  • 8/14/2019 BTC Town Report

    29/38

    Whats the Future of the Trail?

    Titanic Rail Trail Status

  • 8/14/2019 BTC Town Report

    30/38

    Whats the Future of the Trail?

    Palmer

    Monson

    Brimfield

    Holla

    nd

    Sturbridge

    Southbrid

    geDudley

    Web

    ster

    Thompson

    DouglasUxbridge

    Millville Blackstone

    Bellin

    gh

    am

    Frankli

    n

    Palmer

    Monson

    Brimfield

    Holla

    nd

    Sturbridge

    Southbrid

    geDudley

    Web

    ster

    Thompson

    DouglasUxbridge

    Millville Blackstone

    Bellin

    gh

    am

    Frankli

    n

    What does this mean forfuture of the Brimfield Trail?

  • 8/14/2019 BTC Town Report

    31/38

    Whats the Future of the Trail?

    Connect with other points of local interest!Sturbridge section of the Grand Trunk Trail

    Streeter Point Recreation AreaCenter of Brimfield (Antique Show)Old Sturbridge Village

    Sturbridge shops along Route 20

  • 8/14/2019 BTC Town Report

    32/38

    How will the Trailbe funded in the

    Future?

  • 8/14/2019 BTC Town Report

    33/38

  • 8/14/2019 BTC Town Report

    34/38

    Cost of Bridge Work

    The 85ft. bridge over theQuinebaug River has beenestimated to cost $25,000just for the engineering

    using existing Big Digbridges the Army Corp hasstored at the boat ramp.

    Total cost has been

    suggest to be around$200,000 to install thebridge.

  • 8/14/2019 BTC Town Report

    35/38

    Cost of Bridge Work

    To compare, a new bridgedesigned and built for thebike trail using the

    Mass Highway system for

    quick estimates

    Feet in length x $200085 x $2000 = $170,000

  • 8/14/2019 BTC Town Report

    36/38

    Cost of Trail Building

    Handshake agreement: $7,400In kind match: $7,400

    LGV Grant: $5,000

    In kind match: $5,000Funding total: $24,800

    Est. cost total: $125,000

    Shortfall: $100,200This does not include the funds needed for bridges

  • 8/14/2019 BTC Town Report

    37/38

    Funding for Trail Building

    How do we get more $$$$? Fundraising

    Additional Grants State and Federal Government Assistance

  • 8/14/2019 BTC Town Report

    38/38

    Thank you for your interest in our trail project.

    We hope you will come out and enjoy the trailand tell everyone you know to do the same!